Subject: Terminate JPA - So. Miami Ave. Drainage Improvements Project
Purpose of Item:
Resolution authorizing the City Manager to terminate the Joint Participation Agreement
between Miami -Dade County and the City of Miami for the construction of South Miami
Avenue Drainage Improvements, Project B-30637A, that runs along South Miami
Avenue from SW/SE 12 Street to SW/SE 10 Street, Miami, Florida.
Background of Item:
Miami -Dade County Department of Transportation and Public Works has a highway
engineering project that will overlap with the City's proposed drainage improvements
along South Miami Avenue. The County's project runs along South Miami Avenue from
SW 8 Street to SE 15 Road, Miami, Florida; whereas the City's project runs along South
Miami Avenue from SW/SE 12 Street to SW/SE 10 Street, Miami, Florida. As a result, it
would not be constructive to continue the design and construction of two separate
drainage improvements projects overlapping the same street segment. Furthermore,
the drainage structures to be installed by the City would need to be replaced/relocated
during the County's project to accommodate the proposed streets' new cross section.
Nevertheless, the new drainage improvements proposed by the County will improve the
City's flood control measures as originally intended in regard to the City's storm water
pump station currently in construction under a separate project, Project B-30637, Mary
Brickell Drainage Improvements.
Budget Impact Analysis
Item has NOT an Expenditure
Item is NOT funded by Bonds
Item is NOT Related to Revenue
Total Fiscal Impact:
N/A
Reviewed B
Office of Capital Improvements Jeovanny Rodriguez Department Head Review Completed 03/07/2017 2:05 PM
Office of Management and Budget Yvette Smith Budget Analyst Review Completed 03/16/2017 9:56 PM
Office of Management and Budget Christopher M Rose Budget Review Completed 04/03/2017 12:03 PM
City Manager's Office Alberto N. Parjus Assistant City Manager Review Completed 04/04/2017 9:03 AM
Office of the City Attorney Valentin J Alvarez Legislative Division Review Completed 04/04/2017 9:17 AM
City Manager's Office Daniel J. Alfonso City Manager Review Completed 04/04/2017 3:05 PM
Office of the City Attorney Barnaby L. Min Deputy City Attorney Review Completed 04/04/2017 5:13 PM
Office of the City Attorney Victoria Mendez Approved Form and Correctness Completed 04/04/2017 6:31 PM
City Commission Nicole Ewan Meeting Completed 04/13/2017 9:00 AM
Office of the Mayor Mayor's Office Signed by the Mayor Completed 04/19/2017 2:17 PM
Office of the City Clerk City Clerk's Office Signed and Attested by the City Clerk Completed 04/19/2017 2:30 PM
City of Miami
Legislation
Resolution
Enactment Number: R-17-0170
City Hall
3500 Pan American Drive
Miami, FL 33133
www.miamigov.com
File Number: 1902 Final Action Date:4/13/2017
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
AUTHORIZING THE CITY MANAGER TO EXECUTE THE TERMINATION OF THE
JOINT PARTICIPATION AGREEMENT, IN SUBSTANTIALLY THE ATTACHED FORM,
BETWEEN MIAMI-DADE COUNTY ("COUNTY") AND THE CITY OF MIAMI ("CITY"),
ENTERED INTO JULY 3, 2012, FOR THE CONSTRUCTION OF SOUTH MIAMI
AVENUE DRAINAGE IMPROVEMENTS, PROJECT NO. B-30637A, WHICH RUNS
ALONG SOUTH MIAMI AVENUE FROM SOUTHWEST/SOUTHEAST 12 STREET TO
SOUTHWEST/SOUTHEAST 10 STREET, MIAMI, FLORIDA; SUCH TERMINATION
BEING EFFECTIVE IMMEDIATELY UPON SIGNATURE BY BOTH THE CITY AND
THE COUNTY.
WHEREAS, pursuant to Miami -Dade County ("County") Resolution No. 563-12 and City
of Miami ("City") Resolution No. 12-0142, the parties hereto entered into a Joint Participation
Agreement ("JPA") to facilitate the construction of South Miami Avenue Drainage
Improvements, Project B-30637A ("Project"), which runs along South Miami Avenue, from
Southwest/Southeast 12 Street to Southwest/Southeast 10 Street, Miami, Florida; and
WHEREAS, the drainage improvements planned as part of the original Project will be
included in the County's Department of Transportation and Public Works engineering project
that runs along South Miami Avenue, from Southwest 8 Street to Southeast 15 Road, Miami,
Florida; and
WHEREAS, since the Project is no longer needed and such improvements will no longer
be provided by the City, the County has drafted a resolution terminating the JPA, in substantially
the attached form; and
WHEREAS, such termination of the JPA shall be in its entirety and effective immediately
upon execution by both the City and the County; and
WHEREAS, the Project involved reimbursement funding to be provided to the City by the
County, but since the Project has not occurred, no reimbursement or further action by either
party, subsequent to signature, is necessary to terminate the JPA;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF
MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are
adopted by reference and incorporated as if fully set forth in this Section.
Section 2. The City Manager is authorized1 to execute the termination of the JPA, in
1 The herein authorization is further subject to compliance with all requirements that may be imposed by
the City Attorney including but not limited to those prescribed by applicable City Charter and City Code
provisions.
substantially the attached form, between the County and the City, entered into July 3, 2012, for
the construction of South Miami Avenue Drainage Improvements, Project B-30637A, which runs
along South Miami Avenue from Southwest/Southeast 12 Street to Southwest/Southeast 10
Street, Miami, Florida; such termination being effective immediately upon signature by both the
City and County.
Section 3. This Resolution shall become effective immediately upon its adoption and
signature of the Mayor.2
APPROVED AS TO FORM AND CORRECTNESS:
ndez, City Attor
4/4/2017
2 If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10) calendar days
from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective
immediately upon override of the veto by the City Commission.