HomeMy WebLinkAboutMemo from Director of OMBCITY OF MIAMI INTER -OFFICE MEMORANDUM TO: Arthur Noriega, V DATE: November 15, 2021 City Manager FROM: Marie Gouin, Director SUBJECT: Explanation of Capital Appropriations Office of Management and udget and Re -Appropriations This memorandum explains the reason for each of the item being recommended in the capital appropriations and re -appropriations resolution presented to the City Commission at the November 18, 2021 Commission Meeting. The recommended new appropriations (as detailed in Exhibit A) total $8,230,000 The items are being included here to properly amend the Capital Plan and the detail for each line is listed below: Appropriations (Exhibit Al Line 1 - The City Administration is recommending that $3,000,000 be newly appropriated from a Contribution from General Funds pursuant to the FY 2020-21 Year -End Operating Budget Amendment to the Oracle Cloud Implementation capital project (40-B223119). Line 2 - The City Administration is recommending that $2,000,000 be newly appropriated from a Contribution from General Funds pursuant to the FY 2020-21 Year -End Operating Budget Amendment to the Computer Aided Dispatch (CAD) capital project (40-B203215). Line 3 - The City Administration is recommending that $1,300,000 be newly appropriated from a Contribution from General Funds pursuant to the FY 2020-21 Year -End Operating Budget Amendment to the Citywide Light and Heavy Fleet Replacement capital project (40-B223123). Line 4 - The City Administration is recommending that $1,700,000 be newly appropriated from a Contribution from General Funds pursuant to the FY 2020-21 Year -End Operating Budget Amendment to the Fire -Rescue Bunker Gear capital project (40-B223209). Line 5 - The City Administration is recommending that $200,000 be newly appropriated from a Contribution from the Downtown Development Authority (pursuant to DDA Resolution 020/2021) to the 1-395 Baywalk - Phase I (McArthur Causeway Baywalk) capital project (40-B193623). Line 6 - The City Administration is recommending that $30,000 be newly appropriated from a Contribution from the Downtown Development Authority to the Relocation of Downtown Restroom capital project (40-B203108). The recommended re -appropriations (as detailed in Exhibit B) totals $4,113,903.04 and has 1 line that is not being appropriated from the same District to the same District. Line 33 would appropriate from a Citywide Parks Florida Inland Navigation (FIND) grant match capital project to a District 5 FIND grant awarded capital project (Legion Park Shore 5tablization - Design and Permitting) this has been done from time to time in the past in most (if not all) districts. Re -Appropriations (Exhibit B) Line 1- The City Administration is recommending that $36,658.00 be re -appropriated to the NW 18 Terrace East of 27 Avenue capital project (40-B50110) from the Di Roadway capital project (40-B193611) at the request of the Office of Capital Improvements (OCI) because the donating project has available funds and the receiving project needs additional funds for the construction phase. f^` nrUZIWO ,(12,�pc D(fl2 Page 2 of 6 Explanation of Capital Appropriations and Re- Appropriations November 15, 2021 Line 2 - The City Administration is recommending that $121,550.34 be re -appropriated to the NW 13 Avenue from NW 21 Street and NW 23 Street capital project (40-B50112) from the Curtis Park Environmental Remediation capital project (40-B40610) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project needs additional funds for the construction phase. Line 3 - The City Administration is recommending that $73,629.40 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Virginia Key Rowing Center Improvements capital project (40-B30374) at the request of OCI because the donating project has available funds and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 4 - The City Administration is recommending that $400,000.00 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Kennedy Park Restrooms Building Improvements capital project (40-B35838) at the request of OCI because the donating project has available funds and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 5 - The City Administration is recommending that $5,814.30 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Brickell Avenue Park Shade Structures capital project (40-B30685C) at the request