HomeMy WebLinkAboutBid TabulationIF6717331, 1/5-1 LANDSCAPE MAINTENA SCE
910 TABIJtAT-52N-ATACi-I MENT 3..310E SCHE512Lt
i F87173E1. US-1 LANDSCAPE MAINTENANCE
'Aquatic Lands_ap!ng Design, lnc.
SFM Services, Ire. IPRINIAR')
Superior Lands=aping & Lawn
Service, Inc.
/SEC:NOARa)
Line No,
Description
Quantity
item Cost
Quantity !kern lost
Quantity
Item Cost
1
Mowing and Edging: Ail -inclusive price for furn rhirg all labor, equipment,
and material; necessary for mowing, edging. trimming hedges, trimming
branches, weed eating, sweeping and picking up all grass clippings, and hags
within,and an the landscaped medians along US-1 between SW 37th Avenida,
and 1-95, a strip of land located he- ..i.-en. the wail and curb, of fire CS-1
northbound outside lane betxee- ),.....a and SIN 19th Avenue, and
maintaining the 1-95 embers aii - : 3 R. 9/555 27 Avenue from SW 7Sch
Lane to Sir' Eth Street ngbt . i i , r-sral from all tare areas, pant
had: 3..., 1 .• _. 5 .... _" •.,.I be completed arias to each
„i :ua4s-eer-year
5-6am
26 times per year
1
$ 60530.00
26 tithes per }roar
$ 213,200.0C
1
Pruning and Thinning of Trees/Palms: al -inclusive price for rurnlshing all
debar, equipment, and materials necessary for pruning and thinning of trees,
palms, plants, and the initial thinning and shaping of existing tress as noted in
tnese specifications, within and on the landscape medians of U5-1 penveen
SW 37rh Avenue. and 1.95, and a strip of land located between the wail and
curb, of the L5.1 northbound outside lane between Vizcaya and SW 19th
Avenue, the I-95 embankments, and 5.R.9/5W 27 Avenue `rpm SW 23th Lane
to SW Sth Street right-of-way
Annually-44-ziese-
per -year
5-2'.gr.000,70
Annually (1 time
per year
5 39,050.00
Annually I L time
per year
5 29,4C0.00
3
Weeding of Planting Beds: All-indusiveprsce for fr.rn,ihing all labor.
equipment, and materials necessary for the weeding df piantng beds as
noted in these specifications, within and an the landscaped medians or the
05-1 between SW 37th Avenue, and I-95. and a. strip of land located aetween
the wall and curb of the 1.15-1 northbound c-attide lane brit een Vint ya and
SIN 15th Avenue, and the 1-95 embankments, and 5.R. 9/SW 27 Avenue from
2Eth Lane to SW Sth Street ri lit-of.wa
g y-
26-a+rges-?er-yea=
5---2G.000.37
2
2E times per year
5 60. "s30.00
26 times per year
j 77,463.00
4
Mulching: Azl-indushre pr ee for furnishing all :labor, equipmentand nater"a!s
necessary to install 3 dirtiesof5oanish Gold mulch or Eucalyptus mulch
around each tree, palm, and planting bed as noted -n these specifications
within, and an the landscaped medians on US-1 between SW 37th Avenue
and I-95. a strip of land located between the wail and curs of the U5.1
northbound lane between Vizcaya SW 19th Avenue,
Evora Two
Every Two
Months 16 times
per year,
$ 4,CO9.00
Every Two
Months jo times
per year)
$ 79,900. CO
outside and the1-95
emcee?'.n-ents, and 5R.9/SW 27th Avenue from SW 28th Lane to SW Sth
Street right•of•way.
Mocths-:6-Nines-
aee yeaal
fr-----.24r000:00
5
Clean -tip and Litter Removal: All inclusive price for furnishing ail faoar,
equipment, and materials necessary to clean up, remove litter, and oroperiz
dispose of the litter removed as noted in these specifications, within and on
the landscaped medians on U5.1 between SW 37th Avenue and 1-35, a strip of
land located between ,he wail and curb of U5-1 northbound outside lane
between ellacaya and SIN 19th Avenuw, the I.95 embankments, and S,R, 9/SW
27 Avenue from SW 23th Lane to SW E Street right-of-way.
itA145eer yeas
5 21,000.00
26 trr es per year
$ a3.414,00
26 times per}ear
$ 27,135,00
6
Corti rsgencv Allowance (Audit:on& Services) for the duration of the contract.
