HomeMy WebLinkAboutBack-Up DocumentsPROTECTING TOGETHER
Resilient Florida Grant Program Awards Fiscal Year 2021-22
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match Expected RFGP
Amount Funding Total
Project
Duration
(years)
Alachua County
Alachua
Hills of Santa Fe Drainage
Improvements
$1,015,230.13
$507,615.07
$507,615.07
2
Alachua County Public Alachua
Works
Pine Hills Drainage Improvements
$1,345,630.64 $672,815.32 $672,815.32 2
City of Gainesville
Alachua
Wastewater Lift Station Force Main
Resiliency SSO Reduction
$11,865,000.00 $7,119,000.00 $4,746,000.00 3
Brevard County
Brevard
West Crisafuli Road Drainage
Improvements
$1,176,000.00 $588,000.00 $588,000.00 4
Brevard County Board Brevard
of County
Commissioners
Max Brewer Causeway Hurricane
Storm Damage Reduction Restoration
$1,000,000.00 $500,000.00 $500,000.00 3
Brevard County Natural Brevard
Resources Management
Department
Restoring Seagrass and Oyster Habitat
for Improved Natural Resilience
$500,000.00 $250,000.00 $250,000.00 3
Brevard County Natural Brevard
Resources Management
Department
Stormwater Program
West Cocoa Stormwater Flood
Protection and Infrastructure
Upgrades
$7,020,000.00 $3,510,000.00 $3,510,000.00 5
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match
Amount
Expected RFGP Project
Funding Total Duration
(years)
City of Titusville
Brevard
Bayview Sewage Lift Station #31
$ 2, 000,000.00
$0.00
$ 2, 000,000.00
3
Broward County
Aviation Department
Broward
FLL Ravenwood System
Interconnection
$11,406,888.00
$ 5, 703,444.00
$5,703,444.00 3
Broward County Board Broward
of Commissioners
Installation of Dewatering Pumps at
SRA1A to Maintain Access to
Hollywood North Beach Park.
$9,810,566.67
$9, 516, 249.00
$294,317.00 3
Broward County Board Broward
of County
Commissioners
C-4 Canal Conveyance Improvements
$932,400.00
$466,200.00
$466,200.00 2
Broward County Parks Broward
and Recreation
Hardening Seawalls of Intracoastal at
Hollywood North Beach
$18,000,000.00
$0.00
$18,000,000.00 4
City of Dania Beach
Broward
SW 37th Terrace Stormwater Project
$750,000.00
$375,000.00
$375,000.00 1
City of Dania Beach
Broward
Southeast Drainage Project
$14,500,000.00
$11,020,000.00
$3,480,000.00 2
City of Dania Beach
Broward
SW 54th Court Stormwater Project
$700,000.00
$350,000.00
$350,000.00 2
City of Hollywood
City of Hollywood
City of Hollywood
Broward
Broward
Broward
Tidal Flooding Mitigation and
Shoreline Protection
A1A Pump Stations
Recapture the Swale Restoration Pilot
Program
$28,000,000.00
$3,650,000.00
$695,000.00
$13,888,000.00
$1,825,000.00
$368,350.00
$14,112,000.00 4
$1,825,000.00 3
$326,650.00 3
City of Lauderdale Lakes Broward
Canal Rehabilitation
$3,000,000.00
$1,500,000.00
$1,500,000.00 2
City of Lauderdale Lakes Broward
Citywide Drainage Improvements
$7,000,000.00
$3,500,000.00
$3,500,000.00 3
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match
Amount
Expected RFGP
Funding Total
Project
Duration
(years)
City of Miramar
Broward
Swale Regrading
$75,000.00
$0.00
$75,000.00
1
City of Sunrise
Broward
Sunset Strip Drainage Improvement
$3,000,000.00
$1,500,000.00
$1,500,000.00 4
City of Weston
Broward
Stormwater Enhancements
$3,100,000.00
$1,550,000.00
$1,550,000.00 2
