Loading...
HomeMy WebLinkAboutAnalysis and Maps* INCORP�IRAMEO 1* 18 98 PLANNING DEPARTMENT Project Fact Sheet This document is used to provide a summary for Planning Department related projects. PROJECT INFORMATION Project Name: Project Address: 3501 and 3511 Rickenbacker Causeway Miami, Florida APPLICANT INFORMATION Company Name: City of Miami Primary Contact: A Bustamante Email: ABustamante@miamigov.com Secondary Contact: Gabriel Brito Email: GBrito@miamigov.com STAFF RECOMMENDATION/DECISION Pursuant to Article 7, Section 7.1.2.6 and Article 7, Section 7.2.8 of the Miami 21 Code, as amended, the Planning Department recommends Approval with Conditions of the requested Exception and associated Waiver to permit the demolition and construction of a new boat ramp with two fixed docks that will extend 90 feet into Marine Stadium Basin, and the construction of a parking facility within Civic Space (CS) Transect Zone located at 3501 and 3511 Rickenbacker Causeway based upon the facts and findings in this staff report GRAPHIC AERIAL EPLAN ID: PZ-21-11532 EXCEPTION 0 a tic' pus(' NOTICE y This submittal needs b be scheduled fora puboc hearing in accordance wIh timelines set forth in the City of Miami Ccde.The applica de decision -making bcdywill renew the infonna0on at the pubs hearing to render a recommendation or a final decision. 14. Qv�r tVIEW COS` PZ-21-11532 11/04/22 0 PLANNING DEPARTMENT INFORMATION Lead Staff: Maria Adeyefa Principal Division: Urban Design Email: MAdeyefa@miamigov.com PROJECT DESCRIPTION Pursuant to Article 6, Table 13, Article 7, Section 7.1.2.6 and Article 7, Section 7.2.8(a) of Ordinance 13114 ("Miami 21"), as amended, the City of Miami (the "Applicant") requests an Exception and associated Waiver for the demolition and construction of a new boat ramp with two fixed docks that will extend 90 feet into Marine Stadium Basin, and the construction of a parking facility within the Civic Space (CS) Transect Zone located at 3501 and 3511 Rickenbacker Causeway (the "Property"). Webs Link(s): BOARD REQUIREMENTS n HEPB n UDRB n City Commission fl PZAB n WDRC n AIPP Existing Transect Zone(s): "CS" Civic Space Transect Zone Existing FLUM(s): Public Parks and Recreation Commissioner District(s): District 2 - Ken Russell Department of Human Service Neighborhood Service Center(s): Downtown/Brickell Neighborhood Service Center Revision Date: 08/03/2022 Department Director: Lakisha Hull AICP, LEEP AP BD+C DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs to be scheduled fora pubic hearing In accordance wM1h timelines set forth in the City of Mlaml Code. The applica decision-makIng body will renew the Information al the public hearing to render a recommendation or a final decision. PZ-21-11532 11/04/22 City of Miami Planning Department ANALYSIS FOR EXCEPTION Staff Analysis Report No. PZ-21-11532 Location 3501 and 3511 Rickenbacker Causeway Folio Number 0142170000030,0142170000110 Miami 21 Transect "CS" Civic Space Transect Zone MCNP Designation Public Parks and Recreation Commission District District 2 - Ken Russell Department of Human Service Neighborhood Service Center Downtown/Brickell Neighborhood Service Center Planner Maria Adeyefa, Planner II Property Owner City of Miami ABustamante@miamigov.com Project Representative Gabriel Brito, City of Miami DREAM GBrito@miamigov.com A. REQUEST Pursuant to Article 6, Table 13, Article 7, Section 7.1.2.6 and Article 7, Section 7.2.8(a) of Ordinance 13114 ("Miami 21"), as amended, the City of Miami (the "Applicant") requests an Exception and associated Waiver for the demolition and construction of a new boat ramp with two fixed docks that will extend 90 feet into Marine Stadium Basin, and the construction of a parking facility within the Civic Space (CS) Transect Zone located at 3501 and 3511 Rickenbacker Causeway (the "Property"). 1. Exception pursuant to Article 6, Table 13 Supplemental Regulations of Miami 21 "Extension of docks and Piers into other waterways is limited to 10 feet or 10% of the width ePlan PZ No. PZ-21-11532 i 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs to be scheduled fora pane hearing In accordance whh timelines set forth in the City of Miami Code. The applicable decislon-making body NOR resiew the information at the public hearing to render a recommendation or a final decla on. PZ-21-11532 11/04/22 of the waterway, whichever is less. However, by Exception further extension may be approved, subject to approval from all applicable agencies." 2. Waiver pursuant to Article 7, Section 7.2.8 of Miami 21 "No change shall be made in any nonconforming site improvement which increases the nonconformity. Changes may be approved by Waiver, if the changes result in the same or a reduced degree of nonconformity." B. RECOMMENDATION Pursuant to Article 7, Section 7.1.2.6 and Article 7, Section 7.2.8 of the Miami 21 Code, as amended, the Planning Department recommends Approval with Conditions of the requested Exception and associated Waiver to permit the demolition and construction of a new boat ramp with two fixed docks that will extend 90 feet into Marine Stadium Basin, and the construction of a parking facility within Civic Space (CS) Transect Zone located at 3501 and 3511 Rickenbacker Causeway based upon the facts and findings in this staff report. C. NEIGHBORHOOD SERVICES Pursuant to Article 7, Section 7.1.3.4 of the Miami 21 Code, the Planning Department has made referrals to the agencies below: • Office of Zoning • Historic Preservation Office • Environmental Resources Division • Office of Code Compliance • Department of Resilience & Public Works Department of Real Estate, Asset and Marina Management ("DREAM") The comments and recommendations from the reviewing departments and agencies have been considered and are reflected in this final decision. ePlan PZ No. PZ-21-11532 i 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs to be scheduled fora pubic hearing In aaordancc whh timelines set forth in the City of Miami Code. The applicable decision -ma Xing body NOR resiew the information at the public hearing to render a recommendation or a final decla on. PZ-21-11532 11/04/22 D. PROJECT DATA SURROUNDING USES Miami 21 MCNP Existing Use North N/A N/A Open Water South CS Public Parks and Recreation Open Water/ Recreational East GU General (Unincorporated) Educational West CS Recreation/ Restricted Commercial Marine commercial RELATED APPROVALS Date Action 7/22/10 R-10-0331 Resolution of the Miami City Commission for development of Virginia Key in accordance with the Virginia Key Master Plan to create a viable waterfront with recreational and public spaces and protect and enhance the natural resources located on the island. 