Loading...
HomeMy WebLinkAboutBack-Up DocumentSunshine State Air Conditioning - Refrigeration State license. CAC1816239 REVISED PROPOSAL Proposal Submitted To: City of Miami — Attn: Andrew Schimmel Phone: 305-416-1457 Fax: 305-416-5061 Email: aschimmel@miamigov.com Date: November 21, 2016 Work To Be Performed At: Manuel Artime Theatre 900 SW 111 Street Miami, FL 33130 We hereby propose to furnish the materials and perform the labor necessary for the completion of A/C system as per site visit and scope of work: 1. Furnish and Install (1) 80 Ton Chiller as follows: Qty Tag(s) Model 1 CH-1 , YLAA0080 Description Air Cooled Chiller 80 Tons • Micro Channel coils • Scroll Compressors • R410a Refrigerant • Dual Pump Package with VFD • Low Noise fans and compressor blankets • Coated Condenser Coil for Corrosion protection o Controls tie in, controller, sensors, wiring, and graphics J 5 Years parts and labor 2. Provide a new 4" concrete pad for Chiller, 3. Trench digging and underground chilled water piping to building. 4. Resurface trench path with asphalt. 5. Run underground pre -insulated schedule 40 Pipe with HDPE Jacket 6. Furnish and install three way valve and necessary fittings for connection of chiller water lines to two air handlers units. 7. Furnish and Insta I (2) New Chilled Water Air Handler on the South Side as follows: Qty Tag(s) Model Description 2 AHU-1,2 XTI Solution Chilled Water Air Handler (Indoor) 15,000 CFM • Foam injected R13 Insulation Double Wall Construction • Galvanized Panels • Filter section with 2" MERV Proposal# 10905_Rev5 Pagel of 3 • Chilled Water Coil with SS Drain Pan • Supply Fan • Includes: Controller, Valve, CO2 Sensors, to Control OA Damper, wiring & graphics 8. Run Fiberglass ductwork R6 1.5" for main duct on attic space for supply. 9. Reconnect existing branches to new main ductwork. 10. Existing main ductwork to remain on attic. 11. Run galvanized sheet metal for mechanical room ductwork and exhaust as needed as per Smacna., standards. 12. Insulate supply ductwork with duct wrap with 1 1/2" R6 insulation at mechanical room only. 13. Existing 80 tons air handler , compressors, pumps and cooling tower to remain on place. 14. Provide, wire and install (1) Complete Automated Johnson Control System as follows: • Web Enabled Site with 3D Graphics • Chiller Control: Start/Stop/ Status, Flow, Scheduling, Alarms. • Pumps Control Qty (2): Start/Stop/Status • Air Handlers Control Qty (1): DP Switch Filter, Chilled Water Valve, LAT Sensor, EAT Sensor, Fan On/Off/Status, OA Damper Control based on CO2 Sensor on Space. • Owner Training and Commissioning 2 Days 15. Run all new electrical wires to feed both air handler units as well as chiller. 16. Provide Test and Balance report for Water & Air Systems by an independent certified contractor. 17. Start up and check proper operation. 18. Provide seal and sign Engineering drawings by Florida P.E. for permitting as well as As- Builts. 19. Crane service. 20. Warranty is one year on labor and materials.( except the chiller which have a five year parts and labor warranty) 21. Intermediate removal and disposal of Cooling Tower and Chain Link Fence. All material is guaranteed to be as specified, and the above work to be completed in a substantial workmanlike manner, with payments to be made as follows: EXCLUSIONS 1. Asbestos removal if needed. 2. Ceiling insulation by others. 3. Permit by owner. 4. Portable AC furnished by owner Proposal# 10905_Rev5 Page 2 of 3 PAYMENTS Total Job is: $ 473,250.00 Note: If permit costs are substantially more contractor reserves the right to request difference from the Owner. Due 11/21/2016. $180,000.00 to order equipment, mobilization, & immediate removal of cooling tower Due 01/09/2017: $150,000.00 upon arrival of equipment Due 01/20/2017: $143,250.00 at completion of project Any alteration or deviation from above specifications involving extra costs will be executed only upon written order, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our controls Respectfully Submitted By: Suer shine State Air , Ip . 1-17 Note - This proposal may be withdrawn by us if not accepted within 30 days Gilda Correa ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payments will be made as outlined above. Print Name & Title Signature Date Proposal# 1 0905_Rev5 Page 3 of 3