Loading...
HomeMy WebLinkAboutExhibit AlCttp of 1J+ltamt March 24, 2021 Residences at Dr. King Boulevard, Ltd. c/o Ethan Wasserman 333 SE 2 Av., Suite 4400 Miami, FL 33131 wassermanegtlaw.com er EXHIBIT "A" ARTHUR NORIEGA, V. City Manager MLK RESIDENCES - TENTATIVE PLAT #1928-A (FIRST RESUBMITTAL) LOCATED AT THE NORTHWEST CORNER OF NW 62 STREET AND NW 15 AVENUE Ladies and Gentlemen: The City of Miami Plat and Street Committee, at its meeting of March 4, 2021, APPROVED the above tentative plat subject to the following revisions being made to the tentative plat, additional information being provided and/or variances being granted. Please be advised that the processing of your tentative plat cannot proceed until these conditions and/or comments have been satisfied. Resilience and Public Works 1. Location Sketch - Correct Subdivision names of the underlying plat and surrounding subdivisions. 2. Provide correction on the underground information of existing storm water system adjacent to proposed plat. Directions for pipes must be precise. 3. Resolve a small difference in areas for Tract A — 23,146 SF vs. 23,103 SF by the City Surveyor, and Tract B — 5,547 SF vs. 5,591 SF. 4. Delete or modify Note #7 for underground stormwater drainage information. 5. Additional minor comments at a later time may be required by the Survey section. Contact the Survey Section for additional minor comments. 6. Development a. Existing building permit BD19-001768-001 (1501 NW 62 ST) b. Encroachment into visibility triangle — to be resolved. Refer to applicable Planning/Zoning comment. Planning/Zoning 7. Provide a tree table listing all trees with common and botanical names, height, diameter and spread prepared by a Certified Arborist, with name, certification number, date of site visit. 8. Provide verification from Zoning Department if any Unity of Title or other type of covenant in Planning and Zoning records is affecting the subject property. 9. Development — visibility triangle is required at intersection of NW62 St and easement/vacated al ley. Transportation 10. Development — traffic study is to be completed and approved. DEPARTMENT OF RESILIENCE & PUBLIC WORKS 444 SW 2nd Avenue, 8th Floor / Miami, FL 33130 / (305) 416-1200 / Fax: (305) 416-1278 Mailing Address: P.O. Box 330708 Miami, FL 33233-0708 MLK RESIDENCES - TENTATIVE PLAT # 1928-A (FIRST RESUBMITTAL) March 24, 2021 Page 2 of 4 Standard Comments for Street and/or Easement Vacation 11. A letter from the Miami -Dade Water and Sewer Department is required to determine if any adjustments to their facilities or easements are required. 12. Existing utilities located within the street, alley, and easement to be closed and vacated must be relocated or easements provided. 13. Applicant is to comply with requirements of City of Miami Code Section 55-15(b)(1) for the properties on each side of the right of way (street and public/private alley) and easements to be vacated and closed to be included in the plat. City of Miami Code Section 54-4(b) is an alternative method to the requirement for abutting properties for closure and vacation of public street and public/private alley. 14. Applicant must comply with requirements of City of Miami Code Section 55-15(b)(4), Vacation and closure of portion of alley, requires that property owner to provide a suitable access within his/her property from the closed end of the alley to the nearest public street, or streets. All property owners abutting the alley shall join in the plat abandoning and disclaiming all right, title and interest in the portion of the alley being closed. 15. Provide a written request to the City of Miami Office of Capital Improvements and Department of Resilience and Public Works to obtain a Confirmation ("Confirmation"). If the Confirmation indicates that funds were expended, the City's Finance Department and Office of Management and Budget will determine the amount of the City's expenditure, specifically including expenditure of restricted funds (bond funds, grant funds, or otherwise) for such improvements as a separate line item. The City Manager or his or her designee will issue a Total Expenditure, which shall specify the amount that the Subdivider must repay to the City ("Total Expenditure"). Payment to the City of the amount indicated on the Total Expenditure shall be paid to the City before recordation of the Final Plat in accordance with Section 55-8 of the City Code, or before scheduling for PZAB consideration for the Alternative Method under the City Code Section 55- 15(i) and (j). Standard Comments 16. A letter from Comcast is required to determine if any adjustments to their facilities or easements are required. 