Loading...
HomeMy WebLinkAboutR-24-0368City of Miami Resolution R-24-0368 Legislation City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 16479 Final Action Date: 9/26/2024 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING THE CITY MANAGER TO EXECUTE AN OFF -SYSTEM CONSTRUCTION AND MAINTENANCE AGREEMENT, IN SUBSTANTIALLY THE ATTACHED FORM, WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ("FDOT"), FOR IMPROVEMENTS ON STATE ROAD ("SR") 886/PORT BOULEVARD FROM SR-5/BISCAYNE BOULEVARD TO PORT MIAMI, MIAMI, FLORIDA, FOR GENERAL ROADWAY IMPROVEMENTS IN THIS CORRIDOR, INCLUDING IMPROVEMENTS ON ROADS NOT ON THE STATE HIGHWAY SYSTEM. SPONSOR(S): Commissioner Damian Pardo WHEREAS, the Florida Department of Transportation ("FDOT") has developed design plans Financial Management ("FM") Projects No. FM 443913-1-52-01 and 443913-1-52-02 for State Road ("SR") 886/Port Boulevard from SR-5/Biscayne Boulevard to Port Miami, Miami, Florida, for the rehabilitation of the existing concrete pavement, upgrading of pedestrian ramps, upgrading of signing and pavement markings ("Project"); and WHEREAS, FDOT intends to undertake and complete the Project, a portion of which includes work on roads not on the State Highway System but City of Miami ("City") right-of-way, specifically on Northeast 5 Street from SR-5/Biscayne Boulevard to approximately one hundred thirty feet (130') west of the SR-5/Biscayne Boulevard west edge of pavement (for purposes of this agreement, the "Off -System Project Limits") and WHEREAS, the Project includes pavement milling and resurfacing, installation of new roadway signs and pavement markings, replacement of signalization vehicular detection loops and valves and manholes' adjustments ("Local Roadway Improvements") and all activities associated with, or arising out of the construction of the Local Roadway Improvements; and WHEREAS, the Off -System Construction and Maintenance Agreement ("Agreement"), attached and incorporated as Exhibit "A", establishes the terms, conditions, and responsibilities of FDOT and the City to accomplish the Project and Local Roadway Improvements on the City's Streets; and WHEREAS, the City agrees with the terms and conditions in the Agreement, in substantially the attached form; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. City of Miami Page 1 of 2 File ID: 16479 (Revision:) Printed On: 8/7/2025 File ID: 16479 Enactment Number: R-24-0368 Section 2. The City Manager is authorized' to execute the Agreement, in substantially the attached form, with FDOT, for the Project on SR 886/Port Boulevard from SR-5/Biscayne Boulevard to Port Miami, Miami, Florida, which includes improvements on roads not on the state highway system, and the Local Roadway Improvements. Section 3. This Resolution shall become effective immediately upon its adoption. APPROVED AS TO FORM AND CORRECTNESS: 1 The herein authorization is further subject to compliance with all legal requirements that may be imposed, including but not limited to, those prescribed by applicable City Charter and City Code provisions. City of Miami Page 2 of 2 File ID: 16479 (Revision:) Printed on: 8/7/2025