Loading...
HomeMy WebLinkAboutExhibit ASTATE OF FLORIDA DEPARTMENT OF TRANSPORTATION LOCAL AGENCY PROGRAM SUPPLEMENTAL AGREEMENT EXHIBIT 5.0.32 PROGRAM MANAGEMENT 03/22 SUPPLEMENTAL NO. FEDERAL ID NO. (FAIN) 1 D618-081-B Page 1 of 3 CONTRACT NO. FEDERAL AWARD DATE G1553 1/24/2019 FPN RECIPIENT UNIQUE ENTITY ID SAM NO. 420917-2-58-01 & 420917-2-68-01 072220791 Recipient, City of Miami , desires to supplement the original Agreement entered into and executed on January 30, 2019 as identified above. All provisions in the original Agreement and supplements, if any, remain in effect except as expressly modified by this supplement. The changes to the Agreement and supplements, if any, are described as follows: PROJECT DESCRIPTION Name Overtown Greenway Along NW 11th St fro NW 7th Avenue to E of NW 12 Ave Length 0.48 miles Termini NW 11 St from NW 7th Ave to E of NW 12 Ave Description of Work: Extension of the Overtown Greenway into the next phase have uniting the Overtown and Spring Gardens neighborhoods by providing the critical missing connection between the Miami Riverwalk , the existing Overtown Greenway and the Culmer Metrorail Station. The construction of the multi -use path within the swale area will make use of the existing sidewalk and right -of -way along the north side of NW 11 th Street without requiring additional right -of way. The project will include a decorative sidewalk treatment, specialty signage, trash receptacles, benches, and landscaping. In addition, affected curbs along the north side will be repaired without the need to resurface or reconstruct the existing roadway. Reason for Supplement and supporting engineering and/or cost analysis: The attached "Adjusted Exhibit "B" Schedule of Financial Assistance" replaces the "Exhibit "B" Schedule of Funding" which was attached to the LAP Agreement executed on January 30, 2019. The "Adjusted Exhibit "B" Schedule of Funding" will modify the CEI to reallocate federal funding to local funding by the City of Miami in the amount of $62,891.00.. and The "Adjusted Exhibit B" is being replaced to include the District Grant Manager's signature. RECIPIENT NAME & BILLING ADDRESS: STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION E ( F-I 1 B 1 F ,' LOCAL AGENCY PROGRAM SUPPLEMENTAL AGREEMENT ADJUSTED EXHIBIT "B" SCHEDULE OF FINANCIAL ASSISTANCE City of Miami 4444 S 2nd Avenue , Fir 8 Miami, FL 33130 525-010-32 PROGRAM MANAGEMENT 02/22 Page 2 of 3 FINANCIAL PROJECT NUMBER: 420917-2-58- & 420917-2-6801 PHASE OF WORK B Fiscal Year Y FUNDING (1) PREVIOUS TOTAL PROJECT FUNDS (2) ADDITIONAL PROJECT FUNDS (3) CURRENT TOTAL PROJECT FUNDS (4) TOTAL LOCAL FUNDS (5) TOTAL STATE FUNDS (6) TOTAL FEDERAL FUNDS Design FY: 2016 (Local Agency Program) $115,000.00 $115,000.00 $115,000.00 FY: (Insert Program Name) FY: (Insert Program Name) Total Design Cost $115,000.00 $ 0.00 $115,000.00 $115,000.00 $ 0.00 $ 0.00 Right -of -Way FY: (Insert Program Name) FY: (Insert Program Name) FY: (Insert Program Name) Total Right -of -Way Cost $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 Construction FY: 2019 (Local Agency Program) $760,000.00 $760,000.00 $760,000.00 FY: (Insert Program Name) FY: (Insert Program Name) Total Construction Cost $760,000.00 $ 0.00 $760,000.00 $ 0.00 $ 0.00 $760,000.00 Construction Engineering and Inspection (CEI) FY: 2019 (Local Agency Program) $76,000.00 $13,109.00 $13,109.00 FY: 2023 (Local Agency Program) $62,891.00 $62,891.00 FY: (Insert Program Name) Total CEI Cost $76,000.00 $ 0.00 $76,000.00 $76,000.00 $ 0.00 $ 0.00 (Insert Phase) FY: (Insert Program Name) FY: (Insert Program Name) FY: (Insert Program Name) Total Phase Costs $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 TOTAL COST OF THE PROJECT $951,000.00 $ 0.00 $951,000.00 $191,000.00 $ 0.00 $760,000.00 COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES: I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by Section 216.3475, F.S. Documentation is on file evidencing the methodology used and the conclusions reached. District Grant Manager Name Signature Date STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION LOCAL AGENCY PROGRAM SUPPLEMENTAL AGREEMENT EXHIBIT -32 PROGRAM MANAGEMENT 08/19 Page 3 of 3 IN WITNESS WHEREOF, the parties have executed this Agreement on the date last ascribed herein. RECIPIENT STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION By: By: Name: Title: Name: Daniel Iglesias Title: Director of Transportation Development Date: Legal Review: