Loading...
HomeMy WebLinkAboutScrivener's Error MemoCITY OF MIAMI OFFICE OF THE CITY ATTORNEY MEMORANDUM TO: Todd B. Hannon, City Clerk FROM: Victoria Mendez, City Attorney for DATE: November 22, 2022 RE: Ordinance No. 14106 — Zoning Text - SAP - Fourth Amendment to Brickell City Centre Special Area Plan File No. 12008 At its September 22, 2022, Meeting, the City Commission adopted the above referenced agenda item, PZ.8, amending Appendix E, Brickell City Centre Special Area Plan ("BCC SAP") of Ordinance No. 131 14, the Zoning Ordinance of the City of Miami, Florida, as amended, to approve the fourth amendment to the previously approved BCC SAP providing for the One BCC signature office development, an alternate concept for the One BCC parcel which may utilize certain design flexibilities that includes larger tower floorplates for the property generally located at 799 Brickell Plaza, 700 Brickell Avenue, and 710 Brickell Avenue. The Legislation inadvertently published with a formatting error that incompletely captured several edits in the table on page 7 and 10 of the Legislation. The Legislation has been corrected and incremented to Revision A. VM/GKW/vja Enclosure(s) m L ID LO City of Miami Ordinance 14106 Legislation City Hall 3500 Pan American Drive Miami, EL 33133 www,miamigov,com File Number: 12008 Final Action Date: 9/22/2022 AN ORDINANCE OF THE MIAMI CITY COMMISSION, AMENDING APPENDIX E, BRICKELL CITY CENTRE SPECIAL AREA PLAN ("BCC SAP") OF ORDINANCE NO. 13114, THE ZONING ORDINANCE OF THE CITY OF MIAMI, FLORIDA, AS AMENDED ("MIAMI 21 CODE), TO APPROVE THE FOURTH AMENDMENT TO THE PREVIOUSLY APPROVED "BCC SAP"; TO MAKE PROVISION FOR THE ONE BCC SIGNATURE OFFICE DEVELOPMENT, AN ALTERNATE CONCEPT FOR THE ONE BCC PARCEL, WHICH MAY UTILIZE CERTAIN DESIGN FLEXIBILITIES THAT INCLUDES LARGER TOWER FLOORPLATES FOR THE PROPERTY GENERALLY LOCATED AT 799 BRICKELL PLAZA, 700 BRICKELL AVENUE, AND 710 BRICKELL AVENUE; CONTAINING A SEVERABILITY CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE. SPONSOR(S): Mayor Francis X. Suarez WHEREAS, pursuant to Ordinance No. 13279 adopted on July 28, 2011, the 111 i mi,� City Commission approved the original "Brickell CitiCentre ("BCC") Special Area Plan-ri ("BCC SAP"), a 9.038 acre Special Area Plan established pursuant to Articles 3 andr.7 f Ordinance No. 13114, the Zoning Ordinance of the City of Miami, Florida, as amend [ 1111 ("Miami 21 Code), that is generally bound by Brickell Avenue to the east, Southwest 0 Avenue to the west, Southeast 6 Street to the north, and Southwest 8 Street to the south Miami, Florida; and '• =zz �� .. WHEREAS, pursuant to Ordinance No. 13369 adopted on March 28, 2013, Miami City Commission approved an amendment (#1) to the BCC SAP to include an! additional 0.98 of acres of land known as the "N2" block generally located north of this= existing BCC SAP and bounded by Southeast 5 Street to the north, Southeast 1 Avenue to the east, Southeast 6 Street to the south, and South Miami Avenue to the west, resulting in a total of 10.01 acres; and amending the BCC SAP to rename the project from "Brickell CitiCentre" SAP to "Brickell CityCentre" SAP; and WHEREAS, pursuant to Ordinance No. 13440 adopted on March 27, 2014, the Miami City Commission approved an amendment (#2) to the BCC SAP to include an additional 1.55 acres of land known as "One BCC" generally located east of the existing BCC SAP and bounded by Southeast 7 Street to the north, Brickell Avenue to the east, Southeast 8 Street to the south, and the 8 Street Metro Mover right -of way to the west, resulting in a total of 11.57 acres; and WHEREAS pursuant to Ordinance No. 13824 adopted on January 24, 2019, the Miami City Commission approved amendment (#3) to the BCC SAP to incorporate two (2) additional development sites totaling 2.39 acres known as "BCC 650 SMA" and "BCC AP," located at 500, 602, 614, 622, 626, 630, and 640 South Miami Avenue, 11, 21, 31, 37, 45, City of Miami Page 1 of 14 File 1D: 12008 (Revision: A) Printed On: 3/7/2023 File ID: 12008 Enactment Number: 14106 and 55 Southwest 7 Street, and 19 and 42 Southwest 6 Street, Miami, Florida, resulting in a total of 13.96 acres; and; WHEREAS, a fourth amendment (#4) to the BCC SAP, Regulating Plan and Design Guidelines, makes provision for the One BCC Signature Office development, an alternate concept for the One BCC parcel, which may utilize an alternate building configuration including larger tower floorplates; and WHEREAS, the amendment of Appendix E of the Miami 21 Code, the BCC SAP, is necessary to allow for increased tower flexibilities up to a maximum of 2,850,000 SF for the One BCC Signature Office; and WHEREAS, an amendment is necessary to make provision for the One BCC Signature Office development that responds to changing market conditions by allowing for an alternate building configuration to attract global financial service and technology companies that require workspaces featuring increased visibility, flexibility, efficiency, volumetric space, and strategic co -location; and WHEREAS, the Planning, Zoning and Appeals Board ("PZAB"), at its meeting on June 1, 2022, following an advertised public hearing, adopted Resolution No. FZAB-R-22- 013 by a vote of ten to zero (10-0), Item No. PZAB.7, recommending approval of the large scale Land Use Designation Change; and WHEREAS, the City Commission has considered whether the proposed amendments will further the goals, objectives and policies of the Miami Comprehensive Neighborhood Plan ("MCNP"), the Miami 21 Code, and other City regulations; and WHEREAS, the City Commission has considered the Planning Director's recommendations and conducted a public hearing on the proposed amendment; NOW, THEREFORE, BE IT ORDAINED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Ordinance are hereby adopted by reference thereto and incorporated herein as if fully set forth in!t is Section. r) Section 2. Miami 21 Code is amended by amending Appendix E: Brickell CiFie Centre in the following particulars:' "Appendix E - Brickell City Centre 3 >_:; :z r- nl Ps 1 Words and/or figures stricken through shall be deleted. Underscored words and/or figures shall be added. The remaining provisions are now in effect and remain unchanged. Asterisks indicate omitted and unchanged material. 77 tvi City of Miami Page 2 of 14 File ID: 12008 (Revision: A) Printer! on: 3/712023 File ID: 42008 SAP 1.4 Regulating Plan for Brickell City Centre BRICKELL CITY CENTRE Enactment Number: 14106 Brickell City Centre is a mixed -use project in the heart of the Brickell situated on seven (7) parcels totaling approximately 13.9 acres. The site is located along S. Miami Avenue and bounded by S.W. 8th Street to south, S.E. 5 Street to the north, approximately S.W. lst Avenue to the west, and approximately Brickell Avenue to the east. The project as presently built consists of two -levels of underground parking to support the 551,482 s.f. of retail that has been constructed on the West, East, and North blocks. The future One BCC, N2, 650 SMA and AP phases will expand the floor area of the retail to approximately 808,575 s.f. The underground parking has been designed to internalize circulation and limit the impact of vehicular traffic on the adjacent roadway system. The internal circulation is achieved through the connection of the three (3) underground garages at the Basement 02 level via driveways beneath S. Miami Avenue and S.E. 7th Street. The underground parking garage will be expanded to connect to the future N2 phase, and may connect to the One BCC and P.12 phases phase.. In addition to the retail component, Brickell City Centre's ("BCC") program includes the development of approximately 2,358 residential units in six (6) towers, three of which are approximately 40 +l- stories in height on the BCC North, West and N2 parcels. A fourth tower, 80 stories tali, wI4 may be located on the One BCC parcel rOne BCC Mixed Use Tower"'). The 650 SMA tower