7/02/19 HEPB-R-19-042 Special certificate of appropriateness for demolition, restoration, and new construction. 9/03/21 PZ-21-10174 Exception for a Specific Purpose Structure in this case, Commodore R. Munroe Marine Stadium, located at 3501, 3505, and 3511 Rickenbacker Causeway. E. BACKGROUND The Property sits on a waterway parcel located between the Rickenbacker Marina and Marine Stadium; it is accessible through Rickenbacker Causeway. Under Miami 21, the proposed improvements occur on the Property and has a zoning designation of CS (Civic Space) (see Figure 3). The Virginia Key Master Plan (see Attachment 3) was approved by the Miami Waterfront Advisory Board, at its meeting on July 13, 2010. On July 21, 2010, the Master Plan was also Approved with conditions by the Miami Planning, Zoning and Appeals Board (see Attachment 2). The two conditions included: 1) No lighting in the playing field area; and 2) Public ramp to be provided with a minimum of thirty (30) trailer parking spaces of the Virginia Key Master Plan. ePlan PZ No. PZ-21-11532 i 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs to be scheduled fora pane hearing In accordance whh timelines set forth in the City of Miami Code. The applicable decislon-making body NOR resiew the information at the public hearing to render a recommendation or a final decla on. PZ-21-11532 11/04/22 The Master Plan details the guiding tool for the future development of Virginia Key, creating a viable waterfront with recreational and public spaces, and for the protection and enhancement of natural resources located on the island. Site Location & Surrounding Uses The Property is composed of 2 folios: Folio# 01-4217-000-0030 with a lot area of 892,457 square feet, and Folio# 01-4217-000-0110 with a lot area of 348,480 square feet, for a combined lot area of 1,240,937 square feet or 28.49 acres. The Project consists of an existing boat ramp and surface parking located within the Property. The Property is located along Rickenbacker Cswy. The project proposal consists of (2) main components: Component 1: A. Demolition of the existing boat ramp. B. Construction of a new boat ramp/ with asphalt reconstruction, upland grading and rip - rap. The installation of two (2) fixed docks and two (2) floating docks with gangways. Component 2: A. Construction of two (2) provisional boat trailer parking areas with a total of five (5) disabled parking spaces, twenty-seven (27) regular parking spaces, and seventy-two (72) trailer parking spaces, including the installation of markings and signs. ePlan PZ No. PZ-21-11532 i 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE 0 250 500 I I I I I 1,000 Feet Figure 1: Aerial map of site This submittal needs to be scheduled fora pubic hearing In accordance whh Idmatinee set forth in the City of Miami Code. The applicade decision -ma Xing body NOR resiew the intonation at the public hearing to render a recommendation or a final decla on. PZ-21-11532 11/04/22 ePlan PZ No. PZ-21-11532 1 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs to be scheduled fora pane hearing In accordance whh timelines set forth in the City of Miami Code. The applicable decislon-making body NOR resiew the information at the public hearing to render a recommendation or a final decla on. PZ-21-11532 11/04/22 F. ANALYSIS Miami Comprehensive Neighborhood Plan (MCNP) The Future Land Use Map (FLUM) designation for the Property is Public Parks and Recreation. According the MCNP, Public Parks and Recreation land is described as: The primary intent of this land use classification is to conserve open space and green spaces of a park while allowing access and uses which will not interfere with the preservation of any significant environmental features which may exist within the park. This land use designation allows only open space and park uses with recreational and cultural uses where the total building footprints and impervious parking area surfaces in parks of one (1) acre of more may cover no more than 25% of the park land area. Both passive and active recreational uses shall be permitted including but not limited to nature trails, interpretive centers, picnic areas, playgrounds, canoe trails and launches, small concession stands, restrooms, gyms, swimming pools, athletic fields, cultural facilities, marine and marina facilities and other facilities supporting passive and active recreational and cultural use. Analysis: The proposed boat dock is accessory to the features but historically exist within the Property. The proposed construction of the two docks are consistent with the intent of the "Public Parks and Recreation" land use designation, as the dock currently exist on the Property and will be replacing the current dock. The MCNP intends for Public Parks and Recreation designated land to be used for recreational uses, marine and marine facilities, athletic fields, and cultural facilities, making the proposed use on the Property consistent with the MCNP. Findings: Complies Miami 21 Code The Property is located in a Civic Space (CS) Transect Zone. According to Miami 21, Civic Zones "consist of public use spaces and