Loading...
HomeMy WebLinkAboutSubmittal-Elvis Cruz-PowerPoint PresentationSubmitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Morningside Park Shoreline Item RE-5 Miami City Commission Thursday, May 11, 2023 13352-Submittal-Elvis Cruz-PowerPoint Presentation 1 Submitted into the public record for item(s) RE.5 , on 5/11/2023 . City Clerk Public scrutiny? Two public record requests 2 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Submitted into the public 5. A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING THE record for item(s) RE.5 CITY MANAGER TO SUBMIT AN APPLICATION FOR REIMBURSEMENT GRANT FUNDING TO THE on 5/11/2023 . City Clerk FLORIDA INLAND NAVIGATION DISTRICT ("FIND") WATERWAYS ASSISTANCE PROGRAM, FOR AN AMOUNT NOT TO EXCEED FOUR MILLION THREE HUNDRED FIFTY TWO THOUSAND SIX HUNDRED SEVENTY DOLLARS AND ZERO CENTS ($4,352,670.00) ("GRANT FUNDS") FOR THE CONSTRUCTION OF THE BULKHEAD AND BAYWALK, AND IMPROVEMENTS TO THE BOAT RAMP AND TRAILER PARKING AREA AT MORNINGSIDE PARK - PART 1 OF PHASE 2 ("PROJECT"); FURTHER AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE ANY AND ALL NECESSARY DOCUMENTS, ALL IN FORMS ACCEPTABLE TO THE CITY ATTORNEY, FOR THE SUBMISSION OF THE GRANT APPLICATION; FURTHER, IN THE EVENT OF AN AWARD, AUTHORIZING THE CITY MANAGER TO ACCEPT THE GRANT FUNDS FOR FISCAL YEAR 2023-2024 WITHOUT THE NEED FOR FURTHER CITY COMMISSION APPROVAL AND TO ALLOCATE THE REQUIRED MATCHING FUNDS IN AN AMOUNT NOT TO EXCEED FIVE MILLION FIFTY TWO THOUSAND SIX HUNDRED SEVENTY DOLLARS AND ZERO CENTS ($5,052,670.00) TO BE BUDGETED AND APPROPRIATED BY SEPARATE, FUTURE RESOLUTION AT THE TIME OF NEED FROM CAPITAL PROJECT NUMBER 40-B40532 OR OTHER LEGALLY AVAILABLE FUNDING SOURCES AND TO NEGOTIATE AND EXECUTE, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, GRANT OR FFD AGRFFMFNTS. AMFNDMFNTS. MODIFTCATTONS, RENEWALS, AND EXTENSIONS THERETO. Resolution Agenda Summary and Legislation a. 13352 Exhibit A b. 13352 Back -Up Documents c. 13352 Back -Up from Law Dept The plans are not in the public agenda packet. 4 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Commissioner de la Portilla: "the plan stinks" 5 Marked Agenda April 14, 2022 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk NA - NON -AGENDA ITEM(S) DIRECTIVE DIRECTION BY COMMISSIONER RUSSELL TO THE CITY MANAGER TO BRING BACK AN ITEM REGARDING THE MORNINGSIDE PARK MASTER PLAN AND ITS SHORELINE FOR THE APRIL 28, 2022 CITY COMMISSION MEETING. RESULT: DISCUSSED 6 1 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk SHORWNE TRAM. STA91UZED AGGREGATE. 30 SHOREUNE PROTECTION SYSTEM. 23 feet inland - 7 shoreline 1 1 seawall 1. ' IAA/ A70, rq•'. ord; or; W.; fr,i; IP; I n in In In O. _ Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Fttt.. WHO SHORELINE SHORELINE TRAIL i STABIUZED AGGREGATE. 