HomeMy WebLinkAboutExhibit AATTACHMENT E-7
RESOLUTION FOR ASSISTANCE 2023
UNDER THE FLORIDA INLAND NAVIGATION DISTRICT
WATERWAYS ASSISTANCE PROGRAM
WHEREAS, THE City of Miami is interested in carrying out the
(Name ofAgency)
following described project for the enjoyment of the citizenry of Miami
and the State of Florida:
Project Title Design and Permitting of the Mooring Fields at Miami Marine Stadium
Marina — Phase 1.
Total Estimated Cost $ 300,000.00 (City cost $150,000.00 & FIND cost
$150,000.00)
Brief Description of Project: The City of Miami ("The City") is seeking funding to design
and permit the mooring field at Miami Marine Stadium Marina — Phase 1.
AND, Florida Inland Navigation District financial assistance is required for the program
mentioned above,
NOW THEREFORE, be it resolved by the City of Miami
(Name ofAgency)
that the project described above be authorized,
AND, be it further resolved that said City of Miami
(Name ofAgency)
make application to the Florida Inland Navigation District in the amount of eligible 50 % of the
actual cost of the project in behalf of said City of Miami
(Name ofAgency)
AND, be it further resolved by the City of Miami
(Name ofAgency)
that it certifies to the following:
1. That it will accept the terms and conditions set forth in FIND Rule 66B-2
F.A.C. and which will be a part of the Project Agreement for any assistance awarded under
the attached proposal.
2. That it is in complete accord with the attached proposal and that it will carry out
the Program in the manner described in the proposal and any plans and specifications attached
thereto unless prior approval for any change has been received from the District.(1)
Form No. 90-21 (Effective date 12-17-90, Rev. 10-14-92)
3. That it has the ability and intention to finance its share of the cost of the project
and that the project will be operated and maintained at the expense of said City of Miami
for public use.
(Name ofAgency)
4. That it will not discriminate against any person on the basis of race, color or
national origin in the use of any property or facility acquired or developed pursuant to this
proposal, and shall comply with the terms and intent of the Title VI of the Civil Rights Act of
1964, P. L. 88-352 (1964) and design and construct all facilities to comply fully with statutes
relating to accessibility by persons with disabilities as well as other federal, state and local
laws, rules and requirements.
5. That it will maintain adequate financial records on the proposed project to
substantiate claims for reimbursement.
6. That it will make available to FIND if requested, a post -audit of expenses
incurred on the project prior to, or in conjunction with, request for the final 10% of the
funding agreed to by FIND.
This is to certify that the foregoing is a true and correct copy of a resolution duly and
legally adopted by the Miami City Commission at a legal meeting
(Agency Governing Board)
held on this 271_day of April 20 23.
Attest Signature
City Manager
Title Title
(2)
Form No. 90-21 (Effective date 12-17-90, Rev. 10-14-92)
Marine Stadium Mooring Field - Design and Permitting Fees 3/23 Budget
1 Data Collection
Kickoff Meeting
Stakeholder Meetings
Public Meetings
Hydrographic Survey
Marine Resource Mapping
Specific Purpose Survey - upland
2 Planning & Design
Schematic Design - marine
Schematic Design - upland
Design Development - marine
Design Development - upland
Construction Documents - marine
Construction Documents - upland
3 Permitting
USACE Permit Application
FDEP ERP Application
MDC DERM Permit Application
USACE Permit Processing
FDEP Permit Processing
DERM Permit Processing
FWC Permitting
City Permitting Support
Permitting Meetings
Utility Permitting (WASD, FPL)
$ 1,400
$ 2,000
$ 2,800
$ 2,000
$ 1,800
$ 1,600
$ 14,500
$ 4,000
$ 16,400
$ 12,000
$ 27,000
$ 18,000
$ 4,400
$ 4,400
$ 5,000
$ 18,000
$ 15,000
$ 18,000
$ 9,800
$ 8,000
$ 6,000
$ 10,000
Reimbursable/Subconsultant
Hydrographic and Marine Resource Survey $ 18,000
Updated Marine Resource Survey $ 8,000
Seagrass Mitigation Plan and Processing - Contingency $ 50,000
Specific Purpose Survey - upland $ 12,000
$ 290,100
D
C
B
A
2
3
4
APROXIMATE
DEPTH SOUNDINGS
FROM NOAA NAUTICAL
CHART 11468
-6' MLLW CONTOUR
FROM NOAA NAUTICAL
CHART 11468
RICKENBACKER MARINA
AIRWAY
OS)
(6) 6)
75'
FAIRWAY
ARINE STADIUM MARINA
3300' MOORING AREA "B"
9rA"•
-CHANNEL
✓/ 75'
FAIRWAY
wEXISTING MARINA w.
4.11.06, FACILITIES
RICKENBACKER CAUSEWAY •• "
vf-
LIMITS OF
MOORING FIELD
r451`6Imr4B,
APROXIMATE LIMITS
OF MIAMI BOAT SHOW
REGULATORY
BUOY (TYP)
DESIGNATED EXISTING
FLOATING DINGY DOCK
'.DESIGNATED EXISTING
FLOATING DOCK
FOR SEWAGE
PUMPOUT SERVICE
AREAS
LOCATION
AREA
MOORING AREA "A"
26.5 ACRE
MOORING AREA "B`
15.9 ACRE
5
AO figures In feet relative to Hatton datum
LEGEND
— • • — MOORING FIELD LIMITS
(6) DEPTH SOUNDING FROM NOAA
X NAUTICAL CHART 11468
MODRING
�-2—LIMITS OF SWING CIRCLE
MOORING FIELD SLIP MIX
LOA
VESSEL
DRAFT
MIN SWING
DIAMETER
COUNT
9.
50'
5.5'
160'
17
35%
60'
5.5'
180'
31
65%
TOTAL 48 100%
NOTE:
1. ALL ELEVATIONS PROVIDED ARE IN
FEET WITH RESPECT TO MLLW.
250' 0' 250' 500'
SCALE: 1"=250'
100' 0' 100' 200'
SCALE: 1 "=100'
PERMIT DRAWINGS
15 JANUARY 2018
NOT TO BE USED FOR CONSTRUCTION
2
3
4
5
D
C
B
5
0
O 0
Q �
1- w_
w LL
Z Z
5
MOORING FIELD PLAN
€m
8
1g
Sheet
Reference No.
S-101
INDEX: 5 OF 8
DRAWING SCALES SHOWN BASED ON 22`.]9" DRAWING