will be 54 stories and the AP tower will be 62 stories. In the first phase, 780 residential units have been constructed on the West and East blocks. A hotel, consisting of 352 hotel rooms, has been constructed on the BCC East parcel and a 120-room hotel is planned for the mixed use tower on the One BCC bock Mixed Use Tower. In total, 2,683 parking spaces have been constructed in the first phase and a additional 3,612 parking spaces will be provided in the One BCC Mixed Use Tower, P2, 650 SMA and AP phases, for a total of 6,295 spaces, to support the retail, residentii hotel and office uses. .:,r, - Two office buildings on the West and East blocks, totaling 285,567 s.f., have beerrc--, constructed in the first phase of BCC. Approximately 675,000 s.f, of office is prop$skd in ;s- the mixed uce tower on the One BCC p roel Mixed Use Tower, which-wtitl may reSiape the office buildings currently and formerly located at 700 Brickell Avenue, 710 Brickell len, and 799 Brickell Plaza, located immediately east of the Brickell City Center/8th Strr3et c ' MetroMover station. Based on the global changes to market conditions following the COVID-19 pandemic, redevelopment of the One BCC block may also proceed in a different configuration to attract premier office tenants ("One BCC Signature Office"). These market changes are precipitated by an inflow of new residents and businesses to Miami, primarily from urban areas in the Northeast U.S. and California. The resulting increase in investment activity has generated office space interest particularly from significant, global financial service and technology companies that do not traditionally have a presence in south Florida. The SAP allows for larger tower floorplates in a One BCC Signature Office design that will create opportunities for the types of workspaces, these office tenants demand. Such 0 r7 rrt City of Miami Page 3 of 14 Fife ID: 12008 (Revision: A) Printed on: 3/7/2023 File ID: 12006 Enactment Number: 14106 attributes include increased visibility, flexibility, efficiency, volumetric space, and strategic co -location. In addition to the above -listed programmatic elements, the project includes a number of significant features designed to enhance the public realm. Foremost among such elements is the climate ribbon that serves as unifying theme for the project, connecting the various parcels of Brickell City Centre and the project to the Miami River. The climate ribbon provides protection from the elements to patrons traveling along the open air corridors of the retail center and across the pedestrian connections that unify the site above the street. The climate ribbon also collects rainfall that is used for various water features on -site. The development of the One BCC parcel will bring the climate ribbon over the top of the 8th Street MetroMover station to the front door of Brickell Avenue. *O., -r, .., BRICKELL CITY CENTRE GOALS c, ca." ter: .,' :_' 0 crm . cr f'i1 ' :V. 1.2 DEFINITIONS OF TERMS 7"'Y' Fri = cxa r" i - 1 rV Climate Ribbon: A framed Structure, which is open on its sides, fixed and self-supporting aid wIfl-cii may be located over private property or within the Public Right -of -Way. Design Guidelines: Plans, drawings, and diagrams submitted as part of the SAP. Display Window: A window of a Commercial establishment facing a Frontage used to display merchandise for sale on site and shall have sufficient dimensions to display products. Display Window(s) may not be used for the display of posters or other adverting materials unless accompanied by the product being offered. One BCC Mixed Use Tower: An allowable design for the One BCC block under the Second Amendment to the BCC SAP including residential, lodging, office, and commercial uses, as set forth in those plans prepared by Arquitectonica and stamped approved by the City's Hearing Boards Department on December 17, 2013, consisting of 75 pages.. One BCC Signature Office: An allowable configuration for the One BCC block, which may utilize certain design flexiblities that provide for larger tower fioorplates to create opportunities for the types of workspaces that premiere office tenants demand, including attributes such as increased visibility, flexibility, efficiency, volumetric space, and strategic co -location. Open Air Retail: A retail sales establishment operated substantially in the open air including, but not limited to: farmers market, vending carts/kiosks, and the like. Open Air City of Miami Page 4 of 14 File !A: 12008 (Revision.: A) Printed on: 3/7/2023 File ID: 12008 Enactment Number: 14106 Retail use is nonpermanent and mobile. Open Air Retail shalt be located on private property and it shall not be located in an area that is classified as floor area. Open Space: Any parcel or area of land or water essentially unimproved by permanent Buildings, open to the sky and/or covered by a Climate Ribbon; such space shall be reserved for public or private Use. Open Spaces may include Parks, Greens, Squares, Courtyards, Gardens, Playgrounds, paseos (when designed predominantly for pedestrians), pedestrian paths or associated landscaped areas, and those areas covered by a Climate Ribbon. Parking, Off -Street: Any land area designed and used for parking motor vehicles including parking garages, driveways and garages serving residential uses, but excluding areas of Thoroughfares and surface parking lots. Pedestal: Also known as podium. For the Brckell City Centre Special Area Plan parcels BCCN, BCCW and BCCE, that portion of a Building up to a maximum of 129 feet, for the One BCC and N2 parcels, that portion of a Building up to a maximum of 160 feet (10 stories), for the 650 SMA parcel that portion of a Building up to a maximum of 129 feet (10 stories) and for the AP parcel that portion of a Building up to a maximum of 127 feet (12 stories) as depicted in the approved SAP plans and Design Guidelines. Regulating Plan: Modifications of the underlying Miami 21 Transect Zone regulations for the Lots included in this SAP. Retail Ribbon Sign: A sign emitting an illuminated message, image, design or combination thereof that is created electronically by any light source, LED (light emitting diodes) bare electric bulbs, luminous tubes, fiber optics, or any other combination of light sources creating a message. A Retail Ribbon Sign is classified as a Wall Sign. A Retail Ribbon Sign is not considered an Animated Sign or Flashing Sign. Special Area Plan (SAP): Also known as the Brickell City Centre project. Special Area Plan Permit (SAP Permit): A permit issued by the City which CD authorizes Development within an approved SAP. 11 :=- Jr-. j Terminated Vista: A location at the axial conclusion of a Thoroughfare or Pedestri , `---' Passage. A Building located at a Terminated Vista designated on a Special Area zafi is EG m required to be designed in response to the axis. , -i �-, n ro —.,� cc i'i7 r•1 Na 3.14 PUBLIC BENEFITS PROGRAM }4 City of Miami Page 5 of 14 File 10: 12008 (Revision: A) Printed on: 3/7/2023 File ID: 12008 Enactment Number: 14106 3.14.4 For the purposes of the public benefits program, the following criteria shall apply: a. Brickell City Centre Public Benefits. The One BCC, 650 SMA and AP buildings are eligible for the bonus height and Floor Lot Ratio benefits due to the public benefits that the BCC project encompasses. The Brickell City Centre SAP Public Benefits are: • 6th Street/Miami Avenue Roundabout (land costs) • 6th Street/Miami Avenue Roundabout (engineering and construction costs) • Eastward expansion of Metromover Station and direct connection to Brickell Avenue and into Brickell City Centre Active uses on SE 7t' and SE 8th Streets and improved efficiency of ground floor • Below Above -grade pedestrian connection der over Metromover Station • Enhancement to Plazas on Brickell Avenue and Climate Ribbon • Above -ground pedestrian connections across the public rights -of - way and between the Brickell City Centre parcels • Temporary and permanent fire station on N2 block • Improvements to the pedestrian realm along 5th Street underneath and adjacent to the South Miami Avenue bridge, facilitating access to the Miami River Greenway. • Monetary contribution of $600,000 for improvements to the Underline near the Brickell Metrorail station. • Heightened archeological monitoring requirements. The total costs of the public benefits for the Project are above and beyond the monetary payment which would be required under the Public Benefits Trust Fund regulations of Miami 21. Cie 1) f1 CO r i C.) .rM Ci i . 