CITY OF MIAMI
INTER -OFFICE MEMORANDUM
TO: Honorable Mayor and Members DATE: July 19, 2017
of the City Co
FROM: Daniel J. Al o s• / SUBJECT: Backup Detail for
Miami Forever General
Obligation Bond
City Manager
This is both a critical and opportune moment to present a compelling, strategic, and forward -
thinking opportunity to the voters of the City of Miami. The City Commission is being asked to
vote upon large categories of projects of the Miami Forever General Obligation Bond Program,
based on public input and the prioritized, professional opinions of the City's engineers and
Department Directors and strategically reduced from the more than $1.4 billion of needs to the
proposed $300 million list. The values of these large categories were developed using the
attached list of projects. Some of these projects are specific in nature, such as parks and the
renovation of a fire station. Other projects, especially those related to sea level rise mitigation
and flood prevention, roadway improvements, or workforce housing are (of necessity) more
Citywide in nature.
The City's Office of Resilience and Sustainability has been developing the City's Resiliency Plan
with the Miami Forever General Obligation Bond Program in mind. Think of the plan as part of
an integrated approach to lifting up the City, one neighborhood at a time, starting with what's
underground up, coordinating and collaborating across silos of departments, jurisdictions,
community based organizations, university partners, and the private sector and with
appropriate input from residents and local businesses.
However, in order to implement the Resiliency Plan, the City will need significant funds. The
cost to upgrade the existing drainage systems and replace coastal infrastructure Citywide is
estimated at over $900 million. This estimate is based on cost estimates from the existing
Stormwater Master Plan and estimates from the Office of Capital improvements and the Public
Works Department. These investments would also include many roadway, bikeway, walkway,
green space, and other quality of life and resilience -related enhancements. A solid and secured
funding source for these projects can attract other public and private funding or financing
partners.
7Y61-5‘Lmm\i0\-te C\( L\\ - 1,,s\ Qc03tc\s Cor (5ob
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
0001
CD
Affordable Housing
Provide affordable housing
opportunities for the lowest of
incomes and those with moderate
or workforce income levels.
Citywide
CW
Workforce Housing
$20,000,000
0003
PW
Lawrence Pump Station Upgrade
To better address flooding in the
area, the pump station will be
upgraded to increase capacity
342 SW 7th Avenue
3
Sea Level Rise Mitigation and Hood
Prevention
$225,000
0004
PW
Orange Bowl Pump Station Upgrade
To better address flooding in the
area, the pump station will be
upgraded to increase capacity
1775 NW 7th Street
3
Sea Level Rise Mitigation and Flood
Prevention
$457,000
0005
PW
Antonio Maceo Pump Station
Upgrade
To better address flooding in the
area, the pump station will be
upgraded to increase capacity
6311 SW 6th Street
1
Sea Level Rise Mitigation and Hood
Prevention
$69,000
0006
PW
West End Pump Station No.1
Upgrade
To better address flooding in the
area, the pump station will be
upgraded to increase capacity
6321 SW 2nd Street
1,4
Sea Level Rise Mitigation and Flood
Prevention
$42,000
0007
PW
West End Pump Station No.2
Upgrade
To better address flooding in the
area, the pump station will be
upgraded to increase capacity
501 Tamiami Canal Road
1,4
Sea Level Rise Mitigation and Flood
Prevention
$44,000
0008
PW
West End Pump Station No, 3
Upgrade
To better address flooding in the
area, the pump station will be
upgraded to increase capacity
6250 Tamiami Canal Road
1,4
Sea Level Rise Mitigation and Flood
Prevention
$44,000
0009
PW
End Pump Station No. 4
Upgrade
To better address flooding in the
area, the pump station will be
area,
upgraded to increase capacity
Brickell Avenue median and SE 12th
St.
