HomeMy WebLinkAboutExhibit AlCttp of 1J+ltamt
February 10, 2021
Dragon Global Miami Real Estate Investments, LLC
Magic City Properties IV, LLC
Magic City Properties V, LLC
Magic City Properties XXII, LLC
Magic City Properties XXIII, LLC
ATTN: Anthony J. Burns
1 SE 3 Avenue, Suite 2110
Miami, FL 33131
BFernandez@brzoninglaw.com
MCD Miami, LLC
1 SE 3 Avenue, Suite 2110
Miami, FL 33131
EXHIBIT "A"
ARTHUR NORIEGA, V.
City Manager
MCID 1 - TENTATIVE PLAT #1956-A (FIRST RESUBMITTAL) — REVISION
LOCATED BETWEEN NE 4 AVENUE AND THE F.E.C. RAILROAD, ON THE NORTH SIDE OF NE
62 STREET; ALSO LOCATED ALONG THE WEST SIDE OF NE 4 AVENUE, BETWEEN NE 62
STREET AND NE 64 TERRACE
Ladies and Gentlemen:
The City of Miami Plat and Street Committee, at its meeting of June 9, 2020, APPROVED the above
tentative plat subject to the following revisions being made to the tentative plat, additional information
being provided and/or variances being granted. Please be advised that the processing of your tentative plat
cannot proceed until these conditions and/or comments have been satisfied.
Resilience and Public Works
1. There is a pending litigation related to recent approval of corresponding Special Area Plan (SAP).
To the extent that the outcome of litigation invalidates or otherwise modifies the SAP, this plat may
need to be re-evaluated prior to the final plat submittal.
2. Note #13 — to be removed or modified; to include PB/PG.
3. Legal description must match to the Opinion of Title. Remove references to Parcel.
4. Contact Survey section for minor comments and drafting standards.
5. Provide updated survey prior to final plat submittal.
6. Provide and/or correct underground information of existing storm water drainage system adjacent
to proposed plat — underground lines, inlet rim elevation, inlet type, structure bottom elevation, pipe
invert elevation and direction, pipe size, pipe length, exfiltration trench.
7. Location sketch — label name of plat
8. Development information — to include references to SAP, Ordinance number, Hearing Board
application number.
9. Include owner's addresses according to City Code Section 55-7(b)(1)(b).
Planning/Zoning
10. Provide a tree table listing all trees and tree dispositions with common and botanical names, height,
diameter and spread prepared by a Certified Arborist, with name, certification number, date of site
visit. Remove from Surveyor's Note - to located next the table.
DEPARTMENT OF RESILIENCE & PUBLIC WORKS
444 SW 2hd Avenue, 8th Floor / Miami, FL 33130 / (305) 416-1200 / Fax: (305) 416-1278
Mailing Address: P.O. Box 330708 Miami, FL 33233-0708
MCID 1 - TENTATIVE PLAT #1956-A (FIRST RESUBMITTAL)
February 10, 2021
Page 2 of 4
11. Clarify level of density for Tract A (191 max) and Tract B (476 max). Transfer of density shall be
according to the SAP. SAP allows for transfer of density for the areas within the boundaries of
SAP. SAP includes land outside the boundary of this tentative plat.
12. Provide table for shifting of density in accordance with the SAP.
13. Add SF for tract areas.
Standard Comments for Street and/or Easement Vacation
14. A letter from the Miami -Dade Water and Sewer Department is required to determine if any
adjustments to their facilities or easements are required.
15. Existing utilities located within the street, alley, and easement to be closed and vacated must be
relocated or easements provided.
16. Public Hearing/Planning, Zoning and Appeals Board (PZAB).
a. The PZAB will require a sketch and legal description with a square footage, on an 8 '/2" X
11" paper, for the proposed closure. Contact the Office of the Hearing Boards, at 305-416-
2030. Provide a copy to the Resilience and Public Works Department.
17. The Plat and Street Committee has reviewed this tentative plat and determined that all technical
requirements contained in the Miami City Code Subdivision Regulations have been met and has
approved the tentative plat. The members of the Plat and Street Committee have further considered
the request for vacation and closure of the easement with respect to Miami City Code requirements
and have voted 5 (five) in favor and 0 (zero) in denial of this vacation and closure request.
18. Provide a written request to the City of Miami Office of Capital Improvements and Department
of Resilience and Public Works to obtain a Confirmation ("Confirmation"). If the Confirmation
indicates that funds were expended, the City's Finance Department and Office of Management
and Budget will determine the amount of the City's expenditure, specifically including
expenditure of restricted funds (bond funds, grant funds, or otherwise) for such improvements
as a separate line item. The City Manager or his or her designee will issue a Total Expenditure,
which shall specify the amount that the Subdivider must repay to the City ("Total
Expenditure").
Payment to the City of the amount indicated on the Total Expenditure shall be paid to the City
before recordation of the Final Plat in accordance with Section 55-8 of the City Code, or before
scheduling for PZAB consideration for the Alternative Method under the City Code Section 55-
15(i)and(j).
