HomeMy WebLinkAboutExhibit AExhibit A
Category
Project
Project B#
Bond Funding
Sea Level Rise and Flood
Prevention
1
NW 17 Street from NW 27 to NW 32
Avenue
40-B183611
$ 3,659,000.00
Sea Level Rise and Flood
Prevention
1
NW 17 Street from NW 32 to NW 37
Avenue
40-B183611A
$ 2,853,000.00
Sea Level Rise and Flood
Prevention
1
NW 7 Street Road from NW North
River Drive to South of NW 9
Avenue
40-B50904
$ 1,793,000.00
Sea Level Rise and Flood
Prevention
1
Allapattah Flood Improvements -
NW 7 Ave to 14 Ave, NW 23 St to 31
St
40-B233815
$ 5,334,000.00
Sea Level Rise and Flood
Prevention
1
North Grapeland Heights Seawall
(NGHS) at NW 13 Street and NW
32ndAve. -D1
40-B233813
$ 146,000.00
Sea Level Rise and Flood
Prevention
1
Melrose Flood Improvements Phase
1, NW 23 Ave to NW 19 Ave, NW 34
St to NW 30 St (Pump Station)
40-B233816
$ 3,530,000.00
Sea Level Rise and Flood
Prevention
2
South Bayshore Lane/Fairview
Street - Pump Station
40-B30737
$ 6,390,000.00
Sea Level Rise and Flood
Prevention
2
Brickell Bay Drive**
40-B193802
$ 9,085,000.00
Sea Level Rise and Flood
Prevention
2
Edgewater Flood Improvements
Phase I - NE 4 Ave to Biscayne Bay,
NE 22 St to NE 24 St (Pump Station)
40-B233805
$ 8,556,000.00
Sea Level Rise and Flood
Prevention
2
Replacement of Seawalls
Morningside between NE 55 Terr,
NE 65 St and Biscayne Bay - D2
40-B233811
$ 609,000.00
Sea Level Rise and Flood
Prevention
2
Brickell and Coconut Grove Seawalls
between SE 25th Rd to Mathenson
Ave. and Biscayne Bay - D2
40-B233809
$ 830,000.00
Sea Level Rise and Flood
Prevention
2
Replacement of 8 Seawalls in
Edgewater between NE 22 St to NE
34 St. along Biscayne Bay - D2
40-B233810
$ 1,556,000.00
Sea Level Rise and Flood
Prevention
3
Jose Marti Park Seawall, Shoreline,
and Flood Improvements -
Construction
40-B193500
$ 3,000,000.00
Sea Level Rise and Flood
Prevention
3
East Little Havana Flood
Improvements - W 12 Ave to W 17
Ave, NW 2 St to SW 6 St (Pump
Station)
40-6233804
$ 8,132,000.00
Sea Level Rise and Flood
Prevention
3
8 Street Flood Improvements - SW
17 Ave to SW 22 Ave, SW 5 St to SW
12 St
40-6233606
$ 891,000.00
Sea Level Rise and Flood
Prevention
4
SW 49 Ave from SW 8 St to W
Flagler St
40-B233801
$ 375,000.00
Sea Level Rise and Flood
Prevention
5
Little River Mini Park (Outfall
Connection)
40-B193501
$ 1,300,000.00
Sea Level Rise and Flood
Prevention
5
Shorecrest South Flood
Improvements - NE 8 Ct to NE
Bayshore Ct, NE Little River Dr to NE
79 St (Pump Station)
40-6233803
$ 8,034,000.00
Sea Level Rise and Flood
Prevention
5
South-West Wynwood Flood
Improvements - NW 3 Ave to NW 5
PI, NW 16 St to NW 28 St (Pump
Station)
40-6233814
$ 5,072,000.00
Sea Level Rise and Flood
Prevention
5
Replacement of Seawalls Shorecrest
between NE 84 St and Ademar
Canal; NE Bayshore Dr. and Davis
Canal - D5
40-6233812
$ 903,000.00
Sea Level Rise and Flood
Prevention
5
Clemente Park Flood Improvements
- Miami Ave to NW 2 Ave and NW
30 St to 36 St
40-6233817
$ 3,789,000.00
Sea Level Rise and Flood
Prevention
CW
Mary Brickell Village Drainage
Improvements Phase 2
New
$ 2,246,000.00
Sea Level Rise and Flood
Prevention
CW
Localized Flooding Improvements
Citywide
