Loading...
HomeMy WebLinkAboutExhibit C (OBSOLETE)T1I1QKCITY INNOVATION DISTRICT SPECIAL AREA PLAN CONCEPT BOOK CITY OF MIAMI HEARING BOARDS PLANSREVIEWFleming - O. Haeone en. f'ho"kraZTar (,.aid/l ARQUITECTONICA MCD MIAMI, LLC akerman ARQUITECTON!CA LANGAN Kimley »Horn June 20, 2018 1 CITY INNOVATION DISTRICT TABLE OF CONTENTS 1. COVER 2. TABLE OF CONTENTS 3. CONTEXT (MACRO) AND TOPOGRAPHY RESILIENCY 4. CONTEXT (MACRO) 5. CONTEXT (MEDIUM) 6. CONTEXT (MICRO) 7. HISTORICAL CONTEXT - LEMON CITY TRAIN STATION 8. HISTORICAL CONTEXT - DUPUIS BUILDING 9. COMMUNITY CONTEXT - LITTLE HAITI 10. GENERAL EXISTING SITE PHOTOGRAPHS 11. ADOPTED FUTURE LAND USE MAP (MACRO) 12. ADOPTED FUTURE LAND USE MAP (MICRO) 13. PROPOSED FUTURE LAND USE MAP (MACRO) 14. PROPOSED FUTURE LAND USE MAP (MICRO) 15. CURRENT ZONING (MACRO) 16. CURRENT ZONING (MICRO) 17. PROPOSED ZONING (MACRO) 18. PROPOSED ZONING (MICRO) 19. EXISTING CONDITIONS 20. MASTER PLAN 21. PERIMETER LENGTH FOR NEWLY CREATED BLOCKS 22. CAMPUS ZONES 23. CULTURAL, ARCHITECTURAL AND URBAN DESIGN MOOD 24. TECHNOLOGY & INNOVATION 25. HEALTH & WELLNESS 26. SUSTAINABILITY 27. ART, CULTURE & ENTERTAINMENT 28. INNOVATIVE DISTRICTS 29. STREETSCAPE MOOD 30. NON -ACTIVE FACADE TREATMENT 31. SITE FURNISHING MOOD 32. LOT COVERAGE BY CAMPUS ZONE 33. LAND SWAP 34. PARKING CLUSTER 35. THOROUGHFARES + FRONTAGES 36. VEHICULAR CIRCULATION 37. EXISTING AND PROPOSED TRANSIT 38. BICYCLE CIRCULATION 39. PEDESTRIAN CIRCULATION 40. TERMINATED VISTA 41. CIVIC AND OPEN SPACE 42. REQUIRED VS PROVIDED OPEN SPACE 43. PARCELIZATION PLAN 44. SOUTHEAST VIEW MASSING - CURRENT AREA BUILDOUTS 45. SOUTHEAST VIEW MASSING- MAX AREA BUILDOUTS 46. DEVELOPMENT PROGRAM CALCULATIONS 47. CONCEPTUAL PHASING PLAN 48. TREE DISPOSITION SCHEDULE (1) 49. TREE DISPOSITION SCHEDULE (2) 50. TREE DISPOSITION PLAN 51. TREE MITIGATION PLAN 52. TREE MITIGATION CALCULATIONS 53. SITE VEGETATION PALETTE 54. STREETSCAPE VEGETATION PALETTE 55. STREET SECTIONS - NE 2ND AVE & NE 3RD AVE 56. STREET SECTIONS - NE 3RD AVE PROMENADE & NE 4TH AVE PROMENADE 57. STREET SECTIONS - NE 4TH AVE & NE 62ND ST 58. STREET SECTIONS - NE 61ST ST & NE 60TH STREET 59. PROMENADE DU GRAND BOIS SECTIONS - LE MARCHE DUPUIS & LES BUREAUX 60. PROMENADE DU GRAND BOIS SECTIONS - LES RESIDENCES & LES ATELIERS 61. RENDERING - NE 2ND AVE PERSPECTIVE 62. RENDERING - NE 3RD AVE PERSPECTIVE 63. RENDERING - NE 2ND AVE PERSPECTIVE - NIGHT VIEW • oa=a,un<r.n, fm=o„==.o anE CITY OF MIAMI HEARING BOARDS PLANVIEW Mead. Boards ( q PLANTVIEW 0 u'.r e.. - -Dm 41v1AT. C€ ,.1 P▪ IVNno .,.e 6 June 20, 2018 2 CITY INNOVATION DISTRICT I Virginia Gardens Miami Springs Gladeview Brownsville MAGIC CITY INNOVATION DISTRICT Miami GI West Miami Coral Terrace var Heights South Miami MAGIC CITY INNOVATION DISTRICT SAP - CONTEXT (MACRO) AND TOPOGRAPHY RESILIENCY ''4 Fisher Island ft 80 40 15 8 7 5 2 0 June 20, 2018 3 CITY OF MIAMI HEARING BOARDS P REVIEW Nearing Boards • DataPublic mina • Dale ;21� Mgr I N N O V A T I MAGIC CITY INNOVATION DISTRICT SAP — CONTEXT (MACRO) +'f !,yr tr /1, June 20, 2018 4 CITY OF MIAMI HEARING BOARDS HmgPLANSFiE. IVIA�I Planni NNOVATi NotS'e Damp d' Haitl'Chufch Little Haiti Soccer Park NE62ndSt MAGIC CITY INNOVATION DISTRICT SAP - CONTEXT (MEDIUM) P .ii !II 1, _� j Lemon City Llibrary Cushman School June 20, 2018 5 MAGI CITY OF MIAMI HEARING BOARDS PLAN$REVIEW Hea Boa. Peel =r N N O V A T v.:: -..,. •. Plum NE 62nd St lemilb MAGIC CITY INNOVATION DISTRICT SAP - CONTEXT (MICRO) June 20, 2018 6 MANIC INNOVATION DISTRICT MAGIC CITY INNOVATION DISTRICT SAP - HISTORICAL CONTEXT - LEMON CITY TRAIN STATION CITY OF MIAMI HEARING BOARDS PLANS REVIEW HearingPesBoard ��ww-� �ti\ Zoni Planning ti Ada .o,,. 4/d//Id sr Sro�wGf does nmiw appro. June 20, 2018 7 I1ANIC INNOVATION DISTRICT •.. Born in Newnansville, Florida, in 1875, Dr. John Gordon DuPuis moved to Lemon City after graduating from medical school at the University of Kentucky in 1898. He began his practice in a one -room frame building behind the Conolly Hotel. The building served as DuPuis' office and as one of the first drug stores in south Florida. DuPuis was involved in larger Dade County medical affairs, including helping during a yellow fever outbreak in 1899. He worked with the local Seminoles in the early 1900s, who regarded him as a white medicine man. In 1902, DuPuis had a new office built on the corner of Lemon Avenue (NE 61st St.) and Rock Road (NE 2nd Ave.). It was the first concrete building constructed north of downtown Miami. It housed Dupuis' office and drugstore on the first floor, and his family residence on the second. The building is an excellent example of a late 19th-early 20th century commercial structure and is one of the few examples of its type to survive in Miami. Although his family moved out of the building in 1925, the i atients. MAGIC CITY INNOVATION DISTRICT SAP - HISTORICAL CONTEXT - DUPUIS BUILDING CITY OF MIAMI HEARING BOARDS PLANS,pEVIEW ia.nro m.a Lc Public waft -o.i. /ic s 5 82 a. C.ILi0 sr na � mnnft 6ld 4e, 5 June 20, 2018 8 FINK CITY INNOVATION DISTRICT 0 T ono .