Hurricane Irma Debris Recovery Efforts
Submitted into the public
record for item(s) NA.2
on 9-28-17 . City Clerk
3002-Submittal-City Manager -Hurricane Irma Debris Removal Presentation
W
Operational Plan
• Emergency Debris Removal and Disposal Services: contract awarded December 2011
• Debris Removal Contractors
— DRC Emergency Services, Inc.
— CERES Environmental Services Inc.
— CrowderGulf (inactive)
• Monitoring Consultant: Tetra Tech (oversight & inspections)
• Map/Plan: Flagler Street is boundary line
— DRC assigned areas south of Flagler Street
— CERES assigned areas north of Flagler Street
— 12 hour work schedule, Mondays thru Sundays
• Debris Management Sites/Staging Areas
— Virginia Key Composting Facility, Biscayne Park, PBA/Fern Isle Park
— Marlins Park, Private Lots, etc (pending)
• Daily Assignment Conference/Meetings
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Pre -Storm Preparations
• Pre -storm planning - May, June, July 2017 with all contracted companies to
review duties, staging sites, geographical assignments and operations
• Annual training and refresher for City staff on FEMA requirements regarding
storm road clearance (push) and debris removal
• Equipment and SOP review/update by Fire, SW and PW
• Debris Management Sites (DMS) certification by FDEP received July 2017
• City Mini -Dump Facility remained open to the public
• Garbage and recycling collection continued throughout the week before
Hurricane Irma arrival
• Drainage System Cleaning continued throughout the week before Hurricane Irma
arrival
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Initial Challenges
• Shortage of available equipment due to Hurricanes Harvey and Irma
• Delays due to safety concerns and down utilities
• Contractors' demand for contract and rate adjustments statewide
— Old collection/hauling price: $7.22 per cubic yard
— Adjusted collection/hauling price: $15.00 per cubic yard
• Certification: Environmental Sampling/Clearance of DMS by MDC RER (DERM)
• Resources/Equipment
— Slow engagement of local sub -contractors
— Certification of trucks by Tetra Tech
— Loss of Certified Trucks to other Cities
• Tree Assessment:
— Planning Department: identify trees for salvage, re -staking and support
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery Efforts
• Initial delay in commencing post -storm operations
— September 14th: City Operations resumed (MDC Central Transfer Station resumed same day)
— September 14th: City resumed garbage collection (MDC Resource Recovery Facility resumed
same day)
— September 18th: City resumed residential recycling operations (Progressive Waste Recycling
Processing plant was closed for one full week post -storm)
• Contractors mobilized to City on September 11th
• Contractors and Consultant monitors fully mobilized and operations started
1st Push: Required Road/Street Clearance
— All -Clear issued and 1st Push from September 11th to 15th (1st week, post -storm)
— Operations: City (Police, Fire, Solid Waste, Public Works, Parks, Code & NET), Contractors & FPL
— Cutting trees and road opening, including safe -up of utilities
— Major roads opened up for through traffic
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery Efforts
Debris Removal Phasing Plan
• Critical Infrastructure: Hospitals, fire stations, police stations, schools, etc.
• Major arterial roadways: to alleviate traffic impact & assure safety
• County and State roadways
• Residential areas & Parks
• Assignments based on City Maintenance Grid System
• City debris management sites (DMS) - staging areas:
— Virginia Key SW Composting Facility (pre -approved by FDEP)
— Biscayne Park site (pre -approved by FDEP)
— Athalie Range Park (pre -approved by FDEP)
— PBA/Fern Isle Park
— Marlins Park: westside site (NW 17 Ave, north of NW 4 Street)
— Private Lot (7,000 Acre site, south of Biscayne Park) — in negotiation
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
W
Operational Plan
• Emergency Debris Removal and Disposal Services: contract awarded December 2011
• Debris Removal Contractors
— DRC Emergency Services, Inc.
— CERES Environmental Services Inc.
— CrowderGulf (inactive)
• Monitoring Consultant: Tetra Tech (oversight & inspections)
• Map/Plan: Flagler Street is boundary line
— DRC assigned areas south of Flagler Street
— CERES assigned areas north of Flagler Street
— 12 hour work schedule, Mondays thru Sundays
• Debris Management Sites/Staging Areas
— Virginia Key Composting Facility, Biscayne Park, PBA/Fern Isle Park
— Marlins Park, Private Lots, etc (pending)
• Daily Assignment Conference/Meetings
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
ritta
E • ui • ment Inventor — Certified • er FEMA
300
250
200
150
100
50
0
HURRICANE IRMA PTD TRUCK CERTIFICATION REPORT 9-28-17
88
62
1
3
25
18
50
246
DUMP HYDRAULIC DUMP HYDRAULIC PUSH NON HYDRAULIC SELF LOADER BUCKET TRUCKS TOTAL TRUCKS
TRAILER UP DUMP TRAILER
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Equipment Inventory Additional Contractor Resources
• DRC:
— 1 Vermeer 6000 Grinder (additional one in route)
— 2 Track Hoes
— 1 Wheel Loader
— 1 Fuel Storage Tank
— 4 Supervisor Vehicles
• CERES:
— 2 Skid Steers
— 1 Telehandler
— 3 Tractors with debris grapple
— 1 Vermeer 6000 Grinder (additional one in
— 1 Vermeer 8000 horizontal grinder
— 2 Backhoes (additional one
— 2 Bulldozers
— 2 Command Centers
— 2 Fuel Storage Tanks
— 6 Supervisor Vehicles
in route)
route)
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Equipment Inventory — City Resources
• 62 Trash/Dump Trucks & Haulers
• 26 Crane Loaders
• 4 Combination Crane Loaders
• 8 Sweepers
• 1 Mobile Tower Light
• 48 Pickup Trucks
• 58 Bar Chainsaws & 10 Polesaws
• 6 Bob Cats
• 5 Backhoes
• 4 Bucket Trucks
• 2 Vactor Trucks
• 4 Blowers
• 2 Water Pumps
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery Efforts
2nd Push: Roadway Clearance, debris collection and disposal
— Solid Waste/Public Works/Parks/Contractor crews
— Involves Roadways & Sidewalk clearance
— Operations by Police, Solid Waste, Public Works & Parks; and the Contractors
— Cutting trees and road clearance, including utilities by FPL
— Major roads opened up for through traffic
MAJOR STREETS: cleared and cleaned by City Maintenance Contractors
— Brickell Avenue: Florida Turf
— Coral Way: Florida Lawn/FDOT
— SW 8 St/Cuban Memorial Blvd: Lawn Keepers of Florida
— US-1: SFM
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery — Tree Survey
Damage Assessment Grid Subdivisions
Hurricane Irma Tree Recovery Efforts _.,.
