Loading...
HomeMy WebLinkAboutPowerpoint Presentationl� CONNECTING \MIAMI J l-395/SR 836/1-95 DESIGN -BUILD PROJECT Financial Project Numbers: 251688-1-52-01, 423126-1-52-01, 423126-2-52-01, 429300-2-52-01 City of Miami Commission October 11, 2018 FDOT EirP:ibX® R MI I. 11 11 Ea 11 11 r CONNECTING I-395/SR 83611-95 11:j �1MIAMI� DESIGN -BUILD PROJECT PROJECT TEAM FDOT DESIGN PROJECT MANAGER Maria 1. Perdomo, PE FDOT CONSTRUCTION PROJECT MANAGER Jaqueline Sequeira, PE riy►bx MDX PROJECT MANAGER Claudio Diaferia, PE OWNER'S REPRESENTATIVE PROJECT MANAGER William Detwiler, PE CEI SENIOR PROJECT ENGINEER Mark Croft, PE SENIOR COMMUNITY OUTREACH SPECIALIST Oscar Gonzalez CONTRACTOR Archer Western - de Moya Group Joint Venture COMMUNITY MOBILITY SAFETY SUSTAINABILITY 2 r CONNECTING I-395/SR 83611-95 11:j �1MIAM1� DESIGN -BUILD PROJECT PROJECT INFORMATION • Partnership between the Florida Department of Transportation (FDOT) and the Miami -Dade Expressway Authority (MDX) • Construction Cost: $802 million o FDOT: $616 million o MDX: $186 million • Contract Time: Four Years* * Contract time does not reflect days added to the contract for holidays, weather days or special events. riy►bx COMMUNITY MOBILITY SAFETY SUSTAINABILITY 3 Ir CONNECTING I-395/SR 83611-95 I\�1MIAM1� DESIGN -BUILD PROJECT PROJECT MAP Consists of three major projects to be constructed concurrently to minimize impacts to the public; • 1-395 from 1-95 to MacArthur Causeway Bridge • SR 836 from West of NW 17 Ave to Midtown Interchange • 1-95 Pavement Reconstruction from NW 8 St to NW 29 St z ' V4, °rth River Dr z Jackson Memorial gi Hospital NW 29th St W 28th St WYNWOOD Wynwood Walls 1.4 Miles any lu+e!W N riy►bx EDGEWATER 0 z m n Margaret co Pace Park ��� TOWN SQUARE MacArthur `?~\`('�` `- rt Museum Mia p f ..395 G V ERA O W N Museum Park NE AmericanAirlines Arena 9 SR 836 IMPROVEMENTS 1-95 CONCRETE PAVEMENT RECONSTRUCTION' 1-395 RECONSTRUCTION ENHANCEMENTS COMMUNITY MOBILITY SAFETY SUSTAINABILITY 4 11A OfACONNECTING I-395/SR 83611-95 MIAM1� DESIGN -BUILD PROJECT a�b SR 836 ENHANCEMENTS MIDTOWN INTERCHANGE ENHANCEMENTS 1-395 ENHANCEMENTS PROPOSED FEATURES UNDER I-395 PEDESTRIAN AND BICYCLE FACILITIES LOCAL ROADS 1-95 ENHANCEMENTS riy►bx COMMUNITY MOBILITY SAFETY SUSTAINABILITY 5 Ir CONNECTING I-395/SR 83611-95 I\�1MIAM1---- DESIGN -BUILD PROJECT SR 836 ENHANCEMENTS/DOUBLE-DECKING NW 17 Ave 1-395 Mainline N T Z SR 836 Mainline SR 836 Local/1-95 Access riy►bx • Limits: West of NW 17 Avenue to the SR 836/1-95/I-395 Midtown Interchange • Add capacity to SR 836 and improve flow of traffic • Double -decked SR 836 section provides a direct connection to/from 1-395, PortMiami Tunnel and Miami Beach that bypasses traffic entering and exiting local roads and 1-95 COMMUNITY MOBILITY SAFETY SUSTAINABILITY Ir CONNECTING I-395/SR 83611-95 I\�1MIAM1� DESIGN -BUILD PROJECT MIDTOWN INTERCHANGE ENHANCEMENTS