Peace River Manasota DeSoto
Regional Water Supply
Authority
Peace River Regional Reservoir No. 3
(PR3) - Preliminary Engineering
$7,250,000.00
$5,249,000.00
$2,001,000.00 1
Dixie County Board of Dixie
County Commissioners
Airport and Prison Flood Abatement
$600,000.00
$102,000.00
$498,000.00 1
City of Jacksonville
Duval
Stormwater Pump Station
$40,000,000.00
$20,000,000.00
$20,000,000.00 3
City of Jacksonville
Duval
Wills Branch Dredge
$2,738,234.00
$1,369,117.00
$1,369,117.00 2
City of Pensacola
Escambia
Main Street Flooding and Adaptation
$3,982,000.00
$1,991,000.00
$1,991,000.00 2
City of Pensacola
Escambia
9th Avenue Flooding Retrofit
$1,174,977.00
$587,488.50
$587,488.50 2
Escambia Board of
County Commissioners
Escambia
Surrey-Wishsong Pond, Outfall, and
Rehabilitation
$375,000.00
$337,500.00
$37,500.00 1
Escambia County
Escambia
Ellyson Industrial Park Drainage
Improvements
$289,736.00
$144,868.00
$144,868.00 1
Escambia County Board Escambia
of County
Commissioners
Oakfield Acres - Belle Meade Drainage
Improvements
$1,500,000.00
$750,000.00
$750,000.00 1
Escambia County BOCC Escambia
Frinchez Heights (Sabra, Erwin,
Whitmire, Ernistene Area)
$700,000.00
$350,000.00
$350,000.00 1
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match
Amount
Expected RFGP Project
Funding Total Duration
(years)
Gulf County
Gulf
Roads and Stormwater
$9,433,311.54
$47,167.00
$9,386,144.98
3
Hillsborough County
Board of County
Commissioners
Hillsborough
Shimberg Park Parcel Flood Mitigation
Conceptual Design
$250,000.00
$125,000.00
$125,000.00 2
Town of Montverde
Town of Greenville
City of Anna Maria
Lake
Madison
Manatee
Infrastructure Flooding Mitigation
Program
Southside Flooding Mitigation Project
City Hall Hardening Project
$2,000,000.00
$660,000.00
$155,465.00
$200,000.00
$0.00
$77,732.50
$1,800,000.00 2
$660,000.00 1
$77,732.50 1
City of Bradenton
Manatee
Eastside Drainage Improvements From
8th Ave E to 13th Ave E
$ 2, 290,000.00
$1,145,000.00
$1,145,000.00 3
Manatee County
Manatee
Improving Resilience in Manatee
County
$1,375,000.00
$649,000.00
$726,000.00 2
Martin County
Martin
SW Mockingbird Lane Flood Mitigation
$1,620,000.00
$810,000.00
$810,000.00 2
Town of Sewall's Point
Martin
South Sewall's Point Road Phase 3
$4,370,000.00
$950,475.00
$3,419,525.00 2
Bal Harbour Village
Miami Dade
Stormwater Pump Station Upgrades-
Design/Construction
$3,000,000.00
$999,900.00
$ 2, 000,100.00 3
City of Aventura
Miami Dade
Seawall Hardening
$1,200,000.00
$600,000.00
$600,000.00 1
City of Doral
Miami Dade Stormwater Improvement Project Sub
Basin NW 33 Street W
$301,644.00
$150,822.00
$150,822.00 1
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match
Amount
Expected RFGP Project
Funding Total Duration
(years)
City of Homestead
Miami Dade 6th Avenue Drainage Improvements
$ 2, 500,000.00 $1, 250,000.00 $1, 250,000.00
2
City of Miami
Miami Dade
Design/Construction Brickell Bay Drive $27,255,000.00 $10,084,350.00 $17,170,650.00 4
(BBD) Seawall & Flood Improvements
along Biscayne Bay
City of Miami
Miami Dade
Edgewater Flood Improvements (EFI) - $17,111,976.00 $8,555,988.00 $8,555,988.00 3
NE 4 Ave to Biscayne Bay, NE 22 to NE
24 St
City of Miami
Miami Dade
