HomeMy WebLinkAboutSubmittal-Elvis Cruz-PowerPoint PresentationSubmitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Morningside Park Shoreline
Item RE-5
Miami City Commission
Thursday, May 11, 2023
13352-Submittal-Elvis Cruz-PowerPoint Presentation
1
Submitted into the public
record for item(s) RE.5 ,
on 5/11/2023 . City Clerk
Public scrutiny?
Two public record requests
2
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Submitted into the public
5. A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING THE record for item(s) RE.5
CITY MANAGER TO SUBMIT AN APPLICATION FOR REIMBURSEMENT GRANT FUNDING TO THE on 5/11/2023 . City Clerk
FLORIDA INLAND NAVIGATION DISTRICT ("FIND") WATERWAYS ASSISTANCE PROGRAM, FOR AN
AMOUNT NOT TO EXCEED FOUR MILLION THREE HUNDRED FIFTY TWO THOUSAND SIX HUNDRED
SEVENTY DOLLARS AND ZERO CENTS ($4,352,670.00) ("GRANT FUNDS") FOR THE
CONSTRUCTION OF THE BULKHEAD AND BAYWALK, AND IMPROVEMENTS TO THE BOAT RAMP
AND TRAILER PARKING AREA AT MORNINGSIDE PARK - PART 1 OF PHASE 2 ("PROJECT");
FURTHER AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE ANY AND ALL
NECESSARY DOCUMENTS, ALL IN FORMS ACCEPTABLE TO THE CITY ATTORNEY, FOR THE
SUBMISSION OF THE GRANT APPLICATION; FURTHER, IN THE EVENT OF AN AWARD,
AUTHORIZING THE CITY MANAGER TO ACCEPT THE GRANT FUNDS FOR FISCAL YEAR 2023-2024
WITHOUT THE NEED FOR FURTHER CITY COMMISSION APPROVAL AND TO ALLOCATE THE
REQUIRED MATCHING FUNDS IN AN AMOUNT NOT TO EXCEED FIVE MILLION FIFTY TWO
THOUSAND SIX HUNDRED SEVENTY DOLLARS AND ZERO CENTS ($5,052,670.00) TO BE
BUDGETED AND APPROPRIATED BY SEPARATE, FUTURE RESOLUTION AT THE TIME OF NEED
FROM CAPITAL PROJECT NUMBER 40-B40532 OR OTHER LEGALLY AVAILABLE FUNDING SOURCES
AND TO NEGOTIATE AND EXECUTE, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, GRANT OR
FFD AGRFFMFNTS. AMFNDMFNTS. MODIFTCATTONS, RENEWALS, AND EXTENSIONS THERETO.
Resolution Agenda Summary and Legislation
a. 13352 Exhibit A
b. 13352 Back -Up Documents
c. 13352 Back -Up from Law Dept
The plans are not in the
public agenda packet.
4
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Commissioner
de la Portilla:
"the plan stinks"
5
Marked Agenda April 14, 2022
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
NA - NON -AGENDA ITEM(S)
DIRECTIVE
DIRECTION BY COMMISSIONER RUSSELL TO THE CITY
MANAGER TO BRING BACK AN ITEM REGARDING THE
MORNINGSIDE PARK MASTER PLAN AND ITS SHORELINE FOR
THE APRIL 28, 2022 CITY COMMISSION MEETING.
RESULT: DISCUSSED
6
1
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
SHORWNE TRAM.
STA91UZED AGGREGATE.
30 SHOREUNE PROTECTION SYSTEM.
23 feet inland -
7
shoreline
1
1
seawall
1.
' IAA/ A70,
rq•'.
ord; or; W.; fr,i; IP; I
n in In In O.
_
Submitted into the public
record for item(s) RE.5
on 5/11/2023 .
City Clerk
Fttt..
WHO SHORELINE
SHORELINE TRAIL i
STABIUZED AGGREGATE.
30 SHORELINE PROTECTION SYSTEM.
EXISTING NATU
1 N
gig t
•
"al a a•• "Jaaa." a " a 011111/1.11L--"MWSANi
King Tide
23 feet inland
8
a-
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
It's much more important to
get it done right
than to get it done
right away.