riy►bx 0 Additional lane on the SR 836 EB to 1-95 NB ramp to improve flow of traffic a Extend Auxiliary Lane on northbound 1-95 to receive additional ramp lane Double-decker maintains separation of thru traffic and local traffic through the interchange COMMUNITY MOBILITY SAFETY SUSTAINABILITY 7 tACONNECTING I-395/SR 836/I-95 MIAMI� DESIGN -BUILD PROJECT 1-395 ENHANCEMENTS 1-395 Mainline Signature Bridge E Z • Reconstructing 1-395 from the Midtown Interchange to the MacArthur Causeway Bridge • Improving capacity and safety by separating local and 1-95 ramps from through traffic • Building a new Signature Bridge over NE 2 Avenue and Biscayne Boulevard riy►bx COMMUNITY MOBILITY SAFETY SUSTAINABILITY 8 Ir CONNECTING I-395/SR 83611-95 I\�1MIAM1---- DESIGN -BUILD PROJECT riy►bx 1-395 ENHANCEMENTS/SIGNATURE BRIDGE Proposed El vatlon • 330 ft RFP Elevation Requirement - 245 ft 7- Proposed Length - 1025 ft RFP Length Requirement — 650 ft COMMUNITY MOBILITY SAFETY SUSTAINABILITY 9 11:0 tACONNECTING I-395/SR 83611-95 MIAM1� DESIGN -BUILD PROJECT 1-395 ENHANCEMENTS/SIGNATURE BRIDGE riy►bx MOBILITY SAFETY SUSTAINABILITY 10 trACONNECTING I-395/SR 836/1-95 fOt \MIAN11---- DESIGN -BUILD PROJECT 1-395 ENHANCEMENTS/SIGNATURE BRIDGE 11A O CONNECTING I-395/SR 83611-95 �1MIAM1---- DESIGN -BUILD PROJECT riy►bx 1-395 ENHANCEMENTS/SIGNATURE BRIDGE COMMUNITY MOBILITY SAFETY SUSTAINABILITY 12 11A O CONNECTING I-395/SR 83611-95 �1MIAMI---- DESIGN -BUILD PROJECT riy►bx 1-395 ENHANCEMENTS/PROPOSED FEATURE UNDER 1-395 Area underthe Midtown Interchange Under 1-395 from NW 3 Avenue to NW 1 Avenue Under 1-395 from NW 1 Avenue to NE 1 Avenue Under I-395 and Signature Bridge from NE 1 Avenue to Biscayne Boulevard MOBILITY SAFETY SUSTAINABILITY i Ir CONNECTING I-395/SR 83611-95 I\�1MIAM1� DESIGN -BUILD PROJECT MIDTOWN INTERCHANGE CORE riy►bx NMI YFLLQW IRVMREI TREE Fr`` :,.o.: m —a piNK TRUMP, I TREE COMMUNITY MOBILITY SAFETY SUSTAINABILITY 14 11:0 r CONNECTING I-395/SR 83611-95 �1MIAM1---- DESIGN -BUILD PROJECT NW 3 AVENUE TO NW 1 AVENUE ZONE 1 1 riy►bx COMMUNITY MOBILITY SAFETY SUSTAINABILITY 15 Ir CONNECTING I-395/SR 83611-95 I\�1MIAM1---- DESIGN -BUILD PROJECT NW 1 AVENUE TO NE 1 AVENUE riy►bx COMMUNITY MOBILITY SAFETY SUSTAINABILITY 16 tACONNECTING I-395/SR 836/I-95 fewMIAM1� DESIGN -BUILD PROJECT NE 1 AVENUE TO BISCAYNE BOULEVARD riy►bx SUSTAINABILITY 17 trACONNECTING I-395/SR 836/1-95 DESIGN -BUILD PROJECT 1-395 ENHANCEMENTS/PROPOSED FEATURES UNDER 1-395 Existing condition - NE 1 Avenue looking west. Increased vertical clearance will allow more light into the areas under the bridge riyrAbx. COMMUNITY MOBILITY SAFETY SUSTAINABILITY 18 r I-395/SR 83611-95 11:rACONNECTING MIAM1� DESIGN -BUILD PROJECT 1-395 ENHANCEMENTS/PROPOSED FEATURES UNDER 1-395 riy►bx Under -deck and other light fixtures will provide ample lighting. COMMUNITY 1 MOBILITY SAFETY SUSTAINABILITY 19 11A OfACONNECTING I-395/SR 836/1-95 \MIAN11---- DESIGN -BUILD PROJECT 1-395 ENHANCEMENTS - PEDESTRIANS/BICYCLES Under bridge enhancements from Midtown Interchange to NW 1 Avenue 1 NW 14 SI I 7 - Enhanced lighted pedestrian crossings Bike racks riyrAbx. 