facilities that may contrast in use to their surroundings." Article 4, Table 3, Building Function Uses states that "Recreational Facility" Uses are permitted in CS zones (see Figure 2). Due to the extension of the dock into the waterways in excess of 10 feet or 10% of the width of the waterway, Building Function Uses states that this application requires an Exception pursuant to Article 6, Table 13 to allow the construction of two docks and parking on the Property. ePlan PZ No. PZ-21-11532 i 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs b be scheduled for a public hearing In acoordanre r0 h timelines set forth in the City of Miami Code. The applica de decision -making body NOR reWew the information at the pubdc hearing to render a recommendation or a final decision. Figure 2: Zoning Map/Miami 21 Atlas ePlan PZ No. PZ-21-11532 1 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs to be scheduled fora pubic hearing In aaordancc whh timelines set forth in the City of Miami Code. The applicable decision -ma Xing body NOR resiew the information at the public hearing to render a recommendation or a final decla on. PZ-21-11532 11/04/22 Proposal The City of Miami (the "Applicant") has requested an Exception and associated Waiver to permit the demolition and construction of a new boat ramp with two fixed docks and parking facility within Civic Space (CS) Transect Zone that will extend 90 feet into Marine Stadium Basin, located at 3501 and 3511 Rickenbacker Causeway (the Property). The Property is composed of 2 folios: Folio# 01-4217-000-0030 with a lot area of 892,457 square feet, and Folio# 01-4217-000-0110 with a lot area of 348,480 square feet, for a combined lot area of 1,240,937 square feet or 28.49 acres. The project consists of (2) main components: Component 1: A. Demolition of the existing boat ramp. B. Construction of a new boat ramp/ with asphalt reconstruction, upland grading and rip - rap. C. The installation of two (2) fixed docks and two (2) floating docks with gangways. Component 2: B. Construction of two (2) provisional boat trailer parking areas with a total of five (5) disabled parking spaces, twenty-seven (27) regular parking spaces, and seventy-two (72) trailer parking spaces, including the installation of markings and signs. The proposed uses include the following: Redeveloped public boat ramp Parking area Paid major event space Paid event space (codified) (small to mid -size events) Virginia Key Visitor Center Parking and shared space Redeveloped Historic Marine Stadium Parking VK Marina customer/tenant parking City of Miami Park & Recreations (Flex Park) shared parking Other/Visitor Public Parking ePlan PZ No. PZ-21-11532 i 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE PUBL/C4,-1 0 250 500 1,000 Feet Figure 3: Future Land Use Map a NOTICE This submittal needs b la scheduled for a puboc hearing in accordance with timelines set forth in the City of Miami Ccde.The applicade decision -making bcdywill renew the infonnadon at the pubs hearing to render a recommendation or a final decision. PZ-21-11532 11/04/22 R� �f Ew CO° Conservation ePlan PZ No. PZ-21-11532 1 3501 and 3511 Rickenbacker Causeway Z DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs to be scheduled fora pubic hearing In aaordancc whh timelines set forth in the City of Miami Code. The applicable decision -ma Xing body NOR resiew the information at the public hearing to render a recommendation or a final decla on. PZ-21-11532 11/04/22 G. CRITERIA EXCEPTION CRITERIA Criteria 1: Miami 21 Code Article 6, Table 13: Supplemental Regulations Request 1. The requested Exception per Article 6, Table 13 Supplemental Regulations of Miami 21, as related to Transect Zone CS, is for "Extension of docks and Piers into other waterways is limited to 10 feet or 10% of the width of the waterway, whichever is less. However, by Exception further extension may be approved, subject to approval from all applicable agencies." Criteria 1: External Agency Review Analysis: As stated above, the Applicant proposes the redevelopment of the same boat dock area with the addition and construction of two docks at five to eight feet in length, 119-square foot boat dock that will extend 90 feet into the Marine Stadium Basin. The Permit No SAJ-2011-01666 (SP-NML) was issued pursuant to Section 10 of the Rivers and Habors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act obtained by the Applicant from the Army Corp of Engineers for the proposed dock. The authorized proposal lists general terms and conditions applicable for the proposed work. Including but not limited to "the time limit for completing the work authorized ends on July 19, 2024." The Applicant shall install floating turbidity barriers with weighted skirts that extend to within 1 foot of the bottom around all work areas that are in, or adjacent to, surface waters. Turbidity barriers shall be removed upon stabilization of the work area. The project a mitigation plan with regards to the impact of the removal of seagrass, mangrove scrub, mangrove canopy. Analysis: The Applicant demonstrated that the dock has been designed in accordance with the development standards of Article 6, Table 13. The dock is 90 feet from the Mean High - Water Line into the Marine Stadium Basin as illustrated on Sheet S-3.1 of the plan set. Finding: Complies ePlan PZ No. PZ-21-11532 i 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs to be scheduled fora pane hearing In accordance whh timelines set forth in the City of Miami Code. The applicable decislon-making body NOR resiew the information at the public hearing to render a recommendation or a final decla on. PZ-21-11532 11/04/22 Criteria 2: Miami 21 Code, Article 4, Table 12 Design Review Criteria: Request 2. Analysis: Pursuant to Article 2, Section 2.1.3.1(a) of Miami 21, "The City should retain its natural infrastructure and visual character derived from its location and