CONNECTING
\MIAMI J
l-395/SR 836/1-95 DESIGN -BUILD PROJECT
Financial Project Numbers: 251688-1-52-01, 423126-1-52-01, 423126-2-52-01, 429300-2-52-01
City of Miami Commission
October 11, 2018
FDOT EirP:ibX®
R
MI I.
11
11
Ea
11
11
r CONNECTING I-395/SR 83611-95
11:j
�1MIAMI� DESIGN -BUILD PROJECT
PROJECT TEAM
FDOT DESIGN PROJECT MANAGER
Maria 1. Perdomo, PE
FDOT CONSTRUCTION PROJECT
MANAGER
Jaqueline Sequeira, PE
riy►bx
MDX PROJECT MANAGER
Claudio Diaferia, PE
OWNER'S REPRESENTATIVE
PROJECT MANAGER
William Detwiler, PE
CEI SENIOR PROJECT ENGINEER
Mark Croft, PE
SENIOR COMMUNITY OUTREACH
SPECIALIST
Oscar Gonzalez
CONTRACTOR
Archer Western - de Moya Group Joint Venture
COMMUNITY MOBILITY SAFETY
SUSTAINABILITY 2
r CONNECTING I-395/SR 83611-95
11:j
�1MIAM1� DESIGN -BUILD PROJECT
PROJECT INFORMATION
• Partnership between the Florida Department of
Transportation (FDOT) and the Miami -Dade
Expressway Authority (MDX)
• Construction Cost: $802 million
o FDOT: $616 million
o MDX: $186 million
• Contract Time: Four Years*
* Contract time does not reflect days added to the contract for
holidays, weather days or special events.
riy►bx
COMMUNITY
MOBILITY
SAFETY
SUSTAINABILITY
3
Ir CONNECTING I-395/SR 83611-95
I\�1MIAM1� DESIGN -BUILD PROJECT
PROJECT MAP
Consists of three major projects to be constructed
concurrently to minimize impacts to the public;
• 1-395 from 1-95 to MacArthur Causeway Bridge
• SR 836 from West of NW 17 Ave to Midtown Interchange
• 1-95 Pavement Reconstruction from NW 8 St to NW 29 St
z
' V4,
°rth River Dr
z Jackson Memorial gi
Hospital
NW 29th St
W 28th St
WYNWOOD
Wynwood Walls
1.4 Miles
any lu+e!W N
riy►bx
EDGEWATER
0
z
m
n Margaret
co Pace Park
��� TOWN SQUARE
MacArthur
`?~\`('�` `- rt Museum Mia
p f
..395
G V ERA O W N Museum Park
NE
AmericanAirlines Arena 9
SR 836 IMPROVEMENTS 1-95 CONCRETE PAVEMENT RECONSTRUCTION' 1-395 RECONSTRUCTION ENHANCEMENTS
COMMUNITY
MOBILITY SAFETY
SUSTAINABILITY 4
11A OfACONNECTING
I-395/SR 83611-95
MIAM1� DESIGN -BUILD PROJECT
a�b
SR 836 ENHANCEMENTS
MIDTOWN INTERCHANGE ENHANCEMENTS
1-395 ENHANCEMENTS
PROPOSED FEATURES UNDER I-395
PEDESTRIAN AND BICYCLE FACILITIES
LOCAL ROADS
1-95 ENHANCEMENTS
riy►bx
COMMUNITY MOBILITY SAFETY SUSTAINABILITY 5
Ir CONNECTING I-395/SR 83611-95
I\�1MIAM1---- DESIGN -BUILD PROJECT
SR 836 ENHANCEMENTS/DOUBLE-DECKING
NW 17 Ave
1-395 Mainline
N
T
Z
SR 836 Mainline SR 836 Local/1-95 Access
riy►bx
• Limits: West of NW 17 Avenue to the SR 836/1-95/I-395 Midtown Interchange
• Add capacity to SR 836 and improve flow of traffic
• Double -decked SR 836 section provides a direct connection to/from 1-395, PortMiami Tunnel and Miami Beach that bypasses
traffic entering and exiting local roads and 1-95
COMMUNITY MOBILITY