1 rc-< r- rn \ • ' i 0 City of Miami Page 6 of 14 File fa: 12008 (Revision: A) Printed on: 3/7/2023 File ID: 12008 Enactment Number: 14106 Article 4, Table 5 BUILDING FUNCTION: PARKING AND LOADING ;KO es Paii10wc ST4'CDAfrrF'2 PEA Pe F.gC7 E The Sb.tee0Portn; t- -- •- _ - -- air wee/NM erre List:37S"E .; _. s:d re 7ne partrr* .•EQ,ffec 10r 3t1 EY9 F..Acaons 61 3 LCt _..S... Of 403:35 ne::rrec iy 71e :env of Ter S4a uses Df 51e acowZe f3Cci f'0f^ T : :Zre and 3343rky, 0* PitSkt io Tree Valet LISe r3 'eC,1*erndnt for i1SU'tc!for 3 6Jfi flg On 3 RirSitStn031 Us. reg i nlg I C0 spaces xe0 3 COnr^Ier0311U2e RRl. n; 20 SN:tS L'1t;0 533C0S ar.,010 Dy?se IFUflS f3000 of 12 alma ICt71 GltRttr[ 1Q 1110 74i 17 Spaces For dse5 rce rdcZed c Tks M5 t Cel 3 RUM :St 4:3 fXCIRV I 1 3051 3'Jolrta ACCR4►31 vlarrg A abaota oy o3raotAOUHdnal Owing 11 ai rtaa by SO.[mt • TV] OFF•Si REET RAP.1('1iG 0T,W DAR]S "il.'i 0 k tI :l ■le0.e Ga .MY lha hY Ead lib E s1C7.1 cmE oar serr.EsIF) PINE rlw• xL i;f:A0135 +an 01t■ DOLle.f.ati sn t::5e '1'.R 11A :i T:,1. 11'1 .f ty _"aM3e5ltf 00 *1En-+.,-e,- C-.Iti3}Sj/131TTat3ItRt17sft1W17heSofp3aeamaul 7a3Oitn3l •a,F�drr� t+t ra•svi} Or+e 0 1 p3n.rra arta p Jvor ; 10 ;f rove siiss "- FT; • Pectoral entrants 003s Dt 315e3is 3 tee* taont sty do.teNay Co acceWat ft CO L.) • Abel O4 scoe5. p •Anc 3n3 Cf3r..Yye 35 3K Fatro3 e,.fMiny co.asF "+ • r3-2Lrte: P7trIS #'R*S s'133 tune 3 mrt1rti+n Ytrff.3i c3exane.e of 7 fe% Yre•• 7, r; 10 Ue Jse'C L`f ?Lik3 or tout; 1;-Se5 TC -_,3nonior ma'am*5T`3r t>s T: rerrb tlSCe!vi?I 3fC 15 4.' C6"11110rc2 3101f#4S:'1]s • VK ASS retae.-or c.7rrai comes.'5r'Js 3e 'C,C-!>z$ 50 7210 INCt0C6 .l nrinSJIr. orNso iy V 20 *et n WV') 72606e1 Ire Base oz!1s" Loe 153ar1set - F7 74swr2Y.5 2 p71ny ice, -OF to Arxae 0 am toe Csy of sa3rre 004tett P3r5Y1q annex arc 5tl1r23rt LDADJIG flE.ffT'f STARDAR% 15 TE CS, CI-- i.CI 0E5T00CT RE S•.;E r.'t AL' for 25000 if to501000 of Seri Sr:t Loadr'y Berths 42: of f pet. irg a is .Z00I or too. 000trr•a'D1v..3a r'Ti;.r• yr'X Grew, 040 300 300 sf dahh$1to Lo :tog Ser0hs --- 1563 y1 1 sr• fr31':O i is L0000iG Free Mild to 500003 d Berth Sire C] 11 :} 1f Leading Brra11. 1 pr. 3?: roo-a 1 e 1 0.oartt Sneer We 51205 tf Berth Sim 56: d 1 or Loadr-5 Berths 1 rr1:0 •r..-s From 2S 256 tf to SC+7.003'if Ber-11 Sze Loading, Bernd d: sf 1 or 2.22 e5btra „e:•d 1or'X m-s Grease, nae 105 f6o 'Sued Sze 563 31 '.X of Loading Bats 1rt. 3:Cter- t 1 ._ 1X tc-- Of ME. COBILIE 4CtL1' 11101LISTRIAL"' Free 25000 d to 570.000 rf Berth Sir Leaden Saint Area j---- 7ff 1s! 31sr-501ri 22d :ad FAO.1Md i:3 d 304 17d[ re. 3Cre An sr 3t• 5X sr- 50Cf[ GreakerPan 502722sr from 25 00.7 tf to 502 020 t1 Berta lee 125 sf -14 of L_d Load g Sec.'s Mee is. :501f•5:K3 .'e 51. 9 • ` .. et Ya I.3CK3,•ors.3 s.- :sat t-52P{I Create* mire 300 000 0 etrk S1:t ;;c tr keadr-, Bern: Area Witf Soar Sae EC 14 uearg Brett ilex 1 50TK i 3 tSflt 3r-•eo '- s Lose :31A n•ss ,•• ssersvre in a4i .0r•set i L,,true Yar• 2 '"ra,t ar.n'ruet nex.e. S. .n•aS dm lye mite .r`rr atd et t 1 1 "urrlrn'•1.u•rst•arin'd sh_'1 f 1 +se 3.r1,111 `n 'Jos! • 17^7 ma•tar a se.nr r,r a•I Ir• ,{3o r^tar' flan in Deerst1,-•r• Dl•n re•s-n rem • aw.[.:+•aC^.i`+arc •sn. [It. M••t--/•.al f[iarr t !t 1 r•21_,]+ ttt- re, L0-rnutjpst...A [rag) jolt^ 2r-.e1[ts ere ''es a1 •Rot net x e• a•-1ri fr-rs see er]Y1d o. ••• re.-e w•ie•er nr. • -+e [i-are 'c fl•rren•]a•. peg. ®sar-3't11 clan 5'1 _*/ .-,12t^rye LefeaeRI.r'ar t MILK 1,4Lerlrre-a11' 10.0 barn.' 11rrrh Tkpes Resde-nmi• 260 sI a 10 ftx 206 x 12R Ccmniernai": 120 sr = 12 It 25 f7a 156 Irduotrial"•" 660 s1 x 12 fi a 55 I7 x 151e ' Rcsotsnoal loading terlho snail be setback dmrance egai,zl bo :heir berg** rcr the kl block. ritlsden'Sai 1Gif7no ber711 etma ee Mlbatk a mirxrnuen of text 1101 feel " C ,rerret:lae bunt Amy be autallLted etr 2 Rn-.,de1Ta1 bertft* 2 Rerid0*,1oI Cents may be s;ehsktirted by 1 Commented kerb 1 Indusltt t brr1e 'n+y be 11bsMte0ed ey 2 Crtmorr^kei berths 2 Cornmerrsal berms may et suer -wed ed Oy t kalus2Ial hats+ A reputed Industrial 00 Gwnmwrrual teadirag beat near be substdohoe be a Cemnee ecn*I Or Reudemal rasing berth by SAP Port t. d sue ehayc'ler. and operation of eta Usa ES found nab reyvro the drmenswrts mo4eo and tea regmred i:aong berth. sl•rerrn.cn cautd rot onto euete be provided ,aoctxdinq le the reetteLrsgrrs el lhoo Code Tie :et1 number cf iequred loading berths far •Iw 150e ore blme-1, 14r MVO., Our be :e .•en {7t Ir±dtegelal sire Xlaele )g bears and WW1: tiB r Ccermemml s}re tooling l elttba:' ins 20502 r4lrrber of moored loading better kr the 650 SLU beget shall be me {2) :: oenrnererd aired loadng bettio. ro be •oriented and ssarcrred via SAP Pe,eoL The :C31 number or tequred loading berths for the AP bkx 4 shaft he one I t 7 Re oiler aoi xte Iceding bent *tux fete f11 Camrnerctat are kradmg been for a !oral of rat 12: xtaomq beans to he renewed and awrayed +.a SAP' Permrr Luau' r 0 Mows at-a1i eempIy Mete condi0oro es:abliahed by 'he DEescap,t+enl Order City of Miami Page 7 of 14 File ID: 12008 (Revision: A) Printed on: 3/7/2023 File l0: 12008 Enactment Number: 14106 5.6 URBAN CORE TRANSECT ZONES (T6) 5.6.2 Building Configuration (T6) * b. Above the eighth floor (tenth floor for the One BCC and 650 SMA blocks and twelfth floor for the AP block), the Building Floorplate dimensions shall be limited as follows: • 30,000 square feet maximum for Residential and Hotel Uses (One BCC block only) • 24,000 square feet maximum for Residential Uses (650 SMA block only) • 30,000 square feet maximum for Commercial Uses and for parking • 250 feet maximum length for Residential Uses • 250 feet maximum length for Commercial Uses • In a One BCC Signature Office design, the following additional tower flexibilities may be permitted by process of SAP Permit, so long as the Building does not exceed 2,850,000 square feet of total Floor Area: 40,000 square feet maximum Floorplate size for Office and Commercial Uses with a maximum length of 250 feet, on all tower Stories except: 60,000 square feet maximum Floorplate size for Office Uses for the first 100 feet of the tower above the maximum Height of the Pedestal, with a maximum Floorplate length of 350 feet. c. Encroachments shall be as follows: At the First Layer, cantilevered Awnings and entry canopies may encroach up to one hundred percent (100%) of the depth of the Setback and into the Right -of -Way, except as may be further allowed by Chapter 54 of the City Code. Above the first Story, cantilevered balconies, bay windows, decorative features, and roofs may encroach up to three (3) feet (four (4) feet for the N2 block) of the depth of the Setback. The Climate Ribbon and any above -grade connection(s) spanning the Metromover between BCC East and One BCC blocks have no Setback, and may encroach into the Right -of -Way. Other cantilevered portions of the Building shall maintain the required Setback. Above the Pedestal no Encroachments are permitted, except that Facade components promoting energy efficiency such as shading and Screening devices that are non -accessible may encroach a maximum of three (3) feet. d. For the N2 block, Galleries and Arcades (which includes cantilevered overhangs) can be ten (10) feet deep, can encroach 100% of the depth of the Setback and can overlap the whole width of the sidewalk to within four (4) feet of the curb on a Primary