New
$ 10,000,000.00
Sea Level Rise and Flood
Prevention
CW
E & W Glencoe Street, S Bayshore Ct
Flood Improvements
New
$ 1,100,000.00
Sea Level Rise and Flood
Prevention
CW
Immediate Flood Control: Install
Backflow Valves CW
40-6233806
$ 1,996,000.00
TOTAL
$ 91,179,000.00
Priority List of Miami Forever Bond - Sea Level Rise and Flood Prevention Projects
Exhibit 1
Construction Ready Projects
Priority
1
Project Name
Mary Brickell Village Drainage Improvements Phase 2
Project
Number
New
District
CW
Total Cost
Estimate
$2,245,700
Awarded Grant
Funding*
$0
MFB Funding
Total Needs
$2,245,700
Proposed MFB
Funding "Now"
$2,245,700
Previous
, Funding
$0
1
Localized Flooding Improvements Citywide
New
CW
$10,000,000
$0
$10,000,000
$10,000,000
$0
1
E & W Glencoe Street, S Bayshore Ct Flood Improvements
New
CW
$1,100,000
$0
$1,100,000
$1,100,000
$0
1
NW 17 Street from NW 27 to NW 32 Avenue
40-B183611
1
$7,884,329
$2,106,125
$3,081,051
$3,658,889
$2,119,314
1
NW 17 Street from NW 32 to NW 37 Avenue
40-B183611A
1
$6,716,755
$1,644,630
$2,852,475
$2,852,475
$2,219,650
1
NW 7 Street Road from NW North River Drive to South of
NW 9 Avenue
40-B50904
1
$2,634,441
$1,792,610
$1,792,610
$841,831
1
South Bayshore Lane/Fairview Street - Pump Station
40-B30737
2
$11,056,076
$0
$6,389,269
$6,389,269
$4,666,807
1
Jose Marti Park Seawall, Shoreline, and Flood
Improvements- Construction
40-B193500
3
$23,885,629
$20,232,843
$3,000,000
$3,000,000
$652,786
1
SW 49 Ave from SW 8 St to W Flagler St
40-B233801
4
$1,225,000
$0
$375,000
$375,000
$850,000
1
Little River Mini Park (Outfall Connection)
40-B193501
5
$2,270,332
$0
$1,300,000
$1,300,000
$970,332
$69,018,262
$23,983,598
$32,136,105
$32,713,943
$12,320,720
Projects with Awarded Grants that require
Matching
Funds —
Priority
Project Name
Project
Number
District
Total Cost
Estimate
Awarded Grant
Funding*
MFB Funding
Total Needs
Proposed MFB
Funding "Now"
Future Matching
Funds Needs
1
Allapattah Flood Improvements - NW 7 Ave to 14 Ave,
NW 23 St to 31 St
40-B233815
1
$31,376,188
$15,688,094
$15,688,094
$5,333,952
$10,354,142
2
North Grapeland Heights Seawall (NGHS) at NW 13 Street
and NW 32nd Ave. - D1
40-B233813
1
$291,054
$145,527
$145,527
$145,527
$0
2
Melrose Flood Improvements Phase 1, NW 23 Ave to NW
19 Ave, NW 34 St to NW 30 St (Pump Station)
40-B233816
1
$11,029,883
$5,514,942
$5,514,942
$3,529,563
$1,985,378
1
Brickell Bay Drive**
40-B193802
2
$26,255,000
$17,170,650
$9,084,350
$9,084,350
$0
1
Edgewater Flood Improvements Phase - NE 4 Ave to
Biscayne Bay, NE 22 St to NE 24 St (Pump Station)
40-B233805
2
$17,111,976
$8,555,988
$8,555,988
$8,555,988
$0
1
Replacement of Seawalls Morningside between NE 55
Terr, NE 65 St and Biscayne Bay - D2
40-B233811
2
$1,217,523
$608,762
$608,762
$608,762
$0
1
Brickell and Coconut Grove Seawalls between SE 25th Rd
to Mathenson Ave. and Biscayne Bay - D2
40-B233809
2
$1,658,529
$829,265
$829,265
$829,265
$0
2
Replacement of 8 Seawalls in Edgewater between NE 22
St to NE 34 St. along Biscayne Bay - D2
40-B233810
2
$3,111,764
$1,555,882
$1,555,882
$1,555,882
$0
1
East Little Havana Flood Improvements - W 12 Ave to W
17 Ave, NW 2 St to SW 6 St (Pump Station)