Design, Permitting, Construction: $16,067,860.00 $8,033,930.00 $8,033,930.00 3
Shorecrest South Flood Improvements
(SSFI)
City of Miami
Miami Dade
Design, Permitting, Construction - East $28,876,990.00 $14,438,495.00 $14,438,495.00 3
Flagami Flood Improvements Project
(EFFI)
City of Miami
Miami Dade
Replace Seawalls -
Morningside/Shorecrest
(MS)/Biscayne Bay/Ademar
Canal/Davis Canal
$3,021,792.84 $1,510,896.42 $1,510,896.42 2
City of Miami
Miami Dade Brickell and Coconut Grove Seawalls
Project (S-BCG)
$1,658,529.00 $829,264.50 $829,264.50 3
City of Miami Beach Miami Dade North Beach Town Center
$10,000,000.00
$0.00 $10,000,000.00 4
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match
Amount
Expected RFGP Project
Funding Total Duration
(years)
City of Miami Beach
Miami Dade
Dune Enhancements
$1,300,000.00
$299,000.00 $1,001,000.00
2
City of Miami Beach
Miami Dade
Citywide Gravity Sewer Mains
Replacement
$12,500,000.00 $4,875,000.00 $7,625,000.00 5
City of Sunny Isles
Beach
Miami Dade
Central Island Area Pump Stations and
Drainage Improvements
$4,000,000.00 $2,000,000.00 $2,000,000.00 2
Miami Dade County
Miami Dade
Deployable Flood Barriers for Multiple
Miami -Dade County Flood -Prone Fire
Stations
$ 680,000.00 $ 340,000.00 $ 340,000.00 1
Miami Dade County,
RER-DERM
Miami Dade
Little River Basin Phase 2 -
Improvements to Raise Canal Banks
Elevations
$10,400,000.00 $5,200,000.00 $5,200,000.00 4
Miami Shores Village
Miami Dade
Bayfront Park Seawall Elevation
$2,000,000.00 $1,000,000.00 $1,000,000.00 3
Miami -Dade County
Miami Dade
Cutler Pit Land Acquisition Project
$600,000.00 $300,000.00 $300,000.00 2
Miami -Dade County
Miami Dade
Water Reset - Increasing the Resiliency $20,250,000.00 $5,062,500.00 $15,187,500.00 4
of Drinking Water Infrastructure
Miami -Dade County
Miami Dade
Little River Basin Phase 1 -
Improvements to Raise Canal Banks
Elevations
$14,000,000.00 $7,000,000.00 $7,000,000.00 3
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match Expected RFGP
Amount Funding Total
Project
Duration
(years)
Miami -Dade County
Miami Dade
North Dade Chiller Plant - Critical
Infrastructure Hardening
$600,000.00
$300,000.00
$300,000.00
2
Miami -Dade County
Miami Dade
Miami -Dade County/Fairchild Tropical $25,000,000.00 $12,500,000.00 $12,500,000.00 3
Botanic Garden
Miami -Dade County
Miami Dade
Schenley Park Septic to Sewer
Conversion
$55,000,000.00 $27,500,000.00 $27,500,000.00 4
Miami -Dade County
Miami Dade
County Government Center (Stephen
P. Clark Center) Stormwater Drainage
Improvements
$800,000.00 $400,000.00 $400,000.00 2
Miami -Dade County
Department of Cultural
Affairs
Miami Dade
Flood Resiliency for North Side of
Vizcaya Museum and Gardens
$521,230.00 $260,615.00 $260,615.00 4
Miami -Dade County
Parks, Recreation and
Open Spaces
Department
Miami Dade
Black Point Park and Marina Sea Level
Rise and Flood Mitigation Shoreline
Stabilization
$1,530,000.00 $765,000.00 $765,000.00 3
Miami -Dade County
Parks, Recreation and
Open Spaces
Department
Miami Dade Haulover Park Western Shoreline Sea
Level Rise and Flood Mitigation
$1,340,280.00 $670,140.00 $670,140.00 3
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match
Amount
Expected RFGP Project
Funding Total Duration
(years)
Miami -Dade County,