of OCI because the donating project has available funds and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 6 - The City Administration is recommending that $91,427.06 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Emergency Repairs at Merrie Christmas Park capital project (40-B203512) at the request of OCI because the donating project has available funds and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 7 - The City Administration is recommending that $1,194.95 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Barnyard Park Improvements capital project (40- B173405A) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 8 - The City Administration is recommending that $350,000.00 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Virginia Key Rowing Center Park Building capital project (40-B40530) at the request of OCI because the donating project has available funds and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 9 and Line 10 - The City Administration is recommending that $59,408.91 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the 25th Road End of Street Phase I Seawall, Baywalk and Floating Dock capital project (40-B183400) at the request of OCI because the donating project is in the close- out phase with remaining funds that will not be needed and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 11 - The City Administration is recommending that $200,000.00 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Ichimura Japanese Gardens capital project (40- B70502A) at the request of OCI because the donating project has available funds and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Page 3 of 6 Explanation of Capital Appropriations and Re- Appropriations November 15, 2021 Line 12 - The City Administration is recommending that $25,000.00 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Manatee Bend Park capital project (40-B40523) at the request of OCI because the donating project has available funds and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 13 - The City Administration is recommending that $3,740.22 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Miami Women's Club Baywalk Project capital project (40-B30731) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 14 - The City Administration is recommending that $355,000.00 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Arthur Lamb Road Bike Path capital project (40- B203528) at the request of OCI because the donating project has available funds and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 15 - The City Administration is recommending that $5,437.64 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the Douglas Park Playground capital project (40-B173522) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 16 - The City Administration is recommending that $2,643.00 be re -appropriated to the Douglas Park Community Center capital project (40-B40581) from the new park at Broadway and SW 1st Avenue capital project (40-B40355A) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project is currently in the bidding phase and additional funds are needed to commence the construction phase. Line 18 - The City Administration is recommending that $57,000.00 be re -appropriated to the D3 Traffic Calming Device at SW 12 Street between SW 16 Avenue and SW 17 Avenue capital project (40-6223600) from the SW 15 Street from SW 12 Avenue to SW 14 Avenue capital project (40-B173630) at the request of OCI and the District office because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project needs additional funds for the design and construction phases. Line 17 - The City Administration is recommending that $42,000.00 be re -appropriated to the Little Havana Pedestrian Priority Zone capital project (40-B213602) from the Affordable Housing Study at Marlins Park project (40-B213411) at the request of OCI because the donating project has available funds that are no longer needed and the receiving multi -phase project will need additional funds for the future phases. Line 19 - The City Administration is recommending that $40,000.00 be re -appropriated to the Little Havana Pedestrian Priority Zone capital project (40-B213602) from the SW 23 Street from SW 3 and SW 14 Avenue capital project (40-B173622) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving multi -phase project will need additional funds