� MAGIC CITY INNOVATION DISTRICT SAP - COMMUNITY CONTEXT - LITTLE HAITI CITY OF MIAMI HEARING BOARDS b 6/I. Zoning L Planning o ayaPa.. aeo�e= awf�4�w�p� June 20, 2018 9 f1AQIC CITY INNOVATION DISTRICT MAGIC CITY INNOVATION DISTRICT SAP - GENERAL EXISTING SITE PHOTOGRAPHS CITY OF MIAMI HEARING BOARDS PLANS REVIEW Heemg ,con,, "`a _ el, l 'f— °c, 14 aPPrOval June 20, 2018 10 CITY INNOVATION DISTRICT -� .0 e,4 ,v r NW MN ST1 NW 3RD AVE NW STNAVE NW AIX CT NW 51H AVE sprld a C/ ON NE 1,T IST AV! 1,1,1E1 MN NW Is 1 SnE 1.11 rk .11.1 AVE wonw srn er 6P `�env_...-.�--. _.`.. !I� ^ ._ . r nv rv, mry 3} MAGIC CITY INNOVATION DISTRICT SAP - ADOPTED FUTURE LAND USE MAP (MACRO) — �m m�3 Anv a g mom', gm 9 8 g 6 A 8 QkS l70 =ae mm°mg g age i PMEE RR) OD - .lip,,,_ H AN NE 1ST AVE 11,1111.1 AN City Boundary City Parcels Major Roads Expressway Streets FutureLandUse Coastal High Hazard Areal 0 Coastal High Hazard Area Residential Density Incre lase Areas Little Havana - 200 Units/Acre Southeast Ovedowh - 300 Units/Acre rk west- 500 Units/Acre - 500 Units/Acre 500 Un ts/Al re Rwer Quadrant 5 0 Units/Acrr am River 400 Units/Acre Overlays Buenau Edgewater Z! HD/HDRAC HDRAC UCBD d U Conservation, Public Parks e Commercial Rreation Marine Fac 1'lie5' Single Family - Residential Duplex - Res Low Density Resvdential Medium Density Residential High Density Residential Low Density Commercial Medium Density Commercial Restricted Com Central Busi General Co Major Institutional, Public Facilities, Traneport*Pon and UGINes Light lndu Industrial • Notdesignap June 20-2018 11 FINK CITY INNOVATION DISTRICT MED. D.' T RESTRICTED COMMERCIAL PUBLIC PARKS AND RECREATION MED. D. RESTRICTED RESTRICTED COMMERCIAL COMMERCIAL MAJOR PUBLIC FACILITY RESTRICTED COMMERCIAL MED. D. MULTI- RESTRICTED FAMILY COMMERCIAL RES. RECREATION LIGHT INDUSTRIAL 45 MEDIUM DENSITY RESTRICTED COMMERCIAL LIGHT INDUSTRIAL MAGIC CITY INNOVATION DISTRICT SAP -ADOPTED FUTURE LAND USE MAP (MICRO) LI. IND. TRIAL DUPLEX RESIDENTIAL MEDIUM DENSITY MULTI -FAMILY RESIDENTIAL RESTRICTED COMMERCIAL PUBLIC PARKS AND RECREATION SINGLE FAMILY RESIDENTIAL 100120' 180200' 5.000° L.D. M.F. RES. CRY M HEARINGOF BOARDSIAMI PLANS REVIEW Keene oama� . Pate ay Plannne - Vete .fie) ///6 elarteleleereatan* approve, June 20, 2018 12 PINK INNOVATION HIS 3N NW WADI K DNS MN AVF 3M4 HIE MN TN CT saws ry DISTRICT NE STEI AVE Al WNW MN NW MN 3ND CT NW SRD AVE NAP ITII AVE NW SIN AVE aia MN i.95 `CIIJRAN Na� MAGIC CITY INNOVATION DISTRICT SAP - PROPOSED FUTURE LAND USE MAP (MACRO) p`�fLD/S� LI AVE NE STILAVF IL AVE NE E. AVE NE SND CT —'7 NW 1130 AV =—�ILSNEIND:A' �z f -141 AVID3NNE NUMB N[isr Avi NW ST41 AVE AVE CITY OF MIAMI HEARING BOARDS PLANS REVIEW -Oateyg iuNne bl l,L4i . Dos S 6/d/7/1 50 sl reJ 0mi snerv.nn. l ig g 8 [A m; g Ism g 0 0 8 85 8 B 0 g 8BgT,g g 8 115 e 8 8 dsDEl D' O H O g 0 0 mam-.OG' 5 8 g g g 0 „ i 8 '0 H 8 H Imp¢ g g6 0 8 0 gel i 0 3nV 154 MN CityCl y Pame Major Roads Expressway Streets ureLandUse 4 Coastal High Hazard Area Coastal High Hazard Area gential Density Increase Areas LOle Havana - 200 Units/Acre Southeast 0vertovm - 300 Units/Acre - Park West -5000 its/Acre Bdckell- 500 Uni Acre n,... Omni- 500 Units/ re River Quadrant - 500 Units/Acre y j Miami River 400 Units/Acre Other Overlays El Buena Vista RAC Edgewater 1� HD/HDRAC jam! HDRAC m UCBD Future Land Use Conservation public Parks and Recreation rcial Recreation' Facilities" Family RAsdential plex Residen al Low Density Multi may Residential Medium Density uWfamily Residential High Density Mutt family Residential Low 0ensity Resh - hed Commercial Medium Density Restncted Commercial Restricted Commercial Central Business District General Commer lal Major Institution . Public Facilities. Trans nation Ubtities Light Industrial Industrial ' Not designated on map June 20, 2018 13 FlAQIC CITY INNOVATION DISTRICT RESTRICT COMMERCIAL PUBLIC PARKS AND RECREATION MED. D. RESTRICTED RESTRICTED COMMERCIAL COMMERCIAL 2s4r MAJOR PUBLIC FACILITY MED. D. MULTI - RESTRICTED M FAMILY COMMERCIAL RES. LIGHT INDUSTRIAL LIGHT INDUSTRIAL LI. IND. RESTRICTED COMMERCIAL L.I. ,EXT .EXT 541.6 54'S" NE �Fhl RECREATION REC. RESTRICTED COMMERCIAL LIGHT INDUSTRIAL MAGIC CITY INNOVATION DISTRICT SAP - PROPOSED FUTURE LAND USE MAP (MICRO) L.D. M.F. RES. LIGHT INDUSTRIAL LIGHT INDUSTRIAL DUPLEX RESIDENTIA MEDIUM DENSITY MULTI -FAMILY RESIDENTIAL T1 RESTRICTED COMMERCIAL PUBLIC PARKS AND RECREATION SINGLE FAMILY RESIDENTIAL 50. 100'�YJ' CITY OF MIAMI HEARING BOARDS PLANS REVIEW Pak works• Diu By' b lti\ lb /d /j (%1 Y 00 ..3.4 6 m im* aPVmwl June 20, 2018 14 CITY INNOVATION DISTRICT T- I. AV, Il - ,rI;.V�-:_-C•-�5'I�S'd l'JV?I,NIi S13'I` L MAGIC CITY INNOVATION DISTRICT SAP - CURRENT ZONING (MACRO) CRY OF MIAMI HEARING BOARDS PLANS,REVIEW Hearing w�,rvaBoards .p /i�//H .ws pets aril rs ZoningBlr . 