Loading...
HomeMy WebLinkAboutBack-Up DocumentsPROTECTING TOGETHER Resilient Florida Grant Program Awards Fiscal Year 2021-22 Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Expected RFGP Amount Funding Total Project Duration (years) Alachua County Alachua Hills of Santa Fe Drainage Improvements $1,015,230.13 $507,615.07 $507,615.07 2 Alachua County Public Alachua Works Pine Hills Drainage Improvements $1,345,630.64 $672,815.32 $672,815.32 2 City of Gainesville Alachua Wastewater Lift Station Force Main Resiliency SSO Reduction $11,865,000.00 $7,119,000.00 $4,746,000.00 3 Brevard County Brevard West Crisafuli Road Drainage Improvements $1,176,000.00 $588,000.00 $588,000.00 4 Brevard County Board Brevard of County Commissioners Max Brewer Causeway Hurricane Storm Damage Reduction Restoration $1,000,000.00 $500,000.00 $500,000.00 3 Brevard County Natural Brevard Resources Management Department Restoring Seagrass and Oyster Habitat for Improved Natural Resilience $500,000.00 $250,000.00 $250,000.00 3 Brevard County Natural Brevard Resources Management Department Stormwater Program West Cocoa Stormwater Flood Protection and Infrastructure Upgrades $7,020,000.00 $3,510,000.00 $3,510,000.00 5 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Amount Expected RFGP Project Funding Total Duration (years) City of Titusville Brevard Bayview Sewage Lift Station #31 $ 2, 000,000.00 $0.00 $ 2, 000,000.00 3 Broward County Aviation Department Broward FLL Ravenwood System Interconnection $11,406,888.00 $ 5, 703,444.00 $5,703,444.00 3 Broward County Board Broward of Commissioners Installation of Dewatering Pumps at SRA1A to Maintain Access to Hollywood North Beach Park. $9,810,566.67 $9, 516, 249.00 $294,317.00 3 Broward County Board Broward of County Commissioners C-4 Canal Conveyance Improvements $932,400.00 $466,200.00 $466,200.00 2 Broward County Parks Broward and Recreation Hardening Seawalls of Intracoastal at Hollywood North Beach $18,000,000.00 $0.00 $18,000,000.00 4 City of Dania Beach Broward SW 37th Terrace Stormwater Project $750,000.00 $375,000.00 $375,000.00 1 City of Dania Beach Broward Southeast Drainage Project $14,500,000.00 $11,020,000.00 $3,480,000.00 2 City of Dania Beach Broward SW 54th Court Stormwater Project $700,000.00 $350,000.00 $350,000.00 2 City of Hollywood City of Hollywood City of Hollywood Broward Broward Broward Tidal Flooding Mitigation and Shoreline Protection A1A Pump Stations Recapture the Swale Restoration Pilot Program $28,000,000.00 $3,650,000.00 $695,000.00 $13,888,000.00 $1,825,000.00 $368,350.00 $14,112,000.00 4 $1,825,000.00 3 $326,650.00 3 City of Lauderdale Lakes Broward Canal Rehabilitation $3,000,000.00 $1,500,000.00 $1,500,000.00 2 City of Lauderdale Lakes Broward Citywide Drainage Improvements $7,000,000.00 $3,500,000.00 $3,500,000.00 3 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Amount Expected RFGP Funding Total Project Duration (years) City of Miramar Broward Swale Regrading $75,000.00 $0.00 $75,000.00 1 City of Sunrise Broward Sunset Strip Drainage Improvement $3,000,000.00 $1,500,000.00 $1,500,000.00 4 City of Weston Broward Stormwater Enhancements $3,100,000.00 $1,550,000.00 $1,550,000.00 2 Peace River Manasota DeSoto Regional Water Supply Authority Peace River Regional Reservoir No. 3 (PR3) - Preliminary Engineering $7,250,000.00 $5,249,000.00 $2,001,000.00 1 Dixie County Board of Dixie County Commissioners Airport and Prison Flood Abatement $600,000.00 $102,000.00 $498,000.00 1 City of Jacksonville Duval Stormwater Pump Station $40,000,000.00 $20,000,000.00 $20,000,000.00 3 City of Jacksonville Duval Wills Branch Dredge $2,738,234.00 $1,369,117.00 $1,369,117.00 2 City of Pensacola Escambia Main Street Flooding and Adaptation $3,982,000.00 $1,991,000.00 $1,991,000.00 2 City of Pensacola Escambia 9th Avenue Flooding Retrofit $1,174,977.00 $587,488.50 $587,488.50 2 Escambia Board of County Commissioners Escambia Surrey-Wishsong Pond, Outfall, and Rehabilitation $375,000.00 $337,500.00 $37,500.00 1 Escambia County Escambia Ellyson Industrial Park Drainage Improvements $289,736.00 $144,868.00 $144,868.00 1 Escambia County Board Escambia of County Commissioners Oakfield Acres - Belle Meade Drainage Improvements $1,500,000.00 $750,000.00 $750,000.00 1 Escambia County BOCC Escambia Frinchez Heights (Sabra, Erwin, Whitmire, Ernistene Area) $700,000.00 $350,000.00 $350,000.00 1 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Amount Expected RFGP Project Funding Total Duration (years) Gulf County Gulf Roads and Stormwater $9,433,311.54 $47,167.00 $9,386,144.98 3 Hillsborough County Board of County Commissioners Hillsborough Shimberg Park Parcel Flood Mitigation Conceptual Design $250,000.00 $125,000.00 $125,000.00 2 Town of Montverde Town of Greenville City of Anna Maria Lake Madison Manatee Infrastructure Flooding Mitigation Program Southside Flooding Mitigation Project City Hall Hardening Project $2,000,000.00 $660,000.00 $155,465.00 $200,000.00 $0.00 $77,732.50 $1,800,000.00 2 $660,000.00 1 $77,732.50 1 City of Bradenton Manatee Eastside Drainage Improvements From 8th Ave E to 13th Ave E $ 2, 290,000.00 $1,145,000.00 $1,145,000.00 3 Manatee County Manatee Improving Resilience in Manatee County $1,375,000.00 $649,000.00 $726,000.00 2 Martin County Martin SW Mockingbird Lane Flood Mitigation $1,620,000.00 $810,000.00 $810,000.00 2 Town of Sewall's Point Martin South Sewall's Point Road Phase 3 $4,370,000.00 $950,475.00 $3,419,525.00 2 Bal Harbour Village Miami Dade Stormwater Pump Station Upgrades- Design/Construction $3,000,000.00 $999,900.00 $ 2, 000,100.00 3 City of Aventura Miami Dade Seawall Hardening $1,200,000.00 $600,000.00 $600,000.00 1 City of Doral Miami Dade Stormwater Improvement Project Sub Basin NW 33 Street W $301,644.00 $150,822.00 $150,822.00 1 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Amount Expected RFGP Project Funding Total Duration (years) City of Homestead Miami Dade 6th Avenue Drainage Improvements $ 2, 500,000.00 $1, 250,000.00 $1, 250,000.00 2 City of Miami Miami Dade Design/Construction Brickell Bay Drive $27,255,000.00 $10,084,350.00 $17,170,650.00 4 (BBD) Seawall & Flood Improvements along Biscayne Bay City of Miami Miami Dade Edgewater Flood Improvements (EFI) - $17,111,976.00 $8,555,988.00 $8,555,988.00 3 NE 4 Ave to Biscayne Bay, NE 22 to NE 24 St City of Miami Miami Dade Design, Permitting, Construction: $16,067,860.00 $8,033,930.00 $8,033,930.00 3 Shorecrest South Flood Improvements (SSFI) City of Miami Miami Dade Design, Permitting, Construction - East $28,876,990.00 $14,438,495.00 $14,438,495.00 3 Flagami Flood Improvements Project (EFFI) City of Miami Miami Dade Replace Seawalls - Morningside/Shorecrest (MS)/Biscayne Bay/Ademar Canal/Davis Canal $3,021,792.84 $1,510,896.42 $1,510,896.42 2 City of Miami Miami Dade Brickell and Coconut Grove Seawalls Project (S-BCG) $1,658,529.00 $829,264.50 $829,264.50 3 City of Miami Beach Miami Dade North Beach Town Center $10,000,000.00 $0.00 $10,000,000.00 4 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Amount Expected RFGP Project Funding Total Duration (years) City of Miami Beach Miami Dade Dune Enhancements $1,300,000.00 $299,000.00 $1,001,000.00 2 City of Miami Beach Miami Dade Citywide Gravity Sewer Mains Replacement $12,500,000.00 $4,875,000.00 $7,625,000.00 5 