9
DRAFT
ark Amenities and Character
Biscayne Bay
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Retain existing
character of
the park
Keep boat
launch ramp
Repair/
renovated pool
Remove
bollards
Add basketball
rni id
No one asked for the seawall to be set back.
v
Morningside Park — General Plan / Concepts
PUBLIC WORKSHOP COMMENTS
ark Amenities and Character
Keep park as is, but replace
and repair as needed
• Repair, renova e and reopen
existing pool
• Fix/improve existing restrooms
• Remove wood bollards
• Provide small dog park/run
• Focus on waterfront uses
• Add one more basketball court
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
22
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
DRAFT
Bryant Park - Lake Worth Lagoon,
Palm Beach County: Completed 2012
Funded by Palm Beach County and National
Endowment for the Arts
Submitted into the public
record for item(s) RE.5 ,
on 5/11/2023 . City Clerk
The Nature Conservancy offered $400,000
2021 -1 -27, Morningside Park
seawall
I
. I,SIA .i
a�
# ir: #; is
�- -1-I-- --I
1
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
LAW %CREME
SHORWNE TRAM..
STABIUZED AGGREGATE.
30 SHOREUNE PROTECTION SYSTEM.
23 feet inland
14
EXISTING NATURAL GRADING
shoreline
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
A new petition currently has 506 signatures.
Petition To Keep Morningside Park's Facilities In Place
The City of Miami's plan for Morningside Park would harm public enjoyment and waste money. We prefer:
1. Build a new pool in the same location as the old pool, to avoid demolishing, relocating and rebuilding eight
other facilities. 2. Keep the existing double-laned loop road, parking lots, picnic area restroom and palm
garden right where they have been since 1953. 3. Place the new seawall bulkhead along the shoreline, with
no marsh grass, to keep the existing open grassy picnic area along the waterfront, then a 6 foot -wide walkway.
Name (please print)
Address
Signed
Date
1
15
Submitted into the public
record for item(s) RE.5
on 5/11/2023 .
City Clerk
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
/
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
/
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
/
The work of experts.
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
/
2012 - eleven years ago.
The work of experts.
Submitted into the public
record for item(s) RE.5
on 5/11/2023 .
City Clerk
III
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Existing pipe is
submerged with
mangrove roots
locking the outfall
opening
ale
it to
Ll
4A.1
7th Avenue
000
Phase
Continue pipe cleaning operations to the existing
drainage system to increase drainage efficiency into the
pond.
200 LF existing pipe collects runoffs from NE 7th
Avenue and drains into existing pond.
Previous Inspections revealed sand and muck inside
pipe.
Mangrove roots block the opening of the outfall,
restricting flow
Annual Cleaning Cost including sealing, debris
disposal and CCTV inspection - $45,000
City of Miami PPT 2021-11-29, slide 10
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Above ground drainage.
29
PROP. DRAINAGE
RETENTION SWWLE
maw 0U1FALL CULVERT
AND BRDGE TO REMAIN
0 t®
SCALE: 1' - 20'-0-
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
LEGEND
EXISTING PROPOSED
NA
NA
DRANAGE FLOW
CONTOURS
STORM MANHOLE
CATCH BASIN
DRNN BASIN W/ GRATE
DRNN BASIN CONCEALED
NA NUKE DRAW -0 1
MAN UNE (+0.16'
I- NAVD)
PROPOSED TURBIDITY
CURTAN
(SEE SAPPP-501 FOR
DETNLS)
009TNG OUIFALL CULVERT
7 MID BRIDGE TO REMAIN
411
\� PROP. 120 LF 4' EXF.
TRENCH W/ 18' HOPE re\\��/
1� PERBOT. PIPE TRENCH `p
El -PROPOSED PROPSED 10 FT. WIDE DPNNNCE
RETENTION SHALE, 80T. EIEV.+5.0 1717.
\PROP. 15- 0 IF OF \4 -
455' EXF. TRENCH , PROP. 5 LF OF '
W/ 24" HOPE PER. 24 HOPE a ---Lbi,
PIPE TRENCH STORK DP.`BDT.-TARO. eva % n 71
\y` PROP. HLF
P8 F
18' HOPE LSTO
\\\\
CB-7 °.`
Ii10 a zp_
t '. o
PROP. DRNNIGE
RETENTION SHALE
BAYWALK DRAIN BASIN TABLE
STRUC. i
NYLOPIAST
COVER
ELEV.
W.
