HomeMy WebLinkAboutSubstitution Memo from ProcurementCITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO: Arthur Noriega V
City Manager
tio-kssa, Ultra,
FROM: Annie Perez, CPPO
Director/Chief Procurement Officer
Department of Procurement
DATE: November 16, 2023
SUBJECT: Recommendation of Award for
Canal Cleaning Services
REFERENCES: IFB No. 1704386
ENCLOSURES: Bid Tabulations
RECOMMENDATION:
Based on the findings below, the Procurement Department ("Procurement") hereby recommends the
award of Invitation for Bid ("IFB") No. 1704386 to Texas Aquatic Harvesting, Inc. ("TAH") and Aquatic
Control Group, Inc. ("ACG"), to provide canal cleaning services for the Department of Resilience and
Public Works ("RPW") on an as needed basis. The awarded vendor and contract terms are shown
below.
Contract Number/Title: IFB No. 1704386, Canal Cleaning Services
Contract Amount:
Group 1, Federally Funded Projects Approximately $719,100.00 for
ACG; Group 2, Non -Federally Funded Projects Approximately
$828,717.00 for TAH and $712,500.00 for ACG.
Contract Term: Initial term of three (3) years, with the option to renew for two (2)
additional two (2) year periods.
Recommended Vendors: Texas Aquatic Harvesting, Inc. and Aquatic Control Group, Inc.
BACKGROUND:
On June 22, 2023, Procurement issued IFB No. 1704386 for the provision of canal cleaning services,
under full and open competition. On July 14, 2023, at bid closing two (2) bids were received. The bids
were evaluated following the guidelines published in the bid. All bids were found to be responsive and
responsible.
Consequently, approval of this recommendation to award is requested. Your signature below will
indicate approval of this recommendation.
by
Approved: ^b"t3"
Arthur Noriega V
City Manager
AP:tg
c: Zerry Ihekwaba, PhD, PE, Deputy City Manager/Chief of Infrastructure
Larry Spring, CPA, Chief Financial Officer/Assistant City Manager
Juvenal Santana, P.E., Director, RPW
Yadissa A. Calderon, CPPB, Assistant Director, Procurement
Date:
November 16, 2023 1 11:05:50
if/) c c- up c‘oriiii/ul
Ste;
IFB 1704386 Canal Cleaning Services
Attachment E - Classification 1 - Federally Funded Projects Price Sheet
Aquatic Control Grorup
Texas Aquatic Harvesting
ITEM #
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL ITEM
COST
UNIT PRICE
TOTAL ITEM
COST
1
Wagner Creek North Canal - collection of litter, trash and debris in the banks and upland areas within the canal
right of way and shallow surface waters
12
MONTHLY
$2,000.00
$24,000.00
$2,300.00
$27,600.00
2
Wagner Creek North Canal - mowing and trimming all overgrown vegetation in the banks and upland areas
within the canal right of way and shallow surface waters
12
MONTHLY
$2,000.00
$24,000.00
$2,800.00
$33,600.00
3
Wagner Creek North Canal - spraying the banks or upland areas within the canal right of way, using approved
weed control chemical treatment method
4
QUARTERLY
$1,000.00
$4,000.00
$1,800.00
$7,200.00
4
Wagner Creek North Canal spraying the waterways for vegetation growth below the water surface of the canal
with Sonar Herbicide, or approved equal
6
BI-MONTHLY
$2,500.00
$15,000.00
$2,812.00
$16,872.00
5
Wagner Creek North Canal - removal and disposal of any vegetation obstruction (logs, branches, water weeds,
etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
6
Wagner Creek North Canal - removal and disposal of any obstruction (shopping carts, tires, appliances, boats,
furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,500.00
$5,000.00
7
Wagner Creek South Canal - collecting litter, trash and debris in the banks and upland areas within the canal
right of way and surface waters
12
MONTHLY
$1,500.00
$18,000.00
$2,300.00
$27,600.00
$
Wagner Creek South Canal - mowing and trimming all overgrown vegetation in the banks and upland areas
wthin the canal right of way and surface waters
12
MONTHLY
$1,500.00
$18,000.00
$1,100.00
$13,200.00
9
Wagner Creek South Canal - spraying the banks or upland areas within the canal right of way, using approved
weed control chemical treatment method
4
QUARTERLY
$1,000.00
$4,000.00
$1,100.00
$4,400.00
10
Wagner Creek South Canal - spraying the waterways for vegetation growth below the water surface of the canal
with Sonar Herbicide, or approved equal
6
BI-MONTHLY
$1,000.00
$6,000.00
$1,537.00
$9,222.00
11
Wagner Creek South Canal - the removal and disposal of any vegetation obstruction (logs, branches, water
weeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
12
Wagner Creek South Canal - the removal and disposal of any obstruction (shopping carts, tires, appliances,
boats, furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,500.00
$5,000.00
13
Seybold Canal - collecting litter, trash and debris in the banks and upland areas within the canal right of way and
surface waters
12
MONTHLY
$1,500.00
$18,000.00
$2,050.00
$24,600.00
14
Seybold Canal - mowing and trimming all overgrown vegetation in the banks and upland areas within the canal
right of way and surface waters
4
QUARTERLY
$500.00
$2,000.00
$750.00
$3,000.00
15