climate, including topography, landscape and coastline." The proposed 119-foot dock will provide two boat slips which extend outward into Biscayne Bay for the Applicant's private vessels, allowing for the full use of the Subject Property's location at the coastline. Findings: Complies Criteria 3: Miami 21 Code, Article 7, Section 7.2.8(a) Review Criteria: Request 3: The applicant is requesting a non -conforming site improvement waiver to modify the existing non -conforming parking lot to integrate a temporary trailer parking area. Analysis: The intent of the minor modifications to existing paved/asphalt areas to allow trucks and boat trailers to park in the historic Commodore Ralph Middleton Munroe Miami Marine Stadium. Findings: Complies H. CONCLUSION The Applicant applied for an Exception for the demolition and construction of a new boat ramp with two fixed docks that will extend 90 feet into Marine Stadium Basin, and the construction of a parking facility within Civic Space (CS) Transect Zone located at 3501 and 3511 Rickenbacker Causeway. Staff has recommended Approval with Conditions (Conditions I): ,. CONDITIONS 1. The Project shall be developed substantially in accordance with the plans approved as part of the request for Exception No. PZ-21-11532, bearing the e-Plan approval stamp. 2. Any modification to the approved plans as results or consequence of Applicant's compliance with other departments and/or agencies conditions and /or codes, will require a new review for approval confirmation from the Planning Director. ePlan PZ No. PZ-21-11532 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs to be scheduled fora pane hearing In accordance whh timelines set forth in the City of Miami Code. The applicable decislon-making body NOR resiew the information at the public hearing to render a recommendation or a final decla on. PZ-21-11532 11/04/22 3. The Applicant, owner, or successor shall comply with the requirements of all applicable Departments/Agencies as part of the City of Miami building permitting process. 4. Illumination and other lighting effects shall not create a nuisance to adjacent properties. 5. Signage is not a part of this Exception application and shall be reviewed under a separate permit application. 6. The Property shall be cleaned of all litter and debris after each event. Mitigation efforts shall be made to prevent litter from entering into Miami South Channel. 7. The Applicant, owner, or successor shall comply with all applicable building codes, land development regulations, ordinances and other laws and pay all applicable fees due prior to the issuance of a building permit. 8. Signage is not part of this Exception and shall be reviewed under a separate permit application pursuant to Article 10 of the Miami 21 Code. 9. The Applicant or successor shall comply with Chapter 17 of the City of Miami Code of Ordinances and obtain a Tree Permit for any removal, pruning and/or mitigation of existing trees. 10. The Applicant or successor shall comply with all applicable requirements of Chapter 24, Environmental Protection, of the Miami -Dade County Code. 11. The Applicant or successor shall comply with conditions set forth by the Historical and Environmental Preservation Board as per Chapter 23 of the City of Miami Code of Ordinances. 12. The project shall comply with Article 11 entitled "Art in Public Places (AIPP)" of the Miami 21 Code, as amended. The Applicant or Successor is to provide proof of compliance prior to the issuance of the Building Permit. 13. Pursuant to Article 7, Section 7.1.2.6(e), an Exception shall be valid for a period of two (2) years during which a building permit or Certificate of Use must be obtained. This excludes a demolition or landscape permit. A one-time extension, for a period not to ePlan PZ No. PZ-21-11532 i 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE NOTICE This submittal needs to be scheduled for a public hearing in accordance with timelines set forth in the City of Miami Code.The applica de decision -making body will review the information at the pubdc hearing to render a recommendation or a final decision. PZ-21-11532 11/04/22 exceed one (1) additional year, may be obtained under the approval of the Planning Director. 14. Failure to comply with the conditions herein may result in the immediate revocation of this Exception and shall be subject to any fines and penalties pursuant to City Code. ,—DocuSigned by: (Atis6 htt '-7F35FFFOC6C349F Lakisha Hull, AICP, LEED AP BD+C Planning Director ,—DocuSigned by: SwimAIAA, S.kitA ,rr `-3A75CAC5AF7E446... Sevanne Steiner Assistant Director Maria Adeyefa Planner II ePlan PZ No. PZ-21-11532 i 3501 and 3511 Rickenbacker Causeway DocuSign Envelope ID: FDB5881C-B9DF-4D95-890D-28DC436B88AE This submittal needs to be scheduled fora public hearing In accordance wM1h timelines set forth in the City of Miami Code. The applies de decision -making bodywill renew the information at the pubc hearing to render a recommendation or a final decision. PZ-21-11532 11/04/22 Attachments: Attachment 1 — R-10-0331 Attachment 2 — Master Report Resolution R-10-0331 Attachment 3 — Exhibit Virginia Key Consensus Master Plan Attachment 4 — HEPB-2008-56 Attachment 5 — PZ-21-10174 The Planning, Zoning and Appeals Board ("PZAB") decision may be appealed to the City Commission by any aggrieved party within fifteen (15) days of the date of rendition. The filing of an appeal, and payment of appropriate fee, may be submitted with the Hearing Boards Division in -person or online within 15 calendar days of the date of rendition. You may file online by clicking here https://www.miamigov.com/Services/Doing- Business/Get-an-Exception-Permitting ePlan PZ No. PZ-21-11532 1 3501 and 3511 Rickenbacker Causeway City of Miami Legislation Resolution: R-10-0331 This submittal needs to be sc hedu Led for a public hearing in accordance with timelines set forth in the City of