Department of
Transportation and
Public Works
Miami Dade Elevation of Roadway, Infrastructure,
and Drainage Resilience Improvements
$15,000,000.00 $7,500,000.00 $7,500,000.00
3
North Bay Village
Miami Dade
North Bay Village Coastal Resiliency
$15,000,000.00 $12,000,000.00 $3,000,000.00 3
Town of Bay Harbor
Islands
Miami Dade
Seawall Replacement
$225,000.00
$0.00 $225,000.00 2
Town of Bay Harbor
Islands
Miami Dade
West Bay Harbor Terrace Stormwater
Improvements
$310,000.00
$0.00 $310,000.00 2
Town of Cutler Bay
Miami Dade
Cutler Bay Canal Bank Restoration
Project
$1,500,000.00 $750,000.00 $750,000.00 3
Town of Golden Beach
Miami Dade
Pump Station at Tweddle Park
$1,000,000.00 $500,000.00 $500,000.00 2
Town of Surfside
Miami Dade
Surfside's Collins Avenue Water Main
Replacement Design Phase
$340,205.00 $122,474.00 $217,731.00 1
Village of El Portal
Miami Dade
El Jardin Storm Water Improvements
$1,748,986.00 $822,023.42 $926,962.58 3
City of Key Colony
Beach
Monroe
Public Safety Facility Hardening
$6,714,292.00 $4,431,432.72 $2,282,859.28 2
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match
Amount
Expected RFGP
Funding Total
Project
Duration
(years)
Islamorada, Village of
Islands
Monroe
Founders Park Breakwater Restoration
$1,903,754.00
$0.00
$1,903,754.00
2
Monroe County
Monroe
Harry Harris Park Resilient Redesign
$200,000.00
$100,000.00
$100,000.00 2
Village of Islamorada
Monroe
Islamorada Transmission Main
Adaptation
$35,000,000.00
$17,500,000.00
$17,500,000.00 3
City of Fernandina
Beach
Nassau
Historic Fernandina Beach Area 6
Drainage Project
$725,000.00
$199,375.00
$525,625.00 2
City of Belle Isle
Orange
Sol Avenue Rebuild
$492,155.00
$295,293.00
$196,862.00 1
City of Lake Worth
Beach
Palm Beach
South Palm Park Sea Level Rise
Mitigation
$600,000.00
$300,000.00
$300,000.00 3
City of Lake Worth
Beach
Palm Beach
Eden Place Sea Level Rise Mitigation
$600,000.00
$300,000.00
$300,000.00 3
City of West Palm Beach
Palm Beach
Flagler Drive Area Underground
Utilities Hardening
$1,500,000.00
$750,000.00
$750,000.00 1
Palm Beach County
Palm Beach
Australian Avenue Drainage
Improvements
$31,063,067.44
$17,705,949.00
$13,357,119.00 3
Palm Beach County
Palm Beach
M-2 Bypass
$389,324.00
$194,662.00
$194,662.00 2
Palm Beach County
Water Utilities
Palm Beach
Western Region Wastewater
Treatment Facility (WRWWTF)
Operations Building Replacement
$7,945,590.00
$238,367.70
$7,707,222.30 3
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match
Amount
Expected RFGP Project
Funding Total Duration
(years)
Palm Beach County
Water Utilities
Palm Beach
Wastewater Lift Station LS 0637
Hardening Improvements
$500,000.00
$250,000.00
$250,000.00
3
Town of Hypoluxo
Palm Beach
Septic to Sewer Conversion
$1,437,500.00
$733,125.00
$704,375.00 2
Town of Juno Beach
Palm Beach
Universe Boulevard
$2,100,000.00
$1,050,000.00
$1,050,000.00 2
Town of Lake Park
Palm Beach
Storm Water Master Plan 5% Roadway
Bioswales Program
$553,758.54
$0.00
$553,758.54 2
Village of Wellington
Palm Beach
Environmental Preserve at Marjorie
Stoneman Douglas Habitat
$3,403,266.00
$1,701,633.00
$1,701,633.00 2
City of New Port Richey
Pasco
South Gateway Inundation Park
$1,600,000.00
$800,000.00
$800,000.00 3
