Loading...
HomeMy WebLinkAboutBack-Up DocumentsPROTECTING TOGETHER 2023-24 Statewide Flooding and Sea Level Rise Resilience Plan County Project Sponsor Project Title FY22-23 Federal Funding FY23-24 State Funding FY24-25 State Funding FY25-26 State Funding Funding Request Total Brevard City of Cape Canaveral Center Street Drainage Basin Im.rovements $467,500 $467,500 Brevard Brevard County Natural Resource Management Department Titusville Causeway Multitrophic Restoration and Living Shoreline Resiliency Action Project Continuation $670,856 $670,856 Broward City of Hollywood City of Hollywood District 1 - Hollywood Lakes Neighborhood Exfiltration $3,255,000 $3,255,000 Broward City of Dania Beach Dania Beach Lift Station Mitigation - Phase III $2,164,000 $2,164,000 Broward City of Holl wood Coastal Roadway Resilienc $12,200,491 $12,200,491 PROTECTING TOGETHER Broward City of Sunrise Sawgrass Wastewater Treatment Plan Improvements $8,375,000 $8,375,000 $16,750,000 Escambia Escambia County Pensacola Bay Living Shoreline around Naval Air Station Pensacola along Sherman Inlet and White Island $5,150,000 $5,150,000 Escambia Escambia County Bayou Grande Villas Drainage Project $2,250,000 $2,250,000 Hendry Central County Water Control District Central County Water Control District Resilient Infrastructure $4,050,000 $4,050,000 Hillsborough City of Tampa Lower Peninsula Stormwater Improvements — Southeast Regional System $12,500,000 $12,500,000 $25,000,000 PROTECTING TOGETHER Indian River City of Fellsmere Fellsmere Flood Resiliency Lift Station No. 3 $1,500,000 $1,500,000 Jackson Town of Grand Ridge Grand Ridge Town Wide Stormwater Flooding Resiliency Project $3,211,000 $3,211,000 Jackson City of Marianna Marianna WWTP Resilience $1,546,490 $1,546,490 Lee Lee County CREW - Flint Pen/Kiker Preserve Flow Collection Drainageway - Phase 1 $7,574,667 $7,574,667 $7,574,667 $22,724,000 Madison Town of Greenville Town of Greenville Flooding Mitigation $4,968,000 $4,968,000 Manatee City of Holmes Beach Gulf Drive SLR Mitigation - Holmes Blvd to Palm Dr $1,064,900 $1,064,900 Martin Martin County Old Palm City North Neighborhood Improvements $3,242,500 $3,242,500 Martin Martin County MacArthur Boulevard Resilience Project $1,235,000 $1,235,000 Miami- Dade Village of Key Biscayne Central and South Basins Stormwater Improvements $885,626 $885,626 Miami- Dade Miami -Dade County Biscayne Shores 1 and 2 Stormwater Pump Stations Retrofit & Improvements $1,000,000 $1,000,000 Miami- Dade City of Miami Design, Permitting & Construction of Melrose Flood Improvements Project $5,514,942 $5,514,942 Miami- Dade City of Miami Beach Middle Beach Seawalls and Living Shorelines $1,802,955 $1,802,955 Miami- Dade City of Miami Design, Permitting & Construction of 8th Street Flood Improvements Project $4,890,723 $4,890,723 Miami- Dade City of Miami Design, Permitting & Construction of Clemente Park Neighborhood Flood Improvements $7,367,365 $7,367,365 PROTECTING TOGETHER Miami- Dade City of Miami Miami's Citywide Pump Stations Telemetry System $679,895 $679,895 Miami- Dade City of Miami Beach Continuation of Fire Station #1 $2,500,000 $2,500,000 Miami- Dade City of Miami Beach Continuation of First Street Flood Mitigation and Sea Level Rise Adaptation $5,000,000 $5,000,000 $5,000,000 $15,000,000 Miami- Dade Miami -Dade County Biscayne Gardens NE 116 