City of Sunny Isles Beach Miami Dade Central Island Area Pump Stations and Drainage Improvements $4,000,000.00 $2,000,000.00 $2,000,000.00 2 Miami Dade County Miami Dade Deployable Flood Barriers for Multiple Miami -Dade County Flood -Prone Fire Stations $ 680,000.00 $ 340,000.00 $ 340,000.00 1 Miami Dade County, RER-DERM Miami Dade Little River Basin Phase 2 - Improvements to Raise Canal Banks Elevations $10,400,000.00 $5,200,000.00 $5,200,000.00 4 Miami Shores Village Miami Dade Bayfront Park Seawall Elevation $2,000,000.00 $1,000,000.00 $1,000,000.00 3 Miami -Dade County Miami Dade Cutler Pit Land Acquisition Project $600,000.00 $300,000.00 $300,000.00 2 Miami -Dade County Miami Dade Water Reset - Increasing the Resiliency $20,250,000.00 $5,062,500.00 $15,187,500.00 4 of Drinking Water Infrastructure Miami -Dade County Miami Dade Little River Basin Phase 1 - Improvements to Raise Canal Banks Elevations $14,000,000.00 $7,000,000.00 $7,000,000.00 3 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Expected RFGP Amount Funding Total Project Duration (years) Miami -Dade County Miami Dade North Dade Chiller Plant - Critical Infrastructure Hardening $600,000.00 $300,000.00 $300,000.00 2 Miami -Dade County Miami Dade Miami -Dade County/Fairchild Tropical $25,000,000.00 $12,500,000.00 $12,500,000.00 3 Botanic Garden Miami -Dade County Miami Dade Schenley Park Septic to Sewer Conversion $55,000,000.00 $27,500,000.00 $27,500,000.00 4 Miami -Dade County Miami Dade County Government Center (Stephen P. Clark Center) Stormwater Drainage Improvements $800,000.00 $400,000.00 $400,000.00 2 Miami -Dade County Department of Cultural Affairs Miami Dade Flood Resiliency for North Side of Vizcaya Museum and Gardens $521,230.00 $260,615.00 $260,615.00 4 Miami -Dade County Parks, Recreation and Open Spaces Department Miami Dade Black Point Park and Marina Sea Level Rise and Flood Mitigation Shoreline Stabilization $1,530,000.00 $765,000.00 $765,000.00 3 Miami -Dade County Parks, Recreation and Open Spaces Department Miami Dade Haulover Park Western Shoreline Sea Level Rise and Flood Mitigation $1,340,280.00 $670,140.00 $670,140.00 3 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Amount Expected RFGP Project Funding Total Duration (years) Miami -Dade County, Department of Transportation and Public Works Miami Dade Elevation of Roadway, Infrastructure, and Drainage Resilience Improvements $15,000,000.00 $7,500,000.00 $7,500,000.00 3 North Bay Village Miami Dade North Bay Village Coastal Resiliency $15,000,000.00 $12,000,000.00 $3,000,000.00 3 Town of Bay Harbor Islands Miami Dade Seawall Replacement $225,000.00 $0.00 $225,000.00 2 Town of Bay Harbor Islands Miami Dade West Bay Harbor Terrace Stormwater Improvements $310,000.00 $0.00 $310,000.00 2 Town of Cutler Bay Miami Dade Cutler Bay Canal Bank Restoration Project $1,500,000.00 $750,000.00 $750,000.00 3 Town of Golden Beach Miami Dade Pump Station at Tweddle Park $1,000,000.00 $500,000.00 $500,000.00 2 Town of Surfside Miami Dade Surfside's Collins Avenue Water Main Replacement Design Phase $340,205.00 $122,474.00 $217,731.00 1 Village of El Portal Miami Dade El Jardin Storm Water Improvements $1,748,986.00 $822,023.42 $926,962.58 3 City of Key Colony Beach Monroe Public Safety Facility Hardening $6,714,292.00 $4,431,432.72 $2,282,859.28 2 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Amount Expected RFGP Funding Total Project Duration (years) Islamorada, Village of Islands Monroe Founders Park Breakwater Restoration $1,903,754.00 $0.00 $1,903,754.00 2 Monroe County Monroe Harry Harris Park Resilient Redesign $200,000.00 $100,000.00 $100,000.00 2 Village of Islamorada