No Etc, tarn
99
5400,a02iNe
aid :ten,
5100,000
No Bid item
SL00,000
Total
Bid (Lines 1-6)
$ 251,053,00
5 277,567..00
5527,646.00
ADDITIONAL SERVICES. InaMdi:ion to the required services, the City may en an "as needed"
or designee will request a quote' based
basis require :he Successful Bidder to perform the below services. When required, the Project Manager
on prc=ng provided for the additional services.
7
1 Galion Shrubs, Furnish all necessary Tabor, materials, water, fuel, tools, and
equipment for performing the planting of 1 gallon shrubs . Water and fertilize
accordingly, Planting shall be coordinated with the City Engineer and Project
Manager and no additional compensation will be allowed.
ca2a
'> 7.„^0
Each
S 5.,60
Each
$ 12.00
g
3 Galion Shrubs. Furnish all necessary labor, materials, water, fuel, tools. and
equipment for performing the planting of 3 gallon shrubs. Water and fertilize
accordingly, Planting shall be coordinated with the City Engineer and Project
Manager and no additional compensation will be allowed,
Each
3----15,00
Each
S 13.50
Each
$ 22A0
9
7 Gallon Shrubs. Furnish all necessary tabor, materials, water, fuel, 'tools, and
equipment fdi performing the planting of 7 gallon shrubs. Water aril fertilize
accordingly. Planting shall be coordinated with the City Engineer and Project
Manager artd no additional compensation will be allowed.
eat:
S----40:r-0
=_act
$ 45.00
Each
5 36.00
10
Furnish ad necessary labor, materials, water. fuel, tools. and equipment for
performing the planting of Pink Crape Myrtle-Lergerstroemia ineica
'muskoge>_' - 30 gal,
Eac.4
$ 254-00
Each
5 405.00
Each
$ 390.00
11
Furnish all necessary labor, materials, water, fuel, tools, and equipment fe:
performing the planting of Florida Royal Palm-Roystor.oa elate -Field Grown
20'-22' Gs,V
beers
}..----1_•750.00
E
Eac:r
$ 3,500.00
Each
5 3,30(100
12
Furnish an necessary labor, materials, water, fuel, tools, anti equipment for
performing the planting of Live 0ak-Quercus v,rglmana) 4"Dbh/6-7' CT/10'-
22-1-17I12'5PR.
5.55.
5 1.250,00
=acts
5 3,500.00
Each
5 2,400.00
IFB717381, US-1 LANDSCAPE. MAINTENANCE
tine No,
0escriptpn
00 'ttlt/
'Item Cosy
CEaar.tity
Item Cast
7iantity
Item cost
13
Furnish all necessary labor, materials, water, fuer, tools, anti equipment for
performing the planting of Wiest Indian Mahogany-Sv:lateniamahagori-
Field Grown/Full/ 18'-22'HT-8'-10' 190E 5`_T.
Each
$-895-08
Each
$ 1,950.00
Eacn
5 1,600.00
14
Furnish all necessary la oor, materials, water. fuel, tools, and eq,.ipment for
performing the planting of silver Buttonwood tree- Conocarpus erectus
serceus- 30 ga1. Mtln 2" 08H-
'
Each
5--2025;00
Each
$ 495,00
Each
$ 570-00
15
Furnish all necessary labor, materials. water, fuel, tools, and equipment for
performing the planting of Green Buttonwood tree-Conocarpus 15' OAH
Field Grown.
Each
$-33649
Each
$ 1,050.00.
Each
5 750,00
16
Furnish all necessary labor, materials, water, fuel, tools, and equipment for
performing the panting of Addonid:a Palm, 5' Single trunk-100gal.
Each
$ 2E0.00
Each
$ 675.00
Each
$ 6550-00
17
Furnish all necessary labor, materials, water, fuel, tools, and equipment for
performing the planting of Pygmy date palm Multi 1G/5' -45 gal.
Each
5 250,00
Each
$ 475.00
Each
$ 375,00
18
Furnish all necessary labor, materials, water. fuel, tools, and equipment for
performing the planting of Jatrnpha Tree Farm, Jatropha berlandieri 45 gal,
Each
$ 275.00
Each
$ 575,00.