BOTTOM
DB-6
24"
SOUD
5.25
3.14
2.60
DO-7
24"
SOUD
5.25
3.14
2.60
08-8
24-
SOUD
5.25
3.14
2.60
DB-9
24-
SOUD
5.25
3.14
2.60
BISCAYNE B A Y
DIST. VEGETATION TO RDWN MO PROPOSED
SHOREL6E ENHMNCENENT WITH TIDAL ZOKE PLANTS,
1YP. REFER TO LANDSCAPE PLANS.
2020 SEGRASS L8E
WATERFRONT IMPROVEMENT PROJECT
CONSTRUCTION AND HARMONIZATION U005.
MEET OOSTINO, 1YP.
PROPOSED BULKHEAD. CAP
ELEV. +6.50 NAVO
PROP. 8 LF OF
24- HDPE SHORN
PROP. 145 IF OF
45:5' Dff. TRENCH
W/ 24- HOPE PER.
PIPE TRENCH
BOT.-14.00.
\ PROP. 48 LF OF
18- HOPE STORM
PROP. DRAINAGE
RETENTION SAME
PROPOSED PARK IERCM MEAT PROJECT. NOT A PORT OF THE
WATERFRONT IMPROVEMENT PROJECT.
ROADWAY MANHOLE TABLE
STRUC. /
MH-5
MH-6
MH-7
MH-8
MH-9
17PE
0-4
D-4
D-6
0-4
D-4
COVER
SOLD
SOLD
SOLD
SOLD
SOLD
ELEV.
5.00
4.50
5.25
5.25
525
INV. EL DIR. / BAFFLE)
0.00 W.
000 W.
000 W.
0.00 SW.
000 W.
0A0 (N. BAFFLE)
0A0 (S BAFFLE)
0A0 (N. BAFFLE, S. BAFFLE)
0A0 (N. BAFFLE)
0A0 (N. BAFFLE)
BOTTOM
- 3.50
- 3.50
- 3.50
- 3.50
- 3.50
ROADWAY CATCH BASIN TABLE
STRUC. /
C8-7
C8-8
C8-9
C8-10
CB-11
TYPE
D-4
D-4
D-4
D-4
D-4
COVER
INLET
INLET
INLET
INLET
INLET
ELEV.
2.50
2.50
2.50
3.50
3.50
PPE W. ELEV. DIR. (BAFFLE)
0.00
0.00
0.00
0.00
0.00
PROP. 40 IF OF 4'
0P. TRENCH W/ 18-
HOPE P. PIPE.
TRENCH 80T.-0.72.
PROP. 7 LF OF 18'
I HOPE STORM, TYP.
PROP. 20 IF OF
18' HOPE STORM
PROP. 165 LF OF 4'
W. IXE. TRENCH W/
24" HDPE PEKE PIPE
TRENCH 60T. -4.00
PROP. DRAINAGE
RETENTION SHALE
PROP. 5 IF OF
24- HOPE
411
BOTTOM
- 2.00
- 2.00
- 2.00
- 2.00
- 2.00
PROP. 130 IF OF 4'
IXE. TRENCH W/ 18'
HOPE PERE. PIPE
TRENCH 80T.-0.72.
PARKING LOT AND LAWN CATCH BASIN TABLE
STiUC. t
TYPE
COVER
ELEV.
PIPE INV. ELEV. DM (BAFFLE)
BOTTOM
CB-12
D-4
INLET
3.50
0.50
-1.50
CB-13
D-6
INLET
3.00
0.00 S. 0.50 N (N k 5. BAFFLE)
-3.50
CB-14
D-4
INLET
3.00
0.50 S. 0.50 N (S. BAFFLE)
-3,00
CB-15
D-4
INLET
3.50
0.50
-1.50
CB-16
D-4
INLET
3.50
0.50
-1.50
CB-17
D-4
INLET
4.00
0.50
-150
PROP. 5 LF OF -�
18• HDPE STORM
PROP. 50 LF OF 4'
W. IXE TRENCH W/
24- HOPE PERT. PIPE
TRENCH BOT. -14.00
PROP. 5 LF OF
24" HOPE STORM
PROP. 145 IF OF
455' Off. TRENCH H '
W/ 24" HOPE PER. ////\\\\j\\\\ PROP. 5 IF OF
PIPETRENCH 24" HOPE
BOT.-14.00. STORH, TIP.