Street / Biscayne Shores 3 Stormwater Pump Station Retrofit & Improvements $1,000,000 $1,000,000 Miami -Dade City of Florida City Florida City Canal Culvert Project $1,000,000 $1,000,000 Monroe Monroe County Monroe County Area 52-A Road Elevation Resiliency and Adaptation Project #3 $8,240,870 $8,240,870 $8,240,870 $24,722,611 Monroe Monroe County Monroe County Area 10 Road Elevation Resiliency and Adaptation Project #1 $5,124,857 $5,124,857 $5,124,857 $15,374,570 MonroeAqueduct Florida Keys Authority Florida Keys Aqueduct Authority - Marathon Potable Water Pump Station Mitigation and Adaptation Project $3,000,000 $3,000,000 Palm Beach City of West palm Beach West Palm Beach Utilities Adaptation Project $1,000,000 $1,000,000 Palm Beach City of Boynton Beach Coquina Cove Drainage Improvements $1,500,000 $1,500,000 Palm Beach City of Lake Worth Beach 10th and 13th Avenues North Stormwater Improvements for Intracoastal Resilience $352,500 $352,500 Palm Beach Indian Trail Improvemen t District East-West Canal Conveyance $954,864 $723,244 $1,678,108 Pinellas City of St. Petersburg Basin C Resiliency _Salt Creek Outfall Pump Station $10,675,000 $10,675,000 Pinellas City of St. Petersburg Basin C Resiliency _ Salt Creek Conveyance Improvements $900,000 $900,000 Pinellas City of St. Pete Beach Community Center Shoreline Rehabilitation $750,000 $750,000 Pinellas City of St. Petersburg Southwest Operations and Maintenance Buildings Replacement Project $4,760,000 $4,760,000 Pinellas Pinellas County Dunedin Causeway Resiliency and Adaptation Plan $600,000 $600,000 Sarasota City of Venice Tarpon Center Drive Nature Based Flood Mitigation Pilot Project $950,000 $950,000 PROTECTING TOGETHER CountyProject Sponsor Project Title FY22-23 Federal Funding Year 1 State Funding Year 2 State Funding Year 3+4 State Funding Funding Request Total Alachua City of Gainesville Glen Springs Creek Restoration $239,758 $239,758 Bradford City of Hampton City of Hampton Stormwater Infrastructure, Flood/Drainage Miti•ation $225,950 $225,950 Brevard Broward County Broward County Canal Structure S- 27 Resilience Im • rovements $850,000 $850,000 Brevard City of Satellite Beach City of Satellite Beach: Public Works/Fire Station Construction Pro•ect $5,000,000 $5,000,000 PROTECTING TOGETHER Brevard City of Cocoa Dixon Blvd. at Indian River Drive Water Quality and Resiliency Project $1,619,449 $1,619,449 Broward City of Fort Lauderdale Progresso Stormwater Flooding Improvements - City of Fort Lauderdale $13,495,743 $13,495,743 Broward Broward County Boulevard Gardens Neighborhood Stormwater Improvements $8,750,000 $8,750,000 Broward Broward County Andrews Avenue Bridge (860319) Over New River Scour Protection $1,000,000 $1,000,000 Broward Broward County FLL Edgewood Park Stormwater Project $178,650 $178,650 Broward Broward County FLL System 1 Basin B Stormwater Interconnection Project $242,450 $242,450 PROTECTING %TOGETHER Broward City of Fort Lauderdale Dorsey Riverbend Stormwater Flooding Improvements $10,482,997 $10,482,997 Broward Broward County FLL System 1 Basin A Stormwater Interconnection Project $259,100 $259,100 Broward Broward County SW 7th Avenue Bridge (864072) Over New River Scour Protection $1,000,000 $1,000,000 Broward Broward County Broward County Canal Pump Station (S-45) Resilience Improvements $600,000 $600,000 Broward Broward County