Seybold Canal - removal and disposal of any vegetation obstruction (logs, branches, water weeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
16
Comfort Canal - collecting litter, trash and debris in the banks and upland areas within the canal right of way and
surface waters
12
MONTHLY
$4,500.00
$54,000.00
$5,000.00
$60,000.00
17
Comfort Canal - mowing and trimming all overgrown vegetation in the banks and upland areas within the canal
right of way and surface waters
12
MONTHLY
$4,500.00
$54,000.00
$6,000.00
$72,000.00
18
Comfort Canal- spraying the banks or upland areas within the canal right of way, using approved weed control
chemical treatment method
4
QUARTERLY
$4,000.00
$16,000.00
$4,350.00
$17,400.00
19
Comfort Canal - spraying the waterways for vegetation growth below the water surface of the canal with Sonar
Herbicide, or approved equal
6
EACH
$4,500.00
$27,000.00
$5,600.00
$33,600.00
20
Comfort Canal - removal and disposal of any vegetation obstruction (logs, branches, water weeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$3,000.00
$6,000.00
21
Comfort Canal - removal and disposal of any obstruction (shopping carts, tires, appliances, furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
22
Ademar Canal - collecting litter, trash and debris in the banks and upland areas within the canal right of way and
surface waters
16
EACH
$1,000.00
$16,000.00
$1,500.00
$24,000.00
23
Ademar Canal - mowing and trimming all overgrown vegetation in the banks and upland areas within the canal
right of way and surface waters
4
QUARTERLY
$500.00
$2,000.00
$500.00
$2,000.00
1
24
Ademar Canal - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$1,500.00
$3,000.00
$1,750.00
$3,500.00
25
Ademar Canal - removal and disposal of any obstruction (shopping carts, tires, appliances, boats, furniture,
etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
26
Davis Canal - collecting litter, trash and debris in the banks and upland areas within the canal right of way and
surface waters
16
EACH
$500.00
$8,000.00
$750.00
$12,000.00
27
Davis Canal - mowing and trimming all overgrown vegetation in the banks and upland areas within the canal
right of way and surface waters
q
QUARTERLY
$500.00
$2,000.00
$100.00
$400.00
28
Davis Canal - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$1,500.00
$3,000.00
$1,750.00
$3,500.00
29
Davis Canal - removal and disposal of any obstruction (shopping carts, tires, appliances, boats, furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
30
NE 28th Street Cove - collecting litter, trash and debris in the banks and upland areas within the canal right of
way and surface waters
12
MONTHLY
$500.00
$6,000.00
$375.00
$4,500.00
31
NE 28th Street Cove - mowing and trimming all overgrown vegetation in the banks and upland areas within the
canal right of way and surface waters
12
MONTHLY
$200.00
$2,400.00
$50.00
$600.00
32
NE 28th Street Cove - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
33
NE 28th Street Cove - removal and disposal of any obstruction (shopping carts, tires, appliances, furniture,
etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
NE 20-21st Street Cove - collecting litter, trash and debris in the banks and upland areas within the canal right
of way and surface waters
12
MONTHLY
$500.00
$6,000.00
$600.00
$7,200.00
35
NE 20-21st Street Cove - mowing and trimming all overgrown vegetation in the banks and upland areas within
the canal right of way and surface waters
12
MONTHLY
$250.00
$3,000.00
$50.00
$600.00
36
NE 20-21st Street Cove - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
37
NE 20-21st Street Cove - removal and disposal of any obstruction (shopping carts, tires, appliances, boats,
furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
38
Bayfront of Rickenbacker Causeway - collecting litter, trash and debris in the banks and upland areas within the
canal right of way and surface waters
12
MONTHLY
$500.00
$6,000.00
$550.00
$6,600.00
39
Bayfront of Rickenbacker Causeway - mowing and trimming all overgrown vegetation in the banks and upland
areas within the canal right of way and surface waters
q
QUARTERLY
$250.00
$1,000.00
$400.00
$1,600.00
Bayfront of Rickenbacker Causeway - removal and disposal of any vegetation obstruction (logs, branches,
seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
41
Lawrence Waterway and Swell Canal - collecting litter, trash and debris in the banks, swales and upland areas
within the canal right of way and surface waters
12
MONTHLY
$2,000.00
$24,000.00
$2,050.00
$24,600.00
42
Lawrence Waterway and Swell Canal - mowing and trimming all overgrown vegetation in the banks, swales and
upland areas within the canal right of way and surface waters
12
MONTHLY
$1,000.00
$12,000.00
$1,500.00
$18,000.00
43
Lawrence Waterway and Swell Canal - spraying the banks or upland areas within the canal right of way, using
approved weed control chemical treatment method
2
SEMI-
ANNUALLY
$1,000.00
$2,000.00
$1,300.00
$2,600.00
2
Lawrence Waterway and Swell Canal - removal and disposal of any vegetation obstruction (logs, branches,
seaweeds, etc.)