Frontage and sixteen (16) feet on a Secondary Frontage. QBI !B33 J City of Miami Page 8 of 14 File la 12008 (Revision: A) Printed on: 3/7/2023 File ID: 12008 Enactment Number: 14106 f. Loading and service entries shall be pursuant to the Design Guidelines of the Special Area Plan. Loading may be accessed from all Frontages if architectural treatments applied to exposed spaces create a finished appearance. In a One BCC Signature Office design, all loading may be provided above -ground and enclosed within the Pedestal. At ground level, parking and loading in a One BCC Signature Office design shall be screened by a Liner along the Frontage, unless demonstrated through SAP Permit that it is not practical. However, at ground level along the Metromover (west side of One BCC block), parking and loading in a One BCC Signature Office design may also be screened by an art, glass, or architectural treatment. h. Mechanical equipment on a roof shall be screened by a parapet wall of a maximum height of twenty-five (25) feet or enclosure and shall conceal all equipment, except antennas, from lateral view. Where possible, equipment other than solar panels shall be enclosed or screened from overhead views. 5.6.4 Parking Standards (T6) a. Parking shall be required and provided and accessed in accordance with Article 4, Table 5 of Miami 21, the Design Guidelines of this Special Area Plan and as modid irk this section of the Regulating Plan. c;, tr-.; -"`cr x- Parking and loading requirements may be reduced via an SAP Permit, and may 6,7'. - include all parking reductions available under the Miami 21 Codeeamended as of `';'7 March 3, 2022. Any other reduction greater than 30% shall require the submittal of02, mz traffic study and/or parking study to support the greater reduction. As set forth in -< co 7.1.2.a of this Regulating Plan any parking reductions allowed in Miami 21 shall be P processed through an SAP Permit. ca The vehicular entrance of a parking Lot or garage on a Frontage shall have a continuous flush sidewalk crossing and pedestrian safety zones for curb cuts widths over thirty (30) feet. All parking, including drop-off drives and porte-cocheres, open parking areas, covered parking, garages, Loading Spaces and service areas shall be located in accordance with the Design Guidelines of this Special Area Plan, or otherwise located within the Pedestal for a One BCC Signature Office Design, All Screening utilized to visually shield or obscure the aforementioned areas shall be subject to the review and approval of the Planning Director. Above ground parking may extend into the Second Layer by SAP Permit, if an art, glass treatment or Architectural Treatment, of a design to be approved by the Planning Director, with the recommendation of the Urban Development Review Board (UDRB), is provided for one hundred (100%) percent of that portion of the Pedestal Facade. In a One BCC Signature Office design, this process shall also apply to all ground -level parking and loading areas. 0 rri City of Miami Page 9 of 14 File ID: 12008 (Revision: A) Printed on: 317/2023 File ID: 12008 Enactment Number: 14106 MIAMI 21 ARTICLE 5. SPECIFIC TO ZONES AS ADOPTED - APRIL 2013 ILLUSTRATION 5.6 URBAN CORE TRANSECT ZONES (T6-48) 2!i ▪ (( c-, ccs rri - [V s C) City of Miami Page 10 of 14 File ia: 12008 (Revision: A) Printed on: 3/7/2023 File ID: 12008 Enactment Number: 14106 BUILDING DISPOSITION ..,dam ' °7.- ."- ;Prat -, - 30.004q41, me . FtaorptateforResidenti: & Lodging forCne BCC block 24,000 sqft. max. Foorpaatefor Res. ent far85OSVAStack T6i8b. 1$ r SD% adr boar Pttbrc Bete: asperBCCSAP Plana andD2sgn Guvdea BUILDING SETBACK a Frimpai Frpnt IO R min _ 20 ft mrt abo a 8• Story b SeC4rtdty =ems 10 ft nit , 23 A min above 9' Story c &de 0 it mm 301 me above a' Sorry i Rear 0 t MIN. XI. mn above 8} Story e +atucutg ;ae a Rear TS 0 f1 rho 1' through 5" SKr/ i0 It tarn 5• through 8' Story 30 ft Trot above 8' Story BUILDING CONFIGURATION FRONTAGE a Corfrrai Lawn milked n POten 3 FenCe 70630 C Terrace or 1 C Witted' a ,=crecourt owed e Sox eernxtted f Shccf►ont vented 0648 L and 6-48 0 only) 9 Gallery Gemmed by SPeaal Area Pharr h Arcade pennnted by Sat oaf Area Par BUILDING N£IG,Hi a Val Height 2 Stones 'last HE1 48 eS 3' Stories (for One BCC bloc* only) Stores_ for550 Sfe.4 bba,: 1a Sta-ie=fa-AP .r tad.' c u .^ M a ; In a Ore BCC Si-aratura C=tce Lresion. tI a followiro acrlitionel tower flexhiites ma•,, he permitted b./Drones; of SAP Permit so or p; th* auifdii34 does not exceed 2 85C NC souere feet of tote Floor Ares: 40OC4 54uare feet axinl''m FICoretate size kr Off oa and Ccr+zr°lerdal Uses wit a= r taxlm rn length of 250 feet, Cr all tower Stories except:. 3C .X2 cur ;set rri a(irrit.rn Ffocrplste size for CfSce Uses for tha first ° CCU feat of t^e tower above ttl''te me_ximt:' Hei,Cht of tf'a Pete=_t=_I, vtffh a mexin-cm Flc+orpla.e length of 36-o fee!. 7,3 rn 0 m Fri City ofMiarni Page 11 of 14 File ID: 12008 (Revision: R) Printed on: 317/2023 File ID: 12008 Enactment Number: 14106 7.1.2 Permits Brickell City Centre Development Review Process The Brickell City Centre development review process is set forth below. a. SAP Permit. All Development within the Project shall be approved by SAP Permit. In addition, all other permits necessary to develop Property within the Project, such as Warrants, Waivers, Variances, and Exceptions, shall be approved by SAP Permit and subject to the equivalent fee to those established in the Miami 21 Code and Chapter 62 of the City Code. The process and criteria for review and approval of an SAP Permit application is set forth below. Review and approval process. The Zoning Administrator shall review each submitted application for a SAP Permit for completeness within seven (7) days of receipt. Upon verification by the Zoning Administrator, the application shall be referred to the Planning Director. The Planning Director shall review each application for an SAP Permit for consistency with the Brickell City Centre Regulating Plan, Design Guidelines, Development Agreement, Miami 21 and the Miami Comprehensive Neighborhood Plan. The One BCC block may be developed substantially in accordance with the approved One BCC Mixed Use Tower plans, or any other design that complies with the Brickell City Centre SAP. in a One BCC Signature Office design, development shall proceed by process of SAP Permit and be consistent with pages C2.96 to C2.98 of the One BCC Design Guidelines. To facilitate the purposes of the One E4' BCC Signature Office concept, reasonable modifications 16 other pages of the Design Guidelines may be allowed iYi process of SAP Permit, if they otherwise remain in4; compliance with the SAP Regulating Plan, the Develo )irent -- Agreement, and the overall intent and themes of the B `r'akell' City Centre project. —� CO: • rV City of Miami Page 12 of 14 File ID: 12008 (Revision: A) Printed on: 317/2023 Hell]: 12008 Enactment Number: 14106 One BCC Alternate Concept Design Guidelines • .rar.,•1 sere • . a +x r.. ca xu+. u rA v =e x• •n �e•:sx �r:� Fa rvrEnaoS r.rrm ro ow arc 1,04cD ta,- NoaIPEAurnmer • ONE BCC ALTERNATE CONCEPT DESIGN GUIDELIINES M.W EL sere►,cxs Q12 C2.96 ONE BCC ALTERNATE s... z,... o CONCEPT DESIGN F-=.��--�•�=-•^�. .•-•. GUIDELIINES ....... '�-`�......-- MIMdi FL RXCHIME IR Iv L I/ i ,AM Ewe C2.97 m 0 City of Miami Page 13 of 14 File ID: 12008 (Revision: A) Printed on: 31712023 File ID: 12008 Enactment Number: 14106 m 0 CO ry ONE BCC ALTERNATE ..a% ,x- CONCEPT DESIGN �., y G IDELIINES ...