Loading...
HomeMy WebLinkAboutExhibit AATTACHMENT E-7 RESOLUTION FOR ASSISTANCE 2023 UNDER THE FLORIDA INLAND NAVIGATION DISTRICT WATERWAYS ASSISTANCE PROGRAM WHEREAS, THE City of Miami is interested in carrying out the (Name ofAgency) following described project for the enjoyment of the citizenry of Miami and the State of Florida: Project Title Design and Permitting of the Mooring Fields at Miami Marine Stadium Marina — Phase 1. Total Estimated Cost $ 300,000.00 (City cost $150,000.00 & FIND cost $150,000.00) Brief Description of Project: The City of Miami ("The City") is seeking funding to design and permit the mooring field at Miami Marine Stadium Marina — Phase 1. AND, Florida Inland Navigation District financial assistance is required for the program mentioned above, NOW THEREFORE, be it resolved by the City of Miami (Name ofAgency) that the project described above be authorized, AND, be it further resolved that said City of Miami (Name ofAgency) make application to the Florida Inland Navigation District in the amount of eligible 50 % of the actual cost of the project in behalf of said City of Miami (Name ofAgency) AND, be it further resolved by the City of Miami (Name ofAgency) that it certifies to the following: 1. That it will accept the terms and conditions set forth in FIND Rule 66B-2 F.A.C. and which will be a part of the Project Agreement for any assistance awarded under the attached proposal. 2. That it is in complete accord with the attached proposal and that it will carry out the Program in the manner described in the proposal and any plans and specifications attached thereto unless prior approval for any change has been received from the District.(1) Form No. 90-21 (Effective date 12-17-90, Rev. 10-14-92) 3. That it has the ability and intention to finance its share of the cost of the project and that the project will be operated and maintained at the expense of said City of Miami for public use. (Name ofAgency) 4. That it will not discriminate against any person on the basis of race, color or national origin in the use of any property or facility acquired or developed pursuant to this proposal, and shall comply with the terms and intent of the Title VI of the Civil Rights Act of 1964, P. L. 88-352 (1964) and design and construct all facilities to comply fully with statutes relating to accessibility by persons with disabilities as well as other federal, state and local laws, rules and requirements. 5. That it will maintain adequate financial records on the proposed project to substantiate claims for reimbursement. 6. That it will make available to FIND if requested, a post -audit of expenses incurred on the project prior to, or in conjunction with, request for the final 10% of the funding agreed to by FIND. This is to certify that the foregoing is a true and correct copy of a resolution duly and legally adopted by the Miami City Commission at a legal meeting (Agency Governing Board) held on this 271_day of April 20 23. Attest Signature City Manager Title Title (2) Form No. 90-21 (Effective date 12-17-90, Rev. 10-14-92) Marine Stadium Mooring Field - Design and Permitting Fees 3/23 Budget 1 Data Collection Kickoff Meeting Stakeholder Meetings Public Meetings Hydrographic Survey Marine Resource Mapping Specific Purpose Survey - upland 2 Planning & Design Schematic Design - marine Schematic Design - upland Design Development - marine Design Development - upland Construction Documents - marine Construction Documents - upland 3 Permitting USACE Permit Application FDEP ERP Application MDC DERM Permit Application USACE Permit Processing FDEP Permit Processing DERM Permit Processing FWC Permitting City Permitting Support Permitting Meetings Utility Permitting (WASD, FPL) $ 1,400 $ 2,000 $ 2,800 $ 2,000 $ 1,800 $ 1,600 $ 14,500 $ 4,000 $ 16,400 $ 12,000 $ 27,000 $ 18,000 $ 4,400 $ 4,400 $ 5,000 $ 18,000 $ 15,000 $ 18,000 $ 9,800 $ 8,000 $ 6,000 $ 10,000 Reimbursable/Subconsultant Hydrographic and Marine Resource Survey $ 18,000 Updated Marine Resource Survey $ 8,000 Seagrass Mitigation Plan and Processing - Contingency $ 50,000 Specific Purpose Survey - upland $ 12,000 $ 290,100 D C B A 2 3 4 APROXIMATE DEPTH SOUNDINGS FROM NOAA NAUTICAL CHART 11468 -6' MLLW CONTOUR FROM NOAA NAUTICAL CHART 11468 RICKENBACKER MARINA AIRWAY OS) (6) 6) 75' FAIRWAY ARINE STADIUM MARINA 3300' MOORING AREA "B" 9rA"• -CHANNEL ✓/ 75' FAIRWAY wEXISTING MARINA w. 4.11.06, FACILITIES RICKENBACKER CAUSEWAY •• " vf- LIMITS OF MOORING FIELD r451`6Imr4B, APROXIMATE LIMITS OF MIAMI BOAT SHOW REGULATORY BUOY (TYP) DESIGNATED EXISTING FLOATING DINGY DOCK '.DESIGNATED EXISTING FLOATING DOCK FOR SEWAGE PUMPOUT SERVICE AREAS LOCATION AREA MOORING AREA "A" 26.5 ACRE MOORING AREA "B` 15.9 ACRE 5 AO figures In feet relative to Hatton datum LEGEND — • • — MOORING FIELD LIMITS (6) DEPTH SOUNDING FROM NOAA X NAUTICAL CHART 11468 MODRING �-2—LIMITS OF SWING CIRCLE MOORING FIELD SLIP MIX LOA VESSEL DRAFT MIN SWING DIAMETER COUNT 9. 50' 5.5' 160' 17 35% 60' 5.5' 180' 31 65% TOTAL 48 100% NOTE: 1. ALL ELEVATIONS PROVIDED ARE IN FEET WITH RESPECT TO MLLW. 250' 0' 250' 500' SCALE: 1"=250' 100' 0' 100' 200' SCALE: 1 "=100' PERMIT DRAWINGS 15 JANUARY 2018 NOT TO BE USED FOR CONSTRUCTION 2 3 4 5 D C B 5 0 O 0 Q � 1- w_ w LL Z Z 5 MOORING FIELD PLAN €m 8 1g Sheet Reference No. S-101 INDEX: 5 OF 8 DRAWING SCALES SHOWN BASED ON 22`.]9" DRAWING