Loading...
HomeMy WebLinkAboutSubmittal-Commissioner Russell-Proposed Amendment to Attachment CSubmitted into the nub record r r iitep{(s) an SIID {` U ATTACHMENT C DEVELOPER GUIDELINES Hyatt shall provide preference to developers that place particular emphasis on the below guidelines and objectives when submitting their proposals: • Development of a mixed -use river plaza, inclusive of a state-of-the-art Hyatt Hotel and other • compatible uses, including, but not limited to, residential, office, meeting space, retail and public amenities; • Incorporate plans to include nixed-incomshousing on site with a minimum 10 percent set aside for workforce and affordable housing, which will support attainable housing _ within the City and provide significant public benefits to City of Miami residents; • Provide sufficient open and green space for a welcoming public atmosphere; • Attract visitors to the public riverfront by providing visual and physical connections to the River from the street, including pedestrian and bicycle paths along view corridors; • Provide for native landscape design, including shade and coverage; • Renovate and expand the Riverwalk to encourage safe public use, walkability, connectivity, and ease of access to the nearby Fort Dallas Park and Riverwalk MetroMover Station; • Specify plans to enhance lighting and aesthetics to connecting riverwalk, including lighting and other enhancements under the adjacent bridge; • Facilitate access to site by means of the Knight Center MetroMover Station; • Include sufficient on -site parking to accommodate proposed uses; • Incorporate adaptability and flexibility to consider traffic patterns both within and surrounding the site, including potential rearrangement of the 1-95 Downtown Distributor; • Create intuitive site entrance(s) and exit(s), maximizing connectivity to surrounding traffic by increasing flexibility to enter and exit site; • Incorporate adaptability and flexibility to provide staging areas in the event Brickell Avenue bridge is relocated or a tunnel is constructed in the future; • Improve the revenue -producing capacity of the site while balancing public uses; • Include long-term sustainability within design, including considerations for sea -level rise; • Specify construction timelines, including any proposed phasing (note if phasing is proposed, riverwalk improvements must be completed before issuance of a Temporary Certificate of Occupancy for the initial phase). • Provide demolition plans, including mitigation strategies to minimize debris within the river and surrounding areas (such as by providing riverbottom surveys or other strategies); • Address applicable archeological concerns and Historic Preservation guidelines; and • Incorporate a,150, foot setback at the widest, eastern side of theprogerty and a 50-foot setback at the narrower, western side of the property for an unobstructed public riverwalk/greenway at the same elevation as the connecting riverwalk. Developers shall be required to comply with the Miami 21 Zoning Code (including applicable Historic Preservation Guidelines). City Clerk Deleted: either J Deleted: workforce Deleted: or a monetary contribution to qualifying affordable housing projects { Deleted: fifty IDeleted: (50) �� (�� 5v\A\\\\ra\ - (:Amcss\GOr -Q‘6�OSeU RrN4MQAC t6 i�Ntoi\Q