Monroe Islamorada Transmission Main Adaptation $35,000,000.00 $17,500,000.00 $17,500,000.00 3 City of Fernandina Beach Nassau Historic Fernandina Beach Area 6 Drainage Project $725,000.00 $199,375.00 $525,625.00 2 City of Belle Isle Orange Sol Avenue Rebuild $492,155.00 $295,293.00 $196,862.00 1 City of Lake Worth Beach Palm Beach South Palm Park Sea Level Rise Mitigation $600,000.00 $300,000.00 $300,000.00 3 City of Lake Worth Beach Palm Beach Eden Place Sea Level Rise Mitigation $600,000.00 $300,000.00 $300,000.00 3 City of West Palm Beach Palm Beach Flagler Drive Area Underground Utilities Hardening $1,500,000.00 $750,000.00 $750,000.00 1 Palm Beach County Palm Beach Australian Avenue Drainage Improvements $31,063,067.44 $17,705,949.00 $13,357,119.00 3 Palm Beach County Palm Beach M-2 Bypass $389,324.00 $194,662.00 $194,662.00 2 Palm Beach County Water Utilities Palm Beach Western Region Wastewater Treatment Facility (WRWWTF) Operations Building Replacement $7,945,590.00 $238,367.70 $7,707,222.30 3 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Amount Expected RFGP Project Funding Total Duration (years) Palm Beach County Water Utilities Palm Beach Wastewater Lift Station LS 0637 Hardening Improvements $500,000.00 $250,000.00 $250,000.00 3 Town of Hypoluxo Palm Beach Septic to Sewer Conversion $1,437,500.00 $733,125.00 $704,375.00 2 Town of Juno Beach Palm Beach Universe Boulevard $2,100,000.00 $1,050,000.00 $1,050,000.00 2 Town of Lake Park Palm Beach Storm Water Master Plan 5% Roadway Bioswales Program $553,758.54 $0.00 $553,758.54 2 Village of Wellington Palm Beach Environmental Preserve at Marjorie Stoneman Douglas Habitat $3,403,266.00 $1,701,633.00 $1,701,633.00 2 City of New Port Richey Pasco South Gateway Inundation Park $1,600,000.00 $800,000.00 $800,000.00 3 City of Gulfport City of Treasure Island Pinellas County Pinellas Pinellas Pinellas Gulfport Marina Living Shoreline Project - Phase I Living Shoreline and Resiliency Project Philippe Park Living Shoreline Oyster Reef Wave Attenuation $350,000.00 $2,300,000.00 $323,000.00 $175,000.00 $805,000.00 $193,800.00 $175,000.00 2 $1,495,000.00 2 $129,200.00 1 Pinellas County Utilities Pinellas Mobile Home Park Wastewater Collection System Improvements $25,000,000.00 $0.00 $25,000,000.00 5 Pinellas County Utilities Pinellas Utilities Reliability Improvements $10,165,237.00 $6,729,387.00 $3,435,850.00 3 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Expected RFGP Amount Funding Total Project Duration (years) Polk County Parks & Natural Resources Polk Restoring Historic Wetlands - Minimize Flood Risk in the Peace Creek Canal Basin $15,000,000.00 $7,950,000.00 $7,050,000.00 4 Santa Rosa County Santa Rosa Floridatown Park Living Shoreline Implementation $800,057.00 $0.00 $800,057.00 1 City of St. Augustine St. Johns Tidal Backflow Prevention Improvements $461,282.00 $230,641.00 $230,641.00 4 City of St. Augustine St. Johns Lake Maria Sanchez Flood Mitigation/Drainage Improvements $29,830,178.00 $11,037,165.86 $18,793,012.14 3 City of St. Augustine St. Johns Flood Mitigation/Drainage Improvements for Court Theophelia Neighborhood $2,581,600.00 $0.00 $2,581,600.00 4 City of St. Augustine St. Johns South Whitney - West King Street Flood Mitigation $1,822,600.00 $619,684.00 $1,202,916.00 2 City of St. Augustine St. Johns Groundwater Monitoring Network for Sea Level Rise Impacts $217,100.00 $15,197.00 $201,903.00 3 City of St. Augustine St. Johns Inlet Drive Shoreline Resiliency $711,090.00 $0.00 $711,090.00 4 City of St. Augustine St. Johns South Davis Shores Flood Mitigation/Drainage Improvements $2,797,000.00 $0.00 $2,797,000.00 4 Wakulla County