'TPlerinirM t Ws 6-Ali/re n Ciry Parcels, Major Roada E4We Streets LZeningMiami21 she, Setba Area Specific Designation -Miami 21 • Coral Gate (NCO-1) Village West I land and Charles Avenue (NCOr2) Coconut Grove (NCD-3) Miami Worlds star Midtown Mani East Spacial Dise r Midtown Miargi West Special District al Area Plans - Miami 21 Daman Guidelines- ram 21 Coral Way (Zone 1) Coral Way (Zone 2) Coral Way (Z ne 3) Coral Way •ne4) ❑ Coral Way ( .ne 5) Coral Way (Z ne 6) I5 Omni C. ~. Overlown Fo1 life UIl SEOPW Neghborhood_Revilalizaton Di Primary Zoning - Mami 21 • T1 NATURAL ❑ T3 SUB -URBAN ❑ T4 GENERfidr URBAN ❑ T5 URBAN CENTER ❑ T68 URBAN CENTER ❑ T6-12 URBAN CORE ❑ T6-24 URB CORE ❑ T6-36 URB CORE ❑ T6-4SURB CORE ▪ T660 URB CORE ❑ T6-50 URBAN CORE ❑ 01 WORK PEACE ❑ 021NDUS ❑ D3 MARINE ❑ CS CMC Sd P ❑ CI CMCIN• TI0 AL ACE/ ITu ,tune LU, LU I O 15 f11QKC 11. CITY INNOVATION DISTRICT �-1 — I I lII (11 CI NE 60s T51011 H 1 I MAGIC CITY INNOVATION DISTRICT SAP - CURRENT ZONING (MICRO) ]T z7 r L II —--NE-62st— I _fi .. :.: .. a�as� D1 T3-L 7 11 O. 100,120' 180200' CITY OF MIAMI HEARING BOARDS PLANSjiEVIEW work, • rm. ./w By June 20, 2018 16 CITY INNOVATION DISTRICT 1GI �AIrJ JN abU SI'J rau AV' ITO iris.: • f�ji�—Xe —J Z I • C rI:adIJV?I•NO 6' l' L}I MAGIC CITY INNOVi-\TION DISTRICT SAP - PROPOSED ZONING (M O a 1 L,J CITY OF MIAMI HEARING BOARDS PLANS REVIEW Mewing roams_ .ole /s �,zll� Br N710 vzi 'JO-S I^ r I I` GI City Parce. Major Roa Express' Streets ningMiami21 shed Setback -Miami2l Specific Design bon - Miami 21 Coral Gale (NCO-1) Village West Island and Charles Avenue (NCD 2) Coconut Grove (NCD-3) Miami Woddcenter Midtown Mian Dislrm Midtown Miarr District 'East Special Weal Special I Area PlansKarol21 Goidemes-1 Coral Way (Z Coral Way (2 Coral Way (2 ami21 1) re2) e 3) Coral Way (Zo ea) Coral Way (Zo e6) Coral Way(Zo e6) Grand Ave Little Haiti MLK Blvd ❑ Miami River G nway Omni CRA Overloen Folk i/e Ullaga SEOPW Neighborhood_Revita *ation—District 121 ® T1 NATURAL 0 0 Q T660 URBAN 0 0 0 T3 SUB-URB Ta GENERAL URBAN T5 URBAN CE TER T6-8 URBAN CENTER MCID-1 MCID-2 16.36 URBAN CORE T6-as URBAN MIRE ORE TS-AD URBAN 0ORE D1 WORK PCE D2 INDUSTRIAL D3 MARINE CS CMG SPA-EIPARKS ❑ CI CIVIC INSTITUTIONAL '❑ CI -HD HEALTF DISTRICT S,i/171/tisn ", June 20, 2018 17 1'1AQIC CITY INNOVATION DISTRICT I � t L7 I mil I I I Ij L11 ei ' 0 ti+•' NE 62st CI NE 60s1 I ▪ T5 11 I -1 T_ D11_ o t,I MAGIC CITY INNOVATION DISTRICT SAP - PROPOSED ZONING (MICRO) D1 - 2703 MCID-1 EAST T4-R T3-L - GREEN SPACE PERIMETER PROPOSED BUILDINGS ---'-- EXISTING BUILDINGS RAILWAY PLATFORM PARALLEL PARKING PROPERTY LINE • (26) TREES TO REMAIN IN PLACE • (62) TEES TO BE RELOCATED 60100'120' 160'200 400' NEARING BOARDS PLAN REVIEW Reenrc BoardsC PutXt works Date. 9r Dale June 20, 2018 18 MAGIC CITY INNOVATION DISTRICT 3� I" MAGIC CITY INNOVATION DISTRICT SAP - EXISTING CONDITIONS X L r L. F L_ L —.. EXISTING BUILDINGS DUPUIS BUILDING J FORMERRAILROAD STATION RAILROAD TRACK BICYCLE LANES ELEVATIONS ABOVE SEA LEVEL PROPERTY LINE _ - EXISTING TREES 80. 100120' 180200' CITY OF MIAMI HEARING BOARDS PLAN EVIEW l .6/22 ,I,�.o2 0 , P/Zp 5.0001 e • to 2 nA ifa June 20, 2018 19 MAGIC. INNOVATION DISTRICT � I I1 I1 L 11 -ill J NE 62st NE 60st PROPOSED.CONDITIONS CITY /, I JIB SOC ER PARK �—I I \� �\• OPc�BEI � STi-�VOO�OC 1a11�� l= MAGIC CITY INNOVATION DISTRICT SAP - MASTER PLAN I L— ,I 111 111111111 PROPOSED BUILDINGS EXISTING BUILDINGS \-77, RAILWAY PLATFORM BIKE LANES PARALLEL PARKING • PROPERTY LINE • (26) TREES TO REMAIN IN PLACE • (82) TREES TO BE RELOATED W' 100120180200 5.000. 400' CITY OF MIAMI HEARING BOARDS PLANS REVIEW 630303 0.N ,B Pugk wale Dale ��P es not laplyap„wa„1 June 20, 2018 20 MAGIC CITY INNOVATION DISTRICT ■ 1 NE 62st r NE Bost TNE 62st New Block Perimeter Length Approx 2053' _ .. NEU11sl LITTLE HAITI SOCCER PARK New Block Perimeter Length Approx 1148' New Block Perimeter Length Approx 1735' New Block Perimeter Length Approx 908' ew Block Perimeter Length Approx 832' h, newly peait d blocks: length for newly created blocks: Approx 2053' Average perimeter length for newly ^seater] blocks. Approx 1,335' Existing Mega -Block perimeter length: LE Approx 3117' NE 5eth Terrace 60' t00''120' 180700' MAGIC CITY INNOVATION DISTRICT SAP — PERIMETER LENGTH FOR NEWLY CREATED BLOCKS \11 IIPlanem0�;om CITY OF MIAMI HEARING BOARDS HeaKO Ere. PLANS REVIEW w wawa ma -Dare-` - /g Pa C fCx wre a noes not imply appmrel June 20, 2018 21 f1AQIC CITY INNOVATION DISTRICT DU Overall C Zone Are DUPUIS BUILDING CI FOCUSED CAMPUS ZONE T5-O CHE UIS P. 73979 sf 266',4" 15"L D1 HOTEL AND OFFICE FOCUSED CAMPUS ONE 286-102 LES BUREAUX Overall Campus ZoneArea'. 83,813 sf LES RESIDENCES RESI1 FOCU ZONE Overall Campus Zone Area 242 733 sf 541 MAGIC CITY INNOVATION DISTRICT SAP - CAMPUS ZONES LES RESIDEN RESIDENTIAL FOCUSED CAMPU ZONE 181'-8' 224'3" LES FFICE, RETAIL NTERTAINMEN AMPUS ZONE 273,11 ERS ND FOCUSED OFFICE, RETAIL AND ENTERTAINMENT FOCUSED CAMPUS ZONE 10� I 11111 1111 I' 358'-S' IF II D1 D1 "^- 7 130'-0' T3-L T4-R GREEN SPACE PERIMETER SAP BOUNDARY DIVISION OF CAMPUS ZONES 5.000° 60' 100120. 