City of Gulfport
City of Treasure Island
Pinellas County
Pinellas
Pinellas
Pinellas
Gulfport Marina Living Shoreline
Project - Phase I
Living Shoreline and Resiliency Project
Philippe Park Living Shoreline Oyster
Reef Wave Attenuation
$350,000.00
$2,300,000.00
$323,000.00
$175,000.00
$805,000.00
$193,800.00
$175,000.00 2
$1,495,000.00 2
$129,200.00 1
Pinellas County Utilities
Pinellas
Mobile Home Park Wastewater
Collection System Improvements
$25,000,000.00
$0.00
$25,000,000.00 5
Pinellas County Utilities
Pinellas
Utilities Reliability Improvements
$10,165,237.00
$6,729,387.00
$3,435,850.00 3
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match Expected RFGP
Amount Funding Total
Project
Duration
(years)
Polk County Parks &
Natural Resources
Polk Restoring Historic Wetlands - Minimize
Flood Risk in the Peace Creek Canal
Basin
$15,000,000.00 $7,950,000.00 $7,050,000.00
4
Santa Rosa County
Santa Rosa Floridatown Park Living Shoreline
Implementation
$800,057.00
$0.00
$800,057.00 1
City of St. Augustine
St. Johns Tidal Backflow Prevention
Improvements
$461,282.00 $230,641.00
$230,641.00 4
City of St. Augustine
St. Johns Lake Maria Sanchez Flood
Mitigation/Drainage Improvements
$29,830,178.00 $11,037,165.86 $18,793,012.14 3
City of St. Augustine
St. Johns
Flood Mitigation/Drainage
Improvements for Court Theophelia
Neighborhood
$2,581,600.00
$0.00 $2,581,600.00 4
City of St. Augustine
St. Johns South Whitney - West King Street
Flood Mitigation
$1,822,600.00
$619,684.00 $1,202,916.00 2
City of St. Augustine
St. Johns Groundwater Monitoring Network for
Sea Level Rise Impacts
$217,100.00 $15,197.00
$201,903.00 3
City of St. Augustine
St. Johns Inlet Drive Shoreline Resiliency
$711,090.00
$0.00
$711,090.00 4
City of St. Augustine
St. Johns South Davis Shores Flood
Mitigation/Drainage Improvements
$2,797,000.00
$0.00 $2,797,000.00 4
Wakulla County Board Wakulla
of County
Commissioners
Coastal Evacuation Route
Improvement
$459,547.00
$0.00
$459,547.00 2
PROTECTING TOGETHER
Project Sponsor
County
Project Title
Approximate Total
Project Cost
(dollars)
Local Match Expected RFGP
Amount Funding Total
Project
Duration
(years)
Wakulla County Board
of County
Commissioners
Wakulla
Coastal Lift Stations Flood Mitigation
$915,469.00
$0.00
$915,469.00
3
Wakulla County Board Wakulla
of County
Commissioners
Coastal Lift Stations Retrofit and Flood
Mitigation
$1,270,484.00
$0.00 $1,270,484.00 3
Walton County Board of Walton
County Commissioners
Construction of Regional Stormwater
Management System -
Choctawhatchee Bay
$31,000,000.00 $16,120,000.00 $14,880,000.00 2
Total
$730,677,282.80 $326,641,132 $404,036,151
PROTECTING TOGETHER
2022-23 Statewide Flooding and Sea Level Rise Resilience Plan
Project Sponsor
County
Project Title
Approximate
Total Project
Cost (dollars)
Estimated
Requested
Funding
Total
dollars
Year 1
Funding
Year 2
Funding
Year 3
Funding
Alachua County
Alachua
Robin Lane drainage improvements
$1,199,633
$599,817
$599,817
City of Parker
Bay
Inland Flood Protection Retention Pond
$1,163,235 $1,163,235 $1,163,235
Brevard County Mosquito
Control
Brevard
Crystal Lakes Impoundment Breakwater
and Living Shoreline
$61,544
$15,017
$10,917
$4,100
Broward County Aviation
Department
Broward