��.......... Ns.A,MI. FL *" SEC{ION DATE. C2.95 o+rlv2422 Section 3. If any section, part or a section, paragraph, clause, phrase, or word of this Ordinance is declared invalid, the remaining provisions of this Ordinance shall not be affected. Section 4. It is the intention of the City Commission that the provisions of this Ordinance shall become and be made a part of the Miami 21 Code, which provisions may be renumbered or re -lettered and that the word "Ordinance" may be changed to "Section," "Article," or other appropriate word to accomplish such intention. Section 5. This Ordinance shall become effective ten (10) days after final reading and adoption thereof.2 APPROVED AS TO FORM AND CORRECTNESS: 2 This Ordinance shall become effective as specified herein unless vetoed by the Mayor within ten (10) days from the date it was passed and adopted. If the Mayor vetoes this Ordinance, it shall become effective immediately upon override of the veto by the City Commission or upon the effective date stated herein, whichever is later. City of Miami Page 14 of 14 File ID: 12008 (Revision: A) Printer! on: 31702023 City of Miami Legislation Ordinance Enactment Number City Hail 3500 Pan Ameican Drive Miami, FL 33133 www.miamigov.com File Number: 12008 Final Action Date: AN ORDINANCE OF THE MIAMI CITY COMMISSION, AMENDING `w' APPENDIX E, BRICKELL CITY CENTRE SPECIAL AREA PLAN ("BCC::1' SAP") OF ORDINANCE NO. 13114, THE ZONING ORDINANCE OF TTf CITY OF MIAMI, FLORIDA, AS AMENDED ("MIAMI 21 CODE"), TO 5; APPROVE THE FOURTH AMENDMENT TO THE PREVIOUSLY APPROVED "BCC SAP"; TO MAKE PROVISION FOR THE ONE BCC SIGNATURE OFFICE DEVELOPMENT, AN ALTERNATE CONCEPT Ff THE ONE BCC PARCEL, WHICH MAY UTILIZE CERTAIN DESIGN FLEXIBILITIES THAT INCLUDES LARGER TOWER FLOORPLATES FOR THE PROPERTY GENERALLY LOCATED AT 799 BRICKELL PLAZA, 700 BRICKELL AVENUE, AND 710 BRICKELL AVENUE; CONTAINING A SEVERABILITY CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, pursuant to Ordinance No. 13279 adopted on July 28, 2011, the Miami City Commission approved the original "Brickell CitiCentre ("BCC") Special Area Plan" ("BCC SAP"), a 9.038 acre Special Area Plan established pursuant to Articles 3 and 7 of Ordinance No. 13114, the Zoning Ordinance of the City of Miami, Florida, as amended ("Miami 21 Code), that is generally bound by Brickell Avenue to the east, Southwest 1 Avenue to the west, Southeast 6 Street to the north, and Southwest 8 Street to the south in Miami, Florida; and WHEREAS, pursuant to Ordinance No. 13369 adopted on March 28, 2013, the Miami City Commission approved an amendment (#1) to the BCC SAP to include an additional 0.98 of acres of land known as the "N2" block generally located north of the existing BCC SAP and bounded by Southeast 5 Street to the north, Southeast 1 Avenue to the east, Southeast 6 Street to the south, and South Miami Avenue to the west, resulting in a total of 10.01 acres; and amending the BCC SAP to rename the project from "Brickell CitiCentre" SAP to "Brickell CityCentre" SAP; and WHEREAS, pursuant to Ordinance No. 13440 adopted on March 27, 2014, the Miami City Commission approved an amendment (#2) to the BCC SAP to include an additional 1.55 acres of land known as "One BCC" generally located east of the existing BCC SAP and bounded by Southeast 7 Street to the north, Brickell Avenue to the east, Southeast 8 Street to the south, and the 8 Street Metro Mover right -of way to the west, resulting in a total of 11.57 acres; and WHEREAS pursuant to Ordinance No. 13824 adopted on January 24, 2019, the Miami City Commission approved amendment (#3) to the BCC SAP to incorporate two (2) additional development sites totaling 2.39 acres known as "BCC 650 SMA" and "BCC AP," located at 500, 602, 614, 622, 626, 630, and 640 South Miami Avenue, 11, 21, 31, 37, 45, and 55 Southwest 7 Street, and 19 and 42 Southwest 6 Street, Miami, Florida, resulting in a total of 13.96 acres; and City of Miami File ID: 12008 (Revision:) Printed Orr: 7/19/2022 9 y rn WHEREAS, a fourth amendment (#4) to the BCC SAP, Regulating Plan and Design Guidelines, makes provision for the One BCC Signature Office development, an alternate concept for the One BCC parcel, which may utilize an alternate building configuration including larger tower floorplates; and WHEREAS, the amendment of Appendix E of the Miami 21 Code, the BCC SAP, is necessary to allow for increased tower flexibilities up to a maximum of 2,850,000 SF for the One BCC Signature Office; and WHEREAS, an amendment is necessary to make provision for the One BCC Signature Office development that responds to changing market conditions by allowing for an alternate building configuration to attract global financial service and technology companies that require workspaces featuring increased visibility, flexibility, efficiency, volumetric space, and strategic co -location; and WHEREAS, the Planning, Zoning and Appeals Board ("PZAB"), at its meeting on June 1, 2022, following an advertised public hearing, adopted Resolution No. PZAB-R-22-013 by a vote of ten to zero (10-0), Item No. PZAB.7, recommending approval of the large scale Land Use Designation Change; and WHEREAS, the City Commission has considered whether the proposed amendments will further the goals, objectives and policies of the Miami Comprehensive Neighborhood Plan ("MCNP' ), the Miami 21 Code, and other City regulations; and WHEREAS, the City Commission has considered the Planning Director's recommendations and conducted a public hearing on the proposed amendment; NOW, THEREFORE, BE IT ORDAINED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Ordinance are hereby adopted by reference thereto and incorporated herein as if fully set forth in thi§aSection. Section 2. Miami 21 Code is amended by amending Appendix E: Brickell City-Centf in the following particulars:1 ?v• rT "Appendix E - Brickell City Centre SAP 1.4 Regulating Plan for Brickell City Centre BRICKELL CITY CENTRE r = .� R�- m r 0 a -- Brickell City Centre is a mixed -use project in the heart of tho Brickell situated on seven (7) parcels totaling approximately 13.9 acres. The site is located along S. Miami Avenue and bounded by S.W. 8th Street to south, S.E. 5 Street to the north, approximately S.W. 1st Avenue to the west, and approximately Brickell Avenue to the east. 1 Words and/or figures stricken through shall be deleted. Underscored words and/or figures shall be added. The remaining provisions are now in effect and remain unchanged. Asterisks indicate omitted and unchanged material. City of Miami File ID: 12008 (Revision:) Printed On: 7/19/2022 The project as presently built consists of two -levels of underground parking to support the 551,482 s.f. of retail that has been constructed on the West, East and North blocks. The future One BCC, N2, 650 SMA and AP phases will expand the floor area of the retail to approximately 808,575 s.f. The underground parking has been designed to internalize circulation and limit the impact of vehicular traffic on the adjacent roadway system. The internal circulation is achieved through the connection of the three (3) underground garages at the Basement 02 level via driveways beneath S. Miami Avenue and S.E. 7th Street. The underground parking garage will be expanded to connect to the future N2 phase, and may connect to the One BCC and N2 des phase. In addition to the retail component, Brickell City Centre's ("BCC") program includes the development of approximately 2,358 residential units in six (6) towers, three of which are approximately 40 +1- stories in height on the BCC North, West and N2 parcels. A fourth tower, 80 stories tall, wilt may be located on the One BCC parcel ("One BCC Mixed Use Tower"). The 650 SMA tower will be 54 stories and the AP tower will be 62 stories. In the first phase, 780 residential units have been constructed on the West and East blocks. A hotel, consisting of 352 hotel rooms, has been constructed on the BCC East parcel and a 120-room hotel is planned for the mixed use tower on the One BCC bleek Mixed Use Tower. in total, 2,683 parking spaces have been constructed in the first phase and an additional 3,612 parking spaces will be provided in the One BCC Mixed Use Tower, N2, 650 SMA and AP phases, for a total of 6,295 spaces, to support the retail, residential, hotel and office uses. Two office buildings on the West and East blocks, totaling 285,567 