40-B233804
3
$39,269,877
$18,447,439
$20,822,438
$8,131,180
$12,691,258
2
8 Street Flood Improvements - SW 17 Ave to SW 22 Ave,
SW 5 St to SW 12 St
40-6233606
3
$9,781,446
$4,000,000
$890,723
5890,723
50
$4,890,723
1
Shorecrest South Flood Improvements - NE 8 Ct to NE
Bayshore Ct, NE Little River Dr to NE 79 St (Pump Station)
40-B233803
5
$16,067,860
$8,033,930
$8,033,930
$8,033,930
$0
2
South-West Wynwood Flood Improvements - NW 3 Ave to
NW 5 PI, NW 16 St to NW 28 St (Pump Station)
40-B233814
5
$31,698,775
$19,859,977
$11,838,798
$5,071,804
$6,766,994
1
Replacement of Seawalls Shorecrest between NE 84 St
and Ademar Canal; NE Bayshore Dr. and Davis Canal - D5
40-B233812
5
$1,804,270
$902,135
$902,135
$902,135
$0
2
Clemente Park Flood Improvements - Miami Ave to NW 2
Ave and NW 30 St to 36 St
40-B233817
5
$14,734,729
$7,367,366
$7,367,366
$3,788,931
$3,578,432
2
Immediate Flood Control: Install Backflow Valves CW
40-B233806
CW
$3,992,000
$1,996,000
$1,996,000
$1,996,000
$0
$209,400,874
*Grants awarded by WASD, CDBG, FDEP, FIND, RFGP, and HUD.
**Brickell Bay Drive Total Cost Estimate excludes $1M of Previous MFB Funding (Group 1)
$115,566,679
$93,834,199
Grand Total Proposed Miami Forever Bond Funding "Now"
$58,457,991
$91,171,933
$35,376,204
08/04/2023
Sea Level Rise and Flood Prevention - Miami Forever Bond Funding Allocation per District
Exhibit 2
MIAMI FOREVER
Sea Level R.se and Flood
Prevention Distribution Per District
Citywide
D1
D2
D3
D4
D5
Total
Funding allocated by District and
Citywide
$ 25,000,000
$ 33,400,000
$ 33,400,000
$ 33,400,000
$ 33,400,000
$ 33,400,000
$ 192,000,000
Cost of Issuance based on 2%
$500,000
$668,000
$668,000
$668,000
$668,000
$668,000
$3,840,000
Total Funding (less the cost of issuance)
$24,500,000
$32,732,000
$32,732,000
$32,732,000
$32,732,000
$32,732,000
$188,160,000
Funds Remaining
(after Group 1 & 2 Allocation1)*
519,935,703
$30,364,379
$28,273,515
$31,382,269
$4,245,358
$31,728,848
$145,930,072
Proposed Allocation Group 3 "Now"**
$13,345,700
$17,475,015
$28,273,515
$12,021,903
$375,000
$19,680,800
$91,171,933
Future Matching Funds Needs***
$0
$12,339,520
$0
$12,691,258
$0
$10,345,426
$35,376,204
MR Funds Remaining Post Group 3
"Now" and Future Matching Fund
$6,669,108
$3,870,358
$1,702,622
$19,381,934
Project Number
Projects Name
Citywide
D1
D2
D3
D4
05
Total
40-13183611
NW 17 Street from NW 27 AVE to NW 32 AVE -Road & Drainage Construction
31,797,928
$1,797,928
.9
40-830737
Fairview Flood Mitigation Phase II Pump Station
$1,800,000
$1,800,000
40-13193802
Brickell Bay Drive
$1,000,000
$1,000,000
40-13193803
Jose Marti Park Flood Mitigation Study and Design
$940,000
$940,000
40-13193800
Immediate Flood Control: Install Backflow Valves (Phase l)
$5,757
$201,248
$1,505,236
$294,216
$0
$450,543
$2,457,000
40-B193801
Improve Drainage Outside of Priority Drainage Basins (Phase 1)
$8,540
$368,445
$153,249
$115,515
$1,101,642
$552,609
$2,300,000
Group 1 Totals
$14,297
$2,367,621
$4,458,485
$1,349,731
$1,101,642
$1,003,152
$10,294,928
40-8233800
SW 56 Ave from SW 85t to W Flagler 5t
$975,000
$975,000
40-B223801
East Flagami Flood Mitigation
$15,000,000
$15,000,000