17. All encroachments across proposed tract and/or lot lines, including any underground encroachments, must be removed prior to final plat submittal. 18. An Opinion of Title, in the City of Miami Opinion of Title form, must be provided at the time of final plat submittal. 19. Current backup documentation will be required for all who execute the final plat. A resolution for authority to execute documents and a Certificate of Good Standing from the Secretary of State are required, if applicable. 20. Tentative plat application must be made with Miami -Dade County after receiving approval from the City of Miami Plat and Street Committee. Provide a copy of the notice of action to Resilience and Public Works. 21. Be advised that an incomplete final plat package will not be accepted by the City of Miami. It is the owner's responsibility to work with his/her surveyor and attorney to assure that everything is in order before submitting the final plat package. 22. Be advised that if all requirements for scheduling the final plat for City Commission action are not in order, the final plat will not be scheduled for a City Commission meeting. 23. A letter from Miami -Dade Water and Sewer Department is required to release the final plat in connection with water and sewer service agreements. MLK RESIDENCES - TENTATIVE PLAT # 1928-A (FIRST RESUBMITTAL) March 24, 2021 Page 3 of 4 24. For informational purposes, provide two 8 '/A" x 11" sketches of the division of the land; one sketch of the existing divisions before the plat is recorded and one sketch of the divisions after the plat is recorded. In addition to the above requirements, you should be aware of the following: 1. State and local laws require the installation of various physical improvements in the public rights - of -way when property is platted. These subdivision improvements include paving, drainage, landscaping, sidewalks, etc. In some cases this could represent a substantial investment on your part. REQUIRED: The submission of an electronic file of the tentative plat, in an AutoCAD, to the City of Miami Resilience and Public Works Department, Development and Roadway Plans Section will EXPEDITE the preparation and enhance the ACCURACY of the subdivision improvement letter required for the final plat approval. 2. The alteration, relocation or installation of utilities such as storm and sanitary sewers, electric, telephone, water, etc., caused by this plat will be at the property owner's expense. Also, utility easements may be required on the property being platted. 3. A building permit will not be issued on the property being platted until the final plat is recorded or as authorized by the City of Miami Code Section 55-10(i). Also, the Temporary Certificate Occupancy and/or Certificate of Occupancy for any building construction will be issued only after all the required subdivision improvements have been completed. 4. Approval for fire flow requirements must be obtained from the Fire -Rescue Department prior to the issuance of a building permit. 5. In order to mitigate problems associated with access and construction activities throughout the neighborhood, the contractor/developer is encouraged to notify the affected neighborhood residents, in writing, of the project starting and completion dates at the time of issuance of permits. The contractor/developer may coordinate the notification of residents with the local City of Miami NET Service Center. 6. Additional items must be provided to the City of Miami Department of Resilience and Public Works before the final plat is submitted to the City Commission for approval. You will be notified in writing as to what these items are after the amount of the bond has been determined for the necessary subdivision improvements. It is required that the applicant contacts the City of Miami Resilience and Public Works Survey Section to verify that all final plat submittal documents are complete prior to final plat submittal. 7. Tentative plat approval is only valid for 1(one) year and 6(six) months from the date of the Plat and Street Committee meeting at which time it was approved. If you have any questions concerning these requirements, please refer to the attached sheet for the appropriate person to contact. Sincerely, Juvenal Santana, P.E., CFM Supervisor of Plats - Plat and Street Committee Director - Public Works Department of Resilience and Public Works JS/AB/ab MLK RESIDENCES - TENTATIVE PLAT # 1928-A (FIRST RESUBMITTAL) March 24, 2021 Page 4 of 4 Enclosure: Contact Sheet c: Schwebke-Shiskin & Associates, Inc. Attn: Mark Johnson 3240 Corporate Way Miramar, FL 33025 mjohnson@shiskin.com Plat and Street Committee Members Nzeribe Thekwaba, Ph.D., P.E., Assistant City Manager Survey Development and Roadway Plans Central