s.f., have been constructed in the first phase of BCC. Approximately 675,000 s.f. of office is proposed in the mixed -use tower the One BCC parcel Mixed Use Tower, which -wilt may replace the office buildings currently and formerly located at 700 Brickell Avenue, 710 Brickell Avenue and 799 Brickell Plaza, located immediately east of the Brickell City Center/8th Street MetroMover station. Based on the global changes to market conditions following the COVID-19 pandemic, redevelopment of the One BCC block may also proceed in a different configuration to attract premier office tenants ("One BCC Signature Office"). These market changes are precipitated by an inflow of new residents and businesses to Miami, primarily from urban areas in the Northeast U.S. and California. The resulting increase in investment activity has generated office space interest particularly from significant, global financial service and technology companies that do not traditionally have a presence in south Florida. The SAP allows for larger tower floorplates in a One BCC Signature Office design that will create opportunities for the types of workspaces, these office tenants demand. Such attributes include increased visibility, flexibility, efficiency, volumetric space, and strategic co -location. In addition to the above -listed programmatic elements, the project includes a number of significant features designed to enhance the public realm. Foremost among such elements is the climate ribbon that serves as unifying theme for the project, connecting the various parcels of Brickell City Centre and the project to the Miami River. The climate ribbon provides protection from the elements to patrons traveling along the open air corridors of the retail center arid across the pedestrian connections that unify the site above the street. The climate riblibn al$d' collects rainfall that is used for various water features on -site. The development of One' BCC parcel will bring the climate ribbon over the top of the 8th Street MetroMover saixon toe front door of Brickell Avenue. -Tr; , BRICKELL CITY CENTRE GOALS 1.2 DEFINITIONS OF TERMS fir;, ) r- 0 City of Miami File ID: 12008 (Revision:) Printed On: 7/19/2022 Climate Ribbon: A framed Structure, which is open on its sides, fixed and self-supporting and which may be located over private property or within the Public Right -of -Way. Design Guidelines: Plans, drawings, and diagrams submitted as part of the SAP. Display Window: A window of a Commercial establishment facing a Frontage used to display merchandise for sale on site and shall have sufficient dimensions to display products. Display Window(s) may not be used for the display of posters or other adverting materials unless accompanied by the product being offered. One BCC Mixed Use Tower: An allowable design for the One BCC block under the Second Amendment to the BCC SAP including residential, lodging, office, and commercial uses; as set forth in those plans prepared by Arquitectonica and stamped approved by the City's Hearing Boards Department on December 17, 2013, consisting of 75 pages. One BCC Signature Office: An allowable configuration for the One BCC block, which may utilize certain design flexibilities that provide for larger tower floorplates to create opportunities for the types of workspaces that premiere office tenants demand, including attributes such as increased visibility, flexibility, efficiency, volumetric space, and strategic co -location. Open Air Retail: A retail sales establishment operated substantially in the open air including, but not limited to: farmers market, vending carts/kiosks, and the like. Open Air Retail use is nonpermanent and mobile. Open Air Retail shall be located on private property and it shall not be located in an area that is classified as floor area. Open Space: Any parcel or area of land or water essentially unimproved by permanent Buildings, open to the sky and/or covered by a Climate Ribbon; such space shall be reserved for public or private Use. Open Spaces may include Parks, Greens, Squares, Courtyards, Gardens, Playgrounds, paseos (when designed predominantly for pedestrians), pedestrian paths or associated landscaped areas, and those areas covered by a Climate Ribbon. Parking, Off -Street: Any land area designed and used for parking motor vehicles including parking garages, driveways and garages serving residential uses, but excluding areas of Thoroughfares and surface parking lots. Pedestal: Also known as podium. For the Brickell City Centre Special Area Plan pare s BOCN, BCCW and BCCE, that portion of a Building up to a maximum of 129 feet, for the Oni 3Cq _and N2 parcels, that portion of a Building up to a maximum of 160 feet (10 stories), for to403,650SMA J parcel that portion of a Building up to a maximum of 129 feet (10 stories) and forth paiael m that portion of a Building up to a maximum of 127 feet (12 stories) as depicted in th approved SAP plans and Design Guidelines. Regulating Plan: Modifications of the underlying Miami 21 Transect Zone regulatlfore Lots included in this SAP. r ri J ors Retail Ribbon Sign: A sign emitting an illuminated message, image, design or combination thereof that is created electronically by any light source, LED (light emitting diodes) bare electric bulbs, luminous tubes, fiber optics, or any other combination of light sources creating a message. A Retail Ribbon Sign is classified as a Wall Sign. A Retail Ribbon Sign is not considered an Animated Sign or Flashing Sign. Special Area Plan (SAP): Also known as the Brickell City Centre project. Special Area Plan Permit (SAP Permit): A permit issued by the City which authorizes Development within an approved SAP. 0 City of Miami File ID: 12008 (Revision:) Printed On: 7/1912022 Terminated Vista: A location at the axial conclusion of a Thoroughfare or Pedestrian Passage. A Building located at a Terminated Vista designated on a Special Area Plan is required to be designed in response to the axis. 3.14 PUBLIC BENEFITS PROGRAM * 3.14.4 For the purposes of the public benefits program, the following criteria shall apply: a. Brickell City Centre Public Benefits. The One BCC, 650 SMA and AP buildings are eligible for the bonus height and Floor Lot Ratio benefits due to the public benefits that the BCC project encompasses. The Brickell City Centre SAP Public Benefits are: • 6' Street/Miami Avenue Roundabout (land costs) • 6th Street/Miami Avenue Roundabout (engineering and construction costs) • Eastward expansion of Metromover Station and direct connection to Brickell Avenue and into Brickell City Centre •A€tive-t ccs on SE 7 ' and SE 8t Street, and i^ pFeved efciency of gro end Marx • Below Above -grade pedestrian connection under over Metromover Station • Enhancement to Plazas on Brickell Avenue and Climate Ribbon • Above -ground pedestrian connections across the public rights -of -way and between the Brickell City Centre parcels • Temporary and permanent fire station on N2 block • Improvements to the pedestrian realm along 5" Street underneath and adjacent to the South Miami Avenue bridge, facilitating access to the Miami River Greenway. • Monetary contribution of $600,000 for improvements to the Underline near the Brickell Metrorail station. • Heightened archeological monitoring requirements. The total costs of the public benefits for the Project are above and beyond the monetary payment which would be required under the Public Benefits Trust Fund regulations of Miami 21. 0 rn co City of Miami File ►D: 12008 (Revision:) Printed On: 7/1912022 Article 4, Table 5 BUILDING FUNCTION: PARKING AND LOADING SHARED PARKING STANDARDS Sih4kb FACTO; The shared Parking 5:anta•05 Taste provides r1e method for cCs era rg Snared patting for buildings with more thari crte List :yoe. It re*rs to the parGflg fequiterneras mat appear IR iabde d. The parting rec ii•ed Or arty 0w0 FunCti25s On a Lel a r,31-J aie2 by dlrid1 the nullx•er of scares required by Ire ieSSer Of 71e 1wa use' byre appropnate facia Irom irks Tatle era wail the result me greater use parking rogorenler*L For irs5tl,'lce: fa a Dufcmy'w11n a Residenbal Use requiring 100 .".paces and a Commercial Use rC-ftun- ng 20 3p3ST3, me 20 spaces dfoide2 by the manrlg (belts of 1. 