for the future phases. Line 20 - The City Administration is recommending that $55,000.00 be re -appropriated to the Little Havana Pedestrian Priority Zone capital project (40-B213602) from the SW 5 Avenue from SW 24 Road and SW 25 Road capital project (40-6173633) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving multi -phase project will need additional funds for the future phases. Page 4 of 6 Explanation of Capital Appropriations and Re- Appropriations November 15, 2021 Line 21 - The City Administration is recommending that $6,093.76 be re -appropriated to the Dog Run Park capital project (40-B193522A) from the West End Park Open Field Irrigation capital project (40-B173519) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project needs funds for the design phase. Line 22 - The City Administration is recommending that $10,000.00 be re -appropriated to the Auburndale Traffic Device at SW 32nd Avenue and 2nd Street capital project (40-173655) from the Flagami Traffic Calming capital project (40-B40672G) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project needs additional funds for commencement of the construction phase. Line 23 - The City Administration is recommending that $30,000.00 be re -appropriated to the Auburndale Traffic Device at SW 32nd Avenue and 2nd Street capital project (40-173655) from the SW 29 Avenue from SW 23 Terrace to SW 23 Street capital project (40-B50420) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project needs additional funds for commencement ofthe construction phase. Line 24 - The City Administration is recommending that $180,000.00 be re -appropriated to the Spring Garden Traffic Calming Devices capital project (40-B223601) from the Traffic Calming 76 Street between NE 7 and NE 8 Avenue capital project (40-B203604) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project needs funds for the commence design phase. Line 25 - The City Administration is recommending that $35,865.85 be re -appropriated to the NW 2 Avenue from NW 8 Street to NW 11 Street Roadway Reconstruction capital project (40-B223602) from the Lemon City Daycare Roof Replacement capital project (40-B203527) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project needs funds for the design phase. Line 26 - The City Administration is recommending that $17,500.00 be re -appropriated to the NW 2 Avenue from NW 8 Street to NW 11 Street Roadway Reconstruction capital project (40-B223602) from the Traffic Calming 76 Street Between NE 7 and NE 8 Avenue capital project (40-B203604) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project needs funds for the design phase. Line 27 - The City Administration is recommending that $9,027.99 be re -appropriated to the NW 2 Avenue from NW 8 Street to NW 11 Street Roadway Reconstruction capital project (40-B223602) from the District Office Upper Eastside Kitchen Improvements capital project (40-B203116) at the request of OCI because the donating project is in the close-out phase with remaining funds that will not be needed and the receiving project needs funds for the design phase. Line 28 - The City Administration is recommending that $12,500.00 be re -appropriated to the NW 2 Avenue from NW 8 Street to NW 11 Street Roadway Reconstruction capital project (40-6223602) from the District 5 Tree capital project (40-B30615T) at the request of OCI because the donating project has available funds and the receiving project needs funds for the design phase. Line 29 - The City Administration is recommending that $12,500.00 be re -appropriated to the Buena Vista Neighborhood Traffic Calming - Phase II District 5 capital project (40-B193615) from the Traffic Calming 76 Street Between NE 7 and NE 8 Avenue capital project (40-B203604) at the request of OCI because the donating project Page 5 of 6 Explanation of Capital Appropriations and Re- Appropriations November 15, 2021 is in the close-out phase with remaining funds that will not be needed and the receiving project needs additional funds for the construction phase. Line 30 - The City Administration is recommending that $12,500.00 be re -appropriated to the Buena Vista Neighborhood Traffic Calming - Phase II District 5 capital project (40-B193615) from the District 5 Tree capital project (40-B30615T) at the request of OCI because the donating project has available funds and the receiving project needs additional funds for the