Miami Code. The applica de decision-rna king body will 4 reblew the information at the public hearing to render recommended on or a final dec K on. File Number: 09-00579 Final Action Date: A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), APPROVING IN PRINCIPLE, THE VIRGINIA KEY MASTER PLAN, HEREIN REFERRED TO AS THE "VIRGINIA KEY MASTER PLAN", AS THE GUIDING TOOL, FOR THE FUTURE DEVELOPMENT OF VIRGINIA KEY; CREATING A VIABLE WATERFRONT WITH RECREATIONAL AND PUBLIC SPACES; AND PROTECTING AND ENHANCING THE NATURAL RESOURCES LOCATED ON THE ISLAND. PZ-21-11532 11/04/22 7 WHEREAS, the City of Miami ("City") recognizes the key role of parks in providing educational, cultural, recreational, and other well-being programs to our citizens and visitors and in enhancing the quality of life of our citizens; and WHEREAS, pursuant to Resolution No. 05-0606, adopted January 13, 2005, the City Commission authorized the City Manager to execute a negotiated Professional Services Agreement with the firm of Edward D. Stone, Jr. and Associates, Inc. d/b/a EDSA to provide a Master Plan for Virginia Key, pursuant to the Request for Qualifications No. 03-04-028 (the "RFQ"); and WHEREAS, the Miami Waterfront Advisory Board, at its meeting on October 5, 2009, adopted a motion by a unanimous vote, to approve the Virginia Key Master Plan as presented with additions and inclusions; and WHEREAS, the City Commission, at its meeting on October 8, 2009, adopted a motion to defer the presentation and approval of the final master plan to the first City Commission meeting in May 2010 and to (1) immediately allow a mountain bike facility on the North Point, (2) immediately move forward with the remediation of the landfill and utilize the $45 million in Miami -Dade County funds for same, and (3) to ensure the Virginia Key Beach Park Trust has the flexibility to construct, operate, or maintain the proposed Civil Rights Museum complex and any other facilities as the Trust may deem necessary, in order for the Museum to survive; and WHEREAS, The Virginia Key Master Plan, as originally prepared by EDSA, revised through additional public participation resulting in a consensus master plan, and attached hereto, is hereby approved as a guiding tool for the future development of Virginia Key, creating a viable waterfront with recreational and public spaces, and for the protection and enhancement of natural resources located on the island; and WHEREAS, the City Commission, at its meeting on February 12, 2010, adopted a motion to postpone the presentation and approval of the final Virginia Key Master Plan to the second meeting in July 2010; and WHEREAS, the Miami Waterfront Advisory Board, at its meeting on July 13, 2010, adopted Motion No. 2010-01 by a vote of five to one (5-1) recommending APPROVAL of the Virginia Key Master Plan; and City of Miami Page 1 of 2 File Id: 09-00579 (Version: 41 Printed On: 8/3/2017 File Number: 09-00579 Enactm WHEREAS, the Virginia Key Master Plan was presented to the Miami Parks Ad its meeting on July 15, 2010; and WHEREAS, the Miami Planning, Zoning and Appeals Board, at its meeting on Ju adopted Motion No. 10-001 by a vote of eight to one (8-1) recommending APPROVAL 1) No lighting in the playing field area; and 2) Public ramp to be provided with a minimum trailer parking spaces of the Virginia Key Master Plan; This submittal needs to be sc hedu Led for a public hearing in accordance with timelines set forth in the City of Miami Code. The applica de decision-rna king body will reblew the information at the public hearing to render a recommended on or a final dec K on. NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: PZ-21-11532 11/04/22 7 Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. The Virginia Key Master Plan, as originally prepared by EDSA, revised through additional public participation resulting in a consensus master plan, and attached hereto, is hereby approved as a guiding tool for the future development of Virginia Key, creating a viable waterfront with recreational and public spaces, and for the protection and enhancement of natural resources located on the island. Section 3. This Resolution shall become effective immediately upon its adoption and signature of the Mayor. {1} Footnotes: {1} Words and/or figures stricken through shall be deleted. Underscored words and/or figures shall be added. The remaining provisions are now in effect and remain unchanged. Asterisks indicate omitted and unchanged material. City of Miami Page 2 of 2 File Id: 09-00579 (Version: 41 Printed On: 8/3/2017 PURL/ nr City of Miami Master Report Enactment Number: R-10-0331 0 M N y V P NOTICE Thla submittal needs to be schedu Led for a public hearing In accordance wilt tmellnes set forth in the City of Miami Code. The applicable decision -making body will reoewthe intormatlon at the public hearing to render a recommendation or a final dada on. PZ-21-11532 11/04/22 File Number: 09-00579 Version: 4 File Type: Resolution Reference: File Name: Presentation Item - Virginia Key Master Plan Requester: Cost: Status: Passed 44, r Ew cOQ Controlling Body: Office of the City Clerk Introduced: 5/19/2009 Final Action: 7/22/2010 Title: A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), APPROVING IN PRINCIPLE, THE VIRGINIA KEY MASTER PLAN, HEREIN REFERRED TO AS THE "VIRGINIA KEY MASTER PLAN", AS THE GUIDING TOOL, FOR THE FUTURE DEVELOPMENT OF VIRGINIA KEY; CREATING A VIABLE WATERFRONT WITH RECREATIONAL AND PUBLIC SPACES; AND PROTECTING AND ENHANCING THE NATURAL RESOURCES LOCATED ON THE ISLAND. Sponsors: Notes: Please see File ID 10-00135 for February 11, 2010 City Commission motion. Indexes: Attachments: CITY_EXECUTIVE SUM MARY_rev2.pdf,09-00579 Zoning Map.pdf,09-00579 WAB Reso.pdf,09-00579 PAB Reso.pdf,09-00579 Executive Summary OLD.pdf,09-00579 CC Legislation (Version 2) OLD.pdf,09-00579 CC 10-8-09 Legislation (Version 2).pdf,09-00579 Exhibit A (Virginia