FLL Stormwater Outfall Modifications
$626,066
$313,033
$24,079
$288,954
City of North Lauderdale
Broward
Pump Station
$7,100,000
$3,550,000
$466,500 $3,083,500
City of Sunrise
Broward
Springtree Wastewater Treatment Plant
Storage and Equipment Building
$1,310,000 $655,000
$5,000
$325,000 $325,000
City of North Lauderdale
Broward
Canal Rehabilitation
$5,200,000 $2,600,000 $976,666 $1,623,334
City of Lauderdale Lakes
Broward
Fire Station 37 Hardening
$6,000,000 $3,000,000 $3,000,000
Broward County
Broward
FLL Trails End Pump Station
$3,333,672
$1,666, 836
$147,152 $1,519,684
City of Oakland Park
Broward
NE 13th Avenue Stormwater
$3,786,952 $1,893,476 $1,893,476
City of Oakland Park
Broward
Outfall Replacement
$10,000,000 $5,000,000 $225,000 $2,525,000 $2,250,000
City of Oakland Park
Broward
Fire Station #9
$8,928,571 $2,500,000 $300,000 $2,200,000
Broward County Aviation
Department
Broward
FLL Hilton Parcel Interconnection
$6,099,818 $3,049,909 $187,285 $1,923,524 $939,100
PROTECTING TOGETHER
City of Punta Gorda
Charlotte
Tiki Point Harborwalk Living Shoreline
Pilot Project
$1,313,238 $590,957
$27,512
$149,617 $413,828
City of Marco Island
South Water Treatment Plant (SWTP)
Collier West High Service Pump Station (West
HSPS)
$2,250,000 $900,000 $900,000
Escambia County Board of
County Commissioner
Escambia
Beach Haven Phase II
$8,390,000 $4,195,000 $2,097,500 $2,097,500
Escambia County Board of
County Commissioners
Escambia
Chandler Street Drainage
$850,000
$425,000 $425,000
City of Apalachicola
Franklin
Wastewater Plant Repairs
$13,969,266 $13,410,495 $6,410,495 $7,000,000
Gulf County
Gulf Advanced Wastewater Treatment Facility $28,462,469 $27,893,220 $1,588,268 $13,137,737 $13,167,215
Gulf County
Gulf
White City Water Treatment Plant
$7,797,911 $6,784,183 $545,458 $3,101,930 $3,136,795
St. Johns River Water
Management District
Indian River
Sebastian River Improvement District
(SRID) Treatment and Storage
$38,000,000 $19,000,000 $4,750,000 $4,750,000 $9,500,000
Martin County
Martin
Stormwater Backflow Preventer
Installation Program
$540,541
$200,000
$30,000
$70,000 $100,000
Martin County
Martin Twin Rivers Park Shoreline Stabilization $1,724,000 $862,000
$65,000
$797,000
Martin County
Martin
Golden Gate Stormwater Treatment Area
(STA) North Outfall Flood Mitigation
$375,000
$180,000
$30,000
$150,000
Martin County Board of
County Commissioners
Martin
Indian Riverside Park Living Shoreline
Phase II
$4,334,740
$1,863,938 $659,938
$954,000 $250,000
Miami Shores Village
Miami Dade
Miami Shores Village 93rd Street Pump
Station Mitigation
$800,000
$400,000
$40,000
$360,000
Miami Dade County
Miami Dade
Design plan to improve storm water
management for South Dade Landfill
$1,500,000 $750,000 $150,000 $600,000
Town of Surfside
Miami Dade
Town of Surfside's Abbott Avenue
Stormwater Improvements
$4,599,816 $2,000,000 $1,000,000 $1,000,000
Miami Dade County
Miami Dade
MDPLS (Miami Dade Public Library
System) Main Library Resilient Grant
$1,520,000 $760,000 $180,000 $580,000
Miami Dade County
Installation and Elevation of Generators at
Miami Dade multiple Miami -Dade County Fire
Stations
$785,000
$392,500 $392,500
City of Miami
Miami Dade
Immediate Flood Control: Install 79
