HomeMy WebLinkAboutR-17-0214City of Miami
Resolution R-17-0214
Legislation
City Hall
3500 Pan American Drive
Miami, FL 33133
www.miamigov.com
File Number: 2086 Final Action Date: 5/11/2017
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
AUTHORIZING THE CITY MANAGER TO EXECUTE A CONSTRUCTION AND
MAINTENANCE AGREEMENT, IN SUBSTANTIALLY THE ATTACHED FORM,
WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION TO
ACCOMMODATE THE BRIDGE RECONSTRUCTION OVER COMFORT
CANAL AT APPROXIMATELY NORTHWEST 34TH AVENUE, MIAMI, FLORIDA
FROM APPROXIMATELY NORTH OF STATE ROAD 836/DOLPHIN
EXPRESSWAY TO NORTHWEST 14TH STREET, MIAMI, FLORIDA, A ROAD
NOT ON THE STATE HIGHWAY SYSTEM.
WHEREAS, the Florida Department of Transportation ("FDOT") has developed design
plans for Financial Management ("FM") No. 426113-1-52-01, a roadway project; and
WHEREAS, reconstruction of the Northwest 34th Avenue Bridge from approximately
North of State Road 836/Dolphin Expressway to Northwest 14th Street, Miami, Florida and the
project shall include, but may not be limited to bridge reconstruction, asphalt pavement
reconstruction, milling and resurfacing of existing pavement, new sidewalk construction, new
signage, and pavement markings ("Project"); and
WHEREAS, the Construction and Maintenance Agreement ("Agreement"), in
substantially the attached form, establishes the terms, conditions and responsibilities of the
FDOT and the City of Miami ("City") to accomplish the improvements on the City's streets; and
WHEREAS, the City concurs with the proposed Project and overall upgrading and
enhancement of the area; and
WHEREAS, the City agrees with the terms and conditions in the Agreement, in
substantially the attached form;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF
MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are
adopted by reference and incorporated as if fully set forth in this Section.
Section 2. The City Manager is authorized1 to execute the Agreement, in substantially
the attached form, with the FDOT, to accommodate the bridge reconstruction over Comfort
Canal by the FDOT at approximately Northwest 34th Avenue, Miami, Florida from approximately
North of State Road 836/Dolphin Expressway to Northwest 14th Street, Miami, Florida.
1 The herein authorization is further subject to compliance with all requirements that may be imposed by
the City Attorney including but not limited to those prescribed by applicable City Charter and City Code
provisions.
City of Miami Page 1 of 2 File ID: 2086 (Revision:) Printed On: 3/21/2025
File ID: 2086 Enactment Number: R-17-0214
Section 3. This Resolution shall become effective immediately upon its adoption and
signature of the Mayor.2
APPROVED AS TO FORM AND CORRECTNESS:
endez, City Httor4/28/2017
2 If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10) calendar days
from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective
immediately upon override of the veto by the City Commission.
City of Miami Page 2 of 2 File ID: 2086 (Revision:) Printed on: 3/21/2025