'mo0)4 redilirpthe 10131 requirement so 100 Imes 1 i spaces. Fe: uses rot ;rt01 310d in Fria chart on a mixes use tat xllrarng r? j of 1,1 Snell 50 smWE5- 74odi+imal snarrlg tr 31c oe4 by war =Additional sharing It allied by IRS3PormIL t•r1 1L a6 OFF•STREET P.5R11 G STANDARDS AMR of FORKthe AOCeSl:JOLT 102h! 0hE N6T TRA.FIC SJhGLE LOAM) CAE WAY TRL.°F1C 2L14i3LE td1t09 -rwru 11sST W»FTC XIb ELOS= A7I 3.1 211 25 Fe 12cA 10311 ^_5 550 !B36 perehet rye ft Stands:d stet: B.: F x 16 R miarrum v r1(-l! Dlrrrroays11ann2feanyrl,rrx,1or13fee:ofpzre.',widthcfaare-waye.wti r1320Ee 3twtrw eve far parsing area p evia* 10 or mare sSa.1o. (11 • Pedes±•ian entrances snail be at 1ea5t 3 feet bin stall. driveway cr acceic-Sit . CO • AMG'lrab£ 5i09 s, parsing . and draifsage per Florpa Building Ccce. T N • OR-stheel Parking faatil*0s 51101 nave a nlirknSum vertical clearance of 7 fool_ re sugasa facility is 10 be used G! nicks ar Finding Uses, the mlli'num raeanr5 0 ;ISLE he 12 NetS45ieential and 15 feel Co smerciol aria Muni -Lai. • Ingt•tss yeraculdr 0c51 d desires shad! Se lSooled so 3s 10 pre>,1de a minimum Inveway of 20 feel as tengt0I between me Ease Building Lite and dispenser. • For rsg4.1rentir115 of parking yob, refer to Ar*YJe 0 and 1n2 City 4f Ma i Off -Street Parting Goides am Standards. LO!.DSVG BERTH STANDARr05 TS, 73 CS, 01415 A. CI DISTRICT RE:'GEi1T:AL• From 25,000 alto 503,300 of Berth Size ,.-_ sJ 202 e Loading Berths 1 perfrsi 1Ti0wits 1 pee eachedaLkoa1100undsc.- f'o I.on of 11K Greater Clan 500_300sf Berth Size 362 sf 222 si Larding Berths 1 or• fret 1C4 u is 1 lrr eats editienel1R5va cr 6-b.-toe of 105 LODGING From 25.00D sf to 530.500 sr Berth Size ▪ <7sf 722 sf loading i.,1:: •a:-v Graver dun 580.100 si Berth Silt 532 el 222 si Loading &rdhs 1 per 2107 reams 1 pa, 1C0 ma-•! Free) 25 COO 0 re 5t4,000 sr Berth See .427 sf 00 sf Loading Berths 1 se 333 rooms 1 se. 1,05 ram s GcealerChah 500GOO sf Berth Ski CAA sf =09 sf Loading Berths 1 tie• KG rooms 1 per IXmoms Berth Types Residential': 200 sr ' 10 ftx 20 ft x 12 ft Commercial": 420 sf =12 ft x 35 ft x 15 ft Induslria I"•: 660 sf = 12 ft x 55 ft x 15 ft Residential loading berths shall be setback a distance equal to !heir length. For the N2 block, residential loading berths shall be setback a minimum of ten (10) feel. " Cornmorciar berth may bo substituted by 2 Residential berths. 2 Residential berths may be subsliluled by 1 Commercial berth. "" 1 Industrial berth may be substituted by 2 Commercial berths. 2 Commercial berths may be substituted by 1 Industrial berth. A required Industrial or Commercial loading berth may be subslilulod by a Commercial or Residential loading berth. by SAP Permit, if the size, character, and operation of the Use is found to not require the dimensions specified and the required loading berth dimension could not otherwise be provided according to the regulations of Ibis Code. OFFICE 00111EERCIAL" INDUSTRIAL'', From 25.000 sf m 500,003 sf Berth Size 12) d 122 si 410 si - 22 sf Loading Berths 1st end are dth From 25.200 s! so 530.030 sf Area Binh Sze 2SSsf-St7Ksr .125ef 5''eSsJ-1{Gisi 12531 10:1i sf-2°0K 122 ti 7,5Z*Ei-iX.K5* Loading Beetlss ere: 1st[sf-5:(sf -d 5,15e-t27Ke lax sh-23DCsr '2xPS s -SONS sf Gres.er thin 550,d00 s1 C.-ester ct,.s :in ;04 sf Both Size Loading Berth: Area 552st 1 • Ms! Berh Sze E6) sf rg °•,art Area 1 J CtiO sf Management Plan Shill in; tide' the layout of all bertha; entry and exit routes': turning maneuvorabllitY studies' a requirement to have a dockmaster present for all loading hours; and an operational plan setting forth allowable loading hours, on -site poraonnel requirements a radio for alternate) communication !Helium with drivers to provide advance notice of arrival times, and procedural for mowing vehicles when necessary to prevent backuos_ Additional sharing of loading berths between tenants may be cerrnitted by SAP Permit. The total number of required loading berths for the One BCC Mixed Use Tower shall be seven (7) industrial size loading baths and eight (8) Commercial sea loading berths_ The total number of required leading berths for the 650 SMA block shall be two (2) Commercial sized reading berths, to be reviewed and approved via SAP Permit. The total number of required loading berths for the AP block shall be ono (1} Residential size loading berth plus one (1) Commercial sizeloading berth for a fatal or two (2) loading berths, to be reviewed and approved via SAP Permit. Loading Hours shall comply with conditions established by the Development Order. City of Miami File !A: 12008 (Revision: ) Printed On: 7/19/2022 * * * r---3 ▪ r� C"7 Ed,] CI. r" m 5.6.2 Building Configuration (T6) Y ry -- b. Above the eighth floor (tenth floor for the One BCC and 650 SMA blocks and friiielfth floor for the AP block), the Building Floorplate dimensions shall be limited as follows: 5.6 URBAN CORE TRANSECT ZONES (T6) * • 30,000 square feet maximum for Residential and Hotel Uses (One BCC block only) • 24,000 square feet maximum for Residential Uses (650 SMA block only) • 30,000 square feet maximum for Commercial Uses and for parking • 250 feet maximum length for Residential Uses • 250 feet maximum length for Commercial Uses • In a One BCC Signature Office design, the following additional tower flexibilities may be permitted by process of SAP Permit, so long as the Building does not exceed 2,850,000 square feet of total Floor Area: • 40,000 square feet maximum Floorplate size for Office and Commercial Uses with a maximum length of 250 feet, on all tower Stories except: ■ 60,000 square feet maximum Floorplate size for Office Uses for the first 100 feet of the tower above the maximum Height of the Pedestal, with a maximum Floorplate length of 350 feet. c. Encroachments shall be as follows: At the First Layer, cantilevered Awnings and entry canopies may encroach up to one hundred percent (100%) of the depth of the Setback and into the Right -of -Way, except as may be further allowed by Chapter 54 of the City Code. Above the first Story, cantilevered balconies, bay windows, decorative features, and roofs may encroach up to three (3) feet (four (4) feet for the N2 block) of the depth of the Setback. The Climate Ribbon and any above -grade connection(s) spanning the Metromover between BCC East and One BCC blocks have no Setback, and may encroach into the Right -of -Way. Other cantilevered portions of the Building shall maintain the required Setback. Above the Pedestal no Encroachments are permitted, except that Facade components promoting energy efficiency such as shading and Screening devices that are non -accessible may encroach a maximum of three (3) feet. d. For the N2 block, Galleries and Arcades (which includes cantilevered overhangs) can be ten (10) feet deep, can encroach 100% of the depth of the Setback and can overlap the whole width of the sidewalk to within four (4) feet of the curb on a Primary Frontage and sixteen (16) feet on a Secondary Frontage. f. Loading and service entries shall be pursuant to the Design Guidelines of the Special Area Plan. Loading may be accessed from all Frontages if architectural treatments applied to exposed spaces create a finished appearance. In a One BCC Signature Office design, all loading may be provided above -ground and enclosed within the Pedestal. At ground level, parking and loading in a One BCC Signature Office design shall be screened by a Liner along the Frontage, unless demonstrated through SAP Permit that it is not practical. However, at ground level along the Metromover (west side of One BCC block), parking and loading in a One BCC Signature Office design may also be screened by an art, glass, or architectural treatment. 