HomeMy WebLinkAboutSubmittal-Commissioner Russell-Proposed Amendment to Attachment CSubmitted into the nub
record r r iitep{(s)
an SIID {` U
ATTACHMENT C
DEVELOPER GUIDELINES
Hyatt shall provide preference to developers that place particular emphasis on the below
guidelines and objectives when submitting their proposals:
• Development of a mixed -use river plaza, inclusive of a state-of-the-art Hyatt Hotel and
other
• compatible uses, including, but not limited to, residential, office, meeting space, retail
and public amenities;
• Incorporate plans to include nixed-incomshousing on site with a minimum 10 percent
set aside for workforce and affordable housing, which will support attainable housing _
within the City and provide significant public benefits to City of Miami residents;
• Provide sufficient open and green space for a welcoming public atmosphere;
• Attract visitors to the public riverfront by providing visual and physical connections to
the River from the street, including pedestrian and bicycle paths along view corridors;
• Provide for native landscape design, including shade and coverage;
• Renovate and expand the Riverwalk to encourage safe public use, walkability,
connectivity, and ease of access to the nearby Fort Dallas Park and Riverwalk
MetroMover Station;
• Specify plans to enhance lighting and aesthetics to connecting riverwalk, including
lighting and other enhancements under the adjacent bridge;
• Facilitate access to site by means of the Knight Center MetroMover Station;
• Include sufficient on -site parking to accommodate proposed uses;
• Incorporate adaptability and flexibility to consider traffic patterns both within and
surrounding the site, including potential rearrangement of the 1-95 Downtown
Distributor;
• Create intuitive site entrance(s) and exit(s), maximizing connectivity to surrounding
traffic by increasing flexibility to enter and exit site;
• Incorporate adaptability and flexibility to provide staging areas in the event Brickell
Avenue bridge is relocated or a tunnel is constructed in the future;
• Improve the revenue -producing capacity of the site while balancing public uses;
• Include long-term sustainability within design, including considerations for sea -level rise;
• Specify construction timelines, including any proposed phasing (note if phasing is
proposed, riverwalk improvements must be completed before issuance of a Temporary
Certificate of Occupancy for the initial phase).
• Provide demolition plans, including mitigation strategies to minimize debris within the
river and surrounding areas (such as by providing riverbottom surveys or other
strategies);
• Address applicable archeological concerns and Historic Preservation guidelines; and
• Incorporate a,150, foot setback at the widest, eastern side of theprogerty and a 50-foot
setback at the narrower, western side of the property for an unobstructed public
riverwalk/greenway at the same elevation as the connecting riverwalk.
Developers shall be required to comply with the Miami 21 Zoning Code (including applicable
Historic Preservation Guidelines).
City Clerk
Deleted: either J
Deleted: workforce
Deleted: or a monetary contribution to qualifying
affordable housing projects
{ Deleted: fifty
IDeleted: (50)
�� (�� 5v\A\\\\ra\ - (:Amcss\GOr -Q‘6�OSeU RrN4MQAC t6 i�Ntoi\Q