'
40-0223802
Auburndale Flood Mitigation Project
$10,000,000
$10,000,000
q
40-8233801
SW 49 Ave from SW 8 St to W Flagler St
$850,000
$850,000
IN
a
40-B50413
SW 24 St from 27 Ave to SW 32nd Ave
$560,000
$560,000
40-1350412
SW 23 Terrace from SW 27 Avenue to SW 32 Avenue (Mayor approved allocation for D4 under CW)
34,550,000
34,550,000
Group 2 Totals
$4,550,000
$0
$0
$0
$27,385,000
$0
$31,935,000
New
Mary Brickell Village Drainage Improvements Phase 2
$2,245,700
$2,245,700
New
Localized Flooding Improvements Citywide
$10,000,000
$10,000,000
New
E& W Glencoe Street, S Bayshore Ct Flood Improvements
$1,100,000
$1,100,000
40-8233806
Immediate Flood Control: Install Backflow Valves CW
$162,000
31,250,000
3584,000
$1,996,000
40-13183611
NW 17 Street from NW 27 AVE to NW 32 AVE - Road & Drainage Construction
$3,658,889
$3,658,889
40-B183611A
NW 17 Street from NW 32 to NW 37 Avenue
$2,852,475
$2,852,475
40-850904
NW 7 Street Road from NW North River Drive to South of NW 9 Avenue
$1,792,610
$1,792,610
40-13233813
North Grapeland Heights Seawall (NGHS) at NW 13 Street and NW 32nd Ave. - D1
$145,527
$145,527
40-B233815
Allapattah Flood Improvements- NW 7 Ave to 14 Ave, NW 23 St to 31 St
$5,333,952
$5,333,952
40-8233816
Melrose Flood Improvements Phase 1, NW 23 Ave to NW 19 Ave, NW 34 St to NW 30 St (Pump Station)
$3,529,563
$3,529,563
°
40-0193802
Brickell Bay Drive
$9,084,350
$9,084,350
c
40-B233805
Edgewater Flood Improvements Phase I - NE 4 Ave to Biscayne Bay, NE 22 St to NE 24 St (Pump Station)
g P Y Y P
38,555,988
$8,555,988
E
40-B233809
Brickell and Coconut Grove Seawalls between SE 25th Rd to Mathenson Ave. and Biscayne Bay - D2
3829,265
$829,265
40-B233810
Replacement of 8 Seawalls in Edgewater between NE 22 St to NE 34 St. along Biscayne Bay - D2
$1,555,882
$1,555,882
40-B233811
Replacement of Seawalls Morningside between NE 55 Terr, NE 65 St and Biscayne Bay - D2
$608,762
$608,762
40-030737
South Bayshore Lane/Fairview Street - East and West
36,389,269
$6,389,269
40-0193500
Jose Marti Park Seawall, Shoreline, and Flood Improvements- Construction
$3,000,000
$3,000,000
40-13233804
East Little Havana Flood Improvements- W 12 Ave to W 17 Ave, NW 2 St to SW 6 St (Pump Stati on)
$8,131,180
$8,131,180
40-8233606
8 Street Flood Improvements- SW 17 Ave to SW 22 Ave, SW 5 St to SW 12 St
$890,723
$890,723
40-13233801
SW 49 Ave from SW 8 St to W Flagler St
3375,000
$375,000
40-13233803
Shorecrest South Flood Improvements - NE 8 Ct to NE Bayshore Ct, NE Little River Dr to NE 79 St (Pump Station)
$8,033,930
$8,033,930
40-13233812
Replacement of Seawalls Shorecrest between NE 84 St and Ademar Canal; NE Bayshore Dr. and Davis Canal - DS
3902,135
$902,135
40-13233814
South-West Wynwood Flood Improvements- NW 3 Ave to NW 5 PI, NW 16 St to NW 28 St (Pump Station)
$5,071,804
$5,071,804
40-8233817
Clemente Park Flood Improvements- Miami Ave to NW 2 Ave and NW 30 St to 36 St
$3,788,931
$3,788,931
40-B193501
Little River Mini Park (Outfall Connection)
$1,300,000
$1,300,000
Group 3 Totals
$13,345,700
$17,475,015
$28,273,515
$12,021,903
$375,000
$19,680,800
$91,171,933
*Group 1 and 2 Existing Miami Forever Bond Allocations.
