Loading...
HomeMy WebLinkAboutSubmittal-Geoffrey Bash-EmailsSubmitted into the ublic record for i ern(s) .3-1- on II - `' -4(. City Clerk On Jan 29, 2021, at 4:25 PM, Iglesias, Daniel < > wrote: Good evening Mr. Bash, Secretary Wolfe asked me to follow up on your email sent to him this week. My name is Daniel Iglesias and l am the Director of Transportation Development; you can feel free to contact me on this issue moving forward. Your last paragraph indicates that you are well-informed and understand FDOT's limited role in approving land development. We often make comments to local government on the impact of proposed land development on the State Highway System. This includes review of related materials developed by land owners and their representatives. You are correct that these comments may be a factor in the local government decision. FDOT has direct control of the issuance of permits for driveway access to our system or for any permitted changes to our roads. Sometimes our remarks in granting these permits extend to requirements off our right-of-way where those conditions directly impact our highway. This does not generally extend to dedications of property which may occur as part of the zoning or building permit processes administered by local government. In the case of Mr. Bloomberg he has met several times in the last five years met with FDOT or presented roadway concept drawings on which we have made general comments, which he may well have quoted to others. Typical comments would be 'this is a workable roadway concept or 'this concept is superior to the current traffic flow'. In 2017 his traffic engineer generated a memorandum which analyzed potential traffic pattern changes along NE 51h Ct. (an off -system roadway) that was submitted and subsequently reviewed by FDOT. However, a comprehensive traffic study analyzing potential impacts to NE 38+1, Street/Biscayne Boulevard as a result of the re -development has not been presented. l have attached the traffic memorandum and comments made by FDOT to this email. For your information we also have a planning study under way on 1-195 which includes the ramp movernents on 38Lh Street. Our concepts do not include right-of-way acquisition which limits what we can propose to improve the intersection of 38111 Street and Biscayne Boulevard. I can put you in touch with the project manager if you want to learn more about our long range plans. Best Regards, Daniel Iglesias. P.E. Director of Transportation Development Florida Department of Transportation- District 6 .wdam Leigh Cann Building 4000 N.W. 111th Avenue Miami. Florida 33172 Ph: 305-470-5464 email: danieLiolesias@dot.state.fl.us �IS4S From: Iglesias, Daniel < Date: Thu. Jul 22, 2021 at 9:43 AM Subject: RE: 38th St & Biscayne Blvd Land Development - Traffic solutions To: Geoffrey Bash < Submitted into the public,,, record for i em(s) _ 2T ' n 7, City erk Good morning Geoffrey, FDOT has asked the developer to provide a traffic study that analyzes the proposed lane configurations along NE 38 Stand the surrounding roads that takes into account the proposed re -development traffic volumes but have not yet received the study. Daniel Iglesias, P.E. Director of Transportation Devciupanent Florida Department of Transportation- District 6 '1000 N W. 111 th Avenue Miami. Florida 33172 Ph: 305-470-5464 grail: daniel.j+ylesFasiafaot state II +J: Submitted into the ublic reeor for items) ` From: Iglesias, Daniel < on i � j— City lerk Date: Thu, Jul 22, 2021 at 9:43 AM Subject RE: 38th St & Biscayne Blvd Land Development - Traffic solutions To: Geoffrey Bash < Good morning Geoffrey. FDOT has asked the developer to provide a traffic study that analyzes the proposed lane configurations along NE 38 St. and the surrounding roads that takes into account the proposed re -development traffic volumes but have not yet received the study. Daniel lnlosias, P.E. Director ofTransporta iota Uevelopiilent r'oi'ida Department of Transportation- District 6 ..'OC N W 1llth Avenue °h 305-470-5464