1 4
Sea Level Rise Mitigation and Flood
Prevention
$44,000
0010
PW
Brickell Avenue Pump Station
Upgrade
To better address flooding in the
area, the pump station will be
upgraded to increase capacity
7747 NE 8th Avenue
2
Sea Level Rise Mitigation and Flood
Prevention
$164,000
0011
PW
Belle Meade Pump Station Upgrade
To better address flooding in the
area, the pump station will be
upgraded to increase capacity
1515 NW Sth Avenue
5
Sea Level Rise Mitigation and Flood
Prevention
$189,000
0012
PW
Overtown Pump Station Upgrade
To better address flooding in the
area, the pump station will be
upgraded to increase capacity
NW 71st St from N. Miami Avenue
to NW 17th Ave
5
Sea Level Rise Mitigation and Flood
Prevention
$719,000
0015
PW
Maceo Pipe and Manhole
Lining for Pump Station Influent
To better address flooding in the
area, the pump station will be
area,
upgraded to increase capacity
5105 NW 7th Street
1
Sea Level Rise Mitigation and Flood
Prevention
$516,000
0016
PW
Belle Meade Pump Station Pipe and
Manhole Lining for Pump Station
Influent
To increase pump station capacity,
the pipe and manhole lining will be
upgraded
7747 NE 8th Avenue
5
Sea Level Rise Mitigation and Flood
Prevention
$987,000
Printed: 7/19/2017
Submitted into the publ\_ Page 1
record for items)
on 1 In 11 . City Clerk
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
0017
PW
General Storm Sewer Improvements
Citywide
Citywide
CW
Sea Level Rise Mitigation and Flood
Prevention
$5,000,000
0019
PW
Street Condition Category 5 - Very
Poor 10.73 miles of Reconstruction
Citywide
Citywide
CW
Roadway Improvements
$21,838,000
0024
CI
Drainage in Basin Auburn Storm
Sewer Ph. I & II
Stormwater Management System to
address flooding in areas identified
in the pre-2012 Stormwater
Management Master Plan.
Areas within the Auburndale
Neighborhood
4
Sea Level Rise Mitigation and Flood
Prevention
$3,564,000
0027
CI
Drainage in Basin Belle Meade
Storm Sewers Ph. I
Stormwater Management System to
address flooding in areas identified
in the pre-2012 Stormwater
Management Master Plan.
Areas within the Belle Meade
Neighborhood
5
Sea Level Rise Mitigation and Flood
Prevention
$771,000
0028
CI
Drainage in Basin Fairway Storm
Sewers
Stormwater Management System to
address flooding in areas identified
in the pre-2012 Stormwater
Management Master Plan.
Areas within the Fairway
Neighborhood
5
Sea Level Rise Mitigation and Flood
Prevention
$3,832,000
0029
Cl
Drainage in Basin Garden Storm
Sewer - Phase I
Stormwater Management System to
address flooding in areas identified
in the pre-2012 Stormwater
Management Master Plan.
Areas within the Melrose
Neighborhood
1
Sea Level Rise Mitigation and Flood
Prevention
$3 743,000
0030
CI
Drainage in Basin Lawnview Storm
Sewer
Stormwater Management System to
address flooding in areas identified
in the pre-2012 Stormwater
Management Master Plan.
Areas within the Lawnview
Neighborhood
3
Sea Level Rise Mitigation and Flood
Prevention
$2,673,000
0031
CI
Drainage in Basin Liberty Storm
Sewers
Stormwater Management System to
address flooding in areas identified
in the pre-2012 Stormwater
Management Master Plan.
Areas within the Liberty Square
Neighborhood
5
Sea Level Rise Mitigation and Flood
Prevention
$3,832,000
Submitted into the publ'
record for item4Is) t , ?j
on % /Z% 1 11. City Clerk
Printed: 7/19/2017
Page 2
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
0032
Cl
Drainage in Basin Little River Storm
Sewers Ph. II
Stormwater Management System to
address flooding in areas identified
in the pre-2012 Stormwater
Management Master Plan.
Areas within the Little River
Neighborhood
5
Sea Level Rise Mitigation and Flood
Prevention
$2 818,000
0033
CI
Drainage in Basin Reid Acres Storm
Sewers
Stormwater Management System to
address flooding in areas identified
in the pre-2012 Stormwater
Management Master Plan.