Board Wakulla of County Commissioners Coastal Evacuation Route Improvement $459,547.00 $0.00 $459,547.00 2 PROTECTING TOGETHER Project Sponsor County Project Title Approximate Total Project Cost (dollars) Local Match Expected RFGP Amount Funding Total Project Duration (years) Wakulla County Board of County Commissioners Wakulla Coastal Lift Stations Flood Mitigation $915,469.00 $0.00 $915,469.00 3 Wakulla County Board Wakulla of County Commissioners Coastal Lift Stations Retrofit and Flood Mitigation $1,270,484.00 $0.00 $1,270,484.00 3 Walton County Board of Walton County Commissioners Construction of Regional Stormwater Management System - Choctawhatchee Bay $31,000,000.00 $16,120,000.00 $14,880,000.00 2 Total $730,677,282.80 $326,641,132 $404,036,151 PROTECTING TOGETHER 2022-23 Statewide Flooding and Sea Level Rise Resilience Plan Project Sponsor County Project Title Approximate Total Project Cost (dollars) Estimated Requested Funding Total dollars Year 1 Funding Year 2 Funding Year 3 Funding Alachua County Alachua Robin Lane drainage improvements $1,199,633 $599,817 $599,817 City of Parker Bay Inland Flood Protection Retention Pond $1,163,235 $1,163,235 $1,163,235 Brevard County Mosquito Control Brevard Crystal Lakes Impoundment Breakwater and Living Shoreline $61,544 $15,017 $10,917 $4,100 Broward County Aviation Department Broward FLL Stormwater Outfall Modifications $626,066 $313,033 $24,079 $288,954 City of North Lauderdale Broward Pump Station $7,100,000 $3,550,000 $466,500 $3,083,500 City of Sunrise Broward Springtree Wastewater Treatment Plant Storage and Equipment Building $1,310,000 $655,000 $5,000 $325,000 $325,000 City of North Lauderdale Broward Canal Rehabilitation $5,200,000 $2,600,000 $976,666 $1,623,334 City of Lauderdale Lakes Broward Fire Station 37 Hardening $6,000,000 $3,000,000 $3,000,000 Broward County Broward FLL Trails End Pump Station $3,333,672 $1,666, 836 $147,152 $1,519,684 City of Oakland Park Broward NE 13th Avenue Stormwater $3,786,952 $1,893,476 $1,893,476 City of Oakland Park Broward Outfall Replacement $10,000,000 $5,000,000 $225,000 $2,525,000 $2,250,000 City of Oakland Park Broward Fire Station #9 $8,928,571 $2,500,000 $300,000 $2,200,000 Broward County Aviation Department Broward FLL Hilton Parcel Interconnection $6,099,818 $3,049,909 $187,285 $1,923,524 $939,100 PROTECTING TOGETHER City of Punta Gorda Charlotte Tiki Point Harborwalk Living Shoreline Pilot Project $1,313,238 $590,957 $27,512 $149,617 $413,828 City of Marco Island South Water Treatment Plant (SWTP) Collier West High Service Pump Station (West HSPS) $2,250,000 $900,000 $900,000 Escambia County Board of County Commissioner Escambia Beach Haven Phase II $8,390,000 $4,195,000 $2,097,500 $2,097,500 Escambia County Board of County Commissioners Escambia Chandler Street Drainage $850,000 $425,000 $425,000 City of Apalachicola Franklin Wastewater Plant Repairs $13,969,266 $13,410,495 $6,410,495 $7,000,000 Gulf County Gulf Advanced Wastewater Treatment Facility $28,462,469 $27,893,220 $1,588,268 $13,137,737 $13,167,215 Gulf County Gulf White City Water Treatment Plant $7,797,911 $6,784,183 $545,458 $3,101,930 $3,136,795 St. Johns River Water Management District Indian River Sebastian River Improvement District (SRID) Treatment and Storage $38,000,000 $19,000,000 $4,750,000 $4,750,000 $9,500,000 Martin County Martin Stormwater Backflow Preventer Installation Program $540,541 $200,000 $30,000 $70,000 $100,000 Martin County Martin Twin Rivers Park Shoreline Stabilization $1,724,000 $862,000 $65,000 $797,000 Martin County Martin Golden Gate Stormwater Treatment Area (STA) North Outfall Flood Mitigation $375,000 $180,000 $30,000 $150,000 Martin County Board of County Commissioners Martin Indian Riverside Park Living Shoreline Phase II $4,334,740 $1,863,938 $659,938 $954,000 $250,000 Miami Shores Village Miami Dade Miami Shores Village 93rd Street Pump Station Mitigation $800,000 $400,000 $40,000 $360,000 Miami Dade County Miami Dade Design plan to improve storm water management for South Dade Landfill $1,500,000 $750,000 $150,000 $600,000 Town of Surfside Miami Dade Town of Surfside's Abbott Avenue Stormwater Improvements $4,599,816 $2,000,000 $1,000,000 $1,000,000 Miami Dade County Miami Dade MDPLS (Miami Dade Public Library System) Main Library Resilient Grant $1,520,000 $760,000 $180,000 $580,000 Miami Dade County Installation and Elevation of Generators at Miami Dade multiple Miami -Dade County Fire Stations $785,000 $392,500 $392,500 City of Miami Miami Dade Immediate Flood Control: Install 79 Backflow Valves Citywide (BVCW) $4,084,000 $2,042,000 $510,500 $1,531,500 PROTECTING TOGETHER City of Miami Beach Miami Dade Project Title First Street Flood Mitigation and Sea Level Rise Adaptation $67,034,197 $20,110,259 $9,805,130 $9,805,130 $500,000 City of Miami Beach Miami Dade Fire Station #1 $17,171,143 $8,413,860 $1,815,330 $6,598,530 City of Miami Replacement of 8 Seawalls in Edgewater Miami Dade Project (S-EW) between NE 22nd St. to NE 34th St. along Biscayne Bay $3,111,764 $1,555,882 $412,308 $1,143,574 Miami -Dade County Miami Dade #674 Mangrove Restoration Along Gould's Canal to Reduce Storm Surge and Sea Level Rise Risks to Upland Areas and Assets $1,800,000 $900,000 $900,000 Miami -Dade County Miami Dade Enhancing the Resiliency of PHCD's Ingram Terrace Affordable Housing by Reducing Flood Risks with Stormwater Infrastructure and Other Improvements $1,150,549 $575,275 $201,346 $201,346 $172,582 Miami -Dade County, RER- Miami DERM Dade Station Retrofit & Improvements Biscayne Shores 3 Stormwater Pump $1,300,000 $650,000 $325,000 $325,000 North Bay Village Miami Dade North Bay Village Stormwater Collection $3,000,000 $1,500,000 $1,000,000 $500,000 System Miami -Dade County Miami Dade 679 EEL Acquisition & Environmental Enhancement of Lands Needed to Help Reduce Risk from SLR, Storm Surge, & Saltwater Intrusion $8,000,000 $4,000,000 $4,000,000 Miami -Dade County, RER- DERM Miami Dade Lake Belmar New Stormwater Pump Station Pump and Infrastructure System Installation to Mitigate Flooding and Anticipated Sea Level Rise $3,200,000 $1,600,000 $1,600,000 Town of Cutler Bay Miami Dade Cutler Bay Buffer Land Restoration Project $500,000 $250,000 $25,000 $150,000 $75,000 Miami -Dade County DOTPW Elevation of Roadway, Infrastructure and Miami Dade Drainage Improvements to SW 157 Ave $20,000,000 $10,000,000 $10,000,000 from SW 42 to SW 8Street for Resilience Miami -Dade County Critical Equipment Flood Resiliency for Miami Dade County Integrated Command and Communication Center $16,000,000 $6,000,000 $4,400,000 $1,600,000 PROTECTING TOGETHER City of Miami Miami Dade Design, Permitting & Construction North Grapeland Heights Seawall (NGHS) at NW 13th Street and NW 32nd Avenue $291,054 $145,527 $145,527 Miami -Dade County Flood Mitigation Measures for Critical Miami Dade County -wide Data Processing and Communications Center $600,000 $300,000 $300,000 Miami -Dade County Miami Dade Public Housing Resiliency Upgrades in the Little River Adaptation Action Area $30,000,000 $15,000,000 $1,000,000 $3,500,000 $10,500,000 City of Miami Design and Construction of Allapattah Miami Dade Flood Improvements (AFI) NW 7 Ave to $31,376,186 $15,688,093 $3,922,023 $11,766,070 14 Ave, NW 23 St to 31 St Miami -Dade County Miami Dade Resilient