Each
$ 375.00
19
Furnish ail necessary :ahoy, materia'•s, water, fuel. tools, and equips-ent for
performing the planting of Seagrape has'-_5 gal..HT full, heavy.
Earn
$ 22$:00.
Each
$ 225,00
Each
5 250.00
20
Furnish ail necessary lahcr, materials. v, arer, fuel, toms, 3.r1 equipment for
performing the planting of Medjooi lane parr - Bale
Root/Grade41/Single/20'-24' HT
;well
5 7,950.00
Each
$ 9,50000
Each
$ B,833.00
21
Furnish all necessary labor, materials, water, fuel, [oois, and equipment for
performing the planting of Bird of Paradise-45G/28" 10'ht
Eaeh
.$ --395.00
Each
5 325,00
Each
$ 500-00
22
Furnish all neces; err labor, materials, water. fuel, tools, and equipment for
performing the anting of Foxtail palm - 3G G single S'ht.
Bodo
$ 185.03
Each
5 450.00
Each
$ 500,00
23
..
Furnish ail nor .•',abor, material, ,water fuei, tools and equipment for
perform -lag of Alexander Sam- 14' BAH 5-gie 2Jnit- 30 gal.
Each
$ 750-03
Each
$ 50C-00
Each
$ 5E0.00
24
Furnish a' --: -r. r- , labor, materials, water, fuel. tools, and equipment for
perform." _ , ,✓•',ng of Pitc3 Apple- Standard 12-14' H7/5-8' SPR/3" CAL.
€aeh
5 3E0.09-
Each
$ 1130.00
Each
$ 900.00
25
Furnish all nec -_ _ _ • ,re', f_el, tools, and equipment for
performing the, _r].,--.Dc: ...i-..._- 14-15' HT/5 85Pn 5'1F1Field
Grown.
€aeh
} 225E3
Each
$ 3,750.00
Each
$ 9.30-00
26
Furnish all necessary 'a .,or, :nateriais, aa,er rye' SonSS, aria _ , --,ant for
performingthe planting of Pigeon Plum- : _.. r. - s' CAL.
' h
$ 225.00
Each
$ 67$.00:
Each
5 770.0'0
27
Furnish all necessary labor, materials sva er foe -,., ,
performing the planting of Pink Trumpet Tree - abet _- . _-__
OAH, 8' CT Field Grown. lash
5 285.00
Each
$ 3,750.00
Each
$ 990.00
28
Furnish all necessary labor, materials, water, fuel, took, and egmpme-i-far
performing the planting of Yellow Trumpet tree-Tabebuia caraib=_ - 25 'AH,
6' CT Field Grown,
Saab
$ 285.20-
Each
$ 956.00
Each
$ 990.00
29
Furnish ail necessary, labor, materials, water, fuel, Coals, and equipment for
performing the planting of Alexander Palm-Ptychnsperma -45 gal Min 2"
DBH,
Each
$ 2-55-0-
Each
$ 500.30
Each
$ 500.00
30
rurnisn all necess-Pry labor, materials, water, fuel, tools, and equipment for
performing the planting of Bismarck Palm-Bismarckla nohilis "Silver'- 20'
CAN.
Each
5 8_0.30
Each
$ 1,950.00
`each
$ 2,300.00
31
Furnish all necessary labor, materials, wa;a- `_-. , s :._- _-,' -- .,cent for
performing the panting of Cabbage Palm - an ha a_,, --,.. - _Dr. a. Min 2"
DOS.
Each
5 2225.00
Each
$ 500.00.
Each
$ 580.00
32
Furnish all necessary labor, materials, water, f0.-', __:. -• E - r. _-- :C,
perEer.ming the planting of Macarthur Palm - Ft' c-:_.;--a'-., ' 0,:s'- _- -i00
gal. Min 2" 0BH.
Each
5 -250, 0
Each
S 500.00
Each
S 1,200,00
35
St, Augustine Grass (Para ta-n; - 2500 Sgaa:a foot price `.or furnishing ail
labor, material and equipment necessary to install and to water for one (1(
week per planting specifications.
2 00-Sq. Ft.
5 2,530.00-
2501 Sq. Ft..
5 1,875.00
2502 5q, Ft.