Areas within the Little River
Industrial Neighborhood
5
Sea Level Rise Mitigation and Flood
Prevention
$706,000
0034
Cl
Drainage in Basin C4-S-17
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Flagami Neighborhood
4
Sea Level Rise Mitigation and Flood
Prevention
$2,040,000
0035
CI
Drainage in Basin C4-S-18
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Flagami Neighborhood
4
Sea Level Rise Mitigation and Flood
Prevention
$13,216,000
0036
CI
Drainage in Basin C4-S-23
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Flagami and Lejeune
Gardens Neighborhoods
1, 4
Sea Level Rise Mitigation and Flood
Prevention
$8,275,000
0037
CI
Drainage in Basin C6-N-17
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Melrose Neighborhood
and the Allapattah Industrial District
1
Sea Level Rise Mitigation and Flood
Prevention
$11,406,000
0038
CI
Drainage in Basin C6-S-12
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within North Grapeland
Heights Neighborhood
1
Sea Level Rise Mitigation and Flood
Prevention
$7,777,000
0039
Cl
Drainage in Basin CC4-S-21
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within the Liberty Square and
Northwestern Estates
Neighborhoods
5
Sea Level Rise Mitigation and Flood
Prevention
$14,052,000
0040
CI
Drainage in Basin CC6-N-11
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Hadley Park
Neighborhood
5
Sea Level Rise Mitigation and Flood
Prevention
$12,408,000
Printed: 7/19/2017
Submitted into the public _
record fq r ite (s) , 5
on 7 1 E7 / 1 1 . City Clerk
Page 3
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
0041
CI
Drainage in Basin CC6-N-12
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Melrose Neighborhood
1
Sea Level Rise Mitigation and Flood
Prevention
$4,730,000
0042
CI
Drainage in Basin CC7-5-21
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Flagami Neighborhood
4
Sea Level Rise Mitigation and Flood
Prevention
$5,802,000
0043
CI
Drainage in Basin CC7-S-24
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Edison, Little River
Industrial District, Little River Central
Neighborhoods
5
Sea Level Rise Mitigation and Flood
Prevention
52,836,000
0044
CI
Drainage in Basin CC7 S 25
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within King Heights, Orchard
Villa Neighborhoods
5
Sea Level Rise Mitigation and Flood
Prevention
$8,034,000
0045
CI
Drainage in Basin CC7-S-26
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Flora Park, Hadley Park
and Orchard Villas Neighborhoods
5
Sea Level Rise Mitigation and Flood
Prevention
$2,814,000
0046
CI
Drainage in Basin SB04
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within West Grove
Neighborhood
2
Sea Level Rise Mitigation and Flood
Prevention
$12,818,000
0047
CI
Drainage in Basin SB06
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Douglas Park
Neighborhood
4
Sea Level Rise Mitigation and Flood
Prevention
$3,311,000
0048
CI
Drainage in Basin SB09
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Douglas Park
Neighborhood
2, 4
Sea Level Rise Mitigation and Flood
Prevention
$4,259,000
0049
CI
Drainage in Basin SB10
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Coral Gate and
Parkdale South Neighborhoods
4
Sea Level Rise Mitigation and Flood
Prevention
$1,876,000
0050
CI
Drainage in Basin SB12
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Douglas Park and Silver
Bluff Neighborhoods
2 4
Sea Level Rise Mitigation and Flood
Prevention
$9 g66,000
Printed: 7/19/2017
Submitted into the publ'
record for items) 1'1L . 3
on IL7 i . City Clerk
Page 4
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
0051
CI
Drainage in Basin SB13
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within La Pastorita and Coral
Gate Neighborhoods
4
Sea Level Rise Mitigation and Flood
Prevention
$5,913,000
0052
Cl
Drainage in Basin SB14
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Silver Bluff
Neighborhood
4
Sea Level Rise Mitigation and Flood
Prevention
$7,505,000
0053
Cl
Drainage in Basin SB18
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Miami Avenue, Bay
Heights, East Grove, Fair Isle, North
Grove and Grove Center
Neighborhoods.
2
Sea Level Rise Mitigation and Flood
Prevention
$4,728,000
0054
CI
Drainage in Basin 5820
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Auburndale
Neighborhood
4
Sea Level Rise Mitigation and Flood
Prevention
$11,201,000
0060
CI
Drainage in Basin SB34
Stormwater Management System to
address flooding in areas identified
in the 2012 Stormwater
Management Master Plan.
Areas within Latin Quarter
Neighborhood
3
Sea Level Rise Mitigation and Flood
Prevention
$7,056,000
0091
PR
ADA Mandates and Aging Friendly
Improvements
Retrofitting of walkways, steps,
access points, and facilities to be
compliant with DOJ agreement, and
make parks friendly to those with
limited mobility.
City wide
CW
Parks and Cultural Facilities
$5,000,000
0092
PR
Legion Park Enhancements
Renovation and necessary
replacements to the park amenities
and facility. Maintain historical
structure and address aging site
fixtures, walkways, lighting, and
playground.
6448 NE 7th Avenue (33138)
5
Parks and Cultural Facilities
$1,000,000
0093
PR
Armbrister Park Enhancements
Provide updated facility and
amenities at the park to complete
the renovation of the park started in
2013 with the new field.