SAFETY
SUSTAINABILITY
Ir CONNECTING I-395/SR 83611-95
I\�1MIAM1� DESIGN -BUILD PROJECT
MIDTOWN INTERCHANGE ENHANCEMENTS
riy►bx
0 Additional lane on the SR 836 EB to
1-95 NB ramp to improve flow of traffic
a
Extend Auxiliary Lane on northbound
1-95 to receive additional ramp lane
Double-decker maintains separation of
thru traffic and local traffic through the
interchange
COMMUNITY MOBILITY SAFETY SUSTAINABILITY 7
tACONNECTING I-395/SR 836/I-95
MIAMI� DESIGN -BUILD PROJECT
1-395 ENHANCEMENTS
1-395 Mainline
Signature Bridge
E
Z
• Reconstructing 1-395 from the Midtown Interchange to the MacArthur Causeway Bridge
• Improving capacity and safety by separating local and 1-95 ramps from through traffic
• Building a new Signature Bridge over NE 2 Avenue and Biscayne Boulevard
riy►bx
COMMUNITY
MOBILITY
SAFETY
SUSTAINABILITY 8
Ir CONNECTING I-395/SR 83611-95
I\�1MIAM1---- DESIGN -BUILD PROJECT
riy►bx
1-395 ENHANCEMENTS/SIGNATURE BRIDGE
Proposed El vatlon • 330 ft
RFP Elevation Requirement - 245 ft
7-
Proposed Length - 1025 ft
RFP Length Requirement — 650 ft
COMMUNITY
MOBILITY
SAFETY
SUSTAINABILITY
9
11:0
tACONNECTING I-395/SR 83611-95
MIAM1� DESIGN -BUILD PROJECT
1-395 ENHANCEMENTS/SIGNATURE BRIDGE
riy►bx
MOBILITY SAFETY SUSTAINABILITY 10
trACONNECTING I-395/SR 836/1-95
fOt \MIAN11---- DESIGN -BUILD PROJECT
1-395 ENHANCEMENTS/SIGNATURE BRIDGE
11A O
CONNECTING I-395/SR 83611-95
�1MIAM1---- DESIGN -BUILD PROJECT
riy►bx
1-395 ENHANCEMENTS/SIGNATURE BRIDGE
COMMUNITY MOBILITY SAFETY SUSTAINABILITY 12
11A O
CONNECTING I-395/SR 83611-95
�1MIAMI---- DESIGN -BUILD PROJECT
riy►bx
1-395 ENHANCEMENTS/PROPOSED FEATURE UNDER 1-395
Area underthe Midtown
Interchange
Under 1-395 from
NW 3 Avenue to
NW 1 Avenue
Under 1-395 from
NW 1 Avenue to
NE 1 Avenue
Under I-395 and Signature
Bridge from NE 1 Avenue to
Biscayne Boulevard
MOBILITY SAFETY
SUSTAINABILITY
i
Ir CONNECTING I-395/SR 83611-95
I\�1MIAM1� DESIGN -BUILD PROJECT
MIDTOWN INTERCHANGE CORE
riy►bx
NMI
YFLLQW IRVMREI TREE Fr`` :,.o.: m —a piNK TRUMP, I TREE
COMMUNITY
MOBILITY
SAFETY
SUSTAINABILITY
14
11:0
r CONNECTING I-395/SR 83611-95
�1MIAM1---- DESIGN -BUILD PROJECT
NW 3 AVENUE TO NW 1 AVENUE
ZONE 1
1
riy►bx
COMMUNITY
MOBILITY
SAFETY
SUSTAINABILITY
15
Ir CONNECTING I-395/SR 83611-95
I\�1MIAM1---- DESIGN -BUILD PROJECT
NW 1 AVENUE TO NE 1 AVENUE
riy►bx
COMMUNITY
MOBILITY
SAFETY
SUSTAINABILITY
16
tACONNECTING I-395/SR 836/I-95
fewMIAM1� DESIGN -BUILD PROJECT
NE 1 AVENUE TO BISCAYNE BOULEVARD
riy►bx
SUSTAINABILITY
17
trACONNECTING I-395/SR 836/1-95
DESIGN -BUILD PROJECT
1-395 ENHANCEMENTS/PROPOSED FEATURES UNDER 1-395
Existing condition - NE 1 Avenue looking west.
Increased vertical clearance
will allow more light into the
areas under the bridge
riyrAbx.
