Loading...
HomeMy WebLinkAboutExhibitAttachment A - 7/23/20 Revised Miami Recovery Initiative Legacy Project/B Number Project Name Project Owner Current Estimated Total protect Cost CAPITAL IMPROVEMENTS PROJECTS ADDED BY MIAMI RECOVERY INITIATIVE - JULY 2020 40-B30688 Marine Stadium Restoration DREAM $48,879,268 40-B30501C Manuel Artime 970 Building Window Replacement DREAM $1,128,213 40-B40571 Virrick Park New Pool Facility Parks $8,275,746 40-B35838 Kennedy Park Restroom Building Improvements Parks $2,015,476 40-B183511 Little Haiti Cultural Complex Facility Improvements Parks $1,510,000 TBD Brickell Key Bridge RPW $4,700,000 40-B173619 SW 15 Road from SW 3 Avenue and SW 11 Street RPW $1,568,675 40-B30874 Brickell Avenue from SE 15 Road to SE 8 Street RPW $2,100,000 40-B50906 NE 3 Avenue from NE 54 Street to NE 58 Terrace RPW $1,594,741 PROJECTS ON CURRENT EXPEDITED LIST AS OF JULY 2020 40-B40605 Remediation of Former Star Gas Station DREAM $56,500 40-B40606 City of Miami Fire Rescue Training Center Environmental Remediation Project Fire $413,115 N/A Construction and Permanent Financing: MLK Residences Housing $2,000,000 N/A Construction and Permanent Financing: Liberty Renaissance Housing $1,000,000 N/A Affording Housing and Economic Development Housing $8,000,000 N/A Home Ownership Preservation / Single Family Home Rehabilitation Housing $4,000,000 40-B30865G Environmental Remediation-Citywide (Completed) OCI $3,985,453 40-B17357 Antonio Maceo Boat Ramp and Dock Renovations Parks $629,303 40-B183505 West End Park Master Plan, Pool Design and Enhancements Parks $700,000 40-B183526 Bay of Pigs Memorial Park Improvements Parks $1,420,000 40-B193508 City-wide Parks Access and Mobility Renovations Parks $2,212,000 40-B193509 City-wide Parks Playground Renovations Parks $2,788,200 40-B193510 City-wide Parks Roofing Reconstruction Parks $655,400 40-B193511 Curtis Park Community Center Design Parks $850,000 40-B193512 Armbrister Park Community Center Design Parks $780,000 40-B193513 Moore Park Gym Design and Construction Parks $8,700,000 40-B193514 Coral Way Park Expansion and Enhancements Parks $925,000 40-B193515 Riverside Park Renovations and Enhancements Parks $995,000 40-B193516 Bryan Park Playground Renovations and Park Enhancements Parks $650,000 40-B193517 New Park at 3699/3701 SW 1st AVE Parks $1,200,000 40-B193518 New Park at 2200 SW 9th AVE & 910 SW 22nd RD Parks $1,000,000 40-B30531 Dorsey Memorial Library Restoration Parks $593,295 40-B30802 Pallot Park Shoreline Improvements Parks $80,465 40-B35806 Curtis Park New Pool Facility and Boat Ramp Improvement Parks $6,574,671 40-B40454C Alice Wainwright Park Seawall and Baywalk Parks $6,406,964 40-B40510 Legion Park Boat Ramp Parks $2,210,072 40-B40510A Legion Park Building Parks $3,705,131 7/10/2020 1 of 2 Attachment A - 7/23/20 Revised Miami Recovery Initiative Legacy Project/B Number Project Name Project Owner Current Estimated Total protect Cost 40-B40543 PBA/Fern Isle Redevelopment Parks $6,860,669 40-B40563 Shenandoah Park Pool Renovation Parks $9,950,475 40-B40566 Spring Garden Point Park Parks $1,500,000 40-B40581 Douglas Park Community Center Parks $4,825,076 40-B40610 Curtis Park Environmental Remediation Project Parks $7,093,117 40-B40668 Marine Stadium Park Development Parks $24,134,300 40-B193207 Fire Facilities Resiliency Project (FS10) - Design Public Safety $615,000 40-B183603 Miami River Greenway Curtis Park East RPW $2,964,520 40-B183611 NW 17th Street from NW 27th AVE to NW 32nd AVE - Road & Drainage Construction RPW $2,667,239 40-B193622 Very Poor Condition Roads, Phase 1 - Outside Priority Drainage Basins RPW $7,590,182 40-B193800 Immediate Flood Control: Install Backflow Valves (Phase 1) RPW $3,957,000 40-B193801 Improve Drainage Outside of Priority Drainage Basins (Phase 1) RPW $2,300,000 40-B193802 Brickell Bay Drive Design Criteria Package RPW $1,000,000 40-B193803 Jose Marti Park Flood Mitigation Study and Design RPW $940,000 40-B30011 Englewood Road and Storm Sewer Improvements - Phase IV (Completed) RPW $5,821,208 40-B30606 Downtown Beautification Project Phase I RPW $27,572,000 40-B30624 Overtown Greenway at NW 11 Terrace RPW $4,697,301 40-B30628 Bird Avenue Road Improvements (Completed) RPW $2,387,359 40-B30637 Mary Brickell Village Drainage Improvements RPW $5,275,657 40-B30687 Coconut Grove Business Improvement District -Street Improvements RPW $6,938,185 40-B30731 Miami Women's Club Baywalk Project-CRA 92-686001 (Completed) RPW $923,554 40-B30737 Fairview Flood Mitigation RPW $4,944,615 40-B30836 South Grove Roadway and Drainage Improvements -Phase III RPW $2,181,756 40-B30941 Downtown Miami Signage and Wayfinding System RPW $2,001,932 40-B50643 Wagner Creek-Seybold Canal Dredging RPW $23,201,866 40-B40604 Remediation of Virginia Key Composting Facility Solid Waste $38,172 7/10/2020 2 of 2