30 SHORELINE PROTECTION SYSTEM. EXISTING NATU 1 N gig t • "al a a•• "Jaaa." a " a 011111/1.11L--"MWSANi King Tide 23 feet inland 8 a- Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk It's much more important to get it done right than to get it done right away. 9 DRAFT ark Amenities and Character Biscayne Bay Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Retain existing character of the park Keep boat launch ramp Repair/ renovated pool Remove bollards Add basketball rni id No one asked for the seawall to be set back. v Morningside Park — General Plan / Concepts PUBLIC WORKSHOP COMMENTS ark Amenities and Character Keep park as is, but replace and repair as needed • Repair, renova e and reopen existing pool • Fix/improve existing restrooms • Remove wood bollards • Provide small dog park/run • Focus on waterfront uses • Add one more basketball court Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk 22 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk DRAFT Bryant Park - Lake Worth Lagoon, Palm Beach County: Completed 2012 Funded by Palm Beach County and National Endowment for the Arts Submitted into the public record for item(s) RE.5 , on 5/11/2023 . City Clerk The Nature Conservancy offered $400,000 2021 -1 -27, Morningside Park seawall I . I,SIA .i a� # ir: #; is �- -1-I-- --I 1 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk LAW %CREME SHORWNE TRAM.. STABIUZED AGGREGATE. 30 SHOREUNE PROTECTION SYSTEM. 23 feet inland 14 EXISTING NATURAL GRADING shoreline Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk A new petition currently has 506 signatures. Petition To Keep Morningside Park's Facilities In Place The City of Miami's plan for Morningside Park would harm public enjoyment and waste money. We prefer: 1. Build a new pool in the same location as the old pool, to avoid demolishing, relocating and rebuilding eight other facilities. 2. Keep the existing double-laned loop road, parking lots, picnic area restroom and palm garden right where they have been since 1953. 3. Place the new seawall bulkhead along the shoreline, with no marsh grass, to keep the existing open grassy picnic area along the waterfront, then a 6 foot -wide walkway. Name (please print) Address Signed Date 1 15 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk / Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk / Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk / The work of experts. Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk / 2012 - eleven years ago. The work of experts. Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk III Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Existing pipe is submerged with mangrove roots locking the outfall opening ale it to Ll 4A.1 7th Avenue 000 Phase Continue pipe cleaning operations to the existing drainage system to increase drainage efficiency into the pond. 200 LF existing pipe collects runoffs from NE 7th Avenue and drains into existing pond. Previous Inspections revealed sand and muck inside pipe. Mangrove roots block the opening of the outfall, restricting flow Annual Cleaning Cost including sealing, debris disposal and CCTV inspection - $45,000 City of Miami PPT 2021-11-29, slide 10 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Above ground drainage. 29 PROP. DRAINAGE RETENTION SWWLE maw 0U1FALL CULVERT AND BRDGE TO REMAIN 0 t® SCALE: 1' - 20'-0- Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk LEGEND EXISTING PROPOSED NA NA DRANAGE FLOW CONTOURS STORM MANHOLE CATCH BASIN DRNN BASIN W/ GRATE DRNN BASIN CONCEALED NA NUKE DRAW -0 1 MAN UNE (+0.16' I- NAVD) PROPOSED TURBIDITY CURTAN (SEE SAPPP-501 FOR DETNLS) 009TNG OUIFALL CULVERT 7 MID BRIDGE TO REMAIN 411 \� PROP. 120 LF 4' EXF. TRENCH W/ 18' HOPE re\\��/ 1� PERBOT. PIPE TRENCH `p El -PROPOSED PROPSED 10 FT. WIDE DPNNNCE RETENTION SHALE, 80T. EIEV.+5.0 1717. \PROP. 15- 0 IF OF \4 - 455' EXF. TRENCH , PROP. 5 LF OF ' W/ 24" HOPE PER. 24 HOPE a ---Lbi, PIPE TRENCH STORK DP.`BDT.-TARO. eva % n 71 \y` PROP. HLF P8 F 18' HOPE LSTO \\\\ CB-7 °.` Ii10 a zp_ t '. o PROP. DRNNIGE RETENTION SHALE BAYWALK DRAIN BASIN TABLE STRUC. i NYLOPIAST COVER ELEV. W. BOTTOM DB-6 24" SOUD 5.25 3.14 2.60 DO-7 24" SOUD 5.25 3.14 2.60 08-8 24- SOUD 5.25 3.14 2.60 DB-9 24- SOUD 5.25 3.14 2.60 BISCAYNE B A Y DIST. VEGETATION TO RDWN MO PROPOSED SHOREL6E ENHMNCENENT WITH TIDAL ZOKE PLANTS, 1YP. REFER TO LANDSCAPE PLANS. 2020 SEGRASS L8E WATERFRONT IMPROVEMENT PROJECT CONSTRUCTION AND HARMONIZATION U005. MEET OOSTINO, 1YP. PROPOSED BULKHEAD. CAP ELEV. +6.50 NAVO PROP. 8 LF OF 24- HDPE SHORN PROP. 145 IF OF 45:5' Dff. TRENCH W/ 24- HOPE PER. PIPE TRENCH BOT.-14.00. \ PROP. 48 LF OF 18- HOPE STORM PROP. DRAINAGE RETENTION SAME PROPOSED PARK IERCM MEAT PROJECT. NOT A PORT OF THE WATERFRONT IMPROVEMENT PROJECT. ROADWAY MANHOLE TABLE STRUC. / MH-5 MH-6 MH-7 MH-8 MH-9 17PE 0-4 D-4 D-6 0-4 D-4 COVER SOLD SOLD SOLD SOLD SOLD ELEV. 5.00 4.50 5.25 5.25 525 INV. EL DIR. / BAFFLE) 0.00 W. 000 W. 000 W. 0.00 SW. 000 W. 0A0 (N. BAFFLE) 0A0 (S BAFFLE) 0A0 (N. BAFFLE, S. BAFFLE) 0A0 (N. BAFFLE) 0A0 (N. BAFFLE) BOTTOM - 3.50 - 3.50 - 3.50 - 3.50 - 3.50 ROADWAY CATCH BASIN TABLE STRUC. / C8-7 C8-8 C8-9 C8-10 CB-11 TYPE D-4 D-4 D-4 D-4 D-4 COVER INLET INLET INLET INLET INLET ELEV. 2.50 2.50 2.50 3.50 3.50 PPE W. ELEV. DIR. (BAFFLE) 0.00 0.00 0.00 0.00 0.00 PROP. 40 IF OF 4' 0P. TRENCH W/ 18- HOPE P. PIPE. TRENCH 80T.-0.72. PROP. 7 LF OF 18' I HOPE STORM, TYP. PROP. 20 IF OF 18' HOPE STORM PROP. 165 LF OF 4' W. IXE. TRENCH W/ 24" HDPE PEKE PIPE TRENCH 60T. -4.00 PROP. DRAINAGE RETENTION SHALE PROP. 5 IF OF 24- HOPE 411 BOTTOM - 2.00 - 2.00 - 2.00 - 2.00 - 2.00 PROP. 130 IF OF 4' IXE. TRENCH W/ 18' HOPE PERE. PIPE TRENCH 80T.