Loading...
HomeMy WebLinkAboutComposite Exhibit CPage 1 of 2 Exhibit C-1- Infrastructure Projects Category Projects Series A Project B# Bond Funding Roads Very Poor Condition Roads, Phase 1 - Outside Priority Drainage Basins 40-B193622 $7,590,182 Parks Alice Wainwright Park Seawall and Resiliency 40-B40454C $2,650,000 Parks Antonio Maceo Boat Ramp and Dock Renovations 40-B17357 $79,929 Parks Armbrister Park Community Center Design 40-B193512 $400,000 Parks Bay of Pigs Park 40-B183526 $310,000 Parks Bryan Park Playground Renovations and Park Enhancements 40-B193516 $650,000 Parks City-wide Parks Access and Mobility Renovations 40-B193508 $2,212,000 Parks City-wide Parks Playground Renovations 40-B193509 $2,788,200 Parks City-wide Parks Roofing Reconstruction 40-B193510 $655,400 Parks Coral Way Park Expansion and Enhancements 40-B193514 $925,000 Parks Curtis Park Community Center Design 40-B193511 $400,000 Parks Douglas Park Community Center 40-B40581 $1,000,000 Parks Legion Park Boat Ramp 40-B40510 $263,000 Parks Legion Park Building 40-B40510A $825,000 Parks Moore Park Gym Design and Construction 40-B193513 $6,800,000 Parks Morningside Park Pool Design and Permitting TBD $0 Parks Shenandoah Park Pool Design and Permitting 40-B40563 $600,000 Parks New Park at 2200 SW 9th Ave & 910 SW 22nd Rd 40-B193518 $1,000,000 Parks New Park at 3699/3701 SW 1st Ave 40-B193517 $1,200,000 Parks PBA/Fern Isle Park Enhancements 40-B40543 $244,700 Parks Riverside Park Renovations and Enhancements 40-B193515 $995,000 Parks Spring Garden Point Park 40-B40566 $850,000 Parks West End Park Master Plan, Pool Design and Enhancements 40-B183505 $500,000 Public Safety Fire Facilities Resiliency Project (FS10) - Design 40-B193207 $420,000 Department Public Works Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Parks Fire Rescue Page 2 of 2 SLR&FP Brickell Bay Drive Design Criteria Package 40-B193802 $1,000,000 SLR&FP Fairview Flood Mitigation 40-B30737 $1,800,000 SLR&FP Immediate Flood Control: Install Backflow Valves (Phase 1) 40-B193800 $2,457,000 SLR&FP Improve Drainage Outside of Priority Drainage Basins (Phase 1) 40-B193801 $2,300,000 SLR&FP Jose Marti Park Flood Mitigation Study and Design 40-B193803 $940,000 SLR&FP NW 17th Street from NW 27th Ave to NW 32nd Ave - Road & Drainage Construction 40-B183611 $1,797,928 Total $43,653,339 Public Works Public Works Public Works Public Works Parks Public Works Exhibit C-2 - Housing and Economic Development Housing Affordable Housing and Economic Development TBD $8,000,000 Housing Construction and Permanent Financing: MLK Residences TBD $2,000,000 Housing Construction and Permanent Financing: Liberty Renaissance TBD $1,000,000 Housing Home Ownership Preservation / Single Family Home Rehabilitation TBD $4,000,000 Total $15,000,000