HomeMy WebLinkAboutExhibit A and B SUBFISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR NO. 2 - MAY 10, 2018
NEW APPROPRIATIONS
THIS DOCUMENT IS A
SUBSTITUTION TO THE ORIGINAL
BACKUP ORIGINAL CAN BE SEEN
AT THE END OF THE DOCUMENT.
Exhibit A
No. D(s) Project No., Project Name Amount Program Fund Funding Source
1
4
40-B50405 SW 71st Avenue from SW 4th Street
to SW 8th Street
$ 286,314.00
36000 Streets &
Sidewalks
2342 Award 2342-MDC grant accepted by R-13-0469 dated
11/21/2013
2
2
40-B30836 South Grove Phase 3 Roadway and
Drainage Improvements D2
$ 588,668.40
36000 Streets &
Sidewalks
2356 Award 2356-MDC grant accepted by R-13-0469 dated
11/21/2013
3
4
40-B30966 SW 5 Street between SW 27 Avenue
and SW 28 Avenue Roadway
Improvements
$ 198,969.59
36000 Streets &
Sidewalks
- 2383 Award 2383-MDC grant accepted by R-13-0469 dated
11/21/2013
4
CW
40-B173407 Manuel Artime Theater Equipment
Project
$ 7,154.00
34000 Public Facilities-
CIP
2316 Award 2316-Miami-Dade County -Cultural Affairs grant
accepted by City Manager memo dated 6/6/2017
5
2
40-B30731 Miami Women's Club Baywalk
Project - CRA 92-686001
$ 245,000.00
34000 Public Facilities-
CIP
2318 Award 2318-FIND grant accepted by R-16-0128 dated
03/24/2016
6
2
40-B183401 First Presbyterian Church Ph I
$ 153,121.50
34000 Public Facilities-
CIP
2346 Award 2346-FIND grant accepted by R-17-0111 dated
03/09/2017
7
2
40-B30182C Regatta Park Phase II (Baywalk,
Boat Hoist and Floating Dock) - CW
$ 400,000.00
35000 Parks &
Recreation
2347 Award 2347-FIND grant accepted by R-17-0115 dated
03/09/2017
8
2
40-B183500 Myers Park Phase I (Seawall and
Boat Ramp Improvement) - D2
$ 100,870.00
35000 Parks &
Recreation
2348 Award 2348-FIND grant accepted by R-17-0114 dated
03/09/2017
9
CW
40-B183400 25 Road End of Street Phase I
(Seawall, Baywalk & Floating Dock) -
D2
$ 84,409.00
34000 Public Facilities-
CIP
2349 Award 2349-FIND grant accepted by R-17-0110 dated
03/09/2017
10
5
40-B40454A Spring Gdn Pk Seawall & Kayak
$ 552,309.00
35000 Parks &
Recreation
2350 Award 2350-FIND grant accepted by R-17-0098 dated
03/09/2017
11
2
40-B40584 Virginia Key Kayak Launch
$ 1,230,869.00
35000 Parks &
Recreation
2351 Award 2351-FIND grant accepted by R-17-0139 dated
03/23/2017
12
1,5
40-B50643 Wagner Creek/Seybold Canal
Dredging
$ 1,000,000.00
38000 Storm Sewers
2352 Award 2352-FIND grant accepted by R-17-0097 dated
03/09/2017
13
CW
40-B183200 Miami Police Department Patrol
Vessel - CW
$ 59,000.00
32000 Public Safety
2353 Award 2353-FIND grant accepted by R-17-0113 dated
03/09/2017
14
2
40-B183402 Knight Center Vessel Dockage - D2
$ 72,855.00
34000 Public Facilities-
CIP
2363 Award 2363-FIND grant accepted by R-17-0112 dated
03/09/2017
15
3
40-B30558B Manuel Artime Interior Renovations
Project
$ 38,903.00
34000 Public Facilities-
CIP
TBD Award TBD-Florida Department of Cultural Affairs grant
accepted by R-18-0130 dated 04/12/2018
16
CW
40-B183902 Solid Waste Department Building
Retrofit
$ 315,860.15
39000 Solid Waste
TBD Award TBD-State of Florida Division of Emergency
Management grant accepted by R-18-0014 dated 01/11/2018
17
2
40-B183613 Biscayne Boulevard Lane Elimination
Analysis
$ 421,829.00
36000 Streets &
Sidewalks
TBD Award TBD-FDOT grant accepted by R-17-0355 dated
07/27/2017
18
CW
40-B183614 Metromover Station Access
Improvements
$ 361,632.00
36000 Streets &
Sidewalks
TBD Award TBD-FDOT grant accepted at the 4/26/2018
commission meeting
19
CW
40-B30606 DWNTWN Sidewalk & Street
Improvements
$ 869,322.00
36000 Streets &
Sidewalks
TBD Award TBD-Flagler Street Assessment authorized by R-14-
0114 dated 3/27/2014
20
2
40-B30687 Coconut Grove Business
Improvement District
$ 308,526.61
36000 Streets &
Sidewalks
TBD Award TBD-Coconut Grove BID contribution accepted at the
4/26/2018 commission meeting
FILE ID 4099 - SUBSTITUTION
1 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR NO. 2 - MAY 10, 2018
NEW APPROPRIATIONS
THIS DOCUMENT IS A
SUBSTITUTION TO THE ORIGINAL
BACKUP ORIGINAL CAN BE SEEN
AT THE END OF THE DOCUMENT. Exhibit A
No. D(s) Project No. Project Name Amount Program Fund Funding Source
21
2
40-B183207 Fire Station No. 1
$ 500,000.00
32000 Public Safety
2387 Award 2387-FDG Rail Holdings 25 LLC Public Benefits
contribution accepted by 15-0474 dated 10/22/2015
22
2
40-B30688 Marine Stadium Restoration
$ 25,000.00
34000 Public Facilities-
CIP
2384 Award 2384-Makaira, Inc. donation accepted by R-18-0013
dated 01/11/2018
24
CW
40-B183122 Code Compliance Computerized
Enforcement System
$ 100,000.00
31000 General
Government
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Code
25
CW
40-B183123 Graphics Station for Communications
Department
$ 16,000.00
31000 General
Government
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Communications
26
5
40-B183412 Allapattah Elderly Center AC
Replacement
$ 70,000.00
34000 Public Facilities-
CIP
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) DREAM
27
CW
40-B70106A General Firefighting and EMS
Equipment
$ 100,000.00
32000 Public Safety
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Fire
28
CW
40-B183208 MedCat Vehicle for the Fire -Rescue
Department
$ 354,000.00
32000 Public Safety
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Fire
29
CW
40-B183102 Office of Capital Improvements
Reconfiguration
$ 7,000.00
31000 General
Govemment
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Capital Improvements
30
CW
40-B183106 GSA Restoration of City Hall Offices
$ 30,000.00
31000 General
Govemment
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) General Services Administration
31
CW
40-B183116 Civilian Investigative Office
Reconfiguration
$ 50,000.00
31000 General
Government
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Civilian Investigative Panel
32
CW