-0.72. PARKING LOT AND LAWN CATCH BASIN TABLE STiUC. t TYPE COVER ELEV. PIPE INV. ELEV. DM (BAFFLE) BOTTOM CB-12 D-4 INLET 3.50 0.50 -1.50 CB-13 D-6 INLET 3.00 0.00 S. 0.50 N (N k 5. BAFFLE) -3.50 CB-14 D-4 INLET 3.00 0.50 S. 0.50 N (S. BAFFLE) -3,00 CB-15 D-4 INLET 3.50 0.50 -1.50 CB-16 D-4 INLET 3.50 0.50 -1.50 CB-17 D-4 INLET 4.00 0.50 -150 PROP. 5 LF OF -� 18• HDPE STORM PROP. 50 LF OF 4' W. IXE TRENCH W/ 24- HOPE PERT. PIPE TRENCH BOT. -14.00 PROP. 5 LF OF 24" HOPE STORM PROP. 145 IF OF 455' Off. TRENCH H ' W/ 24" HOPE PER. ////\\\\j\\\\ PROP. 5 IF OF PIPETRENCH 24" HOPE BOT.-14.00. STORH, TIP. \ \ \ \ Y/ \ \ ''- \ \_ COST. IWYM FLOATING DOCKS TO REMAIN UNDISTURBED am LINE (+0.16' Ku0O) SPACE RESERVED FOR CITY OF MVeMI APPROVAL STAMP 16 PROPOSED 10 FT. WIDE DRA NP,E RETENTION SWAIE, BOT. ELEV.+SA 1YP. / PROP. 95 LF OF 4' �7 EXF. TRENCH W/ 18' �A HOPE PERE PIPE TRENCH BOT.-0.72. 6. PROP. 7 LF OF 18" HOPE STORM PROP. 20 LF OF 4' W. IXE. TRENCH W/ 18- HOPE PERT. PPE TRENCH BOT. -4.50 PROP. 8 LA OF T 18" HOPE STORM PROP. 20 LF OF 4' r W. DP. TRENCH W/ 18' HOPE PEKE PIPE BENCH BOT. -4.50 CB-16 18' END CAP. \ PROP. 19 LF OF 24" HOPE SHORN imvvvvvv PROP. 10 LF OF 24- HOPE STOW PROP. 7 LF OF 18' HOPE STORM PROP. 5 LF OF 18' HOPE STORM I PROP. DRY RETENTION AREA PROP. 7 LF OF 18' HOPE STORM PROP. 33 LF OF 18' HOPE STORM PROP. oar REIEN110N AREA PROP. 30 LF OF 18' HOPE STORM - WATERFRONT IMPROVEMENT PROJECT CONSTRUCTION AND HARMONIZATION LM15. MEET COSTING, TYP. The new plan is full of underground drainage. LED BY R. SEAL. DNDDER ERIRED DI 11.30 Project Morningside Park Waterfront Improvements 5215 NE 7TH AVENUE MIAMI, FL 33137 Client CITY OF MIAMI Landscape Architect nttlC nnn n'as D eslcN sTUDIo INc SOUTH IRIAIL, FLORIDA SOLD Consultants COASTALSYSTEMS ss ar Seal IDOL 2/7/2023 ENGINEER R. HARVEY SAS50 LICENSE x: 35616 Revision Date Note SHEET TITLE DRAINAGE PLAN • 2 SHEET 2 OF 9 CD•102 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk LEGEND DWYNNGE FLOW CONTOURS STORM MN94OLE OQ MH CATCH BASIN O CB OTNN 848N W/ GRATE ODB DRNN BASIN CONCEALED ODB NUPE DRAIN -8B I BAYWALK DRAIN BASIN TABLE STRUC. ; NYLOPIAST COVER ELEV. W. BOTTOM OB-6 24' SOUD 5.25 3.14 2.60 DO-7 2( SOUD 5.25 3.14 2.60 06-8 24- SOUD 5.25 3.14 2.60 OB-9 24- SOUD 5.25 3.14 2.60 BISCAYNE B A Y DIST. VEGETATION TO REMAIN Me PROPOSED PROPOSED, ORTAN SHORELIE ENHANCEMENT WITH TIDAL ZOE PLANTS, (SEE SNPPP-501 FOR TYP. REFER TO LANDSCAPE PLANS. DUPES) 2 PROPOSED BULKHEAD. CAP ELEV. +8.50 NAVE A‘ \s PROP. 120 LF 4' DP. \_�4�` `, TRENCH W/ 18' HOPE �� ` �4',N- ROT. PIPE TRENCH ,1►p�� ROT.-0.72. \ )(\\\)/ tET \ PROP. 150 IF 4X5' IXF. TRENCH W/ 24' HOPE PERF. PIPE TRENCH 3 STOMA ROT.-14.00. NA a ❑ t`\`Sy` PROP. 48 LF 2.5 18' HOPE STORM CB-7 . ems CB- 12" STORM, TYP. mow OUIFALL CULVERT AND BROGE TO RDWN 0 t® SCALE: 1' - 20.