5 3,000,00
�4
Erecting, staking and bracing fallen existing trees and palms (fallen by traffic
accidents, high winds, or other forces( - furnishing all labor, materials and
equipment necessary to erect, stake and brace any existing tree/ palm
(including digging underneath tree, filling the area with treated planting soil,
bracing tree with 4"x 4" wood boards, as diroaed by city, (0' - 15' overall
helghtl.
Each
$ 60.08-
Each
$ 500_00
Each
$ 390.03.
35
Erecting, staking and 4: adng tali, _xi_ -- a... -, s 'S,, tra"•c
accidents, high winds, : _. .r-z. - -= s-. -. ..=.rid
equipment necessaryro exec•.,sta•.a=-:'-----,,_..,.;...-.:: •._ -;...-
(including digging underneath tree,
bracing tree with 4"x 4" wood board,, as _.Arne; ^Y C.ty. ;1 S • 46' c':erall
height)-
€a,24a
4- 2$0.2C
Each
$ 2,500.CD
Each
$ 39000
36
Erecting, stai:ing and bracing fallen existing trees and palms Ifa Ilan Sy traffic
accidents, high winds, or other forces i -furnishing all labor, materials and
equipment necessary to erect, stake and brace any err st.ng tree/ palm
(including digging underneath tree, filling the area with treated planting soil,
bracing tree with 3"x 4" woad 'boards, as directed by City. (41' - 60' overall
height(.
Eanh
$ 550:80
Each
$ 3,300.00
Each
$ 2,900 00
37
Stump Rernoval,Furnish all labor, mater.als and equipment necessary to
remove, Haul to dump site and dispose of tree/calm stumps, including root
balls, finish grading, any size at various locations if necessary and as directed
lay the City Project Manager or designee.
Eadia
$ 450.00
Eac" '
$ 5500C
Each
$ 580.00,
I[9717381, US-1 LANDSCAPE MAINTENANCE
Line No,
Descnpnon
C1ua.nt,ty I'em Zcst
Cuantity
item Cost Q,antity
item Cost
38
Mulching. "urmsl, all labor, equipment, and materials necessary toTnstall 3"'
of Spanish Gold mulch around each tree, palm, and planting beds as noted in
these specifications wnh,n and on the landscaped medians on'1S-L.berween
SW 37th Avenue and 1-95. a strip of land located between the ,nail and _urb,
northbound US-1 between SW 19th Avenue and 195, the 195 embankments,
and S.R.9/5W 27 Avenue from SW 28th Lane to SW 8th Street right -Of -way.
This work is every 6 months.
6006
-5.--t4,304.30-
Each
$ 4,30800
Each
$ 22,500-00
39
Water Truck,- Furnish all labor, mater.a!s and equipment necessary to provide
water for the entire length of the median (15, 278 ft.), the wail portion (1,2C0
ft.) , the I-95 embankments (49,780 sq. ft.), and 3.,R. 9/SW 27 Avenue from
SW 28th Lane to SW 8th Street right-of-way. As necessary and as directed by
the City.
Eaeh
553.0C
Each
5 880.00
Each
5 2,800.00
40
Top Sort Furnish all labor, material and equipment necessary to install 150i
cubic yards of fertilized top soil 150/50), as necessary and as directed by the
City.
Each
$ 18.80
Each
$ 2,100.00
Each
5 6,690.00
41
Fertilization and Pesticide Applicatons for Turf, Planting beds. and Shrubs- For
furnishing ail labor, equipment and materials necessary for the ferti!katic.n
and chemical pesticide application of ail turf, planting beds. and shrubs as
noted in these specifications, withinand on the landscaped medians en US-1
between SW 37th Avenue and 1-95, a strip of land located between the wall
and curb of the US-1 northbound outside lane between Vizcaya and SW 19th
Avenue, northbound US-2 between. SW 19th Avenue, the 1-9S embankments,
and S.R. 9/SW 27 Avenue from SW 28th Lane to SW 8th Street right-of-inav, as
necessary and as directed by the City.
Per Sq. Ft.
$ 10.90
Per So. Ft.
$ 0.25
Per 5q- Ft.