2
SEMI-
ANNUALLY
$1,500.00
$3,000.00
$1,750.00
$3,500.00
Lawrence Waterway and Swell Canal - removal and disposal of any obstruction (shopping carts, tires,
appliances, furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
46
Lawrence Waterway, Seawall Portion - pressure clean a total of 144 existing concrete bollards and the seawall
area
1
EACH
$1,000.00
$1,000.00
$1,600.00
$1,600.00
47
Lawrence Waterway, Seawall Portion - pressure clean and paint a total of 144 existing concrete bollards. Paint
to be used calls for a one coat Thoroseal #8532, or approved equal. This item includes maintenance and
welding of 1,400 feet of hot -deep galvanized 3/8" anchor chain, 10 ft. in length, as per detail on Division 5. In
addition, if the concrete finish is broken or damaged, apply ACI 301, to a smooth form finish before painting
1
EACH
$4,000.00
$4,000.00
S4.100.00
$4,100.00
Waterfront of Antonio Maceo Park - collecting litter, trash and debris in the banks and upland areas within the
canal right of way and surface waters
12
MONTHLY
$250.00
$3,000.00
$250.00
$3,000.00
49
Waterfront of Antonio Maceo Park - mowing and trimming all overgrown vegetation in the banks and upland
areas within the canal right of way and surface waters
q
QUARTERLY
$250.00
$1,000.00
$200.00
$800.00
50
Waterfront of Antonio Maceo Park - spraying the waterways for vegetation growth below the water surface of
the canal with Sonar Herbicide, or approved equal
4
QUARTERLY
$250.00
$1,000.00
$202.00
$808.00
51
Waterfront of Antonio Maceo Park - removal and disposal of any vegetation obstruction (logs, branches,
seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
52
Waterfront of Antonio Maceo Park - spraying the banks or upland areas within the canal right of way, using
approved weed control chemical treatment method
2
SEMI-
ANNUALLY
$250.00
$500.00
$150.00
$300.00
53
Furnishing all labor, material and equipment necessary for the removal of seaweed and hydrilla from all the
canals and waterways including the Biscayne Bay areas, as directed by the City Engineer. Use of a weed
harvester such as a Kelpin 800 Model, or approved equal REQUIRED.
2
EACH
$6,000.00
$12,000.00
$8,000.00
$16,000.00
Waterfront of Margaret Pace Park - collecting litter, trash and debris in the banks and upland areas within the
right of way and surface waters
12
MONTHLY
$750.00
$9,000.00
$650.00
$7,800.00
55
Waterfront of Margaret Pace Park - mowing and trimming all overgrown vegetation in the banks and upland
areas within the shore right of way and surface waters
4
QUARTERLY
$500.00
$2,000.00
$1,750.00
$7,000.00
Waterfront of Margaret Pace Park - removal and disposal of any vegetation obstruction (logs, branches,
seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
57
Waterfront of Pallot Park - collecting litter, trash and debris in the banks and upland areas within the canal right
of way and surface waters
12
MONTHLY
$500.00
$6,000.00
$450.00
$5,400.00
Waterfront of Pallot Park - mowing and trimming all overgrown vegetation in the banks and upland areas within58
the canal right of way and surface waters
4
QUARTERLY
$250.00
$1,000.00
$50.00
$200.00
59
Waterfront of Pallot Park - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
60
Waterfront of Kennedy Park - collecting litter, trash and debris in the banks and upland areas within the canal
right of way and surface waters
12
MONTHLY
$750.00
$9,000.00
$1,000.00
$12,000.00
61
Waterfront of Kennedy Park - mowing and trimming all overgrown vegetation in the banks and upland areas
within the canal right of way and surface waters
4
QUARTERLY
$1,000.00
$4,000.00
$650.00
$2,600.00
62
Waterfront of Kennedy Park - removal and disposal of any vegetation obstruction (logs, branches, seaweeds,
etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
3
63
Waterfront of Morningside Park - collecting litter, trash and debris in the banks and upland areas within the
canal right of way and surface waters
12
MONTHLY
$750.00
$9,000.00
$1,000.00
$12,000.00
64
Waterfront of Morningside Park - mowing and trimming all overgrown vegetation in the banks and upland areas
within the canal right of way and surface waters
q
QUARTERLY
$1,000.00
$4,000.00
$650.00
$2,600.00
65
Waterfront of Morningside Park - removal and disposal of any vegetation obstruction (logs, branches,
seaweeds, etc.)