construction phase. Line 31 - The City Administration is recommending that $225,000.00 be re -appropriated to the Buena Vista Neighborhood Traffic Calming - Phase II District 5 capital project (40-B193615) from the District 5 Park, Street and Lighting Improvements capital project (40-B40715) at the request of OCI because the donating project has available funds and the receiving project needs additional funds for the construction phase. Line 32 - The City Administration is recommending that $50,000.00 be re -appropriated to the Buena Vista Neighborhood Traffic Calming - Phase I capital project (40-B193620) from the District 5 Park, Street and Lighting Improvements capital project (40-B40715) at the request of OCI because the donating project has available funds and the receiving project needs additional funds for the construction phase. Line 33 - The City Administration is recommending that $234,050.00 be re -appropriated to the Legion Park Shore Stablization - Design and Permitting capital project (40-B223507) from the Parks FIND grant match project capital project (40-B193502) at the request of OCI because the donating project has available funds and the receiving project needs additional funds for the FIND grant match pursuant to Resolution 21-0093. Line 34 - The City Administration is recommending that $20,000.00 be re -appropriated to the Geographic Information System (GIS) Implementation - Riverwalks and Baywalks capital project (40-B223122) from the Office of Capital Improvements Reconfiguration capital project (40-B183102) at the request of OCI because the donating project has available funds and the receiving project needs funds as per the City Commission directive for the development of a GIS database of all properties on the City's riverwalks and baywalks. Line 35 - The City Administration is recommending that $500,000.00 be re -appropriated to the Gusman Hall Improvements and Repairs capital project (40-B70100) from the Department of Real Estate and Asset Management (DREAM) Upgrades capital project (40-B223400) at the request of DREAM because the donating project has available funds and the receiving project is in need of major repairs the apartment units and the Tower air handler unit. Line 36 - The City Administration is recommending that $105,000.00 be re -appropriated to the Marlins W3 Surface Lot Repairs and Drainage Improvements capital project (40-B193403) from the Marlins Garage — Technology Improvments capital project (40-B203407) at the request of DREAM because the donating project has available funds and the receiving project needs additional funds to complete construction. Line 38 - The City Administration is recommending that $100,000.00 be re -appropriated to the Pier Repairs- MiaMarina capital project (40-B183407) from the MiaMarina Ice Machine capital project (40-B213409) at the request of DREAM because the donating project is on -hold with has available funds and the receiving project needs additional funds to cover major grating replacments and piling repairs. Line 39 - The City Administration is recommending that $30,000.00 be re -appropriated to the MiaMarina Ticket Surcharge - Capital Operations and Improvements capital project (40-B183406) from the MiaMarina Ice Machine capital project (40-B213409) at the request of DREAM because the donating project is on -hold with has available funds and the receiving project needs additional funds to cover a shortfall caused by the reduction of ticket surcharge allocation due to COVID 19. Page 6 of 6 Explanation of Capital Appropriations and Re- Appropriations November 15, 2021 Line 40 - The City Administration is recommending that $60,361.62 be re -appropriated to the MiaMarina Ticket Surcharge - Capital Operations and Improvements capital project (40-B183406) from the MiaMarina Emergency Repairs capital project (40-B183404) at the request of DREAM because the donating project has available funds and the receiving project needs additional funds to cover a shortfall caused by the reduction of ticket surcharge allocation due to COVID 19. Line 41 - The City Administration is recommending that $30,000.00 be re -appropriated to the Pier Repairs- MiaMarina capital project (40-6183407) from the MiaMarina Emergency Repairs capital project (40-B183404) at the request of DREAM because the donating project has available funds and the receiving project needs additional