-$ 0.18
42
Fertilization and Pesticide Appiicafions for Trees and Palms: Furnish all labor,
equipment and materials necessary for the fertilization and chemical pesticide
application of all trees and palms as noted in these specifications, within and
on the landscaped medians on U'S-i between SW 37th :Avenue and 1-95, a
strip of land located between the wail and curb of the U5.1 northbound
outside lane between Vizcaya and 5W 19th Avenue, the 1,95 embankments,
and S.R. 9/SW 27 Avenue from SW 28th Lana to SW 8th sweet right-of-way, as
necessary and as directed by the City,
Eaeb
. --- 30
Each
$ 0.25
Each
$ 5,700.00
43
Furnish all leper, materials and equipment necessary for the planting of.a
shade tree (Field Grown/Standard/4" 0BH/16-1376-8' 3P9f5'CT)I indsding
removal of stump, planting a nova 0ne of same species, mc'ching, and
watering for a one ill year period. along the entire length of th=- mc q;ar. at
locations approved by City Engineer and/or Project Manager only.
boob
$ 575.00
Each
$ 675.00
Each
5 2,800.20
44
Furnish all labor, materials and equipment necessary for :he p!anring of a
shade tree 1100 gal) including removal of stump. planting a new one of same
species, mulching, and watering for a one year period, along the entire length
of the median at iota ions approved by City Engineer and/ar Project Manager
only
Eaeh
5 571:30
Each
5 3 550,00
Each
$ 3 9C0.00
45
Furnish all labor, materials and equipment necessary for the planting of a
palm tree (Field Grown/Min. 10' GW/Balled and Burlaped/Single-8and/or 15-
20 CT} including removal of stump. planting a new one of same-specles,
mulching, and watering for a one )1) year period, along the entire length of
the median at locations approved by City Engineer and/or Project Manager
Erik
5 ^50,00-
Each
$ 1,950.00
Each
$ 9,900.00
48
only.
Furnish all !abor. materials and equipment necessary for the planting of a
palm tree (45 gal) including removal of stump, planting a new one of same
species, mulching. and watering fora one I1) year pared, along the entire
length of the median at locations approved by City Engineer anal/or Project
Manager only,
Each
5 380.36-
Each
5 950-00
Each
$ 1,900.00
47
Installation of 150 ,inear feet of root barrier per PW 8ul?etin No. 33
'briny -Lao?
$ 750
L.n_ar foot
$ 50.00
Linear foot
$ 29.00
48
Furnish all labor. materials and equipment necessary for removing a deceased
or damaged shade trees (0' - 15' overall height) including removal of stump,
trunk, crown and roots and restoration of the area
8aeh
S 259.00
Each
5 650,00
Each
5 1,400,09
49
Furnish all labor, materiais and equipment necessary for removing a deceased
or damaged shade trees (16' - 40' overall height) including removal of stump,
trunk, crown and roots and restoration of :he area.
6acka
$ 1,300.3C
Each
$ 1,59900
Each
5 2,400.00
50
Furnish all?abor, materials an: equipmari, - aco:su ', - =.. -.. _34 eased
or damaged shade trees l,F'-_2 worst. 55-c; t. --,,na remo,,ai ..r ;tamp,
trunk, crown and rocrs -nd _._. . , -. -..
Foul
-$.---2;.Si7426-
Each
5 2,500.00
Each
5 3,9C3.:.0
51
Furnish all labor, materra,s a,d e0.. _. _- . nece-:ary for removing a deceased
or damaged palm (0' . 13' overall 4/ 1't) mcluddmg removal of stump, trunk,
crown and roots and restoration of :ne area-
Each
$ 156:00-
Each
$ 250,00
Each
5 56G 00
52
Furnish all labor, materials and equ:pment necessary for removing a deceased
or damaged palm )16' - 40' overall height) including removal at stump, tank,
crown and roots and restoration of the area.
Each
-S---450&
Each
$ 650.00
Each
$ 1,900.00
53
Furnish all labor, materials and equipment necessary for removing a deceased
or damaged palm (41' - 60' overall 'height)-mc!uding removal of stump, trunk,
crown and roots and restoration of the area.
€aeh
5 650.30
Each
5 950 20
Each
5 2,20C-00
54
Emergency Disaster Cebris Services: Cutting, C!earrng, and hac;ing of deb'!s to
the designated debris management site (DMS), Land Fill, or Transfer Station.
Cubie-Vard
;•---25.00
Cubic yard
$ 15.30
Cubic Yard
5 90.00
'=3idder eon-responsve, did not meet minimum gaa!:ficanon requirements