4 COMMUNITY MOBILITY SAFETY SUSTAINABILITY 20 11A OfACONNECTING I-395/SR 83611-95 MIAMI� DESIGN -BUILD PROJECT riy►bx 1-395 ENHANCEMENTS - PEDESTRIANS/BICYCLES Under bridge enhancements from NW 1 Avenue to North Bayshore Drive Continuous trail from NW 3 Avenue to Biscayne Blvd. It i IT ADRIENNEARSHT CENTER ZIFF BALLET OPERA HOUSE ADRIENNEARSHT CENTER KNIGHT CONCALL COMMUNITY MOBILITY SAFETY SUSTAINABILITY Ir CONNECTING I-395/SR 83611-95 I\�1MIAM1---- DESIGN -BUILD PROJECT 1-395 ENHANCEMENTS/LOCAL ROADS • Re -connect NW 2 Avenue in Overtown • Improvements to all other cross streets (resurfacing/new striping) • American with Disabilities Act (ADA) enhancements • Move 1-395 on/off ramps to North Miami Avenue to enhance the flow of traffic and pedestrian safety FOOT riy►bx LEG EN D EXISTING STREETS TO REMAIN EXISTING STREETS TO BE CLOSED STREETS TO BE CONNECTED CITY OF MIAMI ROADS COMMUNITY MOBILITY SAFETY SUSTAINABILITY Ir CONNECTING I-395/SR 83611-95 I\�1MIAMI� DESIGN -BUILD PROJECT 1-95 ENHANCEMENTS mggEO SMOULDER NW VANES 50UTM900N0110} - t0N1T5 OF CONCRETE PRVEN£NT WELONSTA00T10N irarn ,r.F, 9Cm E s'" td CtYt"PaYNE' RAY VANES NORTMOOHHD 1i0] - 1]9.A1 VARIES d TO 6 UNITS OF C0N[RETf PAEN 11 ore SMIo�WEFF� 11 1I II ,E �Esxt R I; �EAS FF�LE55 t 1 1 MVP NTH AVE R FI NI [ONSTxUCifON ri►bx NAf HOMER War 5ML0R MAUL LINE a`x TO BMlOveOp l,F SLAGS • Limits: NW 8 Street to NW 29 Street • Pavement replacement will enhance rideability • Extension of auxiliary lane from NW 17 Street to NW 29 Street will improve the flow of traffic on and westbound 1-395 ramps to northbound 1-95 • New connector ramp from southbound 1-95 to westbound SR 836 will enhance the flow of traffic 0,—LA AM LINE the widened eastbound SR 836 and reduce weaving movements COMMUNITY MOBILITY SAFETY SUSTAINABILITY 23 r CONNECTING I-395/SR 83611-95 11:j �1MIAM1� DESIGN -BUILD PROJECT CONSTRUCTION Q Project is a Design -Build — Plans design underway riy►bx Q Preliminary construction activities are expected to begin in October/November 2018 with major construction anticipated to begin in February/March of 2019 Q Construction will be done in phases to minimize construction impacts to the public COMMUNITY MOBILITY SAFETY SUSTAINABILITY 24 riy►bx 1:Ir CONNECTING I-395/SR 83611-95 I�1MIAM1---- DESIGN -BUILD PROJECT CONSTRUCTION MILESTONES The '" 1 I LESTC 0 Improve operations on NB 1-95 by extending auxiliary lane 1 Open 2nd Lane EB to NB on 1-95 0 Open WB Signature Bridge on 1-395 Q Open Double -Decked Bridge on SR 836 Open EB Signature Bridge on 1-395 Open CommunalAreas underI-395/Complete Project COMMUNITY MOBILITY SAFETY SUSTAINABILITY 25 Ir CONNECTING