Key Master Plan) OLD .pdf,09-00579 Virginia Key Master Plan Presentation.pdf,09-00579 CC 10-08-09 Fact Sheet.pdf,09-00579 CC 10-8-09 Executive Summary pdf,09-00579-Submittal-Don Worth.pdf,09-00579-Submittal-Kissinger.pdf,09-00579-Submittal-Waterfront Advisory Board.pdf,09-00579-Submittal-Greg Bush.pdf,09-00579-Submittal-Laura Reynolds.pdf,09-00579-Submittal-Blanca Mesa.pdf,09-00579-Submittal-Fran Bohnsack.pdf,09-00579-Submittal-District 5.pdf,09-00579-Submittal-Stuart Sorg.pdf,09-00579 CC Legislation (Version 4).pdf,09-00579 Virginia Key Consensus Master Plan.pdf,09-00579 CC 07-22-10 Fact Sheet.pdf,Virginia Key Consensus Master Plan (PZAB).pdf,09-00579-Submittal-Robert Vernon, Mayor of Key Biscayne.pdf,09-00579-Submittal-Waterfront Advisory Board -Motion WAB 2010-01.pdf,09-00579-Submittal-Miami 21 Map.pdf, History of Legislative File Version: Acting Body: Date: Action: Sent To: Due Date: Return Date: Result: 1 Planning Advisory Board 2 City Commission 3 Planning, Zoning and Appeals Board 4 City Commission 6/17/2009 PRESENTED 10/8/2009 DEFERRED 7/21/2010 PRESENTED 7/22/2010 ADOPTED 4 Office of the Mayor 8/9/2010 4 Office of the City Clerk 8/9/2010 Signed by the Mayor Office of the City Clerk Signed and Attested by City Clerk Pass Pass Pass Pass City of Miami Page 1 Printed on 8/3/2017 PURL/ G 0 City of Miami Master Report Enactment Number: R-10-0331 C m N y V� NOTICE This submittal needs to be schedu Led for a pubic hearing accordance with timelines set forth in the City of Miami Code. The applica de decision -making body will reviewthe information at the public hearing to render a r comrnendati on or a final dodo on. 4 Office of the City 12/30/2010 Reviewed and Attorney Approved PZ-21-11532 11/04/22 V� r ew cO Q City of Miami Page 2 Printed on 8/3/2017 NOTICE This submittal. needs to be scheduled for a public hearing in accordance with timelines set forth in the City of Miami Cede. The applicade decision -making body will renew the lnfonnatan at the public hearing to render a recomrnendati on or a final deciri on. VIRGINIA KEY CONSENSUS MASTER PLAN JULY 2010 P UBL, OF. 0 a " NOTICE This submittal. needs to be solledu Led for a public hearing rnacord9ncn9brijm9Irne99etfodhinth9Dtnf Miami Code. The applies de decision -making body rummy the informehon at the public hearing to render recommendation or a lanai deciri on. PZ-21-11532 11/04/22 rew CO VIRGINIA KEY CONSENSUS MASTER PLAN Existing Conditions JULY 2010 • STAKEHOLDER INTERVIEW PROCESS, January 18-22, 2007 • PUBLIC MEETING #1: SITE INVENTORY AND ANALYSIS, March 29, 2007 • PUBLIC MEETING #2: COMMUNITY WORKSHOP AND CONSENSUS BUILDING, June 20, 2007 • PUBLIC MEETING #3: PRELIMINARY MASTER PLANNING, August 26, 2008 • PUBLIC MEETING #4: VIRGINIA KEY MASTER PLAN, May 20, 2009 • WATERFRONT ADVISORY BOARD, June 9, 2009 • PLANNING ADVISORY BOARD, June 17, 2009 • WATERFRONT ADVISORY BOARD, October 5, 2009 • CITY COMMISSION October 8, 2009 This submittal needs to be sc hedu Led fora public hearing in accordance with timelines set forth in the City of Miami Code. The applica de decision -making body will renew the inforrnanon at the public hearing to render a recommendation or a final decis on. PZ-21-11532 N1/04/22 VIRGINIA KEY CONSENSUS MASTER PLAN Public Consensus Building JULY 2010 October 5, 2009 Waterfront Advisory Board MOTION To accept the Virginia Key Master Plan as presented with the following additions and inclusions: • Welcome Center on the Marine Stadium site and restoration of Marine Stadium. • A transportation plan to and from the Marine Stadium, Park and Passive use areas. • No Hotel or Hotels on site. • Inclusion of one or two of the identified Boat Ramps included in the Master Plan. • Re- inclusion of the BMX and Mountain Bike trails. • Creation of an Implementation Committee. • Cleaning up the landfill and examine possible leaking from the site into the bay. Proper remediation. • Increase the buffer areas between nature areas (i.e. mangrove) and the proposed playing fields. • Historic Virginia Key Beach continued restoration. October 8, 2009 City Commission MOTION To defer Item PZ.1 to the first scheduled City Commission meeting in May 2010. • Immediately allow a mountain bike facility on North Point, • Immediately move forward with the remediation of the landfill and utilize the $45 million in Miami -Dade County funds for same, and • To ensure the Virginia Key Beach Park Trust has the flexibility in its efforts to construct, operate, or maintain the proposed Civil Rights Museum complex and any other facilities as the Trust may deem necessary in order for the Museum to survive This submittal needs to be sc hedu Led for a public hearing in accordance with timelines set forth in the City of Miami Code. The applicable decision -making body will renew the infonna0on at the public hearing to render a recommendation or a final dec b on. PZ-21-11532 N1/04/22 VIRGINIA KEY CONSENSUS MASTER PLAN Waterfont Advisory Board and City Commission Action JULY 2010 Lummus Park with UEL by architecture students • January 14, 2010- Second Workshop at • May 5, 2010- Meeting with UM / UEL/ City Lummus Park with UEL Administration at Mayor's Office • February 3, 2010- Mountain Bike Course • July 1, 2010- Meeting at County Public Layout at North Point site Works Department (Basin Area Plan) • February 11, 2010- Discussion Item at City • July 13, 2010- Waterfront Advisory Board Commission. Deferral to July 22, 2010. • July 15, 2010-Parks Advisory Board • March 27, 2010- Dade Heritage Trust and Virginia Key Public Planning Coalition • July 21, 2010- Planning, Zoning and Appeals presentations at Rusty Pelican & design Board workshop at VKBPT offices • July 22, 2010- City Commission Meeting • April 27, 2010- City and County Commissioners / Staff / UM at City Hall Public Consensus Building and Project Schedule following City Commission Deferral on October 8, 2009 This submittal needs to be sc hedu Led bra public hearing in accordance with timelines set forth in the City of Miami Code. The applica de decision -making body will renew the inforrnanon at the public hearing to render a recommendation or a final decis on. PZ-21-11532 N1/04/22 VIRGINIA KEY • December 10, 2009- First Workshop at • May 4, 2010- Final UM Studio presentations CONSENSUS MASTER PLAN Public Consensus Building and Project Schedule JULY 2010 SUSTAINABILITY CRITERIA 1. Structures to follow USGBC's LEED Criteria for environmental sustainability standards 2. Use of Best Management Practices for stormwater management • permeable surfaces for trails, parking areas, and roadways, • bioswales/raingardens, • green roofs and rain cisterns for runoff collection, etc) a 1iI1 i. 4. 