180'200' 400. CITY OF MIAMI HEARING BOARDS PLANS EVIEW Hearing Boa. • Dati6/2- u c works one y/� 13, y re cEre (,L bid //// June 20, 2018 22 f1AQIC my TY CULTURAL, ARCHITECTURAL INNOVATION DISTRICT AND URBAN DESIGN MOOD CITY OF MIAMI HEARING BOARDS soompPLANyLREVIEW Z' Yi Dele Pudic (��(( / ra lmFy o EXAMPLES ONLY June 20, 2018 23 Magic CITY TECHNOLOGY & INNOVATION DISTRICT CITY OF MIAMI HEARING BOARDS PLANS REVIEW nroiK.o,w .o.re av aY�L�Y ti- INNOVATION 24 INNOVATION DISTRICT CITY OF MIAMI HEARING BOARDS FLA�NS,pEVIEW Public works e C, Zl j l g 6/d// Id HEALTH & WELLNESS 25 FINK CITY SUSTAINABILITY INNOVATION DISTRICT CITY OF MIAMI HEARING BOARDS Pc works • Date PLANS REVIEW _ , q CZ.yonI $ mna f.nr 6 / /g .,ST �. not imply mc,aa IlAgIC CITY ART, CULTURE & INNOVATION DISTRICT CITY OF MIAMI HEARING BOARDS PLANS/REVIEW weng eaameyy - om Public wothe - Dale fATS r r,l!q _ ti Plum! - Pate /alg 'Y re abovedoes not Implyeppl ENTERTAINMENT IVIAgIC CITY INNOVATIVE INNOVATION DISTRICT CITY OF MIAMI HEARING BOARDS PU/ry{g.{REVIEW/ P� wo.s •D11—_oe hby INNOVATION DISTRICT CITY STREETSCAPE MOOD CITY OF MIAMI HEARING BOARDS PLANS EVIEW w nro ea„a G • vnalu • ode Co /z�I r6r6 ammmo • paw_ /8 NOTE: ILLUSTRATIVE EXAMPLES ONLY MINI( CITY INNOVATION DISTRICT __ow lam NON -ACTIVE FACADE TREATMENT CITY OF MIAMI HEARING BOARDS PLANS VIEW Haring p.m, .oa works a 6/G'if— or �t zaone c- -- 155 BY Planning PV//4 r; NOTE: ILLUSTRATIVE EXAMPLES ONLY , June 20, 2018 30 1111Q1( CITY INNOVATION DISTRICT SITE FURNISHING MOOD WY OF MIAMI HEARING BOARDS PLANS REVIEW Fsam. e.ree 71"f -Date(2.47/V Public wad. • Dale PAO V-- Zoning - Data Co lif(,4 /.// / re above not ir710V aPPrOV01 NOTE ILLUSTRATIVE EXAMPLES ONLY , June 20, 2018 31 CITY INNOVATION DISTRICT LE -MARCHE DUPUIS I Lot Area: 73,979 sf Lot Coverage: 87,813 sf Overall Lot Coverage Percentage: 36% CI T5-O T5-L D1 LES RESIDENCES Lot Coverage: 181,449sfCT Overall Lot Coverage Percentage: 63% nOtAtEviAlli- 'A VD BOO LES BUREAUX Lot Area: 89.813 et Lot Coverage: 61,502 sf Overall Lot Coverage Percentage'70% r] MAGIC CITY INNOVATION DISTRICT SAP - LOT COVERAGE BY CAMPUS ZONE wt Area: 236,129 of Lot Coverage. 173.972 s! Overall Lot Coverage Percentage AAP D1 T3-L SAP BOUNDARY DIVISION OF CAMPUS ZONES 5.00o° 100120• 180200 400• CITY OF MIAMI HARING BOARDS PLANS Hearing Board rrmlm �r� -Date e� mr eyoo ear d� ^ June 20, 2018 32 MAGIC1CITY INNOVATION DISTRICT II LITTLE HAITI SOCCER PARK u 1111 %i \ 1111 _ = j J 11 J I _—NE-62et-- — — �LJ NE 62st APPROXIMATELY 18.059 SF NE SW NE 8181 ROM __IDLEAND BOL�' NE 59th Terrace MAGIC CITY INNOVATION DISTRICT SAP - LAND SWAP APPROXIMATELY, 7,345 SE II Fr. ,APPROIII Ir I —122,054 XSF TEiY I, 8171 11\ 1 A8,698 SFPPROXIMATE InJI1PI , -Ill JL � I APPROXI Ej'. —IT,8325F I I J L COUNTY CONVEY TO APPLICANT - CONVEY TO CITY - CITY CONVEY TO APPLICANT NOTE. SUBJECT TO REQUIRED APPROVALS 59' 00'120' 180'200' 499' CITY OF MIAMI HEARING BOARDS PLANS REVIEW sBwb= .B.t z/ ;c, B �� sroai � tarry approval June 20, 2018 33 I11QIC CITY INNOVATION DISTRICT NE fits [ NE 60st 91 CLUSTER PROVIDED'. 214 LITRE HAITI SOCCER PARK MAGIC CITY INNOVATION DISTRICT SAP - PARKING CLUSTER CLUSTER C PROVIDED: 505 CLUSTER PROVIDED:: 2 CLUSTER G PRROVIDED:168 CLUSTER F PROVIDED' 515 CLUSTERA PROVIDED'. 731 CLUSTER B PROVIDED: 913 TER D DED: 585 L[MLLI ITLij1 hid \f LILT_ TOTAL PARKING PROVIDED: 6,001 • GARAGE LOCATION o OTHER BLDG LOCATION NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS U SO 100'120180 6 5.0DO. CITY OF MIAMI HEARING BOARDS PLANS REVIEW Oslo G'u zea,ae,,Date 4fti1(14 P10.1r.0 olo s/a///G . MloaM <oo�owa Cr\4/An ' June 20, 2018 34 CITY INNOVATION DISTRICT 77, NE�� NL 60st r, I MAGIC CITY INNOVATION DISTRICT SAP - THOROUGHFARES + FRONTAGES NE 50111 Terrace — — — 81E62q LITTLE HARI SOCCER PARK L I± leMrs., AraTONIA.TIM TIMMY I iI 1 —LJ J 1'I L. 1 Ls PRIMARY GRID + PRINCIPAL FRONTAGES. APPROX. 70% PRIMARY B GRID + SECONDARY FRONTAGES. APPROX. 30% 5.000. 0' 80' 100'120' 18020D' CITY OF MIAMI HEARING BOARDS PLANS REVIEW eY• Zoning C/'(,I/,, Planning 6iA//ie June 20, 2018 35 CITY INNOVATION DISTRICT NE 60st LITTLE RAITI SOCCER PARK 7 r NE ME Terrace 0.71111 l., mm1Mwl1•�e'.Iz,�a l 1.:.. ' MAGIC CITY INNOVATION DISTRICT SAP - VEHICULAR CIRCULATION 1T TT Lam\ 7 li 11'I * GARAGE ENTRANCES ARTERIALROAOS rer COLLECTOR ROADS =LOADING ACCESS POINTS POTENTIAL ON STREET LOADING NOTE ILLUSTRATIVE CONCEPT ONLY SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS 1 SO® D 60 - 106120 180200 \ CITY OF MIAMI HEARING ❑CARDS PLANS REVIEW works - D /+F : Br �re °cm ,wro June 20, 2018 36 f1AQ[C CITY 41 INNOVATION DISTRICT • NE 62. T r- E-1I 0 •1' ()COO C NE 60st OP E ROMH EDU RANDBO XCtJ Ir NE 591h Terrace MAGIC CITY INNOVATION DISTRICT SAP — EXISTING AND PROPOSED TRANSIT LITTLE RAITI II SOCCERAITI // II J nnn,^)nn ( -i OBUS ROUTE 9-DOWNTOWN MIAMI/AVENTURAL MALL BUS ROUTE 10 -OMNI/MIAMI GARDENS DRIVE 183 BUS ROUTE 202 -NW BB ST BUS ROUTE BB- BISCAYNE BLVD/ PALM AVE • EXISTING MIAMI-DADE TRANSIT BUS STOP PROPOSED • PROPOSED BUSSSTOPR PASSENGER/COMMUTER 5,000. CITY OF MIAMI HEARING LOARDS PLANS EVIEW Neenno Boa. cate is we,ro ele �CI4 ey By' R� 6'7 6 Bab re a no„mPI, approval June 20, 2018 37 1'1AQlC INNOVATION • DISTRICT NE 0251 — NE 60st 1g j, --14 NE 59th Terrace AND BO NE 00t st LITTLE HAITI SOCCER PARK zTr MAGIC CITY INNOVATION DISTRICT SAP - BICYCLE CIRCULATION 11 LL E LLI I L IMPROVED EXISTING BICYCLE LANES — PROPOSED BICYCLE IANES STREET CROSSINGS eo maim iao 400' CITY OF MIAMI HEARING BOARDS PLANS REVIEW n°C ti Itil (r4 ra�Im9N enwwel June 20, 2018 38 FINK CITY INNOVATION DISTRICT NE 62st NE 60st E81st1 LITTLE HAlrl SOCCER PARK I`z)l) iSZi NE5901 Terrace. MAGIC CITY INNOVATION DISTRICT SAP - PEDESTRIAN CIRCULATION li 1J Lil L r fl I I - PROMENADE DU GRAND BOIS PEDESTRIAN PATHWAY \, C,TV CROSS -BLOCK PEDESTRIAN PASEO \ fiEA'i:NvP O'AMI ARDS - SIDEWALKS 5 00, I PLANS REVIEW PEDESTRIAN OVERPASS p- III °' .oet� P I. a. s 60' 100'120' 180200' June 20, 2018 39 INNOVATIn CITY ' nrSrat.