2
SEMI-
ANNUALLY
$1,500.00
$3,000.00
$1,750.00
$3,500.00
66
Waterfront of Legion Park - collecting litter, trash and debris in the banks and upland areas within the canal right
of way and surface waters
12
MONTHLY
$500.00
$6,000.00
$500.00
$6,000.00
67
Waterfront of Legion Park - mowing and trimming all overgrown vegetation in the banks and upland areas within
the canal right of way and surface waters
4
QUARTERLY
$500.00
$2,000.00
$500.00
$2,000.00
72
Waterfront of Legion Park - removal and disposal of any vegetation obstruction (logs, branches, seaweeds,
etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
73
Waterfront of Miami River (along NW South River Drive west of NW 27 Ave to NW 29 Ave) - collecting litter,
trash and debris in the banks and upland areas within the canal right of way and surface waters
12
MONTHLY
$2,000.00
$24,000.00
$2,300.00
$27,600.00
74
Waterfront of Miami River (along NW South River Drive west of NW 27 Ave to NW 29 Ave) - mowing and
trimming all overgrown vegetation in the banks and upland areas within the canal right of way and surface
waters
4
QUARTERLY
$2,000.00
$8,000.00
$2,254.00
$9,016.00
75
Waterfront of Miami River (along NW South River Drive west of NW 27 Ave to NW 29 Ave) - removal and
disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
76
Waterfront of Fern Isle Park - collecting litter, trash and debris in the banks and upland areas within the canal
right of way and surface waters
12
MONTHLY
$1,500.00
$18,000.00
$1,900.00
$22,800.00
77
Waterfront of Fern Isle Park - mowing and trimming all overgrown vegetation in the banks and upland areas
within the canal right of way and surface waters
q
QUARTERLY
$1,500.00
$6,000.00
$1,862.00
$7,448.00
78
Waterfront of Fern Isle Park - removal and disposal of any vegetation obstruction (logs, branches, seaweeds,
etc.)
2
SEMI-
ANNUALLY
$1,000.00
$2,000.00
$750.00
$1,500.00
79
Installation of one (1) Type I Turbidity Barrier 50 FT in length, at any waterway location in the City, as directed
by City Engineer.
1
EACH
$400.00
$400.00
$1,700.00
$1,700.00
80
Removal of one (1) turbidity barrier 50 FT in length, at any location in the City, as directed by the City Engineer.
1
EACH
$400.00
$400.00
$400.00
$400.00
81
Removal of Litter at any outfall or Bay areas - removal by hand of litter buried at outfall ends in the waterway
bottom of the shore and at 30 feet of the shoreline.
1
TON
$400.00
$400.00
$600.00
$600.00
82
Removal and disposal of dead animals; removal and disposal of fish due to a fish kill or a pollution event.
1
TON
$400.00
$400.00
$1.00
$1.00
83
Furnishing all labor, material and equipment for the complete removal and disposal of one (1) overgrown tree,
up to 7" d.b.h. in diameter, located in the banks or upland areas within the canal right of way or the waterway of
any of the canals
1
EACH
$500.00
$500.00
$400.00
$400.00
84
Furnishing all labor, material and equipment for the corplete removal and disposal of one (1) overgrown tree, 8"
to 20" d.b.h. in diameter, located in the banks or upland areas within the canal right of way or the waterway of
any of the canals
1
EACH
$600.00
$600.00
$700.00
$700.00
85
Fumishing all labor, material and equipment for the complete removal and disposal of one (1) overgrown tree,
21" to 35" d.b.h. in diameter, located in the banks or upland areas within the canal right of way or the waterway
of any of the canals
1
EACH
$900.00
$900.00
$800.00
$800.00
86
Furnishing all labor, material and equipment for the complete removal and disposal of one (1) overgrown tree,
more than 36" d.b.h. in diameter, located in the banks or upland areas within the canal right of way or the
waterway of any of the canals
1
EACH
$1,200.00
$1,200.00
$1,000.00
$1,000.00
87
Shade Tree and Stump Removal 0'-15' overall height
1
EACH
$1,300.00
$1,300.00
$362.50
$362.50
88
Shade Tree and Stump Removal 15'-40' overall height
1
EACH
$1,400.00
$1,400.00
$387.50
$387.50
89
Shade Tree and Stump Removal41'-60+' overall height
1
EACH
$1,500.00
$1,500.00
$387.50
$387.50
90
Palm Tree and Stump Removal 0'-15' overall height
1
EACH
$1,300.00
$1,300.00
$362.50
$362.50
91
Palm Tree and Stump Removal 16'-40' overall height
1
EACH
$1,400.00
$1,400.00
$387.50
$387.50
92
Palm Tree and Stump Removal41'-60+' overall height
1
EACH
$1,500.00
$1,500.00
$387.50
$387.50
93