40-B183117 District 5 Vehicle Acquisition - 1 SUV
$ 26,000.00
31000 General
Government
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) General Services Administration
33
CW
40-B183118 Citywide Fleet Replacement - 6 SUV
$ 192,000.00
31000 General
Govemment
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) General Services Administration
34
CW
40-B183209 MPD North District Substation
Security Fortification
$ 30,000.00
32000 Public Safety
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Police
35
CW
40-B17327 MPD Body Worn Camera Program
(Grant Match)
$ 95,000.00
32000 Public Safety
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Police
36
CW
40-B183210 CCTV Integration with ShotSpotter
$ 100,000.00
32000 Public Safety
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Police
37
5
40-B183616 NE Miami Court Railroad Crossing
Closure
$ 10,000.00
36000 Streets &
Sidewalks
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Capital Improvements
38
4
40-B30966 SW 5 Street between SW 27 Avenue
and SW 28 Avenue Roadway
Improvements
$ 50,000.00
36000 Streets &
Sidewalks
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Capital Improvements
39
2
40-640523 Manatee Bend Park
$ 53,000.00
35000 Parks &
Recreation
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Capital Improvements
FILE ID 4099 - SUBSTITUTION
2 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR NO. 2 - MAY 10, 2018
NEW APPROPRIATIONS
THIS DOCUMENT IS A
SUBSTITUTION TO THE ORIGINAL
BACKUP ORIGINAL CAN BE SEEN
AT THE END OF THE DOCUMENT.
Exhibit A
No. D(s) Project No. Project Name Amount Program Fund Funding Source
40
2
40-B40532 Morningside Park Floating Dock
$ 70,000.00
35000 Parks &
Recreation
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Capital Improvements
41
CW
40-B183615 Citywide Neighborhood Speed
Reduction Signage
$ 1,056,000.00
36000 Streets &
Sidewalks
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Transportation Management
42
2
40-B173405 Bamyard Improvements
$ 15,000.00
34000 Public Facilities-
CIP
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Parks
43
CW
40-B183903 Acquisition of Solid Waste Roll Off
Containers
$ 62,000.00
39000 Solid Waste-CIP
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Solid Waste
44
CW
40-B183119 Citywide Fleet Replacement
$ 87,000.00
31000 General
Govemment
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) General Services Administration
45
5
40-B183135 Renovations of Dilapidated
Structures in District 5
$ 1,000,000.00
31000 General
Government
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Mayor's Office
46
CW
40-B70715E City of Miami Trolley Program -
Trolley Acquisition
$ 1,400,000.00
39900 Mass Transit
1297 Transit Half -Cent Surtax (FY18 SRF Midyear dated 4/26/18)
Transportation and Transit
47
CW
40-B183617 Citywide Beautification
$ 1,000,000.00
36000 Streets &
Sidewalks
1350 SRF Contribution to Capital - Lane Closure Fund (FY18 SRF
Midyear dated 4/26/18)
48
CW
40-6183617 Citywide Beautification
$ 1,000,000.00
36000 Streets &
Sidewalks
1350 SRF Contribution to Capital - Tree Trust Fund (FY18 SRF
Midyear dated 4/26/18)
49
CW
40-630262 Citywide Storm Sewer Repair Project
$ 447,931.00
38000 Storm Sewers
1350 SRF Contribution to Capital - Lane Closure Fund (FY18 SRF
Midyear dated 4/26/18)
50
CW
40-B183600 Citywide Tree Planting
$ 97,000.00
36000 Streets &
Sidewalks
1350 SRF Contribution to Capital - Lane Closure Fund (FY18 SRF
Midyear dated 4/26/18)
51
2
40-B183517 Regatta Park Enhancements
$ 53,800.00
35000 Parks &
Recreation
1350 SRF Contribution to Capital - Project 29-118001/Award 2068
Parks and Open Space Trust Fund (FY18 SRF Midyear
dated 4/26/18)
52
2
40-B183518 Peacock Park Glasshouse Roof
$ 75,000.00
34000 Public Facilities-
CIP
1350 SRF Contribution to Capital - Project 22-119003/Award 2371
PF Surplus Rollover (FY18 SRF Midyear dated 4/26/18)
53
2
40-B183414 Fort Dallas Worker's House
Renovations
$ 50,021.00
34000 Public Facilities-
CIP
1350 SRF Contribution to Capital - Project 22-119003/Award 2371
PF Surplus Rollover (FY18 SRF Midyear dated 4/26/18)
54
2
40-B183414 Fort Dallas Worker's House
Renovations
$ 148,000.00
34000 Public Facilities-
CIP
1350 SRF Contribution to Capital - Project 22-119003/Award 2000
PF Surplus Rollover (FY18 SRF Midyear dated 4/26/18)
NEW APPROPRIATIONS TOTAL $ 15,665,364.25
FILE ID 4099 - SUBSTITUTION
3 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR NO. 2 - MAY 10, 2018
RE -APPROPRIATIONS
THIS DOCUMENT IS A
SUBSTITUTION TO THE ORIGINAL
BACKUP ORIGINAL CAN BE SEEN
AT THE END OF THE DOCUMENT. Exhibit B
No. D(s) FROM Project
Amount
Program Fund D(s) TO Project
Amount
Program Fund
Fund Source
1
CW
40-B183900 SW Heavy Machinery
Acquisition
$ (19,000.00)
39000 Solid Waste-
CIP
CW
40-B70338 Heavy Equipment
Enhancements
$ 19,000.00
31000 General
Govemment
1426 Contribution from General
Fund
2
CW
40-B74205C GSA Truck Wash Pit
$ (48,929.84)
31000 General
Government
CW
40-B74205D GSA Property Maintenance
Division Building Repairs
$ 48,929.84
31000 General
Government
1426 Contribution from General
Fund
3
CW
40-B70978 City Clerk -Electronic
Campaign Reporting
System
$ (10,000.00)
31000 General
Government
CW
40-B74205D GSA Property Maintenance
Division Building Repairs
$ 10,000.00
31000 General
Government
1426 Contribution from General
Fund
4
CW
40-B70970 IT Modern CIT Software
Program
$ (79,000.00)
31000 General
Government
CW
40-B70970A Program Management
TRACS
$ 79,000.00
31000 General
Government
1998 Contribution from General
Fund-SSL
5
CW
40-630443 Belle Meade Island
Decorative lighting
installation
$ (131,810.79)
36000 Streets &
Sidewalks
CW
40-B30445 Miscellaneous Decorative
Lighting installation-CW
$ 131,810.79
36000 Streets &
Sidewalks
1350 SRF Contribution to
Capital
6
CW
40-B40720 City Wide NC repairs.