^T FNOTRE DAME D'HAIT l'ATHOLIC CHURCH CI NE 60s/ LITTLE A SOCCER HAIRR ®®®NIS NE 61si LITTLE HAITI-- CULTURAL CENTER %I MAGIC CITY INNOVATION DISTRICT SAP - TERMINATED VISTA 11 L_ L _J 1j _r L , LIU PROPOSED RAIL STATION • • r u L xROW DESIGN FEATURE (POTENTIAL FEATURES INCLUDE. DEVELOPER -SELECTED PUBLIC ART, FOUNTAINS, ETC.) 0' 60 100120 160200 P CITY OF MIAMI HEARING SCAHDS PLANS REVIEW sowing RuNic worts - Date 610 IDnna Gl e J—W 610.60 s%rea�ee mlrePre- C\ I June 20, 2018 40 f1AgIC CITY INNOVATION DISTRICT NE 62st NE 60st LITTLE HAITI `I \ SOCCER PARK 11 IIII i ,- 1 NE 5911Tertace I 111 — — — NE-62st_ _ _ _ _ _ MAGIC CITY INNOVATION DISTRICT SAP - CIVIC AND OPEN SPACE II 1 L_. 1- \ III JI CIVIC SPACE s 3 8 ACRES MINIMUM NOTE. ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS 0' 60 100'120180700 5 000' \\ \ 1\ CITY OF MIAMI HEARING BOARDS ,\ PLANES REVIEW \187 ^s C, Date IZIworks (o� �i 6�A/ l / le a ec nrn'moN apo +l June 20, 2018 41 PlAQ1( CITY INNOVATION DISTRICT LITTLE HAITI SOCCER PARK CITY REQUIIRE : 10o/D LOT AREA ASOPEN SCE 77,333 SF - 1.8 ACRES HIGHLIGHTED ABOVE L. NMI �_-- NE but ^� - r— 1— _ice 11 II SAP PROVIDED- 21b/o LOT AREA AS PUBLIC 165,528 SF - 3.8 ACRES MINIMUM HIGHLIGHTED ABOVE 111 i — NES2st- — LITTLE HAITI SOCCER PARK CITY OF MIAMI EARING BOARDSI SrcOZ Signature above does not impl,.ppro. YMNI UN 202018 IL. June 20, 2018 42 MAGICICITY INNOVATION DISTRICT PARCEL 15 Bags: SF/level L Oge (16)5000 1 I Retail (16)6000 1 PARCEL iT Bldga: SF/level Office (12)7,600 Retell (17) 7,600 NE 60st L ll NE 5253 4_/ i PA RqEL1 %Mee SF/lev L ,R Ofiye (14)10000 10.000 Nf PARCEL I5 Bides: SPdeve: L. Office 05)15500 15 Garage ( 5)19,900 8 Retail (15)35,400 1 — — — 51E625t— NE61e1 —� PACEL12 B1 SFlevel: L: H (12) 14,400 14 Re DI. {12) 12,500 Garage (12) 24,290 Retail ) (12A) 28,T50 1 16gs' SF/level. L: d. (13)13.3013.300 24 GIp'rage(13) 18000 4 R 9,ail (13)24200 1 NE59tn Terrace It MAGIC CITY INNOVATION DISTRICT SAP - PARCELIZATION PLAN LITTLE HAITI SOCCER PARK RCEL4 age SPlev - tl. (4A)14,40 --d. (4B) 14,40L arage(4) 27,36[ etail (4) 54,00[ PARCEL Bids S l el.. L Resid. (9) 12,2 �r 24 Garage (9) 20,0i10 3 Retail (9) 29,6?0 , PARCEL 10 P RCEL 10A Bldg SF/level L. BI gs: Re d. (10)12500 24 R sic!. (10A) Garage (10) 19 all (10A) DI � ...ee 1 9)00 1L Redd (11)12500 24 Garage (11) 17,000 5 Retail (11) 26E00 1 - II_ e� II PARCEL Bltlgs: SF/level. L'I Office (1) 24.100 19 Garage (1) 29,700 8 Retail (1) 53,800 1 PARCEL Brags: SF/level. L: Office (2) 23,000 19 Garage (2) 29,700 Retail (2) 52,700 1 PARCEL BId0s: S I'. '. Office (5) 19400 17 2 Garage (5) 800 9 Retail (5A)41,800 Retail all (58)5, 00 1 - - �� -99— i \ PARCEL Edge SP/level'. L ' Office (6) 18000 17 Garage(6) 14,400 12 Retail (6) 22.100� PARCEL 13DIgs SFle 01l () 1800 e (1 P Rate (2) 22.,09sr i Bltlgs 1 SF/level L 2 Ofica (J 1],185 4 ¢I aiLid Expo () 39,870 3 Resid () 31,760 4 Garage() 16,987 8 L11—(s). 3�399— 1- 7 11! - PARCELS Burgs: SF/level: L I Office (3) 12,000 4 Retail (3) 14,000 1 HOTEL RESIDENTIAL OFFICE i RETAIL GARAGE PROPERTY LINE NOTE ILLOSTPATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS 0 lio'- ,0o',zv 1 00 \\ CITY OF ' 'I" MI HEARING ,RDS PLANS P Hewing lic.omsas u-Date Zoning0 aigrette., above PiTRA, ARR.. June 20, 2018 43 MAGIC CITY INNOVATION DISTRICT MAGIC CITY INNOVATION DISTRICT SAP - SOUTH EAST MASSING - PROPOSED SAP MASSING V. CURRENT AREA BUILDOUTS CITY OF MIAMI HEARING BOARDS PLANS pEVI EW Hearing - Date 2j Public work • Date PPrujf_ Zoning • Date C4,0 PlenniN o SiJ!/iG June 20, 2018 44 Magic CITY INNOVATION DISTRICT MAGIC CITY INNOVATION DISTRICT SAP - SOUTH EAST MASSING - PROPOSED SAP MASSING V. MAX. POTENTIAL AREA BUILDOUTS CITY OF MIAMI HEARING BOARDS PLANS REVIEW/ �p Hee�rowoaw - r kr2�/KJ u rcwaits - ZonIng e //(/!a June 20, 2018 45 FINK CITY INNOVATION DISTRICT Parcel 0 0, 2 2 2 2 3 3 4 Magic City SAP * Program Calculations Building Use Units Units/ Level 8 Levels SF/Level Gross SF 1-)% Net51 Parking Calc. Net Program Notes Parking Ratio Fl¢quired Provided 1 Office 19 24,100 457,900 10% 412,110 370,899 2 / 1,000 742 1 Retail 1 53,800 53,800 35% 34,970 2 / 1,000 70 1 Garage 91 8 29,700 23,000 237,600 100% 0 325 sgft/space avg. 731 2 Office 19 437,000 10% 393,300 353,970 2 / 1,000 708 2 Retail 1 52,700 52,700 35% 34,255 2 / 1,000 69 2 Garage 91 10 29,700 297,000 100% 0 325 soft /space avg. 913 3 Office 4 12,000 48,000 10% 43,200 38,880 2 / 1,000 78 3 Retail 1 14,000 14,000 25% 10,500 2 / 1,000 21 4A Residential 342 15 24 19,400 345,600 15% 293,760 858 net sgft/unit 0.6 / Unit 205 a Residential 342 15 24 14,400 345,600 15% 293,760 858 net sgft/unit 0.6 / Unit 205 Retail 1 54,000 54,000 35% 35,100 2 / 1,000 70 Garage 84 6 27,360 164,160 100% 0 325 soft/ space avg. 505 Office 1] 19,400 329,800 10% 296,820 267,138 2 / 