funds to cover major grating replacments and piling repairs. Line 42 - The City Administration is recommending that $20,000.00 be re -appropriated to the Miamarina Canopy Replacement capital project (40-B223403) from the MiaMarina Emergency Repairs capital project (40-B183404) at the request of DREAM because the donating project has available funds that are no longer needed and the receiving project needs additional funds to replace the canopy cover of the Miamarina Piers. Line 43 - The City Administration is recommending that $80,000.00 be re -appropriated to the Miamarina Canopy Replacement capital project (40-B223403) from the Miami Marine Stadium Marina capital project (40-B70042) at the request of DREAM because the donating project has available funds and the receiving project needs additional funds to replace the canopy cover of the Miamarina Piers. Line 44 - The City Administration is recommending that $408,000.00 be re -appropriated to the Repairs at Marlins Garage capital project (40-B203408) from the Marlins Garage - Tech Improv capital project (40-B203407) at the request of DREAM because the donating project has available funds that will consolidate into the main project and the receiving project is used to fund various repairs as needed. Should you have any questions or concerns, please reach out to me at 305-416-1585 or MGouin miami ov.com FY2021-22 Capital Amendment No. 2 New Appropriations Exhibit A \\ , st mom.,_ .�.. _Lw.. ., Q"\ ^�, v.� h .... ._ . CRY. m .. '� ... FundingSail 1 CW 40-B223119 Oracle Cloud Implementation 3,000,000.00 31000 General Government 1426 Contribution from General Fund (per FY 2020-21 Year -End Operating Budget Amendment) 2 CW 40-B203215 Computer Aided Dispatch (CAD) 2,000,000.00 32000 Public Safety 1426 Contribution from General Fund (per FY 2020-21 Year -End Operating Budget Amendment) 3 CW 40-B223123 Citywide Light and Heavy Fleet Replacement 1,300,000.00 31000 General Government 1426 Contribution from General Fund (per FY 2020-21 Year -End Operating Budget Amendment) 4 CW 40-B223209 Fire -Rescue Bunker Gear 1,700,000.00 32000 Public Safety 1426 Contribution from General Fund (per FY 2020-21 Year -End Operating Budget Amendment) 5 2 40-B193623 1-395 Baywalk - Phase! (McArthur Causeway Baywalk) $ 200,000.00 36000 Streets and Sidewalks TBD Contribution from Downtown Development Authority (pursuant to DDA Resolution 020/2021) 6 2 40-B203108 Relocation of Downtown Restroom $ 30,000.00 31000 General Government TBD Contribution from Downtown Development Authority Total New Appropriations $ 8,230,000.00 (10980) Exhibits - CC MTG 11 18 1 of 4 FY2021-22 Capital Amendment No. 2 Re -Appropriations Exhibit B `D1s�trFct �nm:Pra ectNo: J,. Froitt.Pra eCt Name' ' ..... � �, ;" rgaunt `t• .,� ,. .. ,?.'�agxan'! " �unei: r Ctis#rf�t 'I`4 Pgo ecC;No. ,'%PrnJee.# ame` w. / o�unt 6�m..,..,, Pra 4ri� 6'�'� nd ",, � %/<,,, Fundin 8 r—i Sours '4 ' 1 1 40-B193611 D1 Roadway Project $ (36,658.00) 36000 Streets & Sidewalks 1 40-B50110 NW 18 Terrace East of 27 Avenue $ 36,658.00 36000 Streets & Sidewalks 1350 Special Revenue Contribution to Capital 2 1 40-B40610 Curtis Park Environmental Remediation Project $ (121,550.34) 35000 Parks & Recreation 1 40-B50112 NW 13 Avenue from NW 21 Street and NW 23 Street $ 121,550.34 36000 Streets & Sidewalks 1426 Contribution from General Fund 3 2 40-B30374 Virginia Key Rowing Center Improvements $ (73,629.40) 35000 Parks & Recreation 2 40-B40581 Douglas Park Community Center $ 73,629.40 35000 Parks & Recreation 1122 Sanitary Sewer Non -Bonds 4 2 40-B35838 Kennedy Park Restrooms Building Improvements $ (400,000.00) 35000 Parks & Recreation 2 40-B40581 Douglas Park Community Center $ 400,000.00 35000 Parks & Recreation 1122 Sanitary Sewer Non -Bonds 5 2 40-B30685C Brickell Avenue Park Shade Structures $ (5,814.30) 35000 Parks & Recreation 2 40-B40581 Douglas Park Community Center $ 5,814.30 35000 Parks & Recreation 1422 Impact Fees New Ordinance 6 2 40-B203512 Emergency Repair at Merrie Christmas Park $ (91,427.06) 35000 Parks & Recreation 2 40-B40581 Douglas Park Community Center $ 91,427.06 35000 Parks & Recreation 1426 Contribution from General Fund 7 2 40-B173405A Barnyard Park Improvements $ (1,194.95) 34000 Public Facilities- CIP 2 40-B40581 Douglas Park Community Center $ 1,194.95 35000 Parks & Recreation 1426 Contribution from General Fund 8 2 40-B40530 Virginia Key