HomeMy WebLinkAboutR-25-0016City of Miami
Resolution R-25-0016
Legislation
City Hall
3500 Pan American Drive
Miami, FL 33133
www.miamigov.com
File Number: 17039 Final Action Date: 1/23/2025
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
AUTHORIZING THE CITY MANAGER TO EXECUTE AN OFF -SYSTEM
CONSTRUCTION AND MAINTENANCE AGREEMENT, IN SUBSTANTIALLY
THE ATTACHED FORM, WITH THE STATE OF FLORIDA DEPARTMENT OF
TRANSPORTATION ("FDOT"), FOR IMPROVEMENTS ON STATE ROAD
972/CORAL WAY/SOUTHWEST 3 AVENUE FROM 400 FEET WEST OF
SOUTHWEST 12 AVENUE TO BRICKELL AVENUE, AND STATE ROAD
972/CORAL WAY/SOUTHWEST 22 STREET FROM SOUTHWEST 22 AVENUE
TO SOUTHWEST 17 AVENUE, MIAMI, FLORIDA, FOR GENERAL ROADWAY
IMPROVEMENTS IN THIS CORRIDOR, INCLUDING IMPROVEMENTS ON
ROADS NOT ON THE STATE HIGHWAY SYSTEM.
SPONSOR(S): Commissioner Manolo Reyes
WHEREAS, the Florida Department of Transportation ("FDOT") has developed design
plans Financial Management ("FM") Projects No. FM 445998-1-52-01 for State Road ("SR")
972/Coral Way/Southwest 3 Avenue from 400 feet west of Southwest 12 Avenue to Brickell
Avenue which includes milling and resurfacing of the existing asphalt pavement, ADA
improvements, upgrading pavement markings and replacing substandard signs, upgrading
pedestrian signalization features and replacing signal and lighting pull -boxes ("Project 1"), and
FM 446003-1-52-01 for SR 972/Coral Way/Southwest 22 Street from Southwest 22 Avenue to
Southwest 17 Avenue which includes milling and resurfacing of the existing asphalt pavement,
upgrading deficient pedestrian curb ramps, upgrading substandard pedestrian detector
assemblies at the midblock crosswalk near Southwest 21 Avenue, upgrading ground -mounted
signs, upgrading pavement markings damaged by construction, improving lighting and the
midblock crosswalk, and reconstructing broken sidewalks ("Project 2"); and
WHEREAS, FDOT intends to undertake and complete Project 1 and Project 2, portions
of which include work on roads not on the State Highway System but City of Miami ("City") right-
of-way, specifically Southwest 22 Street, Southwest 32 Road, Southwest 30 Road, Southwest
26 Road, Southwest 25 Road, Southwest 23 Road, Southwest 2 Avenue, Southwest 1 Avenue
and Brickell Avenue ("Project 1"), and Southwest 21 Avenue, and Southwest 19 Avenue
("Project 2") (for purposes of this agreement, the "Off -System Project Limits"); and
WHEREAS, Project 1 includes pavement restoration through milling and resurfacing,
signalization improvements, lighting improvements, curb and gutter, sidewalks' replacement,
sod, and signing and pavement markings, and Project 2 includes new conduits for signalization
service points and removal of a load center and re -connecting conduits to a proposed load
center ("Local Roadway Improvements") and all activities associated with, or arising out of the
construction of the Local Roadway Improvements; and
WHEREAS, the Off -System Construction and Maintenance Agreement ("Agreement"),
attached and incorporated as Exhibit "A," establishes the terms, conditions, and responsibilities
of FDOT and the City to accomplish the Project and Local Roadway Improvements on the City's
City of Miami Page 1 of 2 File ID: 17039 (Revision:) Printed On: 8/12/2025
File ID: 17039
Streets; and
Enactment Number: R-25-0016
WHEREAS, the City agrees with the terms and conditions in the Agreement, in
substantially the attached form;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF
MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are
adopted by reference and incorporated as if fully set forth in this Section.
Section 2. The City Manager is authorized to execute the Agreement, in substantially
the attached form, with FDOT, for the Projects No. FM 445998-1-52-01 for SR 972/Coral
Way/Southwest 3 Avenue from 400 feet west of Southwest 12 Avenue to Brickell Avenue
("Project 1") and FM 446003-1-52-01, SR 972/Coral Way/Southwest 22 Street from Southwest
22 Avenue to Southwest 17 Avenue ("Project 2"), which includes improvements on roads not on
the state highway system, and the Local Roadway Improvements.
Section 3. This Resolution shall become effective immediately upon its adoption.
APPROVED AS TO FORM AND CORRECTNESS:
ge = . Wyy ng III, City ttor -y 1/13/2025
1 The herein authorization is further subject to compliance with all legal requirements that may be
imposed, including but not limited to, those prescribed by applicable City Charter and City Code
provisions.
City of Miami Page 2 of 2 File ID: 17039 (Revision:) Printed on: 8/12/2025