HomeMy WebLinkAboutExhibit-SUBTHIS DOCUMENT IS A SUBSTITUTION TO
ORIGINAL. BACKUP ORIGINAL CAN BE
SEEN AT THE END OF THIS DOCUMENT.
fltE
ATTACHMENT"A" r r 3 fkl
CITY OF MIAMI OFFICF 4 :i iY t`!`
CITY OF MIA.111
THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
THE RESILIENT FLORIDA GRANT PROGRAM 2021— 2022
Funding Source
Project Title
Funding
Amount
Florida Department of
Environment Protection
("FDEP") — Resilient
Florida Grant Program
2021- 2022
Design & Construction Brickell Bay Drive
(BBD) Seawall & Flood Improvements SE
14 St to SE 15 Rd along Biscayne Bay
$ 17,170,650
Edgewater Flood Improvements (EFI) — NE
Ave to Biscayne Bay, NE 22 to NE 24 St
$ 8,555,988
Design, Permitting, Construction:
Shorecrest South Flood Improvements
(SSFI) - NE 8 Ct-NE Bayshore Ct, NE Little
River Dr -NE 79 St
$ 8,033,930
Design, Permitting and Construction -East
Flagami Flood Improvements
Project(EFFI)-NW 38 Ctto NW 42Ave, NW
1 St to NW 7 St
$ 14,438,495
Replace Seawalls Morningside/Shorecrest
(MS) between NE 55th Terr/&NE 65th St.
& Biscayne Bay; NE 84th St / &
AdemarCanal; NE Bayshore Dr. / & Davis
Canal
$ 1,510,896.42
Brickell and Coconut Grove Seawalls
Project (S-BCG) (between SE 25th Rd. to
Matheson Ave. and Biscayne Bay)
$829,264.50
Total Resilient Florida Funding
$50,539,224
19338 6xhi
THIS DOCUMENT IS A SUBSTITUTION TO
ORIGINAL. BACKUP ORIGINAL CAN BE
SEEN AT THE END OF THIS DOCUMENT.
ATTACHMENT"A"
CITY OF MIAMI
THE FLORIDA DEPARTMENTOF ENVIRONMENTAL PROTECTION
THE STATEWIDE FLOODING AND SEA LEVEL RISE RESILIENCE PLAN 2022 — 2023
Funding Source
Project Title
Funding
Amount
Florida Department of
Environment Protection
("FDEP") — THE
STATEWIDE FLOODING
AND SEA LEVEL RISE
RESILIENCE PLAN 2022 -
2023
Replacement of 8 Seawalls in Edgewater
Project (S-EW) between NE 22nd St. to NE
34th St. along Biscayne Bay
$1,555,882
Design, Permitting & Construction North
Grapeland Heights Seawall (NGHS) at NW
13th Street and NW 32nd Avenue
$145,527
Design & Construction of Allapattah Flood
Improvements (AFI) NW 7th Ave to 14th
Ave, NW 23rd to 31st Street
$15,688,093
Immediate Flood Control: Install 79
Backflow Valves Citywide (BVCW)
$2,042,000
Total Resilient Florida Funding
$19,431,502
co
rri
m
SUBSTITUTED
ATTACHMENT "A"
CITY OF MIAMI
THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECT!
THE RESILIENT FLORIDA GRANT PROGRAM 2021— 20
Funding Source
Project Title
Funding
Amount
Florida Department of
Environment Protection
("FDEP") — Resilient
Florida Grant Program
2021- 2022
Design & Construction Brick-' Bay Drive
(BBD) Seawall & Flood Im► ovements SE
14 St to SE 15 Rd along B'° cayne Bay
$ 27,255,000
Edgewater Flood Im s. ovements (EFI) — NE
Ave to Biscayne B.:., NE 22 to NE 24 St
$ 17,111,976
Design, P mitting, Construction:
Shorecrest ,south Flood Improvements
(SSFI) - N• 8 Ct-NE Bayshore Ct, NE Little
River D E 79 St
$ 16,067,860
Desi: ' , Permitting and Construction -East
Fla , mi Flood Improvements
P, • ject(EFFI)-NW 38 Ct to NW 42 Ave, NW
St to NW 7 St
$ 28,876,990
Replace Seawalls Morningside/Shorecrest
(MS) between NE 55th Terr/&NE 65th St.
& Biscayne Bay; NE 84th St. / &
AdemarCanal; NE Bayshore Dr. / & Davis
Canal
$ 3,021,792.84
Brickell and Coconut Grove Seawalls
Project (S-BCG) (between SE 25th Rd. to
Matheson Ave. and Biscayne Bay)
$1,658,529
Total Resilient Florida Funding
$93,992,148
SUBSTITUTED
ATTACHMENT "A"
CITY OF MIAMI
THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
THE STATEWIDE FLOODING AND SEA LEVEL RISE RESILIENCE PLAN 202Y— 2023
Funding Source
Project Title
Funding
Amount
Florida Department of
Environment Protection
("FDEP") — THE
STATEWIDE FLOODING
AND SEA LEVEL RISE
RESILIENCE PLAN 2022 -
2023
Replacement of 8 Seawalls in ''gewater
Project (S-EW) between NE 2 d St. to NE
34th St. along Biscayne Bay
$1,555,882
Design, Permitting onstruction North
Grapeland Heights ,seawall (NGHS) at NW
13th Street and .' 32nd Avenue
$145,527
Design & Con uction of Allapattah Flood
Improvemer s (AFI) NW 7th Ave to 14th
Ave, NW :" rd to 31st Street
$15,688,093
Imm:• late Flood Control: Install 79
Ba►<flow Valves Citywide (BVCW)
$2,042,000
otal Resilient Florida Funding
$19,431,502