Rowing Center Park Building $ (350,000.00) 35000 Parks & Recreation 2 40-B40581 Douglas Park Community Center $ 350,000.00 35000 Parks & Recreation 1422 Impact Fees New Ordinance 9 2 40-B183400 25 Road End of Street Phase I (Seawall, Baywalk & Floating Dock) $ (22,000.00) 34000 Public Facilities- CIP 2 40-B40581 Douglas Park Community Center $ 22,000.00 35000 Parks & Recreation 1426 Contribution from General Fund 10 2 40-B70502A Ichimura Japanese Gardens $ (200,000.00) 35000 Parks & Recreation 2 40-B40581 Douglas Park Community Center $ 200,000.00 35000 Parks & Recreation 1426 Contribution from General Fund 11 2 40-6183400 25 Road End of Street Phase I (Seawall, Baywalk & Floating Dock) $ (37,408.91) 34000 Public Facilities- CIP 2 40-B40581 Douglas Park Community Center $ 37,408.91 35000 Parks & Recreation 1350 Special Revenue Contribution to Capital 12 2 40-B40523 Manatee Bend Park $ (25,000.00) 35000 Parks & Recreation 2 40-B40581 Douglas Park Community Center $ 25,000.00 35000 Parks & Recreation 1426 Contribution from General Fund 13 2 40-B30731 Miami Women's Club Baywalk Project $ (3,740.22) 34000 Public Facilities- CIP 2 40-B40581 Douglas Park Community Center $ 3,740.22 35000 Parks & Recreation 1426 Contribution from General Fund 14 2 40-B203528 Arthur Lamb Road Bike Path $ (355,000.00) 35000 Parks & Recreation 2 40-B40581 Douglas Park Community Center $ 355,000.00 35000 Parks & Recreation 2253 Impact Fees New Ordinance_Park 15 2 40-13173522 Douglas Park Playground $ (5,437.64) 35000 Parks & Recreation 2 40-B40581 Douglas Park Community Center $ 5,437.64 35000 Parks & Recreation 2253 Impact Fees New Ordinance_Park 16 2 40-B40355A Broadway and SW 1st Avenue - New Park $ (2,643.00) 35000 Parks & Recreation 2 40-B40581 Douglas Park Community Center $ 2,643.00 35000 Parks & Recreation 1422 Impact Fees New Ordinance (10980) Exhibits - CC MTG 11 18 2 of 4 FY2021-22 Capital Amendment No. 2 Re -Appropriations Exhibit B 1160,iitrict dffilliejeceNai From Project Namet.:•C13P;;,:Amoiiii AP :',,Oraiiiiiktilici: . :aye To Project Nivokilliiii'Od Name ti:: Amouiitr4Viiiin Fund Oa% 'Source 17 3 40-B173630 SW 15 Street from SW 12 Avenue to SW 14 Avenue $ (57,000.00) 36000 Streets & Sidewalks 3 40-B223600 D3 Traffic Calming Device at SW 12 Street between SW 16 Avenue and SW 17 Avenue $ 57,000.00 36000 Streets & Sidewalks 1297 Transit Half -Cent Surtax 18 3 40-B213411 AFH Study at Marlins Park $ (42,000.00) 34000 Public Facilities- CIP 3 40-B213602 Little Havana Pedestrian Priority Zone $ 42,000.00 36000 Streets & Sidewalks 1426 Contribution from General Fund 19 3 40-B173622 SW 23 Street from SW 3 and SW 14 Avenue $ (40,000.00) 36000 Streets & Sidewalks 3 40-B213602 Little Havana Pedestrian Priority Zone $ 40,000.00 36000 Streets & Sidewalks 1552 Local Option Gas Tax 20 3 40-B173633 SW 5 Avenue from SW 24 Road and SW 25 Road $ (55,000.00) 36000 Streets & Sidewalks 3 40-B213602 Little Havana Pedestrian Priority Zone $ 55,000.00 36000 Streets & Sidewalks 1113 Local Option Gas Tax 21 4 4043173519 West End Park Open Field Irrigation $ (6,093.76) 31000 General Governme nt Projects 4 40-B193522A Dog Run Park $ 6,093.76 35000 Parks & Recreation 1422 Impact Fees New Ordinance 22 4 40-B40672G Flagami Traffic Calming $ (10,000.00) 36000 Streets & Sidewalks 4 4043173655 Auburndale Traffic Device at SW 32nd Avenue and 2nd Street $ 10,000.00 36000 Streets & Sidewalks 1998 Contribution from General Fund Replacing Sunshine State Loan 23 4 40-B50420 SW 29 Avenue from SW 23 Terrace to SW 23 Street $ (30,000.00) 36000 Streets & Sidewalks 4 40-13173655 Auburndale Traffic Device at SW 32nd Avenue and 2nd Street $ 30,000.00 36000 Streets & Sidewalks 1426 Contribution from General Fund 24 5 40-B203604 Traffic Calming 76 Street Between NE 7 and NE 8 Avenue $ (180,000.00) 36000 Streets & Sidewalks 5 40-B223601 D5 Spring Garden Traffic Calming Devices $ 180,000.00 36000 Streets & Sidewalks 1426 Contribution from General Fund 25 5 40-B203527 Lemon City Daycare Roof Replacement $ (35,865.85) 35000 Parks & Recreation 5 40-B223602 NW 2 Avenue from NW 8 Street to NW 11 Street Roadway Reconstruction $ 35,865.85 36000 Streets & Sidewalks 1426 Contribution from General Fund 26 5 40-B203604 Traffic Calming 76 Street Between NE 7 and NE 8 Avenue $ (17,500.00) 36000 Streets & Sidewalks 5 40-B223602 NW 2 Avenue from NW 8 Street to NW 11 Street Roadway Reconstruction $ 17,500.00 