CW
$ (100,553.70)
35000 Parks &
Recreation
CW
40-B173524 Citywide Park Facility A/C
Replacement
$ 100,553.70
35000 Parks &
Recreation
1426 Contribution from General
Fund
7
1
40-B183611 NW 17th Street from NW
27 to NW 32 Avenue
$ (250,000.00)
36000 Streets &
Sidewalks
1
40-B183611A NW 17th Street from NW 32
to NW 37 Avenue
$ 250,000.00
36000 Streets &
Sidewalks
1297 Transit Half -Cent Surtax
8
2
40-B30182B Regatta Park
$ (32,959.07)
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 32,959.07
35000 Parks &
Recreation
1669 TVM Production -Basic
Use Fee
9
2
40-B30541E Kennedy Park Floating
Dock Path - Mangrove
Trimming
$ (15,152.96)
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 15,152.96
35000 Parks &
Recreation
1669 TVM Production -Basic
Use Fee
10
2
40-B30541C Kennedy Park Shoreline
Stabilization PH1
$ (1,502.27)
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 1,502.27
35000 Parks &
Recreation
1669 TVM Production -Basic
Use Fee
11
2
40-B30825C Biscayne Bay Spoil Island
C Small Scale Spoil
Island Dock to Tiki
Shelter Path - D2
$ (1,500.00)
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 1,500.00
35000 Parks &
Recreation
1669 TVM Production -Basic
Use Fee
12
2
40-630825E Biscayne Bay Spoil Island
E Public Trail - D2
$ (4.61)
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 4.61
35000 Parks &
Recreation
1669 TVM Production -Basic
Use Fee
13
2
40-B75830A Blanche Park Master Plan
Improvements
$ (465.30)
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 465.30
35000 Parks &
Recreation
1426 Contribution from General
Fund
14
2
40-B30541E Kennedy Park Floating
Dock Path - Mangrove
Trimming
$ (1,446.95)
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 1,446.95
35000 Parks &
Recreation
1998 Contribution from General
Fund-SSL
15
2
40-B40712 D2 Park, Street, and
Lighting Improvovement
$ (193,963.84)
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 193,968.84
35000 Parks &
Recreation
1426 Contribution from General
Fund
16
2
40-B50707 Traffic Calming Devices - $ (5,000.00)
Bay Heights
36000 Streets &
Sidewalks
2
40-B30407 Metromover Parkway.NE
2nd Street and NE 3rd
Street. D2
$ 5,000.00
36000 Streets &
Sidewalks
1426 Contribution from General
Fund
17
2
40-B30662D US-1 Median Closures at
Bridgeport and SW 30 Ct -
D2
$ (42,062.66)
36000 Streets &
Sidewalks
2
40-B183618 Brickell Bay Traffic Calming
$ 42,062.66
36000 Streets &
Sidewalks
1426 Contribution from General
Fund
18
2
40-B40712 D2 Park, Street, and
Lighting Improvovement
$ (18,878.08)
35000 Parks &
Recreation
2
40-B183618 Brickell Bay Traffic Calming
$ 18,878.08
36000 Streets &
Sidewalks
1426 Contribution from General
Fund
FILE ID 4099 - SUBSTITUTION
4 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR NO. 2 - MAY 10, 2018
RE -APPROPRIATIONS
THIS DOCUMENT IS A
SUBSTITUTION TO THE ORIGINAL
BACKUP ORIG3NAL CAN BE SEEN
AT THE END OF THE DOCUMENT. Exhibit B
No. D(s) FROM Project
Amount
Program Fund D(s) TO Project
Amount
Program Fund
Fund Source
19
2
40-B40712 D2 Park, Street, and
Lighting Improvovement
$ (15,200.00)
35000 Parks &
Recreation
2
40-B173405 Barnyard Improvements
$ 15,200.00
34000 Public
Facilities-CIP
1426 Contribution from General
Fund
20
2
40-640712 D2 Park, Street, and
Lighting Improvovement
$ (350,931.98)
35000 Parks &
Recreation
2
40-B40571 Virrick Park New Pool
Facility - D2
$ 350,931.98
35000 Parks &
Recreation
1426 Contribution from General
Fund
21
2
40-B30706 Miscellaneous Repair-
10% Set Aside
$ (20.885.26)
34000 Public
Facilities-CIP
2
40-B70043 Derelict Vessel Removal
$ 20,885.26
34000 Public
Facilities-CIP
1437 Marinas Capital Repairs
and Capital Related
Improvements
22
2
40-B183410 Dinner Key Marina
Emergency
Repairs/Replacements
$ (46,415.00)
34000 Public
Facilities-CIP
2
40-B70043 Derelict Vessel Removal
$ 46,415.00
34000 Public
Facilities-CIP
1437 Marinas Capital Repairs
and Capital Related
Improvements
23
2
40-B70011 Clean Vessel Act - 2013
$ (3,117.21)
34000 Public
Facilities-CIP
2
40-B70047 Mooring Field Offshore
(Watson Island) - D2
$ 3,117.21
34000 Public
Facilities-CIP
1437 Marinas Capital Repairs
and Capital Related
Improvements
24
2
40-B30325B Miamarina Bayside Pump
Out
$ (160.25)
34000 Public
Facilities-CIP
2
40-13183404 MiaMarina Emergency
Repairs
$ 160.25
34000 Public
Facilities-CIP
2150 Miamarina Ticket
Surcharge Revenue
25
2
40-B30689 Marine Stadium Marina
Bulkhead Replacement
$ (900.09)
34000 Public
Facilities-CIP
2
40-B183410 Dinner Key Marina
Emergency
Repairs/Replacements
$ 900.09
34000 Public
Facilities-CIP
1437 Marinas Capital Repairs
and Capital Related
Improvements
26
2
40-B60464 New Dinner Key Marina
Dockmaster Building
$ (1,578.84)
34000 Public
Facilities-CIP
2
40-B183410 Dinner Key Marina
Emergency
Repairs/Replacements
$ 1,578.84
34000 Public
Facilities-CIP
1437 Marinas Capital Repairs
and Capital Related
Improvements
27
2
40-B60474A Piling and Pier Repairs -
Dinner Key Marina
$ (1.00)
34000 Public
Facilities-CIP
2
40-6183408 Miscellaneous Repairs -
Seminole Dinghy Dock &