Replacement of Andrews Avenue Bridge (860159) Over Canal C- 13/Middle River $3,500,000 $3,500,000 Broward Broward County North New River Canal Resilience: Septic to Sewer Conversion $1,500,000 $1,500,000 PROTECTING %TOGETHER Broward Broward County SE 3rd Avenue Bridge (864071) Over New River Scour Protection $1,000,000 $1,000,000 Broward Broward County Dania Cut -Off Canal Resilience: Septic to Sewer Conversion $4,750,000 $4,750,000 Broward Broward County Wastewater Master Pump Station (No. 300) Resilience Rehabilitation $2,900,000 $2,900,000 Broward Broward County Replacement of NE 56th Street Bridge (864065) Over Cypress Waterway $2,750,000 $2,750,000 Broward City of Dania Beach Dania Beach Lift Stations 4,11, and 12 Mitigation $2,005,500 $2,005,500 Broward Broward County Port Everglades Bulkhead Replacement Project - Group 1 $32,536,859 $32,536,859 Broward Broward County Groundwater Resilience: Septic to Sewer Conversion $4,500,000 $4,500,000 PROTECTING TOGETHER Duval City of Jacksonville McCoys Creek Branches Restoration Construction $5,177,094 $5,177,094 Duval City of Atlantic Beach Cavalla Road Lift Station Flood Protection $184,250 $184,250 Escambia Escambia County Eleven Mile Creek North Stream Restoration and Stormwater Enhancement $2,656,000 $2,656,000 Escambia Escambia County Moreno and R Street Retention Pond $177,388 $177,388 Hillsborough City of Tampa Lamb Avenue Canal Rehabilitation for Flood Relief $5,000,000 $5,000,000 Holmes City of Bonifay City of Bonifay Critical Stormwater Infrastructure $2,500,000 $2,500,000 Jackson Jackson County Charm Road Drainage Improvements $380,500 $380,500 PROTECTING TOGETHER Jackson Town of Alford Town of Alford Critical Stormwater Mitigation Project $2,976,784 $2,976,784 Leon City of Tallahassee Orange/Meridian Placemaking Project East Drainage Ditch Improvements Design, Permitting, and Land Acquisition $572,052 $572,052 Levy City of Williston John Henry Celebration Park Drainage Improvements $834,179 $834,179 Manatee Peace River Manasota Regional Water Supply Authority Peace River Regional Reservoir No. 3 (PR3) Project - Final Engineering $7,500,000 $7,500,000 Manatee City of Bradenton LSO3 Expansion and LS13 Demolition $2,937,875 $2,937,875 PROTECTING %TOGETHER Martin Martin County Stormwater Backflow Preventer Installation Program Phase II $198,380 $198,380 Martin Martin County Cypress Creek Restoration Project $750,000 $750,000 Martin Martin County SW Mockingbird Lane Flood Mitigation $1,807,000 $1,807,000 Martin Town of Sewall's Point South Sewall's Point Road Phase 2 $2,900,000 $2,900,000 Martin Town of Sewall's Point South Town of Sewall's Point Septic to Sewer (area south of SR A1A) $8,400,000 $8,400,000 Miami -Dade City of Miami Beach West Avenue Neighborhood Adaptation Project $10,000,000 $10,000,000 PROTECTING TOGETHER Miami -Dade Miami -Dade County Protecting a Coastal Regional Wastewater Treatment Plant Vulnerable to Sea Level Rise and Strom Surge Flooding $10,000,000 $10,000,000 Miami -Dade Miami -Dade County Raising Canal Bank Elevation in Secondary Canals of the C-8 Basin to Protect against Flooding and Sea Level Rise $4,225,000 $4,225,000 Miami -Dade City of Miami Construction of Auburndale Flood Improvements $9,149,197 $9,149,197 Miami -Dade Miami -Dade County Full Restoration of the Environmentally Endangered Lands Program Managed Habitat located