36000 Streets & Sidewalks 1426 Contribution from General Fund 27 5 4043203116 NET Upper Eastside Kitchen Improvements $ (9,027.99) 31000 General Governme nt Projects 5 40-13223602 NW 2 Avenue from NW 8 Street to NW 11 Street Roadway Reconstruction $ 9,027.99 36000 Streets & Sidewalks 1426 Contribution from General Fund 28 5 40-B30615T D5 Tree Funded Project $ (12,500.00) 36000 Streets & Sidewalks 5 40-B223602 NW 2 Avenue from NW 8 Street to NW 11 Street Roadway Reconstruction $ 12,500.00 36000 Streets & Sidewalks 1954 Citiwide Landscape 29 5 40-B203604 Traffic Calming 76 Street Between NE 7 and NE 8 Avenue $ (12,500.00) 36000 Streets & Sidewalks 5 40-B193615 05 Roadway Project (Buena Vista Neighborhood Traffic Calming - Phase II) $ 12,500.00 36000 Streets & Sidewalks 1426 Contribution from General Fund 30 5 40-B30615T D5 Tree Funded Project $ (12,500.00) 36000 Streets & Sidewalks 5 40-B193615 D5 Roadway Project (Buena Vista Neighborhood Traffic Calming - Phase 11) $ 12,500.00 36000 Streets & Sidewalks 1954 Citiwide Landscape 31 5 40-B40715 DS Park, Street and Lighting Improvements $ (225,000.00) 36000 Streets & Sidewalks 5 40-B193615 D5 Roadway Project (Buena Vista Neighborhood Traffic Calming - Phase II) $ 225,000.00 36000 Streets & Sidewalks 1426 Contribution from General Fund 32 5 40-B40715 D5 Park, Street and Lighting Improvements $ (50,000.00) 36000 Streets & Sidewalks 5 40-B193620 Buena Vista Neighborhood Traffic Calming - Phase I $ 50,000.00 36000 Streets & Sidewalks 1426 Contribution from General Fund (10980) Exhibits - CC MTG 11 18 3 of 4 FY2021-22 Capital Amendment No. 2 Re -Appropriations Exhibit B # . Disrict �om ProtNo. F„roltt PraJeGt�±lame ,.. �.,., .. .� .�" „,;,,,Program �Rmovnt Fund .., District[T,o�P ecc'No. .,, Ti3PruJecklVartte. ! ,., .. }�tnoSrit` f j •` PropTairrsF„unii Furlding 5ourc,. 33 CW 40-B193502 Parks FIND Grant Match project $ (234,050.00) 35000 Parks & Recreation 5 40-13223507 Legion Park Shore Stablization - Design and Permitting $ 234,050.00 35000 Parks & Recreation 2253 Impact Fees New Ordinance_Park 34 CW 40-B183102 Office of Capital Improvements Reconfiguration $ (20,000.00) 31000 General Governme nt Projects CW 40-B223122 Geographic Information System (GIS) Implementation - Riverwalks and Baywalks $ 20,000.00 31000 General Governme nt Projects 1426 Contribution from General Fund 35 CW 40-B223400 DREAM UPGRADES $ (500,000.00) 34000 Public Facilities- CIP CW 40-B70100 Gusman Hall Improvements / Repairs $ 500,000.00 34000 Public Facilities- CIP 1426 Contribution from GF DREAM 36 CW 40-B203407 Marlins Garage -Tech Improv $ (105,000.00) 34000 Public Facilities- CIP CW 40-B193403 Marlins W3 Surface Lot Repairs and Drainage Improvements $ 105,000.00 34000 Public Facilities- CIP 1350 SRF Contribution to Capital 38 CW 40-13213409 MiaMarina Ice Machine $ (100,000.00) 34000 Public Facilities- CIP CW 40-B183407 Pier Repairs-MiaMarina $ 100,000.00 34000 Public Facilities- CIP 2150 Miamarina Ticket Surcharge Revenue 39 CW 40-B213409 MiaMarina Ice Machine $ (30,000.00) 34000 Public Facilities- CIP CW 40-B183406 MiaMarina Ticket Surcharge - Capital Operations and Improvements $ 30,000.00 34000 Public Facilities- CIP 2150 Miamarina Ticket Surcharge Revenue 40 CW 40-B183404 MiaMarina Emergency Repairs $ (60,361.62) 34000 Public Facilities- CIP CW 40-B183406 MiaMarina Ticket Surcharge - Capital Operations and Improvements $ 60,361.62 34000 Public Facilities- CIP 2150 Miamarina Ticket Surcharge Revenue 41 CW 40-6183404 MiaMarina Emergency Repairs $ (30,000.00) 34000 Public Facilities- CIP CW 40-B183407 Pier Repairs-MiaMarina $ 30,000.00 34000 Public Facilities- CIP 1437 10% Marinas Revenues 42 CW 40-B183404 MiaMarina Emergency Repairs $ (20,000.00) 34000 Public Facilities- CIP CW 40-B223403 Miamarina Canopy Replacement $ 20,000.00 34000 Public Facilities- CIP 1437 10% Marinas Revenues 43 CW 40-870042 Miami Marine Stadium Marina $ (80,000.00) 34000 Public Facilities- CIP CW 40-B223403 Miamarina Canopy Replacement $ 80,000.00 34000 Public Facilities- CIP 1437 10% Marinas Revenues 44 CW 40-132034O7 Marlins Garage -Tech Improv $ (408,000.00) 34000 Public Facilities- CIP CW 40-6203408 Repairs at Marlins Garage $ 408,000.00 34000 Public Facilities- CIP 1350 SRF Contribution to Capital Total Re -Appropriations (From) $ (4,113,903.04) Total Re -Appropriations (To) $ 4,113,903.04 (10980) Exhibits - CC MTG 11 18 4 of 4