**Group 3 Proposed Miami Forever Bond Allocations.
***Future Matching Funds Needs from Exhibit 1, per District.
08/04/2023
Sea Level Rise and Flood Prevention - Miami Forever Bond Funding Allocation per District
Exhibit 2
MIAMI FOREVER
GENERALOBUGATIONBOND
Sea Level Rise and Flood Prevention Distribution Per District
Citywide
D1
D2
D3
D4
D5
Taal
Funding allocated by District and
Citywide
$ 25,000,000
$ 33,400,000
$ 33,400,000
$ 33,400,000
$ 33,400,000
$ 33,400,000
$ 192,000,000
Con of Issuance based on 2%
5500,000
5668,000
5668,000
5668,000
5668,000
$668,000
53,840,000
Total Funding (less the cost of issuance)
$24,500,000
$32,732,000
$32,732,000
$32,732,000
$32,732,000
$32,732,000
$188,160,000
Funds Remaining
(after Group (&2Allocetions)' M.
$19,935,703
$30,364,379
$28,273,515
$31,382,269
$4,245,358
$31,728,848
$145,930,0
Proposed Allocation Group 3"Now""
$13,345,700
$17,475,015
$28,273,515
$12,021,903
$375,000
$19,680,800
$91,171,933
Future Matching Funds Needs"'
$0
$12,339,520
$0
$12,691,258
$0
$10,345,426
$35,376,204
MfBFunds Remaining Post Gro
"Now" and Future Matching Fund N
,590,003
5549,84311r
$0
$6,669,108
$3,870,358
$1,702,622
$19,381,934
-
Project Number
Projects Name
Citywide
D1
D2
D3
D4
D5
Total
40-B183611
NW 17 Street from NW 27 AVE to NW 32 AVE -Road & Drainage Construction
$1,797,928
$1,797,928
40-B30737
Fairview Flood Mitigation Phase II Pump Station
$1,800,000
$1,800,000
40-B193802
Brickell Bay Drive
$1,000,000
$1,000,000
40-B193803
Jose Marti Park Flood Mitigation Study and Design
$940,000
$940,000
40-B193800
Immediate Flood Control: Install Backflow Valves (Phase 1)
$5,757
$201,248
$1,505,236
$294,216
$0
$450,543
$2,457,000
40-B193801
Improve Drainage Outside of Priority Drainage Basins (Phase 1)
$8,540
$368,445
$153,249
$115,515
$1,101,642
$552,609
$2,300,000
Group 1 Totals
$14,297
$2,367,621
$4,458,485
$1,349,731
$1,101,642
$1,003,152
$10,294,928
40-B233800
SW 56 Ave from SW 8 St to W Flagler St
$975,000
$975,000
40-B223801
East Flagami Flood Mitigation
$15,000,000
$15,000,000
40-B223802
Auburndale Flood Mitigation Project
$10,000,000
$10,000,000
40-B233801
SW 49 Ave from SW 8 St to W Flagler St
$850,000
$850,000
40-B50413
SW 24 St from 27 Ave to SW 32nd Ave
$560,000
$560,000
40-B50412
SW 23 Terrace from SW 27 Avenue to SW 32 Avenue (Mayor approved allocation for D4 under CW)
$4,550,000
$4,550,000
Group 2 Totals
$4,550,000
$0
$0
$0
$27,385,000
$0
$31,935,000
New
Mary Brickell Village Drainage Improvements Phase 2
$2,245,700
$2,245,700
New
Localized Flooding Improvements Citywide
$10,000,000
$10,000,000
New
E & W Glencoe Street, S Bayshore Ct Flood Improvements
$1,100,000
$1,100,000
40-B233806
Immediate Flood Control: Install Backflow Valves CW
$162,000
$1,250,000
$584,000
$1,996,000
40-B183611
NW 17 Street from NW 27 AVE to NW 32 AVE -Road & Drainage Construction
$3,658,889
$3,658,889
40-B183611A
NW 17 Street from NW 32 to NW 37 Avenue
$2,852,475
$2,852,475
40-B50904
NW 7 Street Road from NW North River Drive to South of NW 9 Avenue
$1,792,610
$1,792,610
40-B233813
North Grapeland Heights Seawall(NGHS) at NW 13 Street and NW 32nd Ave.-D1
$145,527
$145,527
40-B233815