ncm
rrir
• w•nnaaar
hr
�r.
616
666.
Hialeah
"r it N
-
1'1t4141a
(..ar4.ns
•
ith Identified Areas
'1a "
1
R/+t
". ■
�, 1i
ANSI
frep re• pre,19
MildjAd ,Am
AK 1111
/'/Dili 4 74111111
mom v)Ar 5%// ebvi,
r;I
I
• Tree Survey Point
Identified Areas
Contractor Debris Clearing Areas
Damage Assessment Grid
® Damage Assessment Grid
.4,
M
4�4
i
$.114.01
C,00.1 El". MEPI[. ^tLtre. Fr.aa. ne,mtm P Gnrc 66lco. Jpi'J..AQ raikr ,yea:,
MgT! Fae C^+�o •:1^a'n r 'P� awta[mrr IAW, No OOPtl t.D a co.t.4r:. arm I a Llancc•:nint,
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery Progress - Contractors
Street Clearing Status
Debris Removal Status
o=k
Lessthen50%
50% or more
Nib 100%
Tleeprrn -- —. " ;",+'•�
Coral Terrace
Hialeah
Alibrni
pangs
•
•
-1
Coral
Gables
I'
Gleristosrd
Heights
5ilvr:r clot(
lrl�-
Squ:re
elites
rtrrsla
MI.ml
6,liar
Beat
1
f I
I A. r
I ♦r ) f
oar:. HERE. 3a. ^,in. N.Z4 LSGS I Esri. HERE
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery Progress
North Miami /
Biscayne Park .
Bescnri7
Street Debris Removal
Cleared
Not Cleared
Debris Removal Status
0%
Li Less then 50%
lb50% or more
100%
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery — Contractor Progress
Debris Removal Status Report
•
Wednesday, September 27, 2017
Job to Date Statistics
Total GuYds Per Day
Total Cubic Yards
Total Loads
Days Operational
Average Cubic Yards Per Load
Maximum Day Cubic Yards 14,698 0 1
Average Day Cubic Yards 6,051 /'
Average Load Call 88.31 %
78,661 16000-
14000
2,001 t, 12000
61:loom
13 8000
48
• 600E
39 " 4000
2000
CERES IM DRC
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery Progress — Trees
Hangers, Learners and Stumps Status Report
09/27/2017
CITY OF M1AMI, FL
FEMA-DR-4337 I FL - HURRICANE IRMA
ROW COLLECTION
Hazard Removals By Day
1200
1000
800
600
09/20/2017 09f21/2017 09+22/2017 09/23/2017 09/24/2017 09/25/2017 09/2622017 09+272017
Hanger
Leaner
Stump
Ciihmittarl into
the public
--•"` recora ror item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery — Progress Todate
Storm Debris Collection and Removal Details:
ESTIMATED DEBRIS TO BE REMOVED = 700,000 cubic yards (140,000 Tons, approx.)
Debris Removal Progress - as of Wednesday, September 27th:
• Quantity Removed by Contractors = 78,661 cubic yards
• Quantity Removed by City Departments = 39,500 cubic yards
• Quantity Removed by City Maintenance Contractors = 4,500 cubic yards
TOTAL DEBRIS REMOVED TODATE = 122,661 cubic yards
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery Challenges
• Powerlines and other Utilities on Trees: FPL, AT&T, Comcast
• MOT and down Traffic Signals: including street light fixtures, unstable traffic signs
• Contaminated Piles on Streets: dumping of non -storm trash on storm debris piles
— FEMA requires that storm debris be separated and taken to different sites
• Unstable trees and branches
• Hauling Distances form pickup to DMS Locations
• Inclement Weather
• Street Sweeping & Drainage System Cleaning - ongoing
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery Recommendation
• Seek additional resources
— Contractors
— Monitoring Consultants
— Identify/Sample/Approve additional DMS Locations
• Expedite new contract procurement
• Address FEMA reimbursement/contract issues
• Public outreach and education of residents on material contamination
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk
Post -Storm Debris Recovery Recommendation
Thank You!
Submitted into the public
record for item(s) NA.2 ,
on 9-28-17 . City Clerk