Shade Tree Pruning 0'-15' overall height
1
EACH
$400.00
$400.00
$362.50
$362.50
94
Shade Tree Pruning 16'-40' overall heigh
1
EACH
$500.00
$500.00
$387.50
$387.50
95
Shade Tree Pruning 41'-60+' overall height
1
EACH
$600.00
$600.00
$387.50
$387.50
96
Palm Tree Pruning 0'-15' overall height
1
EACH
$400.00
$400.00
$362.50
$362.50
97
Palm Tree Pruning 16'-40' overall height
1
EACH
$500.00
$500.00
$387.00
$387.00
98
Palm Tree Pruning 41'-60+' overall height
1
EACH
$600.00
$600.00
$387.50
$387.50
99
SPECIAL PROVISION = Contingency Allowance
$100,000.00
$100,000.00
TOTAL:
$719,100.00
$828,716.50
4
IFB 1704386 Canal Cleaning Services
Attachment F - Classification 2 - Non -Federally
Funded Projects Price Sheet
Aquatic Control Group
Texas Aquatic Harvesting
ITEM #
DESCRIPTION
QTY
UNIT
UNIT PRICE
TOTAL ITEM
COST
UNIT PRICE
TOTAL ITEM
COST
1
Wagner Creek North Canal - collection of litter, trash and debris in the banks and upland areas within the canal
right of way and shallow surface waters
12
MONTHLY
$2,000.00
$24,000.00
$2,300.00
$27,600.00
2
Wagner Creek North Canal - mowing and trimming all overgrown vegetation in the banks and upland areas \Whin
the canal right of way and shallow surface waters
12
MONTHLY
$2,000.00
$24,000.00
$2,800.00
$33,600.00
3
Wagner Creek North Canal - spraying the banks or upland areas within the canal right of way, using approved
weed control chemical treatment method
q
QUARTERLY
$1,000.00
$4,000.00
$1,800.00
$7,200.00
4
Wagner Creek North Canal spraying the waterways for vegetation growth below the water surface of the canal
with Sonar Herbicide, or approved equal
6
BI-MONTHLY
$2,500.00
$15,000.00
$2,812.00
$16,872.00
5
Wagner Creek North Canal - removal and disposal of any vegetation obstruction (logs, branches, water weeds,
etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
8
Wagner Creek North Canal - removal and disposal of any obstruction (shopping carts, tires, appliances, boats,
furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,500.00
$5,000.00
7
Wagner Creek South Canal - collecting litter, trash and debris in the banks and upland areas vvithin the canal right
of way and surface waters
12
MONTHLY
$1,500.00
$18,000.00
$2,300.00
$27,600.00
8
Wagner Creek South Canal - mowing and trimming all overgrown vegetation in the banks and upland areas within
the canal right of way and surface waters
12
MONTHLY
$1,500.00
$18,000.00
$1,100.00
$13,200.00
9
Wagner Creek South Canal - spraying the banks or upland areas within the canal right of way, using approved
weed control chemical treatment method
q
QUARTERLY
$1,000.00
$4,000.00
$1,100.00
$4,400.00
10
Wagner Creek South Canal - spraying the waterways for vegetation growth below the water surface of the canal
with Sonar Herbicide, or approved equal
6
BI-MONTHLY
$1,000.00
$6,000.00
$1,537.00
$9,222.00
11
Wagner Creek South Canal - the removal and disposal of any vegetation obstruction (logs, branches, water
weeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
12
Wagner Creek South Canal - the removal and disposal of any obstruction (shopping carts, tires, appliances,
boats, furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,500.00
$5,000.00
13
Seybold Canal - collecting litter, trash and debris in the banks and upland areas within the canal right of way and
surface waters
12
MONTHLY
$1,500.00
$18,000.00
$2,050.00
$24,600.00
14
Seybold Canal - movving and trimming all overgrown vegetation in the banks and upland areas within the canal
right of way and surface waters
q
QUARTERLY
$500.00
$2,000.00
$750.00
$3,000.00
15
Seybold Canal - removal and disposal of any vegetation obstruction (logs, branches, water weeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
16
Comfort Canal - collecting litter, trash and debris in the banks and upland areas within the canal right of way and
surface waters
12
MONTHLY
$4,500.00
$54,000.00
$5,000.00
$60,000.00
17
Comfort Canal - mowing and trimming all overgrown vegetation in the banks and upland areas within the canal
right of way and surface waters
12
MONTHLY
$4,500.00
$54,000.00
$6,000.00
$72,000.00
18
Comfort Canal- spraying the banks or upland areas \Whin the canal right of way, using approved weed control
chemical treatment method
q
QUARTERLY
$4,000.00
$16,000.00
$4,350.00
$17,400.00
19