Allapattah Flood Improvements- NW 7 Ave to 14 Ave, NW 23 St to 31 St
$5,333,952
$5,333,952
40-B233816
Melrose Flood Improvements Phase 1, NW 23 Ave to NW 19 Ave, NW 34 St to NW 30 St (Pump Station)
$3,529,563
$3,529,563
40-B193802
Brickell Bay Drive
$9,084,350
$9,084,350
40-B233805
Edgewater Flood Improvements Phase l- NE 4 Ave to Biscayne Bay, NE 22 St to NE 24 St (Pump Station)
$8,555,988
$8,555,988
40-B233809
Brickell and Coconut Grove Seawalls between SE 25th Rd to Mathenson Ave. and Biscayne Bay-D2
$829,265
$829,265
40-B233810
Replacement of 8 Seawalls in Edgewater between NE 22 St to NE 34 St along Biscayne Bay-D2
$1,555,882
$1,555,882
40-B233811
Replacement of Seawalls Morningside between NE 55 Terr, NE 65 St and Biscayne Bay-D2
$608,762
$608,762
40-B30737
South Bayshore Lane/Fairview Street - East and West
$6,389,269
$6,389,269
40-B193500
Jose Marti Park Seawall,Shoreline, and Flood Improvements- Construction
$3,000,000
$3,000,000
40-B233804
East Little Havana Flood Improvements- W 12 Ave to W 17 Ave, NW 2 St to SW 6 St (Pump Station)
$8,131,180
$8,131,180
40-B233606
8 Street Flood Improvements -SW 17 Ave to SW 22 Ave, SW 5 St to SW 12 St
$890,723
$890,723
40-B233801
SW 49 Ave from SW 8 St to W Flagler St
$375,000
$375,000
40-B233803
Shorecresr South Flood Improvements- NE 8 Ct to NE Bayshore Ct, NE Little River Dr to NE 79 St (Pump Station)
$8,033,930
$8,033,930
40-B233812
Replacement of Seawalls Shorecrest between NE 84 St and Ademar Canal; NE Bayshore Dr. and Davis Canal-D5
$902,135
$902,135
40-B233814
South-West Wynwood Flood Improvements- NW 3 Ave to NW 5 PI, NW 16 St to NW 28 St (Pump Station)
$5,071,804
$5,071,804
40-B233817
Clemente Park Flood Improvements- Miami Ave to NW 2 Ave and NW 30 St to 36 St
$3,788,931
$3,788,931
40-B193501
Little River Mini Park(Outfall Connection)
$1,300,000
$1,300,000
Group 3 Totals
$13,345,700
$17,475,015
$28,273,515
$12,021,903
$375,000
$19,680,800
$91,171,933
*Gro p 1 and 2 Existing Miami Forever Bond Allocations.
**Group 3 Proposed Miami Forever Bond Allocations.
***Future Matching Funds Needs from Exhibit 1, per District.
08/04/2023
Priority List of Miami Forever Bond - Sea Level Rise and Flood Prevention Projects
Exhibit 1
Construction Ready Projects
Priority
Project Name
Project
Number
District
Total Cost
Estimate
Awarded Grant
Funding*
MFB Funding
Total Needs
Proposed MFB
Funding"Now"
Previous
Funding
1
Mary Brickell Village Drainage Improvements Phase 2
New
CW
$2,245,700
$0
$2,245,700
$2,245,700
$0
1
Localized Flooding Improvements Citywide
New
CW
$10,000,000
$0
$10,000,000
$10,000,000
$0
1
E & W Glencoe Street, S Bayshore Ct Flood Improvements
New
CW
$1,100,000
$0
$1,100,000
$1,100,000
$0
1
NW 17 Street from NW 27 to NW 32 Avenue
40-B183611
1
$7,884,329
$2,106,125
$3,081,051
$3,658,889
$2,119,314
1
NW 17 Street from NW 32 to NW 37 Avenue
40-B183611A
1
$6,716,755
$1,644,630
$2,852,475
$2,852,475
$2,219,650
1
NW 7 Street Road from NW North River Drive to South of
NW 9 Avenue
40-B50904
1
$2,634,441
$1,792,610
$1,792,610
$841,831
1
South Bayshore Lane/Fairview Street - Pump Station
40-B30737
2
$11,056,076
$0
$6,389,269
$6,389,269
