Loading...
HomeMy WebLinkAboutSubmittal-Elvis Cruz-PowerPoint PresentationSubmitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk Virginia Key Park FIND Grant for Boat Ramp and Mangrove Mitigation Miami City Commission, item RE-4 Thursday, April 27, 2023 13662-Submittal-Elvis Cruz -Mangrove facts sheet 40-B70046 VIRGINIA KEY BOAT RAMP AND TRAILER PARKING Submitted into the public FIND SUMMARY COST ESTIMATE - PHASE II (REV 03.07.23) record for item(s) RE.4 on 4/27/2023 . City C RE-4, Back -Up Document Jerk PROJECT ELEMENTS QUANTITY OF TOTAL ESTIMATED COST APPLICANT'S COST (To the nearest $50) FIND COST (To the nearest $50) Demolition, mobilization and general conditions $289,100.00 $144,550.00 $144,550.00 Turbidity control $10,000.00 $5,000.00 $5,000.00 Fixed concrete dock $400,500.00 $200,250.00 $200,250.00 Concrete boat ramp $535,700.00 $267,850.00 $267,850.00 Concrete piles $130,000.00 $65,000.00 $65,000.00 Retaining wall $160,000.00 $80,000.00 $80,000.00 Riprap $99,400.00 $49,700.00 $49,700.00 Floating dock $180,000.00 $90,000.00 $90,000.00 Trailer parking area improvements (asphalt, pavement stripping, signs, lighting, bollards, pathways, etc.) $460,000.00 $230,000.00 $230,000.00 Environmental Mitigation (mangrove and seagrass) $217,700.00 $108,850.00 $108,850.00 40-B70046 VIRGINIA KEY BOAT RAMP AND TRAILER PARKING Submitted into the publicFIND SUMMARY COST ESTIMATE - PHASE II (REV 03.07.23) record for item(s) RE.4 on 4/27/2023 . City RE-4, Back -Up Document PROJECT ELEMENTS QUANTITY OF TOTAL ESTIMATED COST APPLICANT'S COST (To the nearest $50) FIND COST (To the nearest $50) Demolition, mobilization and general conditions $289,100.00 $144,550.00 $144,550.00 Turbidity control $10,000.00 $5,000.00 $5,000.00 Fixed concrete dock $400,500.00 $200,250.00 $200,250.00 Concrete boat ramp $535,700.00 $267,850.00 $267,850.00 Concrete piles $130,000.00 $65,000.00 $65,000.00 Retaining wall $160,000.00 $80,000.00 $80,000.00 Riprap $99,400.00 $49,700.00 $49,700.00 Floating dock $180,000.00 $90,000.00 $90,000.00 Trailer parking area improvements (asphalt, pavement stripping, signs, lighting, bollards, pathways, etc.) $460,000.00 $230,000.00 $230,000.00 Environmental Mitigation (mangrove and seagrass) $217,700.00 $108,850.00 $108,850.00 40-B70046 VIRGINIA KEY BOAT RAMP AND TRAILER PARKING Submitted into the publicFIND SUMMARY COST ESTIMATE - PHASE II (REV 03.07.23) record for item(s) RE.4 on 4/27/2023 . City RE-4, Back -Up Document Jerk PROJECT ELEMENTS QUANTITY OF TOTAL ESTIMATED COST APPLICANT'S COST (To the nearest $50) FIND COST (To the nearest $50) Demolition, mobilization and general conditions $289,100.00 $144,550.00 $144,550.00 Turbidity control $10,000.00 $5,000.00 $5,000.00 Environmental Mitigation (mangrove and seagrass) Riprap $99,400.00 $49,700.00 $49,700.00 Floating dock $180,000.00 $90,000.00 $90,000.00 Trailer parking area improvements (asphalt, pavement stripping, signs, lighting, bollards, pathways, etc.) $460,000.00 $230,000.00 $230,000.00 Environmental Mitigation (mangrove and seagrass) $217,700.00 $108,850.00 $108,850.00 Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk Mangrove mitigation was also done at Albert Paliot Park 5 Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk 2018, Pallot Park Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk 8 Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk For mangroves to be beneficial, you need a large area of them. 9 Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk Submitted into the publi record for item(s) RE. on 4/27/2023 . City Clerk WEDNESDAY APRIL 13, 2022 Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk 33iami cr 40.1100 "If you have a narrow mangrove planter, it doesn't cut it," he said. Three meters of mangrove does nothing. It's a token for the look. If you want to dissipate waves, you need at least 100 meters." — Peter Sheng, University of Florida researcher 12 record foritemkd REA .. itted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk ter. Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk 15 Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk 16 Mangrove Damage and Recovery Following Hurricane Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk Irma in the Florida Keys Kara Radabaugh (FWC), Ryan P. Moyer (FWC),Amanda Chappel (FWC), Emma Dontis (FWC), Christine Russo (FWC), Kristen Joyse (Rutgers University), Melissa Bownik (USF), Audrey Goeckner (USF), Nicole Khan (NanyangTechnological University) FWC Fish and Wildlife Research Institute, St. Petersburg, FL 16 October 2018 Florida Keys National Marine Sanctuary Advisory Council Meeting Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk Other storm impacts • Coastal erosion 18 I0 Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk Mangroves can also be harmful. 1. Release tannic acid, which blocks sunlight to the seagrass. 2. Decrease dissolved oxygen in the water, which can kill fish. 3. Increase storm surge in some situations. 40-B70046 VIRGINIA KEY BOAT RAMP AND TRAILER PARKING Submitted into the public FIND SUMMARY COST ESTIMATE - PHASE II (REV 03.07.23) record for item(s) RE.4 on 4/27/2023 . City RE-4, Back -Up Document PROJECT ELEMENTS QUANTITY OF TOTAL ESTIMATED COST APPLICANT'S COST (To the nearest $50) FIND COST (To the nearest $50) Demolition, mobilization and general conditions $289,100.00 $144,550.00 $144,550.00 Turbidity control $10,000.00 $5,000.00 $5,000.00 Fixed concrete dock $400,500.00 $200,250.00 $200,250.00 Concrete boat ramp $535,700.00 $267,850.00 $267,850.00 Concrete piles $130,000.00 $65,000.00 $65,000.00 Retaining wall $160,000.00 $80,000.00 $80,000.00 Riprap $99,400.00 $49,700.00 $49,700.00 Floating dock $180,000.00 $90,000.00 $90,000.00 Trailer parking area improvements (asphalt, pavement stripping, signs, lighting, bollards, pathways, etc.) $460,000.00 $230,000.00 $230,000.00 Environmental Mitigation (mangrove and seagrass) $217,700.00 $108,850.00 $108,850.00 40-B70046 VIRGINIA KEY BOAT RAMP AND TRAILER PARKING Submitted into the publicFIND SUMMARY COST ESTIMATE - PHASE II (REV 03.07.23) record for item(s) RE.4 on 4/27/2023 . City Clerk • RE-4, Back -Up Document PROJECT ELEMENTS QUANTITY OF TOTAL ESTIMATED COST APPLICANT'S COST (To the nearest $50) FIND COST (To the nearest $50) Demolition, mobilization and general conditions $289,100.00 $144,550.00 $144,550.00 Turbidity control $10,000.00 $5,000.00 $5,000.00 Fixed concrete dock $400,500.00 $200,250.00 $200,250.00 1 200,000 token for t the .t. t ook Floating dock $180,000.00 $90,000.00 $90,000.00 Trailer parking area improvements (asphalt, pavement stripping, signs, lighting, bollards, pathways, etc.) $460,000.00 $230,000.00 $230,000.00 Environmental Mitigation (mangrove and seagrass) $217,700.00 $108,850.00 $108,850.00 Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk Please ask the County to waive mitigation fees for public projects, especially those that will improve public access or protect from sea level rise. Submitted into the public record for item(s) RE.4 on 4/27/2023 . City Clerk Thank you. 23