Boat Ramp
$ 1.00
34000 Public
Facilities-CIP
1350 SRF Contribution to
Capital
28
CW
40-B73102B Citywide Streets Milling &
Resurfacing - CIP Parking
Surcharge
$ (583,800.00)
36000 Streets &
Sidewalks
2
40-B30687 Coconut Grove Business
Improvement District
$ 583,800.00
36000 Streets &
Sidewalks
1419 Parking Surcharge
29
3
40-B173407 Manuel Artime Theater
Equipment Project
$ (18.72)
34000 Public
Facilities-CIP
3
40-B183413 Manuel Artime Dressing
Room
$ 18.72
34000 Public
Facilities-CIP
1998 Contribution from General
Fund-SSL
30
3
40-B30600C Manuel Artime 970 Office
Building A/C Repairs
$ (4,500.00)
34000 Public
Facilities-CIP
3
40-B30600B Manuel Artime AC Repair
$ 4,500.00
34000 Public
Facilities-CIP
1426 Contribution from General
Fund
31
3
40-B30600C Manuel Artime 970 Office
Building A/C Repairs
$ (5,500.00)
34000 Public
Facilities-CIP
3
40-B183413 Manuel Artime Dressing
Room
$ 5,500.00
34000 Public
Facilities-CIP
1426 Contribution from General
Fund
32
3
40-B30600C Manuel Artime 970 Office
Building NC Repairs
$ (9,300.00)
34000 Public
Facilities-CIP
3
40-B183413 Manuel Artime Dressing
Room
$ 9,300.00
34000 Public
Facilities-CIP
1350 SRF Contribution to
Capital
33
3
40-B40354 Tower Theater
Improvements D3
$ (8,173 41)
34000 Public
Facilities-CIP
3
40-B183413 Manuel Artime Dressing
Room
$ 8,173.41
34000 Public
Facilities-CIP
1426 Contribution from General
Fund
34
3
40-B30440 Replanting of existing
empty planters along SW
8 Street between 4th
Avenue and 27th Avenue
$ (3,187.80)
36000 Streets &
Sidewalks
3
40-B30438 Repair & Maintenance of
Cuban Memorial Boulevard-
D3
$ 3,187.80
36000 Streets &
Sidewalks
1350 SRF Contribution to
Capital
35
5
40-1350654 Overtown Stormwater
Pump Station Upgrades
$ (198,578.76)
38000 Storm Sewers
3
40-13183800 Orange Bowl Stormwater
Pump Station Renovations
$ 198,578.76
38000 Storm Sewers
1113 Local Option Gas Tax
36
4
40-650423 Shenandoah Traffic
Calming Devices - D4
$ (13.762.68)
36000 Streets &
Sidewalks
4
40-B50404 Shenandoah/Silver Bluff
Roadway Improvement
Project - D4
$ 13,762.68
36000 Streets &
Sidewalks
1426 Contribution from General
Fund
FILE ID 4099 - SUBSTITUTION
5 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR NO. 2 - MAY 10, 2018
RE -APPROPRIATIONS
THIS DOCUMENT IS A
SUBSTITUTION TO THE ORIGINAL
BACKUP ORIGINAL CAN BE SEEN
AT THE END OF THE DOCUMENT.
Exhibit B
No. D(s) FROM Project
Amount
Program Fund D(s) TO Project
Amount
Program Fund
Fund Source
37
4
40-B30134A Bryan Park Community
Building - D4
$ (42,794.41)
35000 Parks &
Recreation
4
40-B30134B Bryan Park New Irrigation
System
$ 42,794.41
35000 Parks &
Recreation
1422 Impact Fees New
Ordinance
38
4
40-B30134A Bryan Park Community
Building - D4
$ (57,205.59)
35000 Parks &
Recreation
4
40-B173519 West End Open Field
Irrigation
$ 57,205.59
35000 Parks &
Recreation
1422 Impact Fees New
Ordinance
39
5
40-B50566 Wynwood One -Way
Street Conversion
$ (77,438.10)
36000 Streets &
Sidewalks
5
40-B50566A Wynwood Streetscape and
Street Tree Master Plan
$ 77,438.10
36000 Streets &
Sidewalks
1426 Contribution from General
Fund
40
5
40-B50566 Wynwood One -Way
Street Conversion
$ (7,581.92)
36000 Streets &
Sidewalks
5
40-B50566A Wynwood Streetscape and
Street Tree Master Plan
$ 7,561.92
36000 Streets &
Sidewalks
1297 Transit Half -Cent Surtax
46
CW
40-670128 Forensic Lab Expansion - $ (188,000.00)
Police Department
32000 Public Safety
CW
40-B183211 National Integrated Ballistic
Information Network (NIBIN)
Program
$ 188,000.00
32000 Public Safety
2252 Impact Fees_Police
47
CW
40-B40507 Park Expansions and
Land Acquisition
$ (4,000,000.00)
34000 Public
Facilities-CIP
3
40-13183415 D3 Park Land Acquisition
$ 4,000,000.00
34000 Public
Facilities-CIP
2253 Impact Fees New
Ordinance 2007_Park
48
CW
40-B40507 Park Expansions and
Land Acquisition
$ (521.000.00)
34000 Public
Facilities-CIP
4
40-B30304A Shenandoah Park
Enhancements
$ 521,000.00
35000 Parks &
Recreation
2253 Impact Fees New
Ordinance 2007_Park
49
CW
40-B40507 Park Expansions and
Land Acquisition
$ (1,479,000.00)
34000 Public
Facilities-CIP
4
40-B30304A Shenandoah Park
Enhancements
$ 1,479,000.00
35000 Parks &
Recreation
1422 Impact Fees New
Ordinance
TOTAL ADJUSTMENTS
$ (8,591,246.09)
$ 8,591,246.09
FILE ID 4099 - SUBSTITUTION
6 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR No. 2 - MAY 10, 2018
NEW APPROPRIATIONS
No. D(s) Project No. Project Name Amount Program Fund Funding Source
1
4
40-B50405 SW 71st Avenue from SW 4th Street
to SW 8th Street
$ 286,314.00
36000 Streets &
Sidewalks
2342 Award 2342-MDC grant accepted . ' -13-0469 dated
11/21/2013
2
2
40-B30836 South Grove Phase 3 Roadway and
Drainage Improvements D2
$ 588,668.40
36000 Streets &
Sidewalks
2356 Award 2356-MDC grant a ,-pted by R-13-0469 dated
11/21/2013
3
4
40-B30966 SW 5 St between 27 Ave & 28 Ave
Street Improvement - D4
$ 198,969.59
36000 Streets &
Sidewalks
2383 Award 2383-MDC .. -nt accepted by R-13-0469 dated
11/21/2013
4
CW
40-B173407 Manuel Artime Theater Equipment
Project
$ 7,154.00