3. Use of onsite renewable energy resources (i.e. wind, sun, rain, etc) 4. Use of reclaimed water from Sewage Treatment Plant for irrigation and other non -potable water needs 5. Conservation of ecologically -sensitive areas with some opportunities for environmental education 6. Encouraging use of biking and pedestrian circulation through extensive island -wide trails 7. Reuse of brownfields and landfill area for green recreational opportunities 8. Use of environmentally -friendly products and practices for maintenance of parks and recreation areas This submittal needs to be sc hedu Led bra public hearing in accordance with timelines set forth in the City of Miami Code. The applica de decision -making body will renew the inforrnanon at the public hearing to render a recommendation or a final decis on. PZ-21-11532 11/04/22 VIRGINIA KEY CONSENSUS MASTER PLAN Sustainability Criteria JULY 2010 This submittal needs to be schedted for a public hearing in accordance with timelines set forth in the City of Miami Code. The applicade decision -making body will renew the infomnaton at the public hearing to render a recommendation or a final decia on. VIRGINIA KEY CONSENSUS MASTER PLAN NOTE: This is a Conceptual Plan. Site elements such as parking garage, marina design and surface parking area locations may change. JULY 2010 This submittal. needs to be scheduled for a public hearing in accordance with timelines set forth in the City of Miami Code. The applica de decision -making body will renew the infonnaton at the pubMc hearing to render a recomrnendati on or a final deciri on. VIRGINIA KEY CONSENSUS MASTER PLAN North Point Existing Conditions 60.3 acres IIIIIIIIIIIIIIfOOIIIIIIIIIIIII •' 8111fIlllllllllllllU JULY 2010 LAND USE SUMMARY Mountain biking: 33.12 acres (54.9%) Eco Campground: 3.36 acres (5.6%) Information Center/restrooms: 0.02 acres (0.03%) Playground/Biker's was h down: 0.72 acres (1.19%) Pervious parking:1.08 acres (1.79%) Hammock/trails/beach: 22.0 acres (36.49%) TOTAL NORTH POINT: 60.3 acres (100%) ' _ iU —i . r. b1111 W!1!0lnuYFY[HYi..0 This submittal needs to be schebu led bra public hearing In accordance wipe tlmellnes set forth In the City of Miami Code. The appliwde decision -making body wlll renew the information at the pubec hearing to render a recommendation or a final decia on. PZ-21-11532 11/04/22 VIRGINIA KEY CONSENSUS MASTER PLAN North Point Park LEGEND 1. Mountain Bike Trails 2. Eco Campground 3. Biker's wash down area 4. Information Center with Restrooms 5. Pervious parking (100 spaces) 6. Enhanced public beach 7. Future upland habitat restoration 6. Restored mangroves 9. Bill Sadowski Nature Preserve 10. Miami -Dade WASA Treatment Plant 11. Observation opportunities 12. Perimeter Multiuse Nature Trails 13. Coastal Hammock GRAPHIC SCALE 50 0 100 200 JULY 2010 LEGEND 1. Renovated Boat Launch with Canoe/Kayak Rentals and Food Concessions. (Existing to be improved) 2. Elevated Boardwalks with Environmental Educational Signage. (Existing to be improved) 3. Existing Parking to be improved with bio-swales and pervious pavement. 4. Beach Pavilion and Facilities Building, Playground/Tot-lot, Beach Volleyball Courts, and Public Picnic Area (Existing to be improved) 5. Enhanced Existing Public Beach Area and Trails 6. Coastal Hardwood Hammock Restoration Area with Enhanced Interpretive Trail System with Environmental Education Opportunities (minor improvements and additions to existing trails) 7. Public Restrooms and Shelter Building (Existing to be improved) This submittal needs to be sc hedu Led for a public hearing in accordance with timelines set forth in the City of Miami Code. The applicable decision -making body will renew the infonnaaon at the public hearing to render a recommendation or a final dec b on. PZ-21-11532 N1/04/22 VIRGINIA KEY CONSENSUS MASTER PLAN Shrimper's Lagoon, Public Beach and Coastal Hardwood Hammock Restoration JULY 2010 This submittal. needs to be scheduled for a public hearing in accordance with timelines set forth in the city of Miami Cede. The appliczde decision -making body will renew the infomiaion at the public hearing to render a recon,endati on or a final decision. VIRGINIA KEY CONSENSUS MASTER PLAN Landfill Existing Conditions 116.5 acres JULY 2010 PUBL, LAND USE SUMMARY Sport Fields: 19.9 acres (17%) Pervious Parking: 2.2 acres (1.8%) Recreation Center & Restrooms: 0.5 acres (0.5%) Open Meadow: 9.0 acres (7.7%) Mangroves & Hammock: 85.0 acres (73%) TOTAL LANDFILL: 116.5 acres (100%) • coin '41 XI 0100 G 0 4 NOTICE Thls submittal needs to be scheduled bra public hearing In accordance wilt Idmellnes set forth In the City of Miami Code. The applies Lie decision -making body wlll renew the Information at the pubec hearing to render a recommendation or a final decia on. PZ-21-11532 11/04/22 V"/ r Ew c°' VIRGINIA KEY CONSENSUS MASTER PLAN Landfill Park LEGEND 1. Softball / Little League (4 fields) 2. Soccer / Football (4 fields) 3, Tennis (4 courts) 4. Existing / restored mangroves 5. Batting Gage 6. Open Meadow 7. Recreation Center 8. Playground 9. Pervious parking (160 spaces) 10. Restrooms 11. Coastal Hammock / Nature Trails 12. Existing parking