COMMUNITY
MOBILITY
SAFETY
SUSTAINABILITY
18
r I-395/SR 83611-95
11:rACONNECTING
MIAM1� DESIGN -BUILD PROJECT
1-395 ENHANCEMENTS/PROPOSED FEATURES UNDER 1-395
riy►bx
Under -deck and other light fixtures
will provide ample lighting.
COMMUNITY
1
MOBILITY SAFETY SUSTAINABILITY 19
11A OfACONNECTING I-395/SR 836/1-95
\MIAN11---- DESIGN -BUILD PROJECT
1-395 ENHANCEMENTS - PEDESTRIANS/BICYCLES
Under bridge enhancements from Midtown Interchange to NW 1 Avenue
1
NW 14 SI
I 7 -
Enhanced lighted pedestrian crossings
Bike racks
riyrAbx.
4
COMMUNITY
MOBILITY
SAFETY
SUSTAINABILITY
20
11A OfACONNECTING
I-395/SR 83611-95
MIAMI� DESIGN -BUILD PROJECT
riy►bx
1-395 ENHANCEMENTS - PEDESTRIANS/BICYCLES
Under bridge enhancements from NW 1 Avenue to North Bayshore Drive
Continuous trail from NW 3 Avenue to Biscayne Blvd.
It i
IT
ADRIENNEARSHT
CENTER ZIFF BALLET
OPERA HOUSE
ADRIENNEARSHT
CENTER KNIGHT
CONCALL
COMMUNITY MOBILITY
SAFETY
SUSTAINABILITY
Ir CONNECTING I-395/SR 83611-95
I\�1MIAM1---- DESIGN -BUILD PROJECT
1-395 ENHANCEMENTS/LOCAL ROADS
• Re -connect NW 2 Avenue in Overtown
• Improvements to all other cross streets (resurfacing/new striping)
• American with Disabilities Act (ADA) enhancements
• Move 1-395 on/off ramps to North Miami Avenue to enhance the flow of traffic and pedestrian safety
FOOT
riy►bx
LEG EN D
EXISTING STREETS TO REMAIN
EXISTING STREETS TO BE CLOSED
STREETS TO BE CONNECTED
CITY OF MIAMI ROADS
COMMUNITY
MOBILITY
SAFETY
SUSTAINABILITY
Ir CONNECTING I-395/SR 83611-95
I\�1MIAMI� DESIGN -BUILD PROJECT
1-95 ENHANCEMENTS
mggEO SMOULDER
NW VANES 50UTM900N0110} -
t0N1T5 OF CONCRETE PRVEN£NT WELONSTA00T10N
irarn ,r.F, 9Cm E s'"
td CtYt"PaYNE'
RAY VANES NORTMOOHHD 1i0] - 1]9.A1
VARIES d TO 6
UNITS OF C0N[RETf PAEN
11 ore SMIo�WEFF� 11 1I II
,E �Esxt R I; �EAS FF�LE55
t
1 1
MVP
NTH
AVE R FI NI
[ONSTxUCifON
ri►bx
NAf
HOMER War
5ML0R
MAUL LINE a`x
TO BMlOveOp l,F SLAGS
• Limits: NW 8 Street to NW 29 Street
• Pavement replacement will enhance rideability
• Extension of auxiliary lane from NW 17 Street to NW 29 Street will improve the flow of traffic on
and westbound 1-395 ramps to northbound 1-95
• New connector ramp from southbound 1-95 to westbound SR 836 will enhance the flow of traffic
0,—LA AM LINE
the widened eastbound SR 836
and reduce weaving movements
COMMUNITY MOBILITY SAFETY SUSTAINABILITY 23
r CONNECTING I-395/SR 83611-95
11:j
�1MIAM1� DESIGN -BUILD PROJECT
CONSTRUCTION
Q Project is a Design -Build — Plans design underway
riy►bx
Q Preliminary construction activities are expected to begin in October/November
2018 with major construction anticipated to begin in February/March of 2019
Q Construction will be done in phases to minimize construction impacts to the public
COMMUNITY MOBILITY SAFETY SUSTAINABILITY 24
riy►bx
1:Ir CONNECTING I-395/SR 83611-95
I�1MIAM1---- DESIGN -BUILD PROJECT
CONSTRUCTION MILESTONES
The '" 1 I LESTC
0 Improve operations on NB 1-95 by extending auxiliary lane
1 Open 2nd Lane EB to NB on 1-95
0 Open WB Signature Bridge on 1-395
Q Open Double -Decked Bridge on SR 836