Comfort Canal - spraying the waterways for vegetation growth below the water surface of the canal with Sonar
Herbicide, or approved equal
6
EACH
$4,500.00
$27,000.00
$5,600.00
$33,600.00
20
Comfort Canal - removal and disposal of any vegetation obstruction (logs, branches, water weeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$3,000.00
$6,000.00
21
Comfort Canal - removal and disposal of any obstruction (shopping carts, tires, appliances, furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
22
Ademar Canal - collecting litter, trash and debris in the banks and upland areas within the canal right of way and
surface waters
16
EACH
$1,000.00
$16,000.00
$1,500.00
$24,000.00
23
Ademar Canal - mowing and trimming all overgrown vegetation in the banks and upland areas within the canal
right of way and surface waters
q
QUARTERLY
$500.00
$2,000.00
$500.00
$2,000.00
24
Ademar Canal - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$1,500.00
$3,000.00
$1,750.00
$3,500.00
25
Ademar Canal - removal and disposal of any obstruction (shopping carts, tires, appliances, boats, furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
26
Davis Canal - collecting litter, trash and debris in the banks and upland areas within the canal right of way and
surface waters
16
EACH
$500.00
$8,000.00
$750.00
$12,000.00
27
Davis Canal - mowing and trimming all overgrown vegetation in the banks and upland areas within the canal right
of way and surface waters
q
QUARTERLY
$500.00
$2,000.00
$100.00
$400.00
28
Davis Canal - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$1,500.00
$3,000.00
$1,750.00
$3,500.00
29
Davis Canal - removal and disposal of any obstruction (shopping carts, tires, appliances, boats, furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
30
NE 28th Street Cove - collecting litter, trash and debris in the banks and upland areas within the canal right of way
and surface waters
12
MONTHLY
$500.00
$6,000.00
$375.00
$4,500.00
31
NE 28th Street Cove - mowing and trimming all overgrown vegetation in the banks and upland areas within the
canal right of way and surface waters
12
MONTHLY
$200.00
$2,400.00
$50.00
$600.00
32
NE 28th Street Cove - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
33
NE 28th Street Cove - removal and disposal of any obstruction (shopping carts, tires, appliances, furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
NE 20-21st Street Cove - collecting litter, trash and debris in the banks and upland areas within the canal right of
way and surface waters
12
MONTHLY
$500.00
$6,000.00
$600.00
$7,200.00
35
NE 20-21st Street Cove - mowing and trimming all overgrown vegetation in the banks and upland areas within the
canal right of way and surface waters
12
MONTHLY
$250.00
$3,000.00
$50.00
$600.00
36
NE 20-21st Street Cove - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
37
NE 20-21st Street Cove - removal and disposal of any obstruction (shopping carts, tires, appliances, boats,
furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
38
Bayfront of Rickenbacker Causeway - collecting litter, trash and debris in the banks and upland areas within the
canal right of way and surface waters
12
MONTHLY
$500.00
$6,000.00
$550.00
$6,600.00
39
Bayfront of Rickenbacker Causeway - mowing and trimming all overgrown vegetation in the banks and upland
areas within the canal right of way and surface waters
q
QUARTERLY
$250.00
$1,000.00
$400.00
$1,600.00
2
Bayfront of Rickenbacker Causeway - removal and disposal of any vegetation obstruction (logs, branches,
seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
41
Lawrence Waterway and Swell Canal - collecting litter, trash and debris in the banks, swales and upland areas
within the canal right of way and surface waters
12
MONTHLY
$2,000.00
$24,000.00
$2,050.00
$24,600.00
42
Lawrence Waterway and Swell Canal - mowing and trimming all overgrown vegetation in the banks, swales and
upland areas within the canal right of way and surface waters
12
MONTHLY
$1,000.00
$12,000.00
$1,500.00
$18,000.00
Lawrence Waterway and Swell Canal - spraying the banks or upland areas within the canal right of way, using
approved weed control chemical treatment method
2
SEMI-
ANNUALLY
$1,000.00
$2,000.00
$1,300.00
$2,600.00
Lawrence Waterway and Swell Canal - removal and disposal of any vegetation obstruction (logs, branches,
seaweeds, etc.)