236 Grand Avenue (33133)
2
Parks and Cultural Facilities
$3,000,000
0094
PR
Buena Vista Park Enhancements
Funding to allow
renovation/replacement of current
facility and site amenities at the
park.
5300 NW 2nd Avenue (33127)
5
Parks and Cultural Facilities
$1,500,000
Printed: 7/19/2017
Submitted into the public
record for ite (s) 1, , 3
on 7 (Z7 I I7 • City Clerk
Page 5
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
0095
PR
Curtis Park Enhancements
Complete renovation of park to
Facilitate a new recreation
building/gymnasium, and allow
parking, walkway, lighting,
restroom, and sport court
improvements. Deliver to the district
a regional park offering a variety of
amenities in addition to the current
track, artificial turf sports field, and
pool.
1901 NW 24th Avenue (33125)
1
Parks and Cultural Facilities
$7,500,000
0096
PR
Dorsey Park Enhancements
Renovate and replace amenities at
the park to facilitate the delivery of
state of the art and improved access
for all residents. Allow a general
plan process to design recreation
facilities that meet the needs of the
neighborhood.
1701 NW 1st Avenue (33136)
5
Parks and Cultural Facilities
$1,000,000
0099
PR
Juan Pablo Duarte Park
Enhancements
Allow a general plan process to
design recreation facilities that meet
the needs of the neighborhood.
Renovate and replace amenities at
the park to Facilitate the delivery of
state-of-the-art and improved
access for all residents. Incorporate
energy efficient upgrades to provide
long-term savings for the City.
1776 NW 28th St. (33142)
1
Parks and Cultural Facilities
$3,000,000
0101
PR
Lemon City Park Enhancements
Allow a general plan process to
design recreation facilities that meet
the needs of the neighborhood.
Renovate and replace amenities at
the park to facilitate the delivery of
state-of-the-art and improved
access for all residents. Incorporate
energy efficient upgrades to provide
long-term savings for the City.
27 NE 58th St. (33137)
5
Parks and Cultural Facilities
$1,500,000
Printed: 7/19/2017
Submitted into the public r
record for ite (s) `N , 21
on 1 (L7li% . City Clerk
Page 6
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
0102
PR
Morningside Park Enhancements
Implementation of design
recommendations from current
ongoing General Plan. Provide the
ability to renovate and rebuild areas
to better meet user needs for the
park, to include a possible new pool
due to current one being deemed
structurally unsafe. Allow improved
waterfront access and drainage in
the park, and expand programming
capacity of current facilities.
750 NE 55th Terrace (33137)
2
Parks and Cultural Facilities
$5,500,000
0103
PR
Range Park Enhancements
Develop a program plan that
identifies neighborhood needs to
direct the renovation and
replacement of current facilities
with consideration of an older onsite
recreation center. Facilitate overall
park improvements that allow
improved access, walking paths,
security features, lighting
improvements, upgrades to
mechanical equipment of pool
facilities, etc. Make this a Regional
destination park for the community.
525 NW 62nd St. (33150)
5
Parks and Cultural Facilities
$11,500,000
0108
PR
West End Park Enhancements
New pool facility based on structural
assessment that has deemed the
facility at the end of its lifecycle.
250 SW 60th Avenue (33144)
4
Parks and Cultural Facilities
$5,000,000
0111
PR
Citywide Safety
Parks security lighting
enhancements.
City wide
CW
Parks and Cultural Facilities
$2,000,000
0126
FR
Fire Station 10 Renovation
Fire Station 10 Renovation
4101 NW 7 Street
CW
Police and Fire Infrastructure
$7,000,000
0272
DDA
Permanent Public Restrooms
Two additional locations
Downtown
2
Parks and Cultural Facilities
$400,000
Printed: 7/19/2017
Submitted into the publ,�C ' 3
record f ite Page 7
on 7 IL7f1rC. 1 . City Clerk
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
0273
DDA
Citywide Lighting Improvements
Install new lighting
Citywide
2
Roadway Improvements
$1,000,000
0283
PF
Cultural and Historic Facilities
Renovation and improvement of
existing cultural and historic facilities
in the City of Miami
Citywide
2
Parks and Cultural Facilities
$10,000,000
0285
PR
Town Park
17 Street and 5 Avenue
5
Parks and Cultural Facilities
$300,000
Total
$300,000,000