Open EB Signature Bridge on 1-395
Open CommunalAreas underI-395/Complete Project
COMMUNITY
MOBILITY
SAFETY
SUSTAINABILITY
25
Ir CONNECTING I-395/SR 83611-95
I\�1MIAMI---- DESIGN -BUILD PROJECT
riy►bx
MAINTENANCE OF TRAFFIC (MOT)/HOURS
1-395 SPECIFIC
Mainline Nightly Closures
• 10 pm to 5:30 am Sunday thru Thursday
• 1 am to 7:00 am Saturday and Sunday
SR 836 SPECIFIC
Mainline Nightly Closures
• 8 pm to 5:30 am Sunday thru Thursday
• 8:30 pm to 9 am Friday
• 8:30 pm to 11 am Saturday
1-95 SPECIFIC
Mainline Nightly Closures
• 9 pm to 5:30 am Sunday thru Thursday
RAMPS
• 10 pm to 6:30 am Sunday thru Thursday
• 11 pm to 7 am Friday and Saturday
SPECIAL NOTES:
• Special events will be taken into account when scheduling closures
• Hours noted above are for single lane closures, multi -lane closure will occur later
• Weekend lane closures will be permitted on 1-95 from 11 p.m. on Friday to 5:30 a.m. on Monday
• The contract documents allows for weekend closures on certain ramps
MOBILITY
SAFETY
SUSTAINABILITY
r CONNECTING I-395/SR 83611-95
11:j
�1MIAM1� DESIGN -BUILD PROJECT
riy►bx
UPCOMING ACTIVITIES- SIX MONTH LOOK -AHEAD
• Utility relocations
• Surveying and Geotechnical Exploration -Test piles
• Continue to develop roadway and bridge plans
• Construction along 1-95 in the median and begin concrete replacement
• Widening SR 836 in preparation for double -decking
• Construction of the 1-395 bridge foundations
COMMUNITY MOBILITY SAFETY SUSTAINABILITY 27
Ir CONNECTING I-395/SR 83611-95
I\�1MIAM1� DESIGN -BUILD PROJECT
TRAFFIC MANAGEMENT SYSTEM
'9944
LE
41s St —
5th
Smart Work Zone Management
System (SWZMS) - The project will
implement a SWZMS that will utilize
Intelligent Transportation System
(ITS) Devices such as traffic
cameras, data collection devices
and portable message signs to:
• Provide drivers with real-time
travel information;
• Encourage motorists to take
alternate routes;
Clear incidents more quickly,
thereby reducing secondary
incidents; and
• Make work zones safer for
highway workers and motorists.
COMMUNITY MOBILITY SAFETY SUSTAINABILITY
11A OfACONNECTING
I-395/SR 83611-95
MIAMI� DESIGN -BUILD PROJECT
COMMUNITY OUTREACH
riy►bx
PROJECT WEBSITE
• www.i-395miami.com
• Sign-up for project alerts/updates
Lane Closure information
Upcom ing construction activities
• Calendar of events
OUTREACH OFFICE IN THE OVERTOWN COMMUNITY
• 1035 NW 3 Avenue, Miami, Florida 33136
STAKEHOLDER UPDATE MONTHLY MEETINGS
• Monday, October 15, 2018 at MDX Headquarters
UPCOMING PRESENTATIONS/EVENTS
• Miami -Dade TPO FTAC Committee— November 14
• Miami -Dade TPO BPAC Committee — December 11
PUBLIC OUTREACH MEETINGS
• Public open house meetings to be scheduled prior to
major construction beginning in February/March 2019
• Individual stakeholder meetings
COMMUNITY MOBILITY SAFETY SUSTAINABILITY 29
fO11ACONNECTING I-395/SR 83611-95
\�1MIAM1� DESIGN -BUILD PROJECT
THANK YOU!
www.i-395miami.com
Contact:
Oscar Gonzalez
786-280-0983
QQ OGonzalez@MRGmiami.com
riy►bx
COMMUNITY MOBILITY SAFETY
SUSTAINABILITY 30