1,000 534 5 Retail 1 41,800 41,800 45% 22,990 2 / 1,000 46 585 S Retail 1 5,900 5,900 20% 4,720 2 / 1,000 9 Garage 65 9 21,800 196,200 100% 0 335 sgft/space avg. Retail 22,100 22,100 4596 12,155 2 / 1,000 24 515 Office 1J 18,000 306,000 10% 275,400 247,860 2 / 1,000 496 Garage 43 12 14,400 172,800 100% 0 335 snit/space avg. Office 12 18,000 306,000 10% 275,400 247,860 2 / 1,000 496 515 Retail 1 22,100 22,100 45% 12,155 2 / 1,000 24 Garage 43 12 14,400 172,800 100% 0 335 soft/ space avg. Retail 1 31,280 31,280 15% 26,588 per plan Residential 60 13 4 31,760 127,040 15% 107,984 per plan Office 4 17,185 68,740 10% 61,866 55,679 per plan Expo 287 21 12 3 8 24 39,870 119,610 135,899 15% 100% 15% 101,669 0 86,418 per plan 260 172 38 - 168 Garage Residential 16,987 _ per plan 906 net soft /unit 0.6 / Unit 2 / 1,000 12,750 306,000 260,100 Retail 1 29,600 29,600 35% 19,240 Garage 57 3 20,000 60,000 100% 0 350 sgft/space avg. 171 1 Retell 1 28,000 28,000 35% 18,200 2 / 1,000 36 1 a Retail 1 9,000 9,000 35% 5,850 2 / 1,000 12 456 1 Residential 309 14 24 12,500 300,000 15% 255,000 825 net sgft/unit 0.6 / Unit 185 la Residential 309 14 24 12,500 300,000 15% 255,000 825 net sgft/unit 0.6 / Unit 185 1 Garage 51 9 17,000 153,000 1009.6 0 335 sgft/space avg. 1 Retail 1 28,000 28,00D 35% 18,200 2 / 1,000 36 1 Residential 321 14 24 12,500 300,000 15% 255,1300 794 net sgft/unit 0.6/Unit 193 1 Garage 51 5 17,000 85,000 100% 0 335 sgft/ space avg. 253 1 Residential 336 15 24 12,500 300,000 15% 255,000 758 netsgft/unit 0.6 / Unit 202 1 Hotel 432 31 14 14,400 201,600 15% 171,360 396 net sgft/key 0.5 / Key 216 12 Retail 1 28,750 28,750 35% 18,688 2 / 1,000 37 12 Retail 1 17,240 17,240 20% 13,792 2 / 1,000 28 1 Garage 73 8 24,290 194,320 100% 0 335 sqft /space avg. 580 1 Retail 1 24,700 24,700 35% 16,055 2 / 1,000 32 1 Residential 324 14 24 13,300 319,200 15% 271,320 837 net sgft/unit 0.6/Unit 194 1 Garage 54 4 18,000 72,000 100% 0 336 sgft/ space avg. 214 1 office 1 10,000 10,000 10% 9,00D 8,100 2 / 1,000 16 _ 1 Retail 1 10,000 10,000 20% 8,000 2 / 1,000 16 1 Office 15 15,500 232,500 10% 209,250 188,325 2 / 1,000 377 1 Retail 1 35,400 35,400 35% 23,010 2 / 1,000 46 1 Garage 59 8 19,900 5,000 159,200 100% 0 335 sgft/space avg. 475 _ 1 Office 1 5,000 10% 4,500 4,050 OuPuis Building 2 / 1,000 8 1 Retail 1 1 5,000 5,000 20% 4,000 DUPuis Building 2 / 1,000 8 1 Retail 7,600 7,600 20% 6,080 2 / 1,000 12 1 Office 1 7,600 7,600 10% 6,840 6,156 2 / 1,000 12 SAP Summary Use Total Avg. Avg. Avg. SF/Level Total Gross SF (1% Net SF Parking Program Notes Parking Ratio Required Provided Units Units / Levels Cals. Net Level Residential 2,630 14 22 15,179 2,643,440 15% 2,246,924 854 net sgft/unit 0,6 / Unit 1,578 Office 11 15,435 _.. 2,208,540 10% -__ 1,987,686 1,788,917 2 / 1,000 3,578 Expo 3 39,870 119,610 15% 101,669 Hotel 432 31 14,400 201,600 15% 171,360 6 net suit/unit 0.5 / Unit 216 Retail 1 26,049 520970 31% 344,548 2 / 1,000 689 Garage 2,099,979 100% 345 sgft/space avg- total, 6,061 6D 7 20,811 0 6,081 SAPTotals' 7 ,J94,139 As -of -Right: 5,193,088 Delta: 2,601,051 MAGIC CITY INNOVATION DISTRICT SAP - DEVELOPMENT PROGRAM CALCULATIONS , 620 4852,186 6,061 6, 50% 2,596,544 I 5453 2,255,642 608 NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO ADJUSTMENT BY APPLICANT CITY OF MIAMI HEARING BOARDS PLANS REVIEW ome-IN A Public von, - Pate Signalure apse doss. imply 9P,oval June 20, 2018 46 JUN 20 Z018 CITY INNOVATION DISTRICT Magic City Innovation District Conceptual Phasing Plan Paice 2019 21120 2021 2022 2023 2024 2025 2026 2022 2026 2029 2030 2031 2032 2033 2034 2 Conduction Completion Begin Construction OnsttiOtionIn Pm910ee Conduction Completion 3 Begin Construction 4 Begin Construction Construction Completion Begin Construction Conduction Completion 5 6 Begji Carntirdal Constructcn Completion 7 Begin Construction Conduction Completion 8 Begin Construction End Construction 9 Begin Construction Construction in Progress Construction Completion 10 Begin Construction Construction In Progress Construction Completion 11 Begin Construction Construction In Piogiess Construction Completion 12 Begin Construction Construction Completion 13 Begin Construction Construction In Progress Construction Completion 14 Begin Construction Construction Completion 15 Begin Construction 16 Begin Conduction Construction Completion 17 Begin Construction MAGIC CITY INNOVATION DISTRICT SAP - CONCEPTUAL PHASING PLAN NOTE: PROPOSED CONCEPTUAL PHASING PLAN ONLY; SUBJECT TO ADJUSTMENT BY APPLICANT Begin Construction Construction In Progress I Construction Completion CITY OF MIAMI HEARING BOARDS PLANS„Having Boards CR -Date . m.oam -B. w , . pfi6//BB,mon enpm.al June 20, 2018 47 f1AgIC CITY INNOVATION DISTRICT CITY OF MIAMI NEARING BOARDS PLAN� ypEVIEW „.work. Chi` 66 _gam Zon.o oo MP re awe m.. .m Mwv ww_++ DISPOSITION SCHEDULE 0 001 ......0 ,roe,. eo 0 _. _deed_. Oe' ado.".. a.,r w. _m 0 _....... a.. _ ... 