Standard Comments
19. A letter from Comcast is required to determine if any adjustments to their facilities or easements are
required.
20. Verify with Miami -Dade County that the proposed plat name is acceptable.
21. All encroachments across proposed tract and/or lot lines, including any underground
encroachments, must be removed or resolved under all applicable codes prior to final plat submittal.
Encroachment are as follows, but not limited to, fence and gate encroachments into the right of way
area and FEC property.
22. An Opinion of Title, in the City of Miami Opinion of Title form, must be provided at the time of
final plat submittal.
23. Current backup documentation will be required for all who execute the final plat. A resolution for
authority to execute documents and a Certificate of Good Standing from the Secretary of State are
required, if applicable.
24. Tentative plat application must be made with Miami -Dade County after receiving approval from the
City of Miami Plat and Street Committee. Provide a copy of the notice of action to Resilience and
Public Works.
MCID 1 - TENTATIVE PLAT #1956-A (FIRST RESUBMITTAL)
February 10, 2021
Page 3 of 4
25. Be advised that an incomplete final plat package will not be accepted by the City of Miami. It is the
owner's responsibility to work with his/her surveyor and attorney to assure that everything is in
order before submitting the final plat package.
26. Be advised that if all requirements for scheduling the final plat for City Commission action are not
in order, the final plat will not be scheduled for a City Commission meeting.
27. A letter of concurrency from Miami -Dade County School Board is required prior to the final plat
approval (see contact sheet). The tentative plat name and tentative plat number must be included on
the application form.
28. A letter from Miami -Dade Water and Sewer Department is required to release the final plat in
connection with water and sewer service agreements.
29. For informational purposes, provide two 8 '/2" x 11" sketches of the division of the land; one sketch
of the existing divisions before the plat is recorded and one sketch of the divisions after the plat is
recorded.
30. Any covenants applicable to the subject property, as required for the Building permit application
and/or as captured in the Opinion of Title submitted prior to Final Plat submittal, will need to be
annotated in the Final Plat.
In addition to the above requirements, you should be aware of the following:
1. State and local laws require the installation of various physical improvements in the public rights -
of -way when property is platted. These subdivision improvements include paving, drainage,
landscaping, sidewalks, etc. In some cases, this could represent a substantial investment on your
part. REQUIRED: The submission of an electronic file of the tentative plat, in an AutoCAD, to the
City of Miami Resilience and Public Works Department, Development and Roadway Plans Section
will EXPEDITE the preparation and enhance the ACCURACY of the subdivision improvement
letter required for the final plat approval.
2. The alteration, relocation or installation of utilities such as storm and sanitary sewers, electric,
telephone, water, etc., caused by this plat will be at the property owner's expense. Also, utility
easements may be required on the property being platted.
3. A building permit will not be issued on the property being platted until the final plat is recorded or
as authorized by the City of Miami Code Section 55-10(i). A certificate of use may be issued may
for existing buildings prior to subdivision improvements being completed as per the Development
Agreement for the SAP.
4. Approval for fire flow requirements must be obtained from the Fire -Rescue Department prior to the
issuance of a building permit.
5. In order to mitigate problems associated with access and construction activities throughout the
neighborhood, the contractor/developer is encouraged to notify the affected neighborhood residents,
in writing, of the project starting and completion dates at the time of issuance of permits. The
contractor/developer may coordinate the notification of residents with the local City of Miami NET
Service Center.
6. Additional items must be provided to the City of Miami Department of Resilience and Public
Works before the final plat is submitted to the City Commission for approval. You will be notified
in writing as to what these items are after the amount of the bond has been determined for the
necessary subdivision improvements. It is required that the applicant contacts the City of Miami
Resilience and Public Works Survey Section to verify that all final plat submittal documents are
complete prior to final plat submittal.
7. Tentative plat approval is only valid for 1(one) year and 6(six) months from the date of the Plat and
Street Committee meeting at which time it was approved.
If you have any questions concerning these requirements, please refer to the attached sheet for the appropriate
person to contact.
MCID 1 - TENTATIVE PLAT #1956-A (FIRST RESUBMITTAL)
February 10, 2021
Page 4 of 4
Sincerely,
Digitally signed by Santana,
Santana, Juvenal Juvenal
Date: 2021.02.10 13:32:35 -05'00'
Juvenal Santana, P.E., CFM
Supervisor of Plats - Plat and Street Committee
Director, Public Works
Department of Resilience and Public Works
AD/JS/AB/ab
Enclosure: Contact Sheet
c: Leiter, Perez and Associates, Inc.
520 NW 165 Street, Suite 209
Miami, FL 33169
office(cr�,leiterperez. com
Plaza Equity Partners
ATTN: Max Sklar
1 SE 3 Avenue, Suite 2110
Miami, FL 33131
msklar@plazaequity.com
Plat and Street Committee Members
Nzeribe Ihekwaba, Ph.D., P.E., Assistant City Manager
Survey
Development and Roadway Plans
Central