Shoreline Stabilization at Kristi House Children's Center $1,400,124 $450,000 $450,000 Miami -Dade Public Library System Miami Dade Miami Beach Regional Library Resilience Grant $800,000 $400,000 $125,000 $225,000 $50,000 Miami -Dade County Miami Dade #684 MDC EEL - Atlantic Civil - Wink Eye Slough Land Acquisition Project: Nature -Based Approach to Addressing Saltwater Intrusion $700,000 $350,000 $350,000 Miami -Dade County Miami Dade Peters Wetlands Land Acquisition Project: Nature -based Adaptation Approach to Reduce Risks of Storm Surge and Sea Level Rise $650,000 $325,000 $325,000 Monroe County Monroe Still wright Point Road Elevation & Stormwater Design and Permitting $2,369,990 $1,184,995 $710,997 $473,998 Monroe County Monroe Twin Lakes Subdivision Flood Mitigation Project $7,862,534 $3,931,267 $1,965,633 $1,769,070 $196,564 City of Delray Beach Palm Beach Tropic Isle Roadway and Underground Utility Improvements $39,600,000 $19,800,000 $6,600,000 $6,600,000 $6,600,000 Town of Palm Beach Palm Beach Stormwater and Wastewater System Resilience: D-8 Pump Station / E-5 Lift Station Elevation $1,323,529 $90,000 $60,000 $30,000 Town of Palm Beach Palm Beach Wastewater System Resilience: A-5 Lift Station Elevation $1,100,000 $33,000 $16,000 $17,000 City of Boca Raton Palm Beach NE 32nd Street Seawall $600,000 $300,000 $300,000 City of West Palm Beach Palm Beach Flagler Drive Drainage Improvements $2,000,000 $1,000,000 $1,000,000 PROTECTING TOGETHER City of West Palm Beach Palm Beach Palm Beach $3,750,000 $1,875,000 $1,000,000 $875,000 Town of Palm Beach Palm Beach Stormwater System Resilience: D-17 Pump Station Elevation $769,231 $300,000 $180,000 $120,000 City of West Palm Beach Palm Beach City of West Palm Beach Pilot Seawall Elevation Project $7,250,000 $3,625,000 $543,750 $3,081,250 City of Boca Raton Palm Beach Wave crest Way Seawall $700,000 $350,000 $350,000 Town of Palm Beach Palm Beach Stormwater System Resilience: D-12 Pump Station Floodproofing $909,091 $80,000 $63,000 $17,000 City of West Palm Beach Palm Beach Flagler Drive Lift Station Retrofits - Design & Construction $810,000 $405,000 $405,000 City of St. Petersburg Pinellas Bartlett Lake Improvements $3,000,000 $1,500,000 $1,500,000 City of St. Petersburg Pinellas Maximo Park Living Shoreline Project $342,000 $171,000 $171,000 City of Oldsmar Pinellas Water Reclamation Facility Control Building $4,300,000 $2,150,000 $850,000 $1,050,000 $250,000 Polk County Parks and Natural Resources Polk Ridge to River Protection of Critical Assets $6,000,000 $3,000,000 $3,000,000 St. Johns River Water Management District Putnam Riverside Conservancy Living Shoreline $190,440 $95,220 $95,220 St. Johns River Water Management District Putnam South Oslo Riverfront Conservation Area (SORCA) Floodplain Restoration $200,000 $100,000 $30,000 $70,000 St. Johns River Water Management District Putnam C-10 Water Management Area (WMA) $40,000,000 $20,000,000 $4,150,000 $7,925,000 $7,925,000 St. Johns River Water Management District Putnam Bayard Point Land Acquisition $17,000,000 $8,500,000 $8,500,000 St. Johns River Water Management District Putnam Titusville Causeway Multitrophic Restoration and Living Shoreline Resiliency Action Project $3,280,000 $1,640,000 $1,476,000 $82,000 $82,000 City of Sarasota Sarasota The Bay Sarasota: Resilient Infrastructure Part I $2,500,000 $1,250,000 $78,000 $1,172,000 City of Venice Sarasota Tarpon Center Drive Nature Based Flood Mitigation Pilot Project $1,250,000 $625,000 $75,000 $550,000 City of Port St. Lucie St. Lucie Water Control Structure Upgrades in Watersheds A and B of Port St. Lucie $4,000,000 $2,000,000 $1,000,000 $1,000,000