Backflow Valves Citywide (BVCW)
$4,084,000 $2,042,000
$510,500 $1,531,500
PROTECTING TOGETHER
City of Miami Beach Miami Dade
Project Title First Street Flood Mitigation
and Sea Level Rise Adaptation
$67,034,197 $20,110,259 $9,805,130 $9,805,130 $500,000
City of Miami Beach Miami Dade
Fire Station #1
$17,171,143 $8,413,860 $1,815,330 $6,598,530
City of Miami
Replacement of 8 Seawalls in Edgewater
Miami Dade Project (S-EW) between NE 22nd St. to
NE 34th St. along Biscayne Bay
$3,111,764 $1,555,882
$412,308 $1,143,574
Miami -Dade County Miami Dade
#674 Mangrove Restoration Along
Gould's Canal to Reduce Storm Surge and
Sea Level Rise Risks to Upland Areas and
Assets
$1,800,000 $900,000 $900,000
Miami -Dade County Miami Dade
Enhancing the Resiliency of PHCD's
Ingram Terrace Affordable Housing by
Reducing Flood Risks with Stormwater
Infrastructure and Other Improvements
$1,150,549
$575,275 $201,346
$201,346 $172,582
Miami -Dade County, RER-
Miami
DERM Dade Station Retrofit & Improvements
Biscayne Shores 3 Stormwater Pump
$1,300,000 $650,000 $325,000 $325,000
North Bay Village Miami Dade North Bay Village Stormwater Collection $3,000,000 $1,500,000 $1,000,000 $500,000
System
Miami -Dade County Miami Dade
679 EEL Acquisition & Environmental
Enhancement of Lands Needed to Help
Reduce Risk from SLR, Storm Surge, &
Saltwater Intrusion
$8,000,000 $4,000,000 $4,000,000
Miami -Dade County, RER-
DERM
Miami Dade
Lake Belmar New Stormwater Pump
Station Pump and Infrastructure System
Installation to Mitigate Flooding and
Anticipated Sea Level Rise
$3,200,000 $1,600,000 $1,600,000
Town of Cutler Bay Miami Dade
Cutler Bay Buffer Land Restoration
Project
$500,000 $250,000 $25,000 $150,000 $75,000
Miami -Dade County
DOTPW
Elevation of Roadway, Infrastructure and
Miami Dade Drainage Improvements to SW 157 Ave $20,000,000 $10,000,000 $10,000,000
from SW 42 to SW 8Street for Resilience
Miami -Dade County
Critical Equipment Flood Resiliency for
Miami Dade County Integrated Command and
Communication Center
$16,000,000 $6,000,000
$4,400,000 $1,600,000
PROTECTING TOGETHER
City of Miami
Miami Dade
Design, Permitting & Construction North
Grapeland Heights Seawall (NGHS) at
NW 13th Street and NW 32nd Avenue
$291,054
$145,527 $145,527
Miami -Dade County
Flood Mitigation Measures for Critical
Miami Dade County -wide Data Processing and
Communications Center
$600,000
$300,000 $300,000
Miami -Dade County
Miami Dade
Public Housing Resiliency Upgrades in
the Little River Adaptation Action Area
$30,000,000 $15,000,000 $1,000,000 $3,500,000 $10,500,000
City of Miami
Design and Construction of Allapattah
Miami Dade Flood Improvements (AFI) NW 7 Ave to $31,376,186 $15,688,093 $3,922,023 $11,766,070
14 Ave, NW 23 St to 31 St
Miami -Dade County
Miami Dade
Resilient Shoreline Stabilization at Kristi
House Children's Center
$1,400,124 $450,000 $450,000
Miami -Dade Public Library
System
Miami Dade Miami Beach Regional Library Resilience
Grant
$800,000
$400,000 $125,000 $225,000 $50,000
Miami -Dade County
Miami Dade
#684 MDC EEL - Atlantic Civil - Wink
Eye Slough Land Acquisition Project:
Nature -Based Approach to Addressing
Saltwater Intrusion
$700,000
$350,000 $350,000
Miami -Dade County
Miami Dade