$4,666,807
1
Jose Marti Park Seawall, Shoreline, and Flood Improvements-
Construction
40-B193500
3
$23,885,629
$20,232,843
$3,000,000
$3,000,000
$652,786
1
SW 49 Ave from SW 8 St to W Flagler St
40-B233801
4
$1,225,000
$0
$375,000
$375,000
$850,000
1
Little River Mini Park (Outfall Connection)
40-B193501
5
$2,270,332
$0
$1,300,000
$1,300,000
$970,332
$69,018,262
Projects with Awarded Grants that require Matching Funds
$23,983,598
$32,136,105
$32,713,943
$12,320,720
Priority
Project Name
Project
Number
District
Total Cost
Estimate
Awarded Grant
Funding*
MFB Funding
Total Needs
Proposed MFB
Funding "Now"
Future Matching
Funds Needs
1
Allapattah Flood Improvements - NW 7 Ave to 14 Ave, NW
23 St to 31 St
40-B233815
1
$31,376,188
$15,688,094
$15,688,094
$5,333,952
$10,354,142
2
North Grapeland Heights Seawall (NGHS) at NW 13 Street
and NW 32nd Ave. - D1
40-B233813
1
$291,054
$145,527
$145,527
$145,527
$0
2
Melrose Flood Improvements Phase 1, NW 23 Ave to NW 19
Ave, NW 34 St to NW 30 St (Pump Station)
40-B233816
1
$11,029,883
$5,514,942
$5,514,942
$3,529,563
$1,985,378
1
Brickell Bay Drive**
40-B193802
2
$26,255,000
$17,170,650
$9,084,350
$9,084,350
$0
1
Edgewater Flood Improvements Phase - NE 4 Ave to
Biscayne Bay, NE 22 St to NE 24 St (Pump Station)
40-B233805
2
$17,111,976
$8,555,988
$8,555,988
$8,555,988
$0
1
Replacement of Seawalls Morningside between NE 55 Terr,
NE 65 St and Biscayne Bay - D2
40-B233811
2
$1,217,523
$608,762
$608,762
$608,762
$0
1
Brickell and Coconut Grove Seawalls between SE 25th Rd to
Mathenson Ave. and Biscayne Bay - D2
40-B233809
2
$1,658,529
$829,265
$829,265
$829,265
$0
2
Replacement of 8 Seawalls in Edgewater between NE 22 St to
NE 34 St. along Biscayne Bay - D2
40-B233810
2
$3,111,764
$1,555,882
$1,555,882
$1,555,882
$0
1
East Little Havana Flood Improvements - W 12 Ave to W 17
Ave, NW 2 St to SW 6 St (Pump Station)
40-B233804
3
$39,269,877
$18,447,439
$20,822,438
$8,131,180
$12,691,258
2
8 Street Flood Improvements - SW 17 Ave to SW 22 Ave, SW
5 St to SW 12 St
40-B233606
3
$97g1 qq6
$4,000,000
$890,723
$890,723
$0
$4,890,723
1
Shorecrest South Flood Improvements - NE 8 Ct to NE
Bayshore Ct, NE Little River Dr to NE 79 St (Pump Station)
40-B233803
5
$16,067,860
$8,033,930
$8,033,930
$8,033,930
$0
2
South-West Wynwood Flood Improvements - NW 3 Ave to
NW 5 PI, NW 16 St to NW 28 St (Pump Station)
40-B233814
5
$31,698,775
$19,859,977
$11,838,798
$5,071,804
$6,766,994
1
Replacement of Seawalls Shorecrest between NE 84 St and
Ademar Canal; NE Bayshore Dr. and Davis Canal - D5
40-B233812
5
$1,804,270
$902,135
$902,135
$902,135
$0
2
Clemente Park Flood Improvements - Miami Ave to NW 2
Ave and NW 30 St to 36 St
40-B233817
5
$14,734,729
$7,367,366
$7,367,366
$3,788,931
$3,578,432
2
Immediate Flood Control: Install Backflow Valves CW
40-B233806
CW
$3,992,000
$1,996,000
$1,996,000
$1,996,000
$0
$209,400,874
*Grants awarded by WASD, CDBG, FDEP, FIND, RFGP, and HUD.
**Brickell Bay Drive Total Cost Estimate excludes $1M of Previous MFB Funding (Group 1)
$115,566,679
$93,834,199
Grand Total Proposed Miami Forever Bond Funding "Now"
$58,457,991
$91,171, 933
$35,376,204
08/04/2023