Loading...
HomeMy WebLinkAboutExhibit-SUBTHIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT THE END OF THIS DOCUMENT. fltE ATTACHMENT"A" r r 3 fkl CITY OF MIAMI OFFICF 4 :i iY t`!` CITY OF MIA.111 THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION THE RESILIENT FLORIDA GRANT PROGRAM 2021— 2022 Funding Source Project Title Funding Amount Florida Department of Environment Protection ("FDEP") — Resilient Florida Grant Program 2021- 2022 Design & Construction Brickell Bay Drive (BBD) Seawall & Flood Improvements SE 14 St to SE 15 Rd along Biscayne Bay $ 17,170,650 Edgewater Flood Improvements (EFI) — NE Ave to Biscayne Bay, NE 22 to NE 24 St $ 8,555,988 Design, Permitting, Construction: Shorecrest South Flood Improvements (SSFI) - NE 8 Ct-NE Bayshore Ct, NE Little River Dr -NE 79 St $ 8,033,930 Design, Permitting and Construction -East Flagami Flood Improvements Project(EFFI)-NW 38 Ctto NW 42Ave, NW 1 St to NW 7 St $ 14,438,495 Replace Seawalls Morningside/Shorecrest (MS) between NE 55th Terr/&NE 65th St. & Biscayne Bay; NE 84th St / & AdemarCanal; NE Bayshore Dr. / & Davis Canal $ 1,510,896.42 Brickell and Coconut Grove Seawalls Project (S-BCG) (between SE 25th Rd. to Matheson Ave. and Biscayne Bay) $829,264.50 Total Resilient Florida Funding $50,539,224 19338 6xhi THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT THE END OF THIS DOCUMENT. ATTACHMENT"A" CITY OF MIAMI THE FLORIDA DEPARTMENTOF ENVIRONMENTAL PROTECTION THE STATEWIDE FLOODING AND SEA LEVEL RISE RESILIENCE PLAN 2022 — 2023 Funding Source Project Title Funding Amount Florida Department of Environment Protection ("FDEP") — THE STATEWIDE FLOODING AND SEA LEVEL RISE RESILIENCE PLAN 2022 - 2023 Replacement of 8 Seawalls in Edgewater Project (S-EW) between NE 22nd St. to NE 34th St. along Biscayne Bay $1,555,882 Design, Permitting & Construction North Grapeland Heights Seawall (NGHS) at NW 13th Street and NW 32nd Avenue $145,527 Design & Construction of Allapattah Flood Improvements (AFI) NW 7th Ave to 14th Ave, NW 23rd to 31st Street $15,688,093 Immediate Flood Control: Install 79 Backflow Valves Citywide (BVCW) $2,042,000 Total Resilient Florida Funding $19,431,502 co rri m SUBSTITUTED ATTACHMENT "A" CITY OF MIAMI THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECT! THE RESILIENT FLORIDA GRANT PROGRAM 2021— 20 Funding Source Project Title Funding Amount Florida Department of Environment Protection ("FDEP") — Resilient Florida Grant Program 2021- 2022 Design & Construction Brick-' Bay Drive (BBD) Seawall & Flood Im► ovements SE 14 St to SE 15 Rd along B'° cayne Bay $ 27,255,000 Edgewater Flood Im s. ovements (EFI) — NE Ave to Biscayne B.:., NE 22 to NE 24 St $ 17,111,976 Design, P mitting, Construction: Shorecrest ,south Flood Improvements (SSFI) - N• 8 Ct-NE Bayshore Ct, NE Little River D E 79 St $ 16,067,860 Desi: ' , Permitting and Construction -East Fla , mi Flood Improvements P, • ject(EFFI)-NW 38 Ct to NW 42 Ave, NW St to NW 7 St $ 28,876,990 Replace Seawalls Morningside/Shorecrest (MS) between NE 55th Terr/&NE 65th St. & Biscayne Bay; NE 84th St. / & AdemarCanal; NE Bayshore Dr. / & Davis Canal $ 3,021,792.84 Brickell and Coconut Grove Seawalls Project (S-BCG) (between SE 25th Rd. to Matheson Ave. and Biscayne Bay) $1,658,529 Total Resilient Florida Funding $93,992,148 SUBSTITUTED ATTACHMENT "A" CITY OF MIAMI THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION THE STATEWIDE FLOODING AND SEA LEVEL RISE RESILIENCE PLAN 202Y— 2023 Funding Source Project Title Funding Amount Florida Department of Environment Protection ("FDEP") — THE STATEWIDE FLOODING AND SEA LEVEL RISE RESILIENCE PLAN 2022 - 2023 Replacement of 8 Seawalls in ''gewater Project (S-EW) between NE 2 d St. to NE 34th St. along Biscayne Bay $1,555,882 Design, Permitting onstruction North Grapeland Heights ,seawall (NGHS) at NW 13th Street and .' 32nd Avenue $145,527 Design & Con uction of Allapattah Flood Improvemer s (AFI) NW 7th Ave to 14th Ave, NW :" rd to 31st Street $15,688,093 Imm:• late Flood Control: Install 79 Ba►<flow Valves Citywide (BVCW) $2,042,000 otal Resilient Florida Funding $19,431,502