34000 Public Facilities-
CIP
2316 Award 231.. 1 ami-Dade County -Cultural Affairs grant
accepte. ey City Manager memo dated 6/6/2017
5
2
40-B30731 Miami Women's Club Baywalk
Project - CRA 92-686001
$ 245,000.00
34000 Public Facilities-
CIP
2318 Aw.. 2318-FIND grant accepted by R-16-0128 dated
S ;'24/2016
6
2
40-B183401 First Presbyterian Church Ph I
$ 153,121.50
34000 Public Facilities-
CIP
23!-: Award 2346-FIND grant accepted by R-17-0111 dated
03/09/2017
7
2
40-B30182C Regatta Park Phase II (Baywalk,
Boat Hoist and Floating Dock) - CW
$ 400,000.00
35000 Parks &
Recreation
2347 Award 2347-FIND grant accepted by R-17-0115 dated
03/09/2017
8
2
40-B183500 Myers Park Phase I (Seawall and
Boat Ramp Improvement) - D2
$ 100,870.00
35000 Parks &
Recre..'.n
2348 Award 2348-FIND grant accepted by R-17-0114 dated
03/09/2017
9
CW
40-B183400 25 Road End of Street Phase I
(Seawall, Baywalk & Floating Dock) -
D2
$ 84,409.00
34000 Pu' 'c Facilities-
P
2349 Award 2349-FIND grant accepted by R-17-0110 dated
03/09/2017
10
5
40-B40454A Spring Gdn Pk Seawall & Kayak
$ 552,309.00
5000 Parks &
Recreation
2350 Award 2350-FIND grant accepted by R-17-0098 dated
03/09/2017
11
2
40-B40584 Virginia Key Kayak Launch
$ 1,230,869.00
35000 Parks &
Recreation
2351 Award 2351-FIND grant accepted by R-17-0139 dated
03/23/2017
12
1,5
40-B50643 Wagner Creek/Seybold Canal
Dredging
$ 1,000,000. k9
38000 Storm Sewers
2352 Award 2352-FIND grant accepted by R-17-0097 dated
03/09/2017
13
CW
40-B183200 Miami Police Department Patrol
Vessel - CW
$ ,000.00
32000 Public Safety
2353 Award 2353-FIND grant accepted by R-17-0113 dated
03/09/2017
14
2
40-B183402 Knight Center Vessel Dockage - D2
$ , 72,855.00
34000 Public Facilities-
CIP
2363 Award 2363-FIND grant accepted by R-17-0112 dated
03/09/2017
15
3
40-B30558B Manuel Artime Interior Renovation
Project
$ 38,903.00
34000 Public Facilities-
CIP
TBD Award TBD-Florida Department of Cultural Affairs grant
accepted by R-18-0130 dated 04/12/2018
16
CW
40-B183902 Solid Waste Department B. 'ding
Retrofit
$ 315,860.15
39000 Solid Waste
TBD Award TBD-State of Florida Division of Emergency
Management grant accepted by R-18-0014 dated 01/11/2018
17
2
40-B183613 Biscayne Boul-.. -rd Lane Elimination
Analysis
$ 421,829.00
36000 Streets &
Sidewalks
TBD Award TBD-FDOT grant accepted by R-17-0355 dated
07/27/2017
18
CW
40-B183614 Metro . er Station Access
Imp .vements
$ 361,632.00
36000 Streets &
Sidewalks
TBD Award TBD-FDOT grant accepted at the 4/26/2018
commission meeting
19
CW
40-B30606 NTWN Sidewalk & Street
Improvements
$ 869,322.00
36000 Streets &
Sidewalks
TBD Award TBD-Flagler Street Assessment authorized by R-14-
0114 dated 3/27/2014
20
2
40- 0687 Coconut Grove Business
Improvement District
$ 308,526.61
36000 Streets &
Sidewalks
TBD Award TBD-Coconut Grove BID contribution accepted
at the 4/26/2018 commission meeting
21
2
40-B183207 Fire Station No. 1
$ 500,000.00
32000 Public Safety
2387 Award 2387-FDG Rail Holdings 25 LLC Public Benefits
contribution accepted by 15-0474 dated 10/22/2015
1 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR No. 2 - MAY 10, 2018
NEW APPROPRIATIONS
Exhibit
No. D(s) Project No. Project Name Amount Program Fund Funding Source
22
2
40-B30688 Marine Stadium Restoration
$ 25,000.00
34000 Public Facilities-
CIP
2384 Award 2384-Makaira, Inc. donatio , .ccepted by R-18-0013
dated 01/11/2018
24
CW
40-B183122 Code Compliance Computerized
Enforcement System
$ 100,000.00
31000 General
Government
Projects
1426 Contribution from General F+nd (FY18 GF Midyear dated
4/26/18) Code
25
CW
40-B183123 Content Center Furniture for
Communications Department
$ 16,000.00
31000 General
Govemment
Projects
1426 Contribution fro General Fund (FY18 GF Midyear dated
4/26/18) Co 'munications
26
5
40-B183412 Allapattah Elderly Center AC
Replacement
$ 70,000.00
34000 Public Facilities-
CIP
1426 Co i.ution from General Fund (FY18 GF Midyear dated
6/18) DREAM
27
CW
40-B70106A General Firefighting and EMS
Equipment
$ 100,000.00
32000 Public Safety
1 ° . Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Fire
28
CW
40-B183208 Bearcat Armored Vehicle for the Fire-
Rescue Department
$ 354,000.00
32000 Public Safety
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Fire
29
CW
40-B183102 Office of Capital Improvements
Reconfiguration
$ 7,000.00
31000 General
Govemm
Projec
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Capital Improvements
30
CW
40-B183106 GSA Restoration of City Hall Offices
$ 30,000.00
31000 Ge eral
overnment
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) General Services Administration
31
CW
40-6183116 Civilian Investigative Office
Reconfiguration
$ 50,000.00
31000 General
Govemment
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Civilian Investigative Panel
32
CW
40-B183117 District 5 Vehicle Acquisition - 1 SUV
$ 26,000.00
31000 General
Government
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) General Services Administration
33
CW
40-B183118 Citywide Fleet Replacement - 6 SUV