\ \ \ \ Y/ \ \ ''- \ \_
COST. IWYM FLOATING DOCKS
TO REMAIN UNDISTURBED
am LINE (+0.16'
Ku0O)
SPACE RESERVED FOR CITY OF MVeMI APPROVAL STAMP
16
PROPOSED 10 FT. WIDE DRA NP,E
RETENTION SWAIE, BOT. ELEV.+SA 1YP. /
PROP. 95 LF OF 4' �7
EXF. TRENCH W/ 18' �A
HOPE PERE PIPE
TRENCH BOT.-0.72. 6.
PROP. 7 LF OF
18" HOPE STORM
PROP. 20 LF OF 4'
W. IXE. TRENCH W/
18- HOPE PERT. PPE
TRENCH BOT. -4.50 PROP. 8 LA OF
T 18" HOPE STORM
PROP. 20 LF OF 4'
r W. DP. TRENCH W/
18' HOPE PEKE PIPE
BENCH BOT. -4.50 CB-16
18' END CAP. \
PROP. 19 LF OF 24"
HOPE SHORN imvvvvvv
PROP. 10 LF OF 24-
HOPE STOW
PROP. 7 LF OF
18' HOPE STORM
PROP. 5 LF OF
18' HOPE STORM
I PROP. DRY
RETENTION AREA
PROP. 7 LF OF
18' HOPE STORM
PROP. 33 LF OF
18' HOPE STORM
PROP. oar REIEN110N
AREA
PROP. 30 LF OF
18' HOPE STORM -
WATERFRONT IMPROVEMENT PROJECT
CONSTRUCTION AND HARMONIZATION
LM15. MEET COSTING, TYP.
The new plan is full of underground drainage.
LED BY R.
SEAL.
DNDDER
ERIRED DI
11.30
Project
Morningside Park
Waterfront Improvements
5215 NE 7TH AVENUE
MIAMI, FL 33137
Client
CITY OF MIAMI
Landscape Architect
nttlC nnn n'as
D eslcN sTUDIo INc
SOUTH IRIAIL, FLORIDA SOLD
Consultants
COASTALSYSTEMS ss
ar
Seal
IDOL 2/7/2023
ENGINEER R. HARVEY SAS50
LICENSE x: 35616
Revision
Date
Note
SHEET TITLE
DRAINAGE PLAN • 2
SHEET 2 OF 9
CD•102
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
LEGEND
DWYNNGE FLOW
CONTOURS
STORM MN94OLE OQ MH
CATCH BASIN O CB
OTNN 848N W/ GRATE ODB
DRNN BASIN CONCEALED ODB
NUPE DRAIN -8B I
BAYWALK DRAIN BASIN TABLE
STRUC. ;
NYLOPIAST
COVER
ELEV.
W.
BOTTOM
OB-6
24'
SOUD
5.25
3.14
2.60
DO-7
2(
SOUD
5.25
3.14
2.60
06-8
24-
SOUD
5.25
3.14
2.60
OB-9
24-
SOUD
5.25
3.14
2.60
BISCAYNE B A Y
DIST. VEGETATION TO REMAIN Me PROPOSED
PROPOSED,
ORTAN SHORELIE ENHANCEMENT WITH TIDAL ZOE PLANTS,
(SEE SNPPP-501 FOR TYP. REFER TO LANDSCAPE PLANS.
DUPES) 2
PROPOSED BULKHEAD. CAP
ELEV. +8.50 NAVE
A‘ \s PROP. 120 LF 4' DP. \_�4�`
`, TRENCH W/ 18' HOPE �� ` �4',N-
ROT. PIPE TRENCH ,1►p��
ROT.-0.72. \ )(\\\)/
tET
\ PROP. 150 IF
4X5' IXF. TRENCH
W/ 24' HOPE PERF.
PIPE TRENCH 3 STOMA
ROT.-14.00. NA a
❑ t`\`Sy` PROP. 48 LF
2.5 18' HOPE STORM
CB-7 . ems
CB-
12" STORM, TYP.
mow OUIFALL CULVERT
AND BROGE TO RDWN
0 t®
SCALE: 1' - 20.-0-
Sunshinep
PROP. DRNNIGE
RETENTION SCALE
WATERFRONT IMPROVEMENT PROJECT
CONSTRUCTION AND HARMONIZATION UNNS.
MEET 005DNG, TYP.
PROPOSED PAMK IMPROVEMENT PROJECT. NOT A PORT OF THE
WATERFRONT IMPROVEMENT PROJECT.
PROP. 145 IF OF
45:5' DE. TRENCH
W/ 24- HOPE PERF.