0 al, 0.....0 ,..Oak .dm ®0 o.....,u. W � „ ® @, ..deed.. ®� odd .,..,,,, 0 .. .....,.... ®on m_....... P ® ., .....",A .deal.. ,< m m ® .w W ._,.o- : ,. w .. ® a, e.......w, a um wan „ pm, F9 0 w, ma ... . w, .a,. a... . . . ,.. MAGIC CITY INNOVATION DISTRICT SAP - TREE DISPOSITION SCHEDULE .,. a.....,..... u.o. x ., ., ® m a.... P.. w.a 49 ® w, a.e....._ 0 . w a, ow wwwa new. ..... . „ FL. ® "' .0... C. F. ® .n Om... * b ,. ,a 0 rn de em..... m. .,• n >�< ... ,mom..,..._... ._,. .b ,......... , ro . peed ._ 0 .., o�.�.W. .s p� Rm.. 1 IC ..,w.d..re... .wow,... , ,. m wdd .mod. ® ' .,.m SA... NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS Q,oe a....p._. ou sr o deal. __ Om 'T.'" . a v. rn oa ,= m m9.0 0 _ o..a._..,.. ,wow w m ® ^.deem. .... 0 W. Poloimna an ® „ otwo.wow. w . ,o. ® ode..,.... we . a.. ar June 20, 2018 48 !INK CITY INNOVATION DISTRICT CITY OF MIAMI HEARING BOARDS PLANS VIEW sr: 0 175 ..... . sr as sa (2) In Lenceedele... 7077 1779 2..... 73.771.7 r 7 7 73 ...... 'AO 179 174....... M... E L...-) 0"....... leuce e ce) 17 Onereuse.X. Ilee. 2. 25 35 ,e 0 . ...... saal...a 0 ' ' .. era a a Sem. 0 17 777.7.7 77.7.71 IT IT IT Fs& Renreve 0 IN rms.. 777.0.1.7 or as ao ay 0 sr a a' 0 . ourarree.. .907 SE . 45 75 Rerrele 0 27 7.279.996.9 27 30' 25 F. Raman ci) 209 7..77.. 770. sr . so Fee Pernein 0 907 iminelle .97a 7.9.191.7 IT 7 45 F. Mr. 0 77.... sr 952 40 79 171.7018 0 . .77.77. 7777/207491 ra 37 910 777.... 7967.7. . 7' Is a. rerara 0 211 T a.. 70.1.7. 29. aa ST 212 17/.10erme elepins 79.777 T 25 . 0.7 e'1' T'a* 707.7 1. 7 7 Relr 0 . er. storana Is. sr so rar 0 sr a etwro. vl.m. L.55 rar so er rap 0 219 174re.... 157 202 952 25' F. 0 . orecurror. le lir IS 0 re ..... r es err . 0 au rm. ser.na sr ao ea arra rm. 0 27 RI.eues .72570.• 59Re.en r 0 a.. sr,. 270. Wr` 97 7' pad retcam . ...... 11071.17 P. TT IT IT need Sem. MAGIC CITY INNOVATION DISTRICT SAP - TREE DISPOSITION SCHEDULE 0 osa rm. ...roe . as sr rao. (1) 7...7.. 1329.172.1 7" 7' 7 Ref. ii, . 77.....21. Soneir.5151 5' IT 7' Deed ,...1., 9. ......2. ...r 5' . .? 262 Tea la Golden 9.77ree IT 35' 30 0 '7 I77.9.67.7 67E7 . 95' 7 c) ass 0 . 17171.41 Rerel Rannere 7 40 7 F. 0 " n" as. 15 10 Fe 420 vs rrarss... 7.7.95.91 IT . 20' F 7.00171. IT ar 2T FaV In R.A.I* a aa 22' Fair earara 12.9171* Ler. E Reno. 0 Ta 0 274 1.29.991.7 Neepo 299 AO' 55 7ar 4., on e'6) TeeT ,T 0 ora 0 . ....... too. sas a... cresroarrarn'' “ .• 2. .,..., 0 oaremdarial uv5.5 . 5s. , 0 72.... 70nieell. 97 36. . F. error 0 2a2 as. rms. EA 0 " r sar Is• CD7...- res. ainorr T es so' reo NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS 0 291 LW. 0 0 7.27.7rena 99.777111 0 ass Ones. depasena 0 298 0 2D7 Termlnel97.17. Sabel palmetto E.. FY. 0 aarnikrene I V 0 1 6. 0.d emillee TO. 20" Far 0 03.0.17Iniena 27' 0 Tr. 0 0 0 0 0 0 1.2171729 CODE 91.911127.17 COO., ONE REIT. ors 10 12' 11 IT 7Re 17 21 22 22 11 'June 20, 2018 49 MAGI( INNOVATION DISTRICT NE 82st NE 60st OIL CITY oP 0 0 411' IIi MiriNIVIMIT•RIMIIMMININI !h. et tc 1: 001.1' 0111,111110:010. AGAte10/6/1 10 du II, 4 0 fir 1,0 0 0/N 411 -lb iv .1.0..%_.;.,.,,.I.f. . r..a.r. 0 ...l0 iekMe.t,0.-„-- .-...10r1m0r1m10 .AmGyAmuytmiSiTA/IGITIASGTAASGTAISGTAATBOiTle4*P0.*. FA raet. .tit.* 44 11 :9r.oi: titibilLI • 1 0I.1 ,44 i,-1m0P.Z,A 7n,,iejliir r Afir 1110 ,1',.. • /•—• /,•'. --...,- - eei eSe L. ,,tt‘ 4i, .. .t.44416.•:Am.....,-- '''''.7.1411111, '..rilii kl il0 '4f. ''411. ..- P 111/L70.i '... •:--:-'skt,a ,,.1. 0-7-0/Namoilt:irid-b- Aqi,ftAr—o-tariouift,:, p 4, toi"r It .-ty,t_. .......A...,,,,),.......A _......0.1..N.v.44..., ,*---lOtrIfi ":•;'" *7 if — '" liktV/01111M - 111- i im4P-4 111 It 11, 4 _11-1 11 _. aL f'-•-_ ,' ',w0.0%,W.,0 - e.rt'f.,--,-.1Wle4.7,S,-- 6.m.... r> NE 59th Terrace I 7 MAGIC CITY INNOVATION DISTRICT SAP - TREE DISPOSITION PLAN MEM NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS PLANS VIEW Nearing Boa. - Dee q2,( (t.e work8 • WI- f, r - eee 4.-,1/174 s, • PROPOSED BUILDINGS EXISTING BUILDINGS RAILWAY PLATFORM PARALLEL PARKING PROPERTY LINE 0 (26) TREES TO REMAIN IN PLACE 0 (82) TREES TO BE RELOCATED 0' 60 100120 180200' c"--),14,--InJune 20, 2018 50 f1i1 I( CITY 'INNOVATION DISTRICT NE 62st 114 NE 60st oY ri II II NE 59th Terrace MAGIC CITY INNOVATION DISTRICT SAP - TREE MITIGATION PLAN �`�.►�tIN I 0 MI Mg tior9A4 to ?:11 � �'/�iwi—h • Teri* •,••*•11 i09819•6ii W - OAS IL� ^.aID 4�� -per -._ - -. J II NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS lap Dade TT T In PROPOSED BUILDINGS EXISTING BUILDINGS RAILWAY PLATFORM PARALLEL PARKING PROPERTY LINE o(26) TREES TO REMAIN IN PLACE .. (82) TREES TO BE RELOCATED 60 100'120' 180'200' _ June 20, 2018 51 MINI( CITY INNOVATION DISTRICT MITIGATION CHAPTER 17.6.1.1 TREE REPLACEMENT CHART Total diameter of tree(s) to be removed (sum of inches at DBH) Total number of replacement trees required (2" DBH minimum each: 12' minimum height) OR Total number of replacement trees required (4" DBH minimum each: 16' minimum height) 2"-3" 1 or 0 4"-6" 2 or 1 7"-12" 4 or 2 13"-18" 6 or 3 19"-24" 8 or 4 25"-30" 10 or 5 31"-36" 12 or 6 37"-42" 14 or 7 43"-48" 16 or 8 TREE REPLACEMENT CALCULATIONS 1500"/60"= 25 DBH o' oved Tre Total diameter of tree(s) to be removed (sum of inches at DBH) 49"-60"; 25 TIMES Total number of replacement trees required (2" DBH minimum each: 12' minimum height) Total number of replacement trees required (4" DBH minimum each: 16' minimum height) OR or CHAPTER 17.6.2.1 TREE SPECIES DIVERSITY CHART REQUIRED NUMBER OF TREES REQUIRED MINIMUM NUMBER OF SPECIES 11-20 2 21-50 4 TREE MITIGATION: 500 211 DBH TREES OR 250 4" DBH TREES OR 125 8" DBH TREES OR $500,000.00 TREE TRUST FUND CONTRIBUTION MAGIC CITY INNOVATION DISTRICT SAP - TREE MITIGATION CALCULATIONS NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS CITY OF MIAMI HEARING BOARDS PLANS,REVIEW Pudic works .ate 6.46�z1 /K! ",re o".