$ .' ,000.00
31000 General
Govemment
Projects
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) General Services Administration
34
CW
40-B183209 MPD North District Substation
Security Fortification
$ 30,000.00
32000 Public Safety
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Police
35
CW
40-B17327 MPD Body Worn Camera Pr 'ram
(Grant Match)
$ 95,000.00
32000 Public Safety
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Police
36
CW
40-B183210 CCTV Integration wit : ' hotSpotter
$ 100,000.00
32000 Public Safety
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Police
37
5
40-B183616 NW 71st Stre Railroad Crossing
Closure
$ 10,000.00
36000 Streets &
Sidewalks
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Capital Improvements
38
4
40-B30966 SW 5treet between SW 27 Avenue
a SW 28 Avenue Roadway
mprovements
$ 50,000.00
36000 Streets &
Sidewalks
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Capital Improvements
39
2
40-B , t 23 Manatee Bend Park
$ 53,000.00
35000 Parks &
Recreation
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Capital Improvements
40
2
40-840532 Morningside Park Floating Dock
$ 70,000.00
35000 Parks &
Recreation
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Capital Improvements
41
40-6183615 Citywide Neighborhood Speed
Reduction Signage
$ 1,056,000.00
36000 Streets &
Sidewalks
1426 Contribution from General Fund (FY18 GF Midyear dated
4/26/18) Office of Transportation Management
2 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR No. 2 - MAY 10, 2018
NEW APPROPRIATIONS
Exhibit A
No. D(s) Project No. Project Name Amount Program Fund Funding Source
42
2
40-B173405 Barnyard Improvements
$ 15,000.00
34000 Public Facilities-
CIP
1426 Contribution from General Fund (F GF Midyear dated
4/26/18) Parks
43
CW
40-B183903 Acquisition of Solid Waste Roll Off
Containers
$ 62,000.00
39000 Solid Waste-CIP
1426 Contribution from General Fes' d (FY18 GF Midyear dated
4/26/18) Solid Waste
44
CW
40-B183119 Citywide Fleet Replacement
$ 87,000.00
31000 General
Government
Projects
1426 Contribution from G- eral Fund (FY18 GE Midyear dated
4/26/18) Gener., ervices Administration
45
5
40-B183135 Renovations of Dilapidated
Structures in District 5
$ 1,000,000.00
31000 General
Government
Projects
1426 Contrib : 'on from General Fund (FY18 GF Midyear dated
4/2..,'8) Mayor's Office
46
CW
40-B70715E City of Miami Trolley Program -
Trolley Acquisition
$ 1,400,000.00
39900 Mass Transit
1 . Transit Half -Cent Surtax (FY18 SRF Midyear dated 4/26/18)
Transportation and Transit
47
CW
40-B183617 Citywide Beautification
$ 1,000,000.00
36000 Streets &
Sidewalks
1350 SRF Contribution to Capital - Lane Closure Fund (FY18 SRF
Midyear dated 4/26/18)
48
CW
40-B183617 Citywide Beautification
$ 1,000,000.00
36000 Streets &
Sidewalk .
1350 SRF Contribution to Capital - Tree Trust Fund (FY18 SRF
Midyear dated 4/26/18)
49
CW
40-B30262 Citywide Storm Sewer Repair Project
$ 447,931.00
38000 Stor ewers
1350 SRF Contribution to Capital - Lane Closure Fund (FY18 SRF
Midyear dated 4/26/18)
50
CW
40-B183600 Citywide Tree Planting
$ 97,000.00
3600,. Streets &
Sidewalks
1350 SRF Contribution to Capital - Lane Closure Fund (FY18 SRF
Midyear dated 4/26/18)
51
2
40-B183517 Regatta Park Enhancements
$ 53,800.00
35000 Parks &
Recreation
1350 SRF Contribution to Capital - Project 29-118001/Award 2068
Parks and Open Space Trust Fund (FY18 SRF Midyear
dated 4/26/18)
52
2
40-B183418 Peacock Park Glasshouse Roof
$ 75,000.0l. '
34000 Public Facilities-
CIP
1350 SRF Contribution to Capital - Project 22-119003/Award 2371
PF Surplus Rollover (FY18 SRF Midyear dated 4/26/18)
53
2
40-B183414 Fort Dallas Worker's House
Renovations
$ 0,021.00
34000 Public Facilities-
CIP
1350 SRF Contribution to Capital - Project 22-119003/Award 2371
PF Surplus Rollover (FY18 SRF Midyear dated 4/26/18)
54
2
40-B183414 Fort Dallas Worker's House
Renovations
$ 148,000.00
34000 Public Facilities-
CIP
1350 SRF Contribution to Capital - Project 22-119003/Award 2000
PF Surplus Rollover (FY18 SRF Midyear dated 4/26/18)
NEW APPROPRIAT, S TOTAL $ 15,665,364.25
3 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR No. 2 - MAY 10, 2018
RE -APPROPRIATIONS
Exhibi
No. D(s) FROM Project Amount
Program Fund D(s) TO Project
Amount
Program Fund
Fu. Source
1
CW
40-B183900 SW Heavy Machinery $ (19,000.00)
Acquisition
39000 Solid Waste-
4 CIP
CW
40-B70338 Heavy Equipment
Enhancements
$ 19,000.00
31000 General
Govemmen. '
426 Contribution from General
Fund
2
CW
40-B74205C GSA Truck Wash Pit $ (48.929.84)
31000 General
Government
CW
40-B74205D GSA Property Maintenance
Division Building Repairs
$ 48,929.84
31000 Genera
Gov- nment
1426 Contribution from General
Fund
3
CW
40-B70978 City Clerk -Electronic $ (10,000.00)
Campaign Reporting
System
31000 General
Government
CW
40-B74205D GSA Property Maintenance
Division Building Repairs
$ 10,000.00
311.'"I General
Govemment
1426 Contribution from General
Fund
4
CW
40-B70970 Manuel Artime Theater $ (79,000.00)