at Matheson Hammock $2,500,000 $2,500,000 PROTECTING TOGETHER Miami -Dade City of Miami Beach Bayshore Park Retention Lake Resiliency Project $3,029,472 $3,029,472 Miami -Dade Miami -Dade County Storm Water Improvements - West Transfer Station $250,000 $250,000 Monroe Monroe County Shoreline 1 Long Key Living Shoreline Adaptation Project $900,000 $900,000 Monroe Monroe County Shoreline 3 Duck Key Living Shoreline Adaptation Project $3,327,266 $3,327,266 Monroe Monroe County Monroe County Area 26 Road Elevation Resiliency and Adaptation Project #2 $3,566,825 $3,566,825 Nassau Nassau County Thomas Creek Land Acquisition $1,400,000 $1,400,000 Okaloosa Town of Cinco Bayou Glenwood Stream Restoration $500,000 $500,000 Okeechobee Okeechobee County Berman Road Drainage $1,557,522 $1,557,522 PROTECTING TOGETHER Osceola Tohopekaliga Water Authority Buena Ventura Lakes Water Treatment Plant (BVL WTP) Flood Mitigation Improvements $1,529,187 $1,529,187 Palm Beach Palm Beach County Corbett WMA Levee Upgrade to Protect ITID from Overtopping and Breaching and Provide Southeast Corbett with Improved Recession Rates $7,705,000 $7,705,000 Palm Beach City of Delray Beach Thomas Street Stormwater Pump Station Improvement $2,500,000 $2,500,000 Palm Beach City of Boca Raton City of Boca Raton Lake Wyman Living Shoreline Project $700,000 $700,000 PROTECTING TOGETHER Palm Beach City of Boca Raton City of Boca Raton Old Floresta Innovative Sustainable Stormwater Infrastructure Project $627,500 $627,500 Palm Beach City of Delray Beach Historic Marine Way Seawall, Roadway and Drainage Improvement $10,000,000 $10,000,000 Palm Beach South Florida Water Management District Coastal Structures Enhancement and Self -Preservation Mode $6,290,625 $6,290,625 Palm Beach South Florida Water Management District Hardening of S-2, S-3, S-4, S-7, S-8 Engine Control Panels - Building Resiliency in Water Management South of Lake Okeechobee $8,500,000 $8,500,000 PROTECTING TOGETHER Palm Beach South Florida Water Management District L8 FEB / G-539 Pump Resiliency Upgrades $4,000,000 $4,000,000 Palm Beach Town of palm Beach Wastewater System Resilience: A-39 Pump Station Dry Floodproofing $435,000 $435,000 Palm Beach West Palm Beach West Palm Beach Tidal Valve Adaptation Project $800,000 $800,000 Palm Beach Indian Trail Improvemen t District M-0 Canal Control Structure $397,110 $397,110 Pinellas City of St. Petersburg Shore Acre Resiliency Infrastructure Project $7,874,335 $7,874,335 Santa Rosa Santa Rosa County Floridatown Living Shoreline Implementation Project $94,501 $94,501 Sarasota City of Sarasota Sarasota Bay Resiliency Initiative $2,588,000 $2,588,000 PROTECTING TOGETHER St. Johns St. Johns County Coastal Groves Park Shoreline Restoration $450,000 $450,000 St. Johns St. Johns County San Julian Secondary Outfall (Drainage System Upgrade) $421,950 $421,950 St. Lucie City of Fort Pierce Ft. Pierce Utilities Authority Resilient Wastewater Adaptation $15,000,000 $15,000,000 St. Lucie City of Port St. Lucie City of Port St. Lucie Force Main Interconnect for Wastewater Treatment Resiliency $8,762,155 $8,762,155 Volusia Volusia County Installation of Flood Mitigation Measures to Daytona Regional Library $800,000 $800,000 Volusia City of New Smyrna Beach North Atlantic Avenue Drainage Im • rovements $837,500 $125M $47.5M $46.8M $837,500 $275M $494,410,132