2
SEMI-
ANNUALLY
$1,500.00
$3,000.00
$1,750.00
$3,500.00
45
Lawrence Waterway and Swell Canal - removal and disposal of any obstruction (shopping carts, tires, appliances,
furniture, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$2,750.00
$5,500.00
Lawrence Waterway, Seawall Portion - pressure clean a total of 144 existing concrete bollards and the seawall
area
1
EACH
$1,000.00
$1,000.00
$1,600.00
$1,600.00
47
Lawrence Waterway, Seawall Portion - pressure clean and paint a total of 144 existing concrete bollards. Paint to
be used calls for a one coat Thoroseal #8532, or approved equal. This item includes maintenance and welding of
1,400 feet of hot -deep galvanized 3/8" anchor chain, 10 ft. in length, as per detail on Division 5. In addition, if the
concrete finish is broken or damaged, apply ACI 301, to a smooth form finish before painting
1
EACH
$4,000.00
$4,000.00
$4,100.00
$4,100.00
48
Waterfront of Antonio Maceo Park - collecting litter, trash and debris in the banks and upland areas within the
canal right of way and surface waters
12
MONTHLY
$250.00
$3,000.00
$250.00
$3,000.00
49
Waterfront of Antonio Maceo Park - mowing and trimming all overgrown vegetation in the banks and upland areas
within the canal right of way and surface waters
4
QUARTERLY
$250.00
$1,000.00
$200.00
$800.00
Waterfront of Antonio Maceo Park - spraying the waterways for vegetation growth below the water surface of the50
canal with Sonar Herbicide, or approved equal
4
QUARTERLY
$250.00
$1,000.00
$202.00
$808.00
51
Waterfront of Antonio Maceo Park - removal and disposal of any vegetation obstruction (logs, branches,
seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
52
Waterfront of Antonio Maceo Park - spraying the banks or upland areas within the canal right of way, using
approved weed control chemical treatment method
2
SEMI-
ANNUALLY
$250.00
$500.00
$150.00
$300.00
53
Furnishing all labor, material and equipment necessary for the removal of seaweed and hydrilla from all the canals
and waterways including the Biscayne Bay areas, as directed by the City Engineer. Use of a weed harvester such
as a Kelpin 800 Model, or approved equal REQUIRED.
2
EACH
$6,000.00
$12,000.00
$8,000.00
$16,000.00
54
Waterfront of Margaret Pace Park - collecting litter, trash and debris in the banks and upland areas within the right
of way and surface waters
12
MONTHLY
$750.00
$9,000.00
$650.00
$7,800.00
Waterfront of Margaret Pace Park - mowing and trimming all overgrown vegetation in the banks and upland areas
within the shore right of way and surface waters
4
QUARTERLY
$500.00
$2,000.00
$1,750.00
$7,000.00
Waterfront of Margaret Pace Park - removal and disposal of any vegetation obstruction (logs, branches,
seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
57
Waterfront of Pallot Park - collecting litter, trash and debris in the banks and upland areas within the canal right of
way and surface waters
12
MONTHLY
$500.00
$6,000.00
$450.00
$5,400.00
Waterfront of Pallot Park - mowing and trimming all overgrown vegetation in the banks and upland areas within the58
canal right of way and surface waters
4
QUARTERLY
$250.00
$1,000.00
$50.00
$200.00
3
59
Waterfront of Pallot Park - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
60
Waterfront of Kennedy Park - collecting litter, trash and debris in the banks and upland areas within the canal right
of way and surface waters
12
MONTHLY
$750.00
$9,000.00
$1,000.00
$12,000.00
61
Waterfront of Kennedy Park - mowing and trimming all overgrown vegetation in the banks and upland areas within
the canal right of way and surface waters
q
QUARTERLY
$1,000.00
$4,000.00
$650.00
$2,600.00
62
Waterfront of Kennedy Park - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
Waterfront of Morningside Park - collecting litter, trash and debris in the banks and upland areas within the canal
right of way and surface waters
12
MONTHLY
$750.00
$9,000.00
$1,000.00
$12,000.00
Waterfront of Morningside Park- mowing and trimming all overgrown vegetation in the banks and upland areas
within the canal right of way and surface waters
q
QUARTERLY
$1,000.00
$4,000.00
$650.00
$2,600.00
65
Waterfront of Morningside Park - removal and disposal of any vegetation obstruction (logs, branches, seaweeds,
etc.)