Equipment Project
31000 General
Government
CW
40-B70970A Program Management
TRACS
$ 79,000.0
31000 General
Government
1998 Contribution from General
Fund-SSL
5
CW
40-B30443 Belle Meade Island $ (131.810.79)
Decorative lighting
installation
36000 Streets &
Sidewalks
CW
40-B30445 Miscellaneous Decorative
Lighting installation-CW
$ 13-,;10.79
36000 Streets &
Sidewalks
1350 SRF Contribution to
Capital
6
CW
40-1340720 City Wide A/C repairs. $ (100,553.70)
CW
35000 Parks &
Recreation
CW
40-13173524 Citywide Park Facility NC
Replacement
"$ 100,553.70
35000 Parks &
Recreation
1426 Contribution from General
Fund
7
1
40-B183611 NW 17th Street from NW $ (250,000.00)
27 to NW 32 Avenue
36000 Streets &
Sidewalks
1
40-B183611A NW 17th Street from, ' 32
to NW 37 Avenu
$ 250,000.00
36000 Streets &
Sidewalks
1297 Transit Half -Cent Surtax
8
2
40-B30182B Regatta Park $ (32,959.07)
35000 Parks &
Recreation
2
40-B30182C Regatta F=rk Phase II
(Ba = k, Boat Hoist and
F 0.ting Dock) - CW
$ 32,959.07
35000 Parks &
Recreation
1669 TVM Production -Basic
Use Fee
9
2
40-B30541 E Kennedy Park Floating $ (15,152.96)
Dock Path - Mangrove
Trimming
35000 Parks &
Recreation
2
40-133018 f Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 15,152.96
35000 Parks &
Recreation
1669 TVM Production -Basic
Use Fee
10
2
40-B30541 C Kennedy Park Shoreline $ (1,502.27)
Stabilization PH1
35000 Parks &
Recreation
2
r i-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 1,502.27
35000 Parks &
Recreation
1669 TVM Production -Basic
Use Fee
11
2
40-B30825C Biscayne Bay Spoil Island $ (1,500.00)
C Small Scale Spoil
Island Dock to Tiki
Shelter Path - D2
35000 Parks &
Recreatio
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 1,500.00
35000 Parks &
Recreation
1669 TVM Production -Basic
Use Fee
12
2
40-B30825B Biscayne Bay Spoil Island $ (4.61)
E Public Trail - D2
35001 'arks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 4.61
35000 Parks &
Recreation
1669 TVM Production -Basic
Use Fee
13
2
40-B75830A Blanche Park Master Plan $ (465.30)
Improvements
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 465.30
35000 Parks &
Recreation
1426 Contribution from General
Fund
14
2
40-B30541 E Kennedy Park Floating $ .446.95)
Dock Path - Mangrove
Trimming
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 1,446.95
35000 Parks &
Recreation
1998 Contribution from General
Fund-SSL
15
2
40-B40712 D2 Park, Street, and $ (193,968.84)
Lighting Improvovem-.F
35000 Parks &
Recreation
2
40-B30182C Regatta Park Phase II
(Baywalk, Boat Hoist and
Floating Dock) - CW
$ 193,968.84
35000 Parks &
Recreation
1426 Contribution from General
Fund
16
2
40-B50707 Traffic Calminevices - $ (5,000.00)
Bay Heigh
36000 Streets &
Sidewalks
2
40-B30407 Metromover Parkway.NE
2nd Street and NE 3rd
Street. D2
$ 5,000.00
36000 Streets &
Sidewalks
1426 Contribution from General
Fund
17
2
40-B30662D U Median Closures at $ (81,121.92)
ridgeport and SW 30 Ct -
D2
36000 Streets &
Sidewalks
2
40-B183618 Brickell Bay Traffic Calming
$ 81,121.92
36000 Streets &
Sidewalks
1426 Contribution from General
Fund
18
2
40-z40712 D2 Park, Street, and $ (18,878.08)
Lighting Improvovement
35000 Parks &
Recreation
2
40-B183618 Brickell Bay Traffic Calming
$ 18,878.08
36000 Streets &
Sidewalks
1426 Contribution from General
Fund
4 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR No. 2 - MAY 10, 2018
RE -APPROPRIATIONS
No. D(s) FROM Project
Amount
Program Fund D(s) TO Project
Amount
Program Fund
Fund urce
19
2
40-640712 D2 Park, Street, and
Lighting Improvovement
$ (15,200.00)
35000 Parks &
Recreation
2
40-B173405 Barnyard Improvements
$ 15,200.00
34000 Public
Facilities-CIP
14 Contribution from General
Fund
20
2
40-640712 D2 Park, Street, and
Lighting lmprovovement
$ (350,931.98)
35000 Parks &
Recreation
2
40-B40571 Virrick Park New Pool
Facility - D2
$ 350,931.98
35000 Parks : - -
Rec, ation
1426 Contribution from General
Fund
21
2
40-B30706 Miscellaneous Repair -
10% Set Aside
$ (20.885.26)
34000 Public
Facilities-CIP
2
40-670043 Derelict Vessel Removal
$ 20,885.26
341 , Public
Facilities-CIP
1437 Marinas Capital Repairs
and Capital Related
Improvements
22
2
40-B183410 Dinner Key Marina
Emergency
Repairs/Replacements
$ (46,415.00)
34000 Public
Facilities-CIP
2
40-670043 Derelict Vessel Removal
$ 46,415.1 r
34000 Public
Facilities-CIP
1437 Marinas Capital Repairs
and Capital Related
Improvements
23
2
40-B70011 Clean Vessel Act - 2013
$ (3,117.21)
34000 Public
Facilities-CIP
2
40-B70047 Mooring Field Offshore
(Watson Island) - D2
$ 3,117.21
34000 Public
Facilities-CIP
1437 Marinas Capital Repairs
and Capital Related
Improvements
24
2
40-B30325B Miamarina Bayside Pump
Out
$ (160.25)
34000 Public
Facilities-CIP
2
40-B183404 MiaMarina Emergency
Repairs
$ 160.25
34000 Public
Facilities-CIP
2150 Miamarina Ticket
Surcharge Revenue
25
2
40-B30689 Marine Stadium Marina
Bulkhead Replacement
$ (900.09)
34000 Public
Facilities-CIP
2
40-B183410 Dinner Key Mari.:
Emergency
Repairs/' -placements
