Loading...
HomeMy WebLinkAboutExhibitECONOMIC STIMULUS Expedite Legislation Attachment A - 4/12/19 Revised 1 Very Poor Condition Roads, Phase 1 - Outside Priority Drainage Basins Alice Wainwright Park Seawall and Resiliency Douglas Park Community Center Legion Park Boat Ramp Spring Garden Point Park Legion Park Building City-wide Parks Access and Mobility Renovations City-wide Parks Playground Renovations City-wide Parks Roofing Reconstruction Bay of Pigs Park Shenandoah Park Pool Renovation West End Park Master Plan, Pool Design and Enhancements Antonio Maceo Boat Ramp and Dock Renovations Curtis Park Community Center Design Armbrister Park Community Center Design Moore Park Gym Design and Construction PBA/Fern Isle Park Enhancements Coral Way Park Expansion and Enhancements Riverside Park Renovations and Enhancements Bryan Park Playground Renovations and Park Enhancements New Park at 3699/3701 SW 1st AVE New Park at 2200 SW 9th AVE & 910 SW 22nd RD Fire Facilities Resiliency Project (FS10) - Design Immediate Flood Control: Install Backflow Valves (Phase 1) Improve Drainage Outside of Priority Drainage Basins (Phase 1) Brickell Bay Drive Design Criteria Package Jose Marti Park Flood Mitigation Study and Design Fairview Flood Mitigation NW 17th Street from NW 27th AVE to NW 32nd AVE - Road & Drainage Construction Construction and Permanent Financing: MLK Residences Construction and Permanent Financing: Liberty Renaissance Affording Housing and Economic Development Home Ownership Preservation / Single Family Home Rehabilitation Project B# 40-B193622 40-B40454C 40-B40581 40-B40510 40-B40566 40-B40510A 40-B193508 40-B193509 40-B193510 40-B183526 40-B40563 40-B183505 40-B17357 40-B193511 40-B193512 40-B193513 40-B40543 40-B193514 40-B193515 40-B193516 40-B193517 40-B193518 40-B193207 40-B193800 40-B193801 40-B193802 40-B193803 40-B30737 40-B183611 N/A N/A N/A N/A Est.Total Cost Category $ 7,590,182 Roads $ 4,906,280 $ 4,365,345 $ 1,895,536 Parks Parks Parks $ 1,500,000 Parks $ 2,995,893 $ 2,212,000 $ 2,788,200 Parks Parks Parks $ 655,400 Parks $ 1,020,000 Parks $ 7,600,497 Parks $ 700,000 Parks $ 579,929 Parks $ 400,000 Parks $ 400,000 Parks $ 6,800,000 Parks $ 4,211,007 Parks $ 925,000 Parks $ 995,000 Parks $ 650,000 Parks $ 1,200,000 Parks $ 1,000,000 $ 420,000 $ 2,457,000 Parks Public Safety SLR&FP $ 2,300,000 SLR&FP $ 1,000,000 SLR&FP $ 940,000 SLR&FP $ 4,944,615 SLR&FP $ 2,047,928 SLR&FP Housing Housing Housing Housing