Loading...
HomeMy WebLinkAboutExhibit ASeptember 1, 2016 Biscayne Apartments LLC ATIN: William T. Fabbri 27 Edgewater Midtown, LLC ATTN: Brett Greet Moss Greenberg Traurig P.A. c/o Ryan D. Bailine 333 SE 2 Avenue, Suite 4400 Miami, FL 33131 EXHIBIT "A" Tlie Richman Group of Florida; ,Inc. Greenberg T'raurig P.A. c/o Ryan D. Bailine 477 S. Rosemary Avenue Suite 301 West Palm Beach, FL 33401 DANIEL J. ALFONSO City Massager RODRIGUEZ SUBDIVISION TENTATIVE PLAT #1875—A (FIRST RESUBMITTAL LOCATED BETWEEN NE 27 STREET AND NE 28 STREET FROM BISCAYNE OULEVARD BOULEVARDTO APPROXIMATELY-730 FEET TO THE EAST Ladies and Gentlemen: The City of Miami Plat and Street Committee, at its meeting of Sembe, APPROVED the above tentative plat subject to the following revisions being made to the tentative plat, additional information being providedand/or variances being granted. Please be advised that the processing of your tentative plat cannot proceed until these conditions and/or comments have been satisfied: Standard Comments 1, Utilities located within the alley to be closed and vacated must be relocated or easements provided, 2. Verify with Miami -Dade County that the plat narne is acceptable: 3. All encroachments across proposed tract and/or lot lines must be removed prior to final plat submittal,: 4. An Opinion :of Title, in the City of Miami Opinion of Title form, must be provided at the time of final plat submittal. 5 Current backup documentation will be required for all who execute the final plat. A resolution for authority to execute documents and a Certificate of Good standing from the Secretary of State are required, if applicable. 6. Tentative plat application must be made with Miami -Dade County after receiving approval from the City of Miami Plat and Street Committee. 7. Be advised that an incomplete final plat package will not be accepted by the City of Miami. It is the owner's responsibility to work with his/her surveyor and attorney to assure that everything is in. order before submitting the final plat package. 8. Be advised that if all the requirements for scheduling the final plat for the City Commission action are not in order, the final plat will not be scheduled for a City Commission meeting. Public Works 9 Show the City of Miami Resolution number for the alley closure on the main sketch. 10. Provide existing elevations along base building line on 20'-25' intervals. 11..A formal notice to and acknowledgement from the Supervisor of Plats for the cancellation of the previously approved Rodriguez Subdivision tentative plat ##1811-B must be provided, DEPARTMENT OF PUBLIC WORKS 414 SW.2nd Avenue, 5th Floor / Miami, FL 33130 / (305) 416-1200 / Fax; 005) 416-1278. Mailing Address: t'.0, Box.330708 Miarni, FL 33233-0708 1 .SUi3PJVi4 ON —TENTATIVE PLAT 1875-A (FIR T RpSl1l M1 TAL) Septet pa 1,f 2016 Page2o 12. For it fortttatianal purposes only, in accordance with City Code Section i$-15(b), the Plat and Street Committee, by vote- of 7 to 0, has determined that the revised tentative plat of Rodriguez Subdivision, 411375 .is Compatible with .the previously approved alley closure and vacation Resolution #R 13.0472 adopted November 21, 2013,.. mining/Zoning 13. For informational purpose only a) A waiver is required for any modification to the existing structures that are to remain. b) Existing structures, site improvements and asphalt that are to remain shall remain as it is. Any changes must be in compliance With current Miami 21 regulations, 6) An exception will be required if future developtnent requires a Unity of Title that inereases the lot size beyond the maximurn lot size foi the Zoning Transect, 14, Provide zoning boundary/limit on main sketch wilding 15. Corteet flood zone lime on main sketch. I n addition tothe above requirements., you should be awareof the folloyving: 1 State and local laws require the installation of various physical iinprovetnents in the public rights of -Way when property is platted. These subdivision improvements include' paving, drainage, landscaping, sidewalks, ete. in some cases this could represent a substantial investrnent on your part. REQUIRED: The submission of art electronic copy of the tentative plat, in an, AutoCAD version, to the City of Miami Public Works Department, Roadway Plans Section will 'EXPEDITE the preparation and enitanee the ACCURACY of 'the subdivi ton irnprovetrient letter required, fo • the final plat approval. The alteration, relocation or 'mutilation of utilities such as storm and:sanitary sewers, electric, telephone, water, ete, Caused by this plat will be .at the "property owner's expense. Also, utility easements may be required On the property being platted. A building permit will not be issued on the property being platted until the final plat is recorded or as authorized by the City of Miami Code Section 5540(i). Also, the Certifieateof.Occepaney for atiy building eonstruetion will be issued only after- all the required subdivision improvements have. been completed. 4.. Approval for fire flow tttust be obtained from the Fireaescue Department "prier to the issuance of a building penult, 5, fit order to -Mitigate problems associated with access and construction activities throughout the neighborhood, the contractor/developer is encouraged to notify the affeeted neighborhood residents; in writing, of the project starting end eompletieri dates at the time of issuance of permits. The contractor/developer may coordinate the notification of residents with the local City of Miami NET 'Service Center, 6> Additional heirs rnust. be provided to the City of Miarni Department of Public Works before the Final plat is submitted to the City Commission for approval. You will be notified in writing as to what these .items aro after the .arriount of the bond has been .determined :for the necessary subdivision improvetnents. It is required that the applicant contacts die City of Miami Public Works Survey Section to verify that all final plat submittal doeuinents are complete .prior to final plat submittal. ?., 'Tentative plat approval is only valid for one (1) year and six (6) months from the date of the Plat and Street Coiurnittee meeting at whichtime it was approved. korguouEz suBnivl SIM —TENTATIVE PLATIA1.875-A(PIRST RESIII31VIITTAL) September I, 2016 Page 3 cf3 if you have any questions concerning these requirements, please referto the attached sheet for the approriate person to contact, S"ncerely E ) gantarnaria, P.E., CGC Diz�etbr of fubIic Works ES/A3/an/1(c Enclosure: Contact •Sheet C: Schwebke Shiskin & Associates, Inc, 3240 Corporate Way Miramar, EL 33025 Darlene Gonzalez Greenberg Traurig 333 SE 2 Avenue, Suite-4400 Miami, FL33131 :Platand Street Committee Members 'NXe.fihd Ihekwaba, PhD., PJ3., AsSia.(atlt:CitY Ma0agellehiCl'of Operations Survey Veveloptnent anciRoachitay Plans %Central