2
SEMI-
ANNUALLY
$1,500.00
$3,000.00
$1,750.00
$3,500.00
Waterfront of Legion Park - collecting litter, trash and debris in the banks and upland areas within the canal right of
way and surface waters
12
MONTHLY
$500.00
$6,000.00
$500.00
$6,000.00
67
Waterfront of Legion Park - mowing and trimming all overgrown vegetation in the banks and upland areas within
the canal right of way and surface waters
q
QUARTERLY
$500.00
$2,000.00
$500.00
$2,000.00
72
Waterfront of Legion Park - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
73
Waterfront of Miami River (along NW South River Drive west of NW 27 Ave to NW 29 Ave) - collecting litter, trash
and debris in the banks and upland areas within the canal right of way and surface waters
12
MONTHLY
$2,000.00
$24,000.00
$2,300.00
$27,600.00
74
Waterfront of Miami River (along NW South River Drive west of NW 27 Ave to NW 29 Ave) - mowing and
trimming all overgrown vegetation in the banks and upland areas within the canal right of way and surface waters
q
QUARTERLY
$2,000.00
$8,000.00
$2,254.00
$9,016.00
75
Waterfront of Miami River (along NW South River Drive west of NW 27 Ave to NW 29 Ave) - removal and
disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$2,000.00
$4,000.00
$1,750.00
$3,500.00
76
Waterfront of Fern Isle Park - collecting litter, trash and debris in the banks and upland areas within the canal right
of way and surface waters
12
MONTHLY
$1,500.00
$18,000.00
$1,900.00
$22,800.00
77
Waterfront of Fern Isle Park - mowing and trimming all overgrown vegetation in the banks and upland areas within
the canal right of way and surface waters
q
QUARTERLY
$1,500.00
$6,000.00
$1,862.00
$7,448.00
78
Waterfront of Fern Isle Park - removal and disposal of any vegetation obstruction (logs, branches, seaweeds, etc.)
2
SEMI-
ANNUALLY
$1,000.00
$2,000.00
$750.00
$1,500.00
79
Installation of one (1) Type I Turbidity Barrier 50 FT in length, at any waterway location in the City, as directed by
City Engineer.
1
EACH
$400.00
$400.00
$1,700.00
$1,700.00
80
Removal of one (1) turbidity barrier 50 FT in length, at any location in the City, as directed by the City Engineer.
1
EACH
$400.00
$400.00
$400.00
$400.00
81
Removal of Litter at any outfall or Bay areas - removal by hand of litter buried at outfall ends in the waterway
bottom of the shore and at 30 feet of the shoreline.
1
TON
$400.00
$400.00
$600.00
$600.00
82
Removal and disposal of dead animals; removal and disposal of fish due to a fish kill or a pollution event.
1
TON
$400.00
$400.00
$1.00
$1.00
83
Furnishing all labor, material and equipment for the complete removal and disposal of one (1) overgrown tree, up
to 7" d.b.h. in diameter, located in the banks or upland areas within the canal right of way or the waterway of any
of the canals
1
EACH
$300.00
$300.00
$400.00
$400.00
84
Furnishing all labor, material and equipment for the complete removal and disposal of one (1) overgrown tree, 8"
to 20" d.b.h. in diameter, located in the banks or upland areas within the canal right of way or the waterway of any
of the canals
1
EACH
$600.00
$600.00
$700.00
$700.00
85
Furnishing all labor, material and equipment for the complete removal and disposal of one (1) overgrown tree, 21"
to 35" d.b.h. in diameter, located in the banks or upland areas within the canal right of way or the waterway of any
of the canals
1
EACH
$900.00
$900.00
$800.00
$800.00
86
Furnishing all labor, material and equipment for the complete removal and disposal of one (1) overgrown tree,
more than 36" d.b.h. in diameter, located in the banks or upland areas within the canal right of way or the
waterway of any of the canals
1
EACH
$1,200.00
$1,200.00
$1,000.00
$1,000.00
87
Shade Tree and Stump Removal 0'-15' overall height
1
EACH
$300.00
$300.00
$362.50
$362.50
88
Shade Tree and Stump Removal 15'-40' overall height
1
EACH
$400.00
$400.00
$387.50
$387.50
89
Shade Tree and Stump Removal 41'-60+' overall height
1
EACH
$500.00
$500.00
$387.50
$387.50
90
Palm Tree and Stump Removal 0'-15' overall height
1
EACH
$300.00
$300.00
$362.50
$362.50
91
Palm Tree and Stump Removal 16'-40' overall height
1
EACH
$400.00
$400.00
$387.50
$387.50
92
Palm Tree and Stump Removal 41'-60+' overall height
1
EACH
$500.00
$500.00
$387.50
$387.50
93
Shade Tree Pruning 0'-15' overall height
1
EACH
$300.00
$300.00
$362.50
$362.50
94
Shade Tree Pruning 16'-40' overall heigh
1
EACH
$500.00
$500.00
$387.50
$387.50
95
Shade Tree Pruning 41'-60+' overall height
1
EACH
$600.00
$600.00
$387.50
$387.50
96
Palm Tree Pruning 0'-15' overall height
1
EACH
$300.00
$300.00
$362.50
$362.50
97
Palm Tree Pruning 16'-40' overall height
1
EACH
$400.00
$400.00
$387.50
$387.50
98
Palm Tree Pruning 41'-60+' overall height
1
EACH
$500.00
$500.00
$387.50
$387.50
99
SPECIAL PROVISION = Contingency Allowance
$100,000.00
$100,000.00
TOTAL
$ 712,500.00
$ 828,717.00