HomeMy WebLinkAboutExhibit ACttp of 1J+ltanu EXHIBIT "A"
ARTHUR NORIEGA, V.
City Manager
October 18, 2021
Toscano 1004S, LLC
10311 NW 62 St
Doral, FL 33178
kcatnpbell(dccmgus.com
TOSCANO HOMES - TENTATIVE PLAT #1986
LOCATED ALONG THE SOUTHEASTERLY SIDE OF SOUTH MIAMI AVENUE, BETWEEN SW 23
ROAD AND SW 24 ROAD.
Ladies and Gentlemen:
The City of Miami Plat and Street Committee, at its meeting of October 7, 2021, APPROVED the above
tentative plat subject to the following revisions being made to the tentative plat, additional information
being provided and/or variances being granted. Please be advised that the processing of your tentative plat
cannot proceed until these conditions and/or comments have been satisfied.
Resilience and Public Works
1. Application
a. Owner is to include Florida LLC.
b. Signature block — correct owner's name; clarify "s".
c. Notary — to include title as manager.
d. Item #4 — Exhibit A — correct subdivision name to Flagler, not Brickells Flagler
e. Provide updated Opinion of Title.
2. Surveyor's Notes need corrections.
3. Main sketch needs corrections - bearings and section corner; must be revised prior to any Hold
Harmless agreement.
4. Section 5 — replace "were" to "was".
Planning/Zoning
5. Provide a tree table listing all trees with common and botanical names, height, diameter and spread
prepared by a Certified Arborist, with name, certification number, date of site visit.
6. Surveyor's Notes
a. Folio # is incorrect.
7. Scenic transportation corridor with characteristic of coral rock wall and tree canopies (royal
poinciana). Sensitive on tree removal due to any proposed driveway/driveway approach
b. Provide preliminary site plan showing location of proposed driveway/driveway approach.
c. Indicate or show tree locations within right of way area.
d. Relocation of existing street light pole may be required. Contact Julio Navarro of Miami -
Dade County.
8. Development — Archeological zone requires certificate of dig.
Standard Comments
9. Contact RPW Survey section for additional minor comments.
DEPARTMENT OF RESILIENCE & PUBLIC WORKS
444 SW 2nd Avenue, 8th Floor / Miami, FL 33130 / (305) 416-1200 / Fax: (305) 416-1278
Mailing Address: P.O. Box 330708 Miami, FL 33233-0708
TOSCANO HOMES - TENTATIVE PLAT #1986
October 18, 2021
Page 2 of 3
10. Provide updated tentative plat prior to final plat submittal to be reviewed by Committee members
for compliance to applicable City Codes.
11. All easements by separate instruments listed in the Opinion of Title must be plotted and annotated
on tentative plat. Otherwise, the tentative plat is NOT permitted to be used for Building permitting
purposes under the provisions of City Code Section 55-10(i).
12. Execution of Covenant for Postponement of Subdivision Improvements is required in cases where
the required subdivision improvements are not completed.
13. Any covenants applicable to the subject property, as required for the Building permit application
and/or as captured in the Opinion of Title submitted prior to Final Plat submittal, will need to be
annotated in the Final Plat.
14. A letter from Comcast is required to determine if any adjustments to their facilities or easements are
required.
15. Verify with Miami -Dade County that the proposed plat name is acceptable.
16. All encroachments across proposed tract and/or lot lines, including any underground
encroachments, must be removed or resolved under all applicable codes prior to final plat submittal.
17. An Opinion of Title, in the City of Miami Opinion of Title form, must be provided at the time of
final plat submittal.
18. Current backup documentation will be required for all who execute the final plat. A resolution for
authority to execute documents and a Certificate of Good Standing from the Secretary of State are
required, if applicable.
19. Tentative plat application must be made with Miami -Dade County after receiving approval from the
City of Miami Plat and Street Committee. Provide a copy of the notice of action to Resilience and
Public Works.
20. Be advised that an incomplete final plat package will not be accepted by the City of Miami. It is the
owner's responsibility to work with his/her surveyor and attorney to assure that everything is in
order before submitting the final plat package.
21. Be advised that if all requirements for scheduling the final plat for City Commission action are not
in order, the final plat will not be scheduled for a City Commission meeting.
22. A letter of concunrency from Miami -Dade County School Board is required prior to the final plat
approval (see contact sheet). The tentative plat name and tentative plat number must be included on
the application form.
23. A letter from the Miami -Dade Water and Sewer Department is required to determine if any
adjustments to their facilities or easements are required.
24. A letter from Miami -Dade Water and Sewer Department is required to release the final plat in
connection with water and sewer service agreements.
25. Provide two 8 '/z" x 11" sketches of the division of the land; one sketch of the existing divisions
before the plat is recorded and one sketch of the divisions after the plat is recorded.
In addition to the above requirements, you should be aware of the following:
1. State and local laws require the installation of various physical improvements in the public rights -
of -way when property is platted. These subdivision improvements include paving, drainage,
landscaping, sidewalks, etc. In some cases, this could represent a substantial investment on your
part. REQUIRED: The submission of an electronic file of the tentative plat, in an AutoCAD, to the
City of Miami Resilience and Public Works Department, Development and Roadway Plans Section
will EXPEDITE the preparation and enhance the ACCURACY of the subdivision improvement
letter required for the final plat approval.
2. The alteration, relocation or installation of utilities such as storm and sanitary sewers, electric,
telephone, water, etc., caused by this plat will be at the property owner's expense. Also, utility
easements may be required on the property being platted.
3. A building permit will not be issued on the property being platted until the final plat is recorded or
as authorized by the City of Miami Code Section 55-10(i). Also, the Temporary Certificate
TOSCANO HOMES - TENTATIVE PLAT #1986
October 18, 2021
Page 3 of 3
Occupancy and/or Certificate of Occupancy for any building construction will be issued only after
all the required subdivision improvements have been completed.
4. Approval for fire flow requirements must be obtained from the Fire -Rescue Department prior to the
issuance of a building permit.
5. In order to mitigate problems associated with access and construction activities throughout the
neighborhood, the contractor/developer is encouraged to notify the affected neighborhood residents,
in writing, of the project starting and completion dates at the time of issuance of permits. The
contractor/developer may coordinate the notification of residents with the local City of Miami NET
Service Center.
6. Additional items must be provided to the City of Miami Department of Resilience and Public
Works before the final plat is submitted to the City Commission for approval. You will be notified
in writing as to what these items are. It is required that the applicant contacts the City of Miami
Resilience and Public Works Survey Section to verify that all final plat submittal documents are
complete prior to final plat submittal.
7. Tentative plat approval is only valid for 1(one) year and 6(six) months from the date of the Plat and
Street Committee meeting at which time it was approved.
If you have any questions concerning these requirements, please refer to the attached sheet for the appropriate
person to contact.
Sincerely,
Santana,
Juvenal
Digitally signed by Santana,
Juvenal
Date: 2021.10.18 15:16:02
-04'00'
Juvenal Santana, P.E., CFM
Supervisor of Plats - Plat and Street Committee
Director - Public Works
Department of Resilience and Public Works
AD/JS/AB/ab
Enclosure: Contact Sheet
c: Hadonne
1985 NW 88 Ct., Suite 101
Doral, FL 33172
ma@hadonne.com
Plat and Street Committee Members
Nzeribe Ihekwaba, Ph.D., P.E., Deputy City Manager
Survey
Development and Roadway Plans
Central