$ 900.09
34000 Public
Facilities-CIP
1437 Marinas Capital Repairs
and Capital Related
Improvements
26
2
40-B60464 New Dinner Key Marina
Dockmaster Building
$ (1,578.84)
34000 Public
Facilities-CIP
2
40-B183410 Din Key Marina
ergency
Repairs/Replacements
$ 1,578.84
34000 Public
Facilities-CIP
1437 Marinas Capital Repairs
and Capital Related
Improvements
27
2
40-B60474A Piling and Pier Repairs -
Dinner Key Marina
$ (1.00)
34000 Public
Facilities-CIP
2
40-B1 408 Miscellaneous Repairs -
Seminole Dinghy Dock &
Boat Ramp
$ 1.00
34000 Public
Facilities-CIP
1350 SRF Contribution to
Capital
28
CW
40-B73102B Citywide Streets Milling &
Resurfacing - CIP Parking
Surcharge
$ (583,800.00)
36000 Streets &
Sidewalks
2
40-B30687 Coconut Grove Business
Improvement District
$ 583,800.00
36000 Streets &
Sidewalks
1419 Parking Surcharge
29
3
40-8173407 Manuel Artime Theater
Equipment Project
$ (18.72)
34000 Public
Facilif ^' -CIP
3
40-B183413 Manuel Artime Dressing
Room
$ 18.72
34000 Public
Facilities-CIP
1998 Contribution from General
Fund-SSL
30
3
40-B30600C Manuel Artime 970 Office
Building A/C Repairs
$ (4,500.00)
34000 P . is
acilities-CIP
3
40-B30600B Manuel Artime AC Repair
$ 4,500.00
34000 Public
Facilities-CIP
1426 Contribution from General
Fund
31
3
40-B30600C Manuel Artime 970 Office
Building NC Repairs
$ (5,500.00)
34000 Public
Facilities-CIP
3
40-B183413 Manuel Artime Dressing
Room
$ 5,500.00
34000 Public
Facilities-CIP
1426 Contribution from General
Fund
32
3
40-B30600C Manuel Artime 970 Office
Building A/C Repairs
$ (9 „ 0.00)
34000 Public
Facilities-CIP
3
40-B183413 Manuel Artime Dressing
Room
$ 9,300.00
34000 Public
Facilities-CIP
1350 SRF Contribution to
Capital
33
3
40-B40354 Tower Theater
Improvements D3
(8,173 41)
34000 Public
Facilities-CIP
3
40-B183413 Manuel Artime Dressing
Room
$ 8,173.41
34000 Public
Facilities-CIP
1426 Contribution from General
Fund
34
3
40-B30440 Replanting of existing
empty planters a -' g SW
8 Street betw>.-n 4th
Avenue a. 27th Avenue
$ (3,187.80)
36000 Streets &
Sidewalks
3
40-630438 Repair & Maintenance of
Cuban Memorial Boulevard-
D3
$ 3,187.80
36000 Streets &
Sidewalks
1350 SRF Contribution to
Capital
35
5
40-650654 •- ertown Stormwater
Pump Station Upgrades
$ (198,578.76)
38000 Storm Sewers
3
40-13183800 Orange Bowl Stormwater
Pump Station Renovations
$ 198,578.76
38000 Storm Sewers
1113 Local Option Gas Tax
36
4
411-:50423 Shenandoah Traffic
Calming Devices - D4
$ (13,762.68)
36000 Streets &
Sidewalks
4
40-B50404 Shenandoah/Silver Bluff
Roadway Improvement
Project - D4
$ 13,762.68
36000 Streets &
Sidewalks
1426 Contribution from General
Fund
5 of 6
FISCAL YEAR 2017-2018
CAPITAL FUND APPROPRIATION AMENDMENT
MIDYEAR No. 2 - MAY 10, 2018
RE -APPROPRIATIONS
No. D(s) FROM Project
Amount
Program Fund D(s) TO Project
Amount
Program Fund
Fund »ource
37
4
40-B30134A Bryan Park Community
Building - D4
$ (42,794.41)
35000 Parks &
Recreation
4
40-B30134B Bryan Park New Irrigation
System
$ 42,794.41
35000 Parks &
Recreation
1+'2 Impact Fees New
Ordinance
38
4
40-B30134A Bryan Park Community
Building - D4
$ (57,205.59)
35000 Parks &
Recreation
4
40-B173519 West End Open Field
Irrigation
$ 57,205.59
35000 Parks &
Recre.. "'.n
1422 Impact Fees New
Ordinance
39
5
40-B50566 Wynwood One -Way
Street Conversion
$ (77,438.10)
36000 Streets &
Sidewalks
5
40-B50566A Wynwood Streetscape and
Street Tree Master Plan
$ 77,438.10
36000 St is &
idewalks
1426 Contribution from General
Fund
40
5
40-B50566 Wynwood One -Way
Street Conversion
$ (7,561,92)
36000 Streets &
Sidewalks
5
40-B50566A Wynwood Streetscape and
Street Tree Master Plan
$ 7,561.92
6000 Streets &
Sidewalks
1297 Transit Half -Cent Surtax
41
4
40-630614 D4 Miscellaneous Street
Maintenance
$ (568.016,91)
36000 Streets &
Sidewalks
4
40-B183619 SW 22nd Avenue Roadway
Traffic Calming
$ 568, 6.91
36000 Streets &
Sidewalks
1297 Transit Half -Cent Surtax
42
4
40-B30614 D4 Miscellaneous Street
Maintenance
$ (239,148.66)
36000 Streets &
Sidewalks
4
40-B183619 SW 22nd Avenue Roadway
Traffic Calming
$ 239,148.66
36000 Streets &
Sidewalks
1426 Contribution from General
Fund
43
4
40-B30614 D4 Miscellaneous Street
Maintenance
$ (48,251.57)
36000 Streets &
Sidewalks
4
40-B183619 SW 22nd Avenue Roadwa
Traffic Calming
$ 48,251.57
36000 Streets &
Sidewalks
1552 Local Option Gas Tax
44
4
40-B30614 D4 Miscellaneous Street
Maintenance
$ (5,033.17)
36000 Streets &
Sidewalks
4
40-B183619 SW 22nd Avenue adway
Traffic Calmin,
$ 5,033.17
36000 Streets &
Sidewalks
1998 Contribution from General
Fund SSL
45
4
40-B30614T D4 Tree Funded Projects
$ (224..758.36)
33000 Disaster
Recovery
4
40-B183619T SW 22nd enue Roadway $ 224,758.36
Traffic Iming
33000 Disater
Recovery
1954 Citiwide Landscape
46
CW
40-670128 Forensic Lab Expansion - $ (188,000.00)
Police Department
32000 Public Safety
CW
40-B183211 Na ' naI Integrated Ballistic
formation Network (NIBIN)
Program
$ 188,000.00
32000 Public Safety
2252 Impact Fees_Police
TOTAL ADJUSTMENTS $ (3,715,514.02)
$ 3,715,514.02
6 of 6