Loading...
HomeMy WebLinkAboutR-18-0260City of Miami Resolution R-18-0260 Legislation City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 4198 Final Action Date: 6/28/2018 A RESOLUTION OF THE MIAMI CITY COMMISSION AUTHORIZING THE CITY MANAGER TO ELIMINATE APPROXIMATELY TWO HUNDRED (200) FEET OF RAILROAD CROSSING AT THE NORTHEAST MIAMI COURT RAILROAD CROSSING, LOCATED BETWEEN NORTHEAST 71 STREET AND NORTHEAST 73 STREET, AND THE NORTHEAST 36 STREET RAILROAD CROSSING, LOCATED ALONG NORTHEAST 2 AVENUE, PURSUANT TO FLORIDA EAST COAST RAILROAD ("FECR") REQUIREMENTS FOR IMPROVEMENTS, INCLUDING A NEW RAILROAD CROSSING AT NORTHEAST 42 STREET, CONNECTING NORTHEAST 2 AVENUE TO EAST DIXIE HIGHWAY. WHEREAS, part of the proposed improvements for traffic circulation near the City of Miami ("City") Design District is a newly proposed railroad crossing at Northeast 42 Street, connecting Northeast 2 Avenue to East Dixie Highway; and WHEREAS, the Florida Department of Transportation ("FDOT"), in conjunction with the Miami -Dade County Department of Transportation and Public Works ("County"), is working on roadway, signalization, and railroad crossing improvements at the Northeast 2nd Avenue/Northeast 36th Street/East Dixie Highway intersection; and WHEREAS, the Florida East Coast Railroad ("FECR") requires that for every new railroad crossing built, two (2) existing railroad crossings must be eliminated; and WHEREAS, the City proposes to eliminate two (2) railroad crossings, consisting of approximately two hundred (200) feet, at the Northeast Miami Court railroad crossing, located between Northeast 71 Street and Northeast 73 Street, and the Northeast 36 Street railroad crossing, located along Northeast 2 Avenue; and WHEREAS, at an April 19, 2018, public meeting, hosted by the City's Office of Capital Improvements ("OCI") at Athalie Range Park regarding the proposed removal of the railroad crossings, no concerns were raised by the public; and WHEREAS, a study of the closure was conducted by a third party and determined that under existing conditions, the impact of the closure at Northeast Miami Court to the adjacent North/South bound roadways would operate at acceptable levels of service; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. City of Miami Page 1 of 2 File ID: 4198 (Revision:) Printed On: 4/1/2025 File ID: 4198 Enactment Number: R-18-0260 Section 2. The City Manager is hereby authorized1 to eliminate approximately two hundred (200) feet of railroad crossings at the Northeast Miami Court railroad crossing, between Northeast 71 Street and Northeast 73 Street, and the Northeast 36 Street railroad crossing, located along Northeast 2 Avenue, pursuant to FECR requirements for improvements, including a new railroad crossing at Northeast 42 Street, connecting Northeast 2 Avenue to East Dixie Highway. Section 3. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.2 APPROVED AS TO FORM AND CORRECTNESS: _ndez, ity Attor ey 6/19/2018 1 The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to, those prescribed by applicable City Charter and City Code provisions. 2 If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10) calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. City of Miami Page 2 of 2 File ID: 4198 (Revision:) Printed on: 4/1/2025