�C _ are above does not [ropy appro. June 20, 2018 52 MAW CITY INNOVATION DISTRICT TREES/PALM STRANGLER FIG SHRUBS GROUNDCOVERS MAGIC CITY INNOVATION DISTRICT SAP - SITE VEGETATION PALETTE PIGEON PLU' NOTE: ILLUSTRATIVE EXAMPLES ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS SABAL PALM CRY OF MIAMI HEARING BOARDS PLANS REVIEW ud .alums �/4 LP er: N z,xs, -ow I I40 en Plm. ro Care 6ia///� S stave olr approval June 20, 2018 53 Magic CITY INNOVATION DISTRICT TREES/PALMS SHRUB/GROUNDCOVERS GAMMA GRASS MAGIC CITY INNOVATION DISTRICT SAP - STREETSCAPE VEGETATION PALETTE NOTE: ILLUSTRATIVE EXAMPLES ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS CITY OF MIAMI HEARING BOARDS PLANS REVIEW Br lag G/ l� Planning 6/'''1//4 Sg ne a roa6es am ntPN aPPraaa, June 20, 2018 54 CITY INNOVATION DISTRICT 10-0" 10'41' SUE IA SR EWFHWA.WU LAM SUMMON, LWt IUMLNt WALK G LANE 10,0' 10'-0' 10'U 5'-0' 5 0' 5'-0' NUHTHWU2LAN NUNGHOLWOLNIt W'OW Yt vUX* SNtWNR LWE NE 2NDAVE SO-0" ROW 10,0' SETBACK MARCHE DUPUIS CAMPUSZONE 33'-0' 4T-0' fi .y T :� R NE 2ND AVE 1/16" = 1'-0" MAGIC CITY INNOVATION DISTRICT SAP - STREET SECTION CITY OF MIAMI HEARING BOARDS PLANS REVIEW Hewing Goa. Gete (21 Hale Gs . o<le A6V7W � (rnA' -,-j1a .,m0).par. a LES BUREAUX CAMPUS ZONE LWJJ( niIEl-0if.-MG u' BI ' suwH�uu unt' wrilrEM.ELMK uia LANE LANE NE 3RD AVE 1/16" = 1'-0" NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS #f 0S LES RESIDENCES CAMPUS ZONE Draft dated March 26, 2018 55 CITY INNOVATION DISTRICT LES RESIDENCES CAMPUS ZONE 10-0' SETBACK 4'-0" 10-0' 10-0" 4'-0' 6'-0' UIf MAPIOJIULVIE AUNTINEVANLWE UIQ vAMINL UWE LINE NE 3RD ANENUEST-01 ROW NE 3RD AVE PROMENADE 1/16" =1'-0" 6'-0' 3'-0' KUHN.. S. WAIL( MAGIC CITY INNOVATION DISTRICT SAP - STREET SECTION LES RESIDENCES 10-0SETBACK CAMPUS ZONE CRY OF MIAMI HEARING BOARDS PLANS REVIEW ZoSOwe /Id LES ATELIERS CAMPUS ZONE y 100' SETBACK 6'-0' 0 5'-0' WImHMIP G� LANE SIgPr➢URWNIN LANE NE 4TH AVE PROMENADE 1/16" =1'-0" YXJIIEWIULMt LEII1dWX"LWE NE 4TH AVE 70-0' ROW 10'-0' Slgvkll L]kVHIR! NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS LANE G aNNwxv� LANE LES ATELIERS 10'-0' SETBACK , CAMPUS ZONE Draft dated March 26, 2018 56 MINK CITY INNOVATION DISTRICT LESATELIERS CAMPUS ZONE 1V4'SETBACK 1Z.0 12'-0' 10'-0' EI IaYHIUtglaJNT YJJIMUNUWt u(JMaume 'su.mtvurzvt NE4TH AVE7V-0' ROW NE 4TH AVE 1/16" =1'-0'. MAGIC CITY INNOVATION DISTRICT SAP - STREET SECTION IES ATELIERS W041SETBACK CAMPUS ZONE e31 CITY OF MIAMI HEARING BOARDS PLANS, { I Hoeft "aloe sy. ...,_ -=" G('LI glib N V n,.. 250' NE 62ND ST 1/16" =1'-0" NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS Draft dated March 26, 2018 57 1'1AQK CITY INNOVATION DISTRICT LES RESIDENCES CAMPUS ZONE 10'-0'SETBACK LINE NE6I ST60'-0'ROW 25-0' 26'-0' NE 61ST ST 1/16" =1'-0" MAGIC CITY INNOVATION DISTRICT SAP - STREET SECTION 10'4'SEIBACK ESRESIDENCES CAMPUS ZONE LID CRY OF MIAMI HEARING BOARDS PLANS EVIEW "earl, Board.. Pubic works • Deis. Zara, Pri Bo. (/ti Mannino •Deta (5nttAd NE 60TH ST 1/16" =1'-0" 25-0' NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS LES RESIDENCES 10-0'SETBACK , CAMPUS ZONE Draft dated March 26, 2018 58 1'1AQIC CITY INNOVATION DISTRICT DUPUIS BUILDING LES BUREAUX CAMPUS ZONE RETAILIDINING/KIOSKS HOTELIOFFICE PUZA MAGIC CITY INNOVATION DISTRICT SAP - PROMENADE DU GRAND BOIS SECTION PROMENADE DU GRAND BOIS PATHWAY PROMENADE DU GRAND BOIS 11T-6' PROMENADE DU GRAND BOIS PATHWAY PROMENADE DU GRAND BOIS 11Td' RETAIUDININDKIOSKS HOTELIOFFICE PLAZA E MARCHE DUPUIS CAMPUS ZONE LES BUREAUX CAMPUS ZONE LE MARCHE DUPUIS 1/16" = CITY OF MIAMI HEARING BOARDS PLANNS,REVIEW� zon .ro GI^'ll Jb LES BUREAUX 1/16" =1'-0" NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS Draft dated March 26, 2018 59 I'1PQI( CITY INNOVATION DISTRICT v LES RESIDENC CAMPUS ZONE RESIDENTIAL DOG PARKIPIAY GROUNDIFITNESS RECREA710N AREAS LES ATELIERS CAMPUS ZONE % 7" PROMENADE DU GRAND BOIS PATHWAY 1 RESIDENTIAL DOG PARK/PLAYGROUND/FITNESS RECREATION AREAS PROMENADE DU GRAND BOIS 161'E' RETAIL PLAZADININGMIDSKS 4MENADE DU GRAND BOIS PATH RETAIL PLAINDININGIKIOSKS PROMENADE DU GRAND BOIS 73'-6' LES ATELIERS CAMPUS ZONE MAGIC CITY INNOVATION DISTRICT SAP - PROMENADE DU GRAND BOIS SECTION LES RESIDENCES 1/16" =1'-0" LES RESIDENCES CAMPUS ZONE LES ATELIERS 1/16" =1'-0" NOTE: ILLUSTRATIVE CONCEPT ONLY; SUBJECT TO REQUIRED DEPARTMENTAL APPROVALS CITY OF MIAMI HEARING BOARDS PLANS REVIEW Hewing Boa.�_ �( p ti�rt, Pen l/d(//Q Draft dated March 26, 2018 60 - NE 2AVE PER PE TI une 61 CITY OF MIAMI HEARING BOARDS PLANS REVIEW RENDERING - NE 3RD AVE PERSPECTIVE une 20, 2018 62 CITY OF MIAMI HEARING BOARDS PLANSREVIEW flag 1,:c1 INNOVAXIO C T RENDERIN NE ND A PER PE TIVE - NI HT VIEW 63