I-395/SR 83611-95 I\�1MIAMI---- DESIGN -BUILD PROJECT riy►bx MAINTENANCE OF TRAFFIC (MOT)/HOURS 1-395 SPECIFIC Mainline Nightly Closures • 10 pm to 5:30 am Sunday thru Thursday • 1 am to 7:00 am Saturday and Sunday SR 836 SPECIFIC Mainline Nightly Closures • 8 pm to 5:30 am Sunday thru Thursday • 8:30 pm to 9 am Friday • 8:30 pm to 11 am Saturday 1-95 SPECIFIC Mainline Nightly Closures • 9 pm to 5:30 am Sunday thru Thursday RAMPS • 10 pm to 6:30 am Sunday thru Thursday • 11 pm to 7 am Friday and Saturday SPECIAL NOTES: • Special events will be taken into account when scheduling closures • Hours noted above are for single lane closures, multi -lane closure will occur later • Weekend lane closures will be permitted on 1-95 from 11 p.m. on Friday to 5:30 a.m. on Monday • The contract documents allows for weekend closures on certain ramps MOBILITY SAFETY SUSTAINABILITY r CONNECTING I-395/SR 83611-95 11:j �1MIAM1� DESIGN -BUILD PROJECT riy►bx UPCOMING ACTIVITIES- SIX MONTH LOOK -AHEAD • Utility relocations • Surveying and Geotechnical Exploration -Test piles • Continue to develop roadway and bridge plans • Construction along 1-95 in the median and begin concrete replacement • Widening SR 836 in preparation for double -decking • Construction of the 1-395 bridge foundations COMMUNITY MOBILITY SAFETY SUSTAINABILITY 27 Ir CONNECTING I-395/SR 83611-95 I\�1MIAM1� DESIGN -BUILD PROJECT TRAFFIC MANAGEMENT SYSTEM '9944 LE 41s St — 5th Smart Work Zone Management System (SWZMS) - The project will implement a SWZMS that will utilize Intelligent Transportation System (ITS) Devices such as traffic cameras, data collection devices and portable message signs to: • Provide drivers with real-time travel information; • Encourage motorists to take alternate routes; Clear incidents more quickly, thereby reducing secondary incidents; and • Make work zones safer for highway workers and motorists. COMMUNITY MOBILITY SAFETY SUSTAINABILITY 11A OfACONNECTING I-395/SR 83611-95 MIAMI� DESIGN -BUILD PROJECT COMMUNITY OUTREACH riy►bx PROJECT WEBSITE • www.i-395miami.com • Sign-up for project alerts/updates Lane Closure information Upcom ing construction activities • Calendar of events OUTREACH OFFICE IN THE OVERTOWN COMMUNITY • 1035 NW 3 Avenue, Miami, Florida 33136 STAKEHOLDER UPDATE MONTHLY MEETINGS • Monday, October 15, 2018 at MDX Headquarters UPCOMING PRESENTATIONS/EVENTS • Miami -Dade TPO FTAC Committee— November 14 • Miami -Dade TPO BPAC Committee — December 11 PUBLIC OUTREACH MEETINGS • Public open house meetings to be scheduled prior to major construction beginning in February/March 2019 • Individual stakeholder meetings COMMUNITY MOBILITY SAFETY SUSTAINABILITY 29 fO11ACONNECTING I-395/SR 83611-95 \�1MIAM1� DESIGN -BUILD PROJECT THANK YOU! www.i-395miami.com Contact: Oscar Gonzalez 786-280-0983 QQ OGonzalez@MRGmiami.com riy►bx COMMUNITY MOBILITY SAFETY SUSTAINABILITY 30