PROP. 5 LF OF
HOPE STOR
ROADWAY MANHOLE TABLE
ANY. EL GR. / BAFFLE)
0.00 (N. BAFFLE
0.00 (5. BAFFLE)
0A0 (N. BAFFLE, 5. BAFFLE)
0.00 (N. BAFFLE)
0.00 (N. BAFFLE)
ROADWAY CATCH BASIN TABLE
PPE W. ELEV. OAR. (BAFFLE)
PROP. 7 LF OF
I HOPE STORM, TYP.
PROP. 20 IF OF
HOPE STORM
PROP. 5 IF OF
24- HOPE
PROP. 130 IF OF 4'
IXF. TRENCH W/ 16'
PERF. PIPE
72.
PROP. 5 LF OF
18• HDPE STORM
PARKING LOT AND LAWN CATCH BASIN TABLE
STRUC. t
TYPE
COVER
ELEV.
PIPE ANY. ELEV. OAR. (BAFFLE)
BOTTOM
CB-12
D-4
INLET
3.50
0.50
-1.50
CB-13
D-6
INLET
3.0E
0A0 S. 0.50 N (N k 5. 6*FFRE)
-3.50
CD-14
D-4
INLET
3.00
0.50 S. 0.50 N (S. BAFFFLE)
-3.00
CB-15
D-4
INLET
3.50
0.50
-1.50
CB-16
D-4
INLET
3.50
0.50
-1.50
CB-17
D-4
INLET
4.0E
0.50
-150
PROP. 5 LF OF
24 HOPE STOMA
A -
PROP. 145 IF OF apt
TRENC
H �'
W/ 24'" 4. HOPE PEW. �//�\\ PAP. 5 LF OF
MPEIRENCH 24' HDPE
ROT.-14.00. STORH, TIP.
\ h \
PROP. 50 LA
W. IXF. TRENCH W/
24- HOPE PERF. PIPE
TRENCH ROT. -14.00
'y
COST. KAYAK FLOATING DOCKS
TO REMAIN UNDISTURBED
MHW LINE (+0.16'
NAND
POSED 10 FT. WIDE DRANAGE
SWAIE, ROT. ELEV.+5A TYP.
1YSTORM, TYP. I
PROP. 20 LF OF 4'
W. IXF. TRENCH W/
18' HOPE PERE. PPE
TRENCH BOT. -4.50 NPROP. 6 LA OF
18' HOPE STORM
PROP. 20 LF OF 4'
W. DIE. TRENCH W/
HDPE PERF. PIPE
ROT. -4.50 CB-16
18' De CAP.
C8-12
C8-17
S
--PROP. DRY RETENTION
AREA
PROP. 30 IF OF
18- HOPE STORM -
SPACE RESERVED FOR CITY OF MLAMI APPROVAL STAMP
.7 LF OF
18' HOPE STORM
PROP. 5 LF OF
- 16' HDPE STORM
PROP. 7 LF OF
18' HOPE STO9M
PROP. 33 LA OF
- 18' HOPE STORM
WATERFRONT IMPROVEMENT PROJECT
CONSTRUCTION AND HARMONIZATION
LNA15. MEET OOSRNG, TYP.
The new plan is full of underground drainage.
LED BY R.
SEAL
xDDER
EWE, DI
11.30
Project
Morningside Park
Waterfront Improvements
5215 NE 7TH AVENUE
MIAMI, FL 33137
Client
CITY OF MIAMI
Landscape Architect
CceslcuaTxss-Tuoaolo ceIxcas
. o
75. S RED ROAD, SUITE NI
SOUTH
aos.aazr,nal a s.a t.seas FAX
Consultants
COASTALSYSTEMS ss
arHIM=IRIIi gram,.
Seal
1M1E: 2/7/2323
ENGINEER R. HARVEY SAS50
LICENSE x. 35616
_®__
--I
--_
SHEET TITLE
DRAINAGE PLAN • 2
SHEET 2 OF 9
CD•102
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Above ground drainage.
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Please:
Put the seawall at the sea
with access areas,
to protect the shoreline,
allow the loop road and pool to stay in place,
protect the concession building
and improve our bay views.
33
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Please:
Put the seawall at the sea
with access areas,
to protect the shoreline,
allow the loop road and pool to stay in place,
protect the concession building
and improve our bay views.
Please let common sense prevail.
34
Submitted into the public
record for item(s) RE.5
on 5/11/2023 . City Clerk
Thank you