Peters Wetlands Land Acquisition Project:
Nature -based Adaptation Approach to
Reduce Risks of Storm Surge and Sea
Level Rise
$650,000
$325,000 $325,000
Monroe County
Monroe
Still wright Point Road Elevation &
Stormwater Design and Permitting
$2,369,990 $1,184,995
$710,997 $473,998
Monroe County
Monroe
Twin Lakes Subdivision Flood Mitigation
Project
$7,862,534 $3,931,267 $1,965,633 $1,769,070 $196,564
City of Delray Beach
Palm Beach
Tropic Isle Roadway and Underground
Utility Improvements
$39,600,000 $19,800,000 $6,600,000 $6,600,000 $6,600,000
Town of Palm Beach
Palm Beach
Stormwater and Wastewater System
Resilience: D-8 Pump Station / E-5 Lift
Station Elevation
$1,323,529
$90,000
$60,000
$30,000
Town of Palm Beach
Palm Beach
Wastewater System Resilience: A-5 Lift
Station Elevation
$1,100,000
$33,000
$16,000
$17,000
City of Boca Raton
Palm Beach
NE 32nd Street Seawall
$600,000
$300,000 $300,000
City of West Palm Beach
Palm Beach
Flagler Drive Drainage Improvements
$2,000,000
$1,000,000
$1,000,000
PROTECTING TOGETHER
City of West Palm Beach Palm Beach
Palm Beach
$3,750,000 $1,875,000
$1,000,000 $875,000
Town of Palm Beach
Palm Beach
Stormwater System Resilience: D-17
Pump Station Elevation
$769,231
$300,000 $180,000 $120,000
City of West Palm Beach
Palm Beach
City of West Palm Beach Pilot Seawall
Elevation Project
$7,250,000 $3,625,000
$543,750 $3,081,250
City of Boca Raton
Palm Beach
Wave crest Way Seawall
$700,000
$350,000 $350,000
Town of Palm Beach
Palm Beach
Stormwater System Resilience: D-12
Pump Station Floodproofing
$909,091
$80,000
$63,000
$17,000
City of West Palm Beach
Palm Beach
Flagler Drive Lift Station Retrofits -
Design & Construction
$810,000
$405,000 $405,000
City of St. Petersburg
Pinellas
Bartlett Lake Improvements
$3,000,000 $1,500,000 $1,500,000
City of St. Petersburg
Pinellas
Maximo Park Living Shoreline Project $342,000
$171,000 $171,000
City of Oldsmar
Pinellas
Water Reclamation Facility Control
Building
$4,300,000 $2,150,000 $850,000 $1,050,000 $250,000
Polk County Parks and
Natural Resources
Polk
Ridge to River Protection of Critical
Assets
$6,000,000 $3,000,000 $3,000,000
St. Johns River Water
Management District
Putnam
Riverside Conservancy Living Shoreline $190,440
$95,220
$95,220
St. Johns River Water
Management District
Putnam
South Oslo Riverfront Conservation Area
(SORCA) Floodplain Restoration
$200,000
$100,000
$30,000
$70,000
St. Johns River Water
Management District
Putnam
C-10 Water Management Area (WMA) $40,000,000 $20,000,000 $4,150,000 $7,925,000 $7,925,000
St. Johns River Water
Management District
Putnam
Bayard Point Land Acquisition
$17,000,000 $8,500,000 $8,500,000
St. Johns River Water
Management District
Putnam
Titusville Causeway Multitrophic
Restoration and Living Shoreline
Resiliency Action Project
$3,280,000 $1,640,000 $1,476,000 $82,000
$82,000
City of Sarasota
Sarasota
The Bay Sarasota: Resilient Infrastructure
Part I
$2,500,000 $1,250,000 $78,000 $1,172,000
City of Venice
Sarasota
Tarpon Center Drive Nature Based Flood
Mitigation Pilot Project
$1,250,000 $625,000
$75,000
$550,000
City of Port St. Lucie St. Lucie
Water Control Structure Upgrades in
Watersheds A and B of Port St. Lucie
$4,000,000 $2,000,000 $1,000,000 $1,000,000