along Arthur Lamb Road GRAPHIC SCALE 50 0 100 200 JULY2010 PUBL, LAND USE SUMMARY Sport Fields: 19.9 acres (17%) Pervious Parking: 2.2 acres (1.8%) Recreation Center & Restrooms: 0.5 acres (0.5%) Open Meadow: 9.0 acres (7.7%) Mangroves & Hammock: 85.0 acres (73%) TOTAL LANDFILL: 116.5 acres (100%) • coin '41 XI 0100 G 0 4 NOTICE Thls submittal needs to be scheduled bra public hearing In accordance wilt Idmellnes set forth In the City of Miami Code. The applies Lie decision -making body wlll renew the Information at the pubec hearing to render a recommendation or a final decia on. PZ-21-11532 11/04/22 V"/ r Ew c°' VIRGINIA KEY CONSENSUS MASTER PLAN Landfill Park LEGEND 1. Softball / Little League (4 fields) 2. Soccer / Football (4 fields) 3, Tennis (4 courts) 4. Existing / restored mangroves 5. Batting Gage 6. Open Meadow 7. Recreation Center 8. Playground 9. Pervious parking (160 spaces) 10. Restrooms 11. Coastal Hammock / Nature Trails 12. Existing parking along Arthur Lamb Road GRAPHIC SCALE 50 0 100 200 JULY2010 Miami skyline viewing point BILL SADOWSKI CRITICAL WILDLIFE AREA Wildlife watch tower g Thls submittal needs to be schebu Led bra public hearing In accordance wiHi tlmellnes set forth In the City of Miami Code. The applies Lie decision -making belly wlll renew the Information at the pubec hearing to render e recommendation or a final decia on. PZ-21-11532 11/04/22 VIRGINIA KEY CONSENSUS MASTER PLAN BILL SADOWSKI CRITICAL WILDLIFE AREA: ENVIRONMENTAL EDUCATIONAL TRAILS JULY 2010 West Lake Park, Florida Park, Broward County, Florida This aubmitlal needs to be scnedted for a public hearing in accordance with timelines set forth in the City of Miami Cede. The applicade decision -making body will renew the infomnaton at the public hearing to render a recomrnendati on or a final decis on. VIRGINIA KEY CONSENSUS MASTER PLAN Bill Sadowski Critical Wildlife Area: Environmental Educational Trails JULY 2010 MAST ACADEMY MIAMI MARINE MIAMI ROWING CLUB STADIUM & PARKING AND SWIM GYM RICKENBACKER MARINA RUSTY PELICAN RESTAURANT DRY -STACK BOAT STORAGE This submittal. needs to be scheduled for a public hearing in accordance with timelines set forth in the City of Miami Code. The applica de decision -making body will renew the infonnaton at the pubMc hearing to render a recomrnendati on or a final deciri on. VIRGINIA KEY CONSENSUS MASTER PLAN Basin Area Properties Existing Conditions 42.2 acres JULY 2010 This submittal. needs to be scheduled for a public hearing in accordance with timelines set forth in the city of Miami Cede. The appliczde decision -making body will renew the infomiaion at the public hearing to render a recon,endati on or a final decision. VIRGINIA KEY CONSENSUS MASTER PLAN Basin Area Properties NOTE: This is a Conceptual Plan. Site elements such as parking garage, marina design and surface parking area locations may change JULY 2010 This submittal. needs to be scheduled for a public hearing in accordance with timelines set forth in the city of Miami Cede. The appliczde decision -making body will renew the infomiaion at the public hearing to render a recon,endati on or a final decision. VIRGINIA KEY CONSENSUS MASTER PLAN Transportation Plan 1. Bus Route Service 2. Water Transit Service 3. Solar Powered Tram 4. Green Parking GRAPHIC SCALE 50 0 100 200 JULY 2010 RESOLUTION NO, HEPB-2008-56 A RESOLUTION OF THE HISTORIC AND ENVIRONMENTAL PRESERVA BOARD ("HEPB") OF THE CITY OF MIAMI, FLORIDA, DESIGNATI SUBJECT TO THE FOLLOWING CONDITIONS, THE COMMODORE RALPH MIDDLETON MUNROE MIAMI MARINE STADIUM, LOCATED AT 3501 RICKENBACKER CAUSEWAY, AS A HISTORIC SITE, AFTER FINDING THAT IT MEETS CRITERIA (3) (4) (5) AND (7) OF SECTION 23-4 OF THE MIAMI CITY CODE AND RECOMMENDING THAT THE STADIUM BE LISTED IN THE MIAMI REGISTER OF HISTORIC PLACES AND THAT THE OFFICIAL HISTORIC AND ENVIRONMENTAL PRESERVATION ATLAS OF THE CITY OF MIAMI, FLORIDA BE AMENDED TO REFLECT ITS DESIGNATION. This subrntsi needs to be schedu lea fora public hearing in accordance with timelines set forth in the City of Miami Cede. The appticsbe decision -malting bodywill renew the information at the public hearing to render a recommendation or a final decision. 1. The designation shall include the footprint of the stadium itself; the entire aquatic basin area measuring some 6,000 feet by 1,400 feet stretching from Biscayne Bay to the marine stadium; and an area that includes the land one hundred (100) feet to the north, south, and east of the stadium's footprint as that area includes the location of the original fountain and ticket booths; and that the boundaries established by the 100 foot buffer on the east and west of the stadium be extended forward to the Rickenbacker Causeway, thus creating a rectangle from the stadium to the roadway. 2. That should there be a challenge to any of the boundaries proposed for designation, that it would not affect the Historic and Environmental Preservation Board's designation of the Miami Marine Stadium's footprint. PASSED AND ADOPTED THIS 7TH DAY OF OCTOBER 2008. ITEM NO. 5 VOTE: 8 TO 0 ATTEST. ELL 1 J ` GUCCIONI PRESEUVATIfON OFFICER PZ-21-11532 11/04/22 This submittal needs to be scheduled fora public hearing in accordance with timelines set forth in the City of Miami Code. The applicable decision -making body will review the information at the public hearing to render a recommendation or a final. decid on. FUTURE LAND USE MAP (EXISTING) EPLAN ID: PZ-21-11532 EXCEPTION ADDRESS: 3501 & 3511 RICKENBACKER CSWY 0 250 500 1,000 Feet Public Parks and Recreation AERIAL EPLAN ID: PZ-21-11532 EXCEPTION ADDRESSES: 3501 & 3511 RICKENBACKER CSWY 0 250 500 1,000 Feet This submittal needs to be scheduled fora public hearing in accordance with timelines set forth in the City of Miami Code. The applicable decision -making body will reNewlhe Information at the public hearing to render a recommendation or a final decision. PZ-21-11532 11/04/22