73 111 it City of Miami File ID: 12008 (Revision:) Printed On: 7/19/2022 h. Mechanical equipment on a roof shall be screened by a parapet wall of a maximum height of twenty-five (25) feet or enclosure and shall conceal all equipment, except antennas, from lateral view. Where possible, equipment other than solar panels shall be enclosed or screened from overhead views. 5.6.4 Parking Standards (T6) a. Parking shall be required and provided and accessed in accordance with Article 4, Table 5 of Miami 21, the Design Guidelines of this Special Area Plan and as modified in this section of the Regulating Plan. Parking and loading requirements may be reduced via an SAP Permit, and may include ail parking reductions available under the Miami 21 Code, amended as of March 3, 2022. Any other reduction greater than 30% shall require the submittal of a traffic study and/or parking study to support the greater reduction. As set forth in 7.1.2.a of this Regulating Plan any parking reductions allowed in Miami 21 shall be processed through an SAP Permit. The vehicular entrance of a parking Lot or garage on a Frontage shall have a continuous flush sidewalk crossing and pedestrian safety zones for curb cuts widths over thirty (30) feet. All parking, including drop-off drives and porte-cocheres, open parking areas, covered parking, garages, Loading Spaces and service areas shall be located in accordance with the Design Guidelines of this Special Area Plan, or otherwise located within the Pedestal for a One BCC Signature Office Design. All Screening utilized to visually shield or obscure the aforementioned areas shall be subject to the review and approval of the Planning Director. Above ground parking may extend into the Second Layer by SAP Permit, if an art, glass treatment or Architectural Treatment, of a design to be approved by the Planning Director, with the recommendation of the Urban Development Review Board (UDRB), is provided for one hundred (100%) percent of that portion of the Pedestal Facade. In a One BCC Signature Office design, this process shall also apply to all ground -level parking and loading areas. 9 rrl rV m 17-1 rn City of Miami File ID: 12008 (Revision:) Printed On: 7/19/2022 MIAMI 21 AS ADOPTED - APRIL 2013 BUILDING DISPOSITION LOT OCCUPATION T6-48B1BCC SAP ARTICLE 5. SPECIFIC TO ZONES ILLUSTRATION 5.6 URBAN CORE TRANSECT ZONES (TG-48) a Lot Area 5,430 s.f. min. b. Lot %WPt 100 ft min. c, Lot Coverage - f-B Storks 80%max. -Above &ri Starry 18,000 sq. ft. max. Ftrxate tor Rena & Lodging 30,000 N. ft. max. Fi ,orpfate for Office 8 Commercial d. Floor Lot Ratio it LR) T'6-48a: 11 i 50% addisonal Pucac &Mesa T6-48b: 18 ; 50% addidc J Puty c Bene`r e. Frordage at front Setback ; 0 rein. f. Open Space 10= Lot Area min 9. Doty as per BCC SAP Plans and Design Guidelin BUILDING SETBACK a Princxpaf Front 10 ft. min.; 20 & rr.:& above 8' Story b. Sacoraay Front 13 fr_ ntin.; 20 Ifman abotit 81` Story c. Side mA.; 30 fit_ rrrn, above 8" Sory d Rear 0 ft_ nun.; 30 ft. It1Ln. above 8" Story e. Abutting Side or Rear T5 0 tt min. 1" Ihnaugh 5" Story 10 f1. min. 6r through 8h Story 30 ft. min above 8' Story BUILDING CONFIGURATION FRONTAGE a. Common Lam prohibited b. Porch & Fence orchibiced c. Terrace or L.C. prohibited d Forecourt W177tte-71 Sloop .nenrYtiedl f. Shgofront :errrelted (T6-48 L and T6-48 0 onlyi 9 Gallery cern-Med by Spedal Area Ian b Arcade Uermttcd by Sp 7al Area 17on BUILDING HEIGHT a Mn. Height 2 Stories b Max. Height 48 Stories c. Max. Berea Height 30,000 sq.ft. max. Floorplate for Residential & Lodging for One BCC block 24,000 sq. ft. max. Floorplate for Residential for 650 SMA Block In a One BCC Signature Office design, the following additional tower fiexibtities may be permitted by process of SAP Permit. sq fonq as the Building does not exceed 2.850.000 square feet of total Floor Area: 40,000 square feet maximum Floorplate size for Office and Commercial Uses with a maximum length of 250 feet, on at tower Stories except: 60,000 square feet maximum Floorplate size for Office Uses for the first 100 feet of the tower above the maximum Height of the Pedestal. with a maximum Floorplate length of 350 feet. 37 Stories for One BCC block only} 32 Stories Abut& g all Transecls Zones 6 Stories for 650 SMA block; 14 Stories for AP block except T3 'Or as modifed kr Diagram 8 tffi City of Miami File 10: 12008 (Revision:) Printed On: 7/19/2022 * 7.1.2 Permits Brickell City Centre Development Review Process The Brickell City Centre development review process is set forth below. a. SAP Permit. All Development within the Project shall be approved by SAP Permit. In addition, all other permits necessary to develop Property within the Project, such as Warrants, Waivers, Variances, and Exceptions, shall be approved by SAP Permit and subject to the equivalent fee to those established in the Miami 21 Code and Chapter 62 of the City Code. The process and criteria for review and approval of an SAP Permit application is set forth below. 1. Review and approval process. The Zoning Administrator shall review each submitted application for a SAP Permit for completeness within seven (7) days of receipt. Upon verification by the Zoning Administrator, the application shall be referred to the Planning Director. The Planning Director shall review each application for an SAP Permit for consistency with the Brickell City Centre Regulating Plan, Design Guidelines, Development Agreement, Miami 21 and the Miami Comprehensive Neighborhood Plan. The One BCC block may be developed substantially in accordance with the approved One BCC Mixed Use Tower plans, or any other design that complies with the Brickell City Centre SAP. In a One BCC Signature Office design, development shall proceed by process of SAP Permit and be consistent with pages C2.96 to C2.98 of the One BCC Design Guidelines. To facilitate the purposes of the One BCC Signature Office concept, reasonable modifications to other pages of the Design Guidelines may be allowed by process of SAP Permit, if they otherwise remain in compliance with the SAP Regulating Plan, the Development Agreement, and the overall intent and themes of the Brickell City Centre project. * One BCC Alternate Concept Design Guidelines City of Miami File ID: 12008 (Revision:) Printed On: 7/1912022 .40.0014.011. IXhtif:'.'KJ�Y/�%N:'Af iY'•FW5.9RsF'X FEiaNPaA[:726RJq i':if'Yl'lfISIYR>PI 33 OOM1E 9[C YJ(FOIISF ION'FR'FF'fDIARWI I: fMy •tL ?Il NIS E3N.Hfrfj:-, '�ef1CSi fassW %%l'r•af;y+yY a7 AAOWIFCFAINCA ONE BCC ALTERNATE CONCEPT DESIGN GUIDELIINES MIAM I, FL SETBACKS DATE 012142022 C2.96 ANQUItalOAYCA ONE BCC ALTERNATE rt..-:...; CONCEPT DESIGN Y ...__ GUIFEL,IINES MlfeM1. Ft A%ONOIAETRIC DIAGRAM 01DATE .2022 C2.91 City of !Warn! File in: 12008 (Revision:) Printed On: 7/19/2022 ARIXIJJECIONICA ONE BCC ALTERNATE CONCEPT DESIGN GUIDELIINES IMMO. FL SECTION I AT C2.98 01rzano22 Section 3. If any section, part or a section, paragraph, clause, phrase, or word of this Ordinance is declared invalid, the remaining provisions of this Ordinance shall not be affected. Section 4. It is the intention of the City Commission that the provisions of this Ordinance shall become and be made a part of the Miami 21 Code, which provisions may be renumbered or re -lettered and that the word "Ordinance" may be changed to "Section," "Article," or other appropriate word to accomplish such intention. Section 5. This Ordinance shall become effective ten (10) days after final reading and adoption thereof.2 APPROVED AS TO FORM AND CORRECTNESS: 1 dez, ity ttor ey 7/19/2022 2 This Ordinance shall become effective as specified herein unless vetoed by the Mayor within ten (10) days from the date it was passed and adopted. If the Mayor vetoes this Ordinance, it shall became effective immediately upon override of the veto by the City Commission or upon the effective date stated ,herein. whichever is later. City of Miami File ID: 12008 (Revision:) Printed On: 7119/2022