-0- Sunshinep PROP. DRNNIGE RETENTION SCALE WATERFRONT IMPROVEMENT PROJECT CONSTRUCTION AND HARMONIZATION UNNS. MEET 005DNG, TYP. PROPOSED PAMK IMPROVEMENT PROJECT. NOT A PORT OF THE WATERFRONT IMPROVEMENT PROJECT. PROP. 145 IF OF 45:5' DE. TRENCH W/ 24- HOPE PERF. PROP. 5 LF OF HOPE STOR ROADWAY MANHOLE TABLE ANY. EL GR. / BAFFLE) 0.00 (N. BAFFLE 0.00 (5. BAFFLE) 0A0 (N. BAFFLE, 5. BAFFLE) 0.00 (N. BAFFLE) 0.00 (N. BAFFLE) ROADWAY CATCH BASIN TABLE PPE W. ELEV. OAR. (BAFFLE) PROP. 7 LF OF I HOPE STORM, TYP. PROP. 20 IF OF HOPE STORM PROP. 5 IF OF 24- HOPE PROP. 130 IF OF 4' IXF. TRENCH W/ 16' PERF. PIPE 72. PROP. 5 LF OF 18• HDPE STORM PARKING LOT AND LAWN CATCH BASIN TABLE STRUC. t TYPE COVER ELEV. PIPE ANY. ELEV. OAR. (BAFFLE) BOTTOM CB-12 D-4 INLET 3.50 0.50 -1.50 CB-13 D-6 INLET 3.0E 0A0 S. 0.50 N (N k 5. 6*FFRE) -3.50 CD-14 D-4 INLET 3.00 0.50 S. 0.50 N (S. BAFFFLE) -3.00 CB-15 D-4 INLET 3.50 0.50 -1.50 CB-16 D-4 INLET 3.50 0.50 -1.50 CB-17 D-4 INLET 4.0E 0.50 -150 PROP. 5 LF OF 24 HOPE STOMA A - PROP. 145 IF OF apt TRENC H �' W/ 24'" 4. HOPE PEW. �//�\\ PAP. 5 LF OF MPEIRENCH 24' HDPE ROT.-14.00. STORH, TIP. \ h \ PROP. 50 LA W. IXF. TRENCH W/ 24- HOPE PERF. PIPE TRENCH ROT. -14.00 'y COST. KAYAK FLOATING DOCKS TO REMAIN UNDISTURBED MHW LINE (+0.16' NAND POSED 10 FT. WIDE DRANAGE SWAIE, ROT. ELEV.+5A TYP. 1YSTORM, TYP. I PROP. 20 LF OF 4' W. IXF. TRENCH W/ 18' HOPE PERE. PPE TRENCH BOT. -4.50 NPROP. 6 LA OF 18' HOPE STORM PROP. 20 LF OF 4' W. DIE. TRENCH W/ HDPE PERF. PIPE ROT. -4.50 CB-16 18' De CAP. C8-12 C8-17 S --PROP. DRY RETENTION AREA PROP. 30 IF OF 18- HOPE STORM - SPACE RESERVED FOR CITY OF MLAMI APPROVAL STAMP .7 LF OF 18' HOPE STORM PROP. 5 LF OF - 16' HDPE STORM PROP. 7 LF OF 18' HOPE STO9M PROP. 33 LA OF - 18' HOPE STORM WATERFRONT IMPROVEMENT PROJECT CONSTRUCTION AND HARMONIZATION LNA15. MEET OOSRNG, TYP. The new plan is full of underground drainage. LED BY R. SEAL xDDER EWE, DI 11.30 Project Morningside Park Waterfront Improvements 5215 NE 7TH AVENUE MIAMI, FL 33137 Client CITY OF MIAMI Landscape Architect CceslcuaTxss-Tuoaolo ceIxcas . o 75. S RED ROAD, SUITE NI SOUTH aos.aazr,nal a s.a t.seas FAX Consultants COASTALSYSTEMS ss arHIM=IRIIi gram,. Seal 1M1E: 2/7/2323 ENGINEER R. HARVEY SAS50 LICENSE x. 35616 _®__ --I --_ SHEET TITLE DRAINAGE PLAN • 2 SHEET 2 OF 9 CD•102 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Above ground drainage. Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Please: Put the seawall at the sea with access areas, to protect the shoreline, allow the loop road and pool to stay in place, protect the concession building and improve our bay views. 33 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Please: Put the seawall at the sea with access areas, to protect the shoreline, allow the loop road and pool to stay in place, protect the concession building and improve our bay views. Please let common sense prevail. 34 Submitted into the public record for item(s) RE.5 on 5/11/2023 . City Clerk Thank you