HomeMy WebLinkAbout2553 Submittal-SEOPW-Presentation on Town Park Plaza North RehabSubmitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
Town. ParkPlaza
rth Rehabilita
ogress Update — June 2017
Films42553 - Sohmi+frcL!- sEOPvAl- P ifafioii On rDWn Park Pia z_a
IJovfh ReIth
4, 0
Project Location
Overview:
• 169 Condominium Units
• 20 Residential Buildings & Clubhouse
• Temporary Relpcation of Residents
• Full -Gut Renovation
• SitewOrWCommon Area Upgrades
4,
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
•?.
1,1J J
4.)
-nii.00,61471;51
I 1
10 T
WLSt
. •
(mo
,Nvviv4th,Tie„,9-ce
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
Existing Conditions
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
What Are We Doing?
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
❑ Site Improvements
What Are We Doing?
• Drainage System Repairs/Replacement
• New Water & Sewer Lines Throughout
• New Individual Water Metering
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
Site Improvements
• Drainage System Repairs/Replacement
• New Water & Sewer Lines Throughout
• New Individual Water Metering
• New Asphalt Parking & Drives
• Sidewalk Improvements
What Are We Doing?
,
ID Site Improvements
Drainage System Repairs/Replacement
•
• New Water & Sewer Lines Throughout
• New Individual Water Metering
• New Asphalt Parking & Drives
• Sidewalk Improvements
4 41k
• Perimeter Fencing with Powered Gates
• Landscaping '1,1k\
What Are We Doing?
•
'011.
^ ,
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
07/02/2010
L3 Site Improvements
What Are We Doing?
• Drainage System Repairs/Replacement
• New Water & Sewer Lines Throughout
• New Individual Water Metering
• New Asphalt Parking & Drives
• Sidewalk Improvements
• Perimeter Fencing with Powered Gates
• Landscaping
• New Playgrounctn.d *Site Lighting
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
-4 4
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
❑ Site Improvements What Are We Doing?
• Drainage System Repairs/Replacement
• New Water & Sewer Lines Throughout
• New Individual Water Metering
• New Asphalt Parking & Drives
• Sidewalk Improvements
• Perimeter Fencing with Powered Gates
• Landscaping
• New Playground and Site Lighting
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
❑ Site Improvements
• Drainage System Repairs/Replacement
• New Water & Sewer Lines Throughout
• New Individual Water Metering
• New Asphalt Parking & Drives
• Sidewalk Improvements
• Perimeter Fencing with Powered Gates
•
Landscaping
• New Playground and Site Lighting
�.w r :
U New Metal Roofing with 40-ear Life
•
What Are We Doing?
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
What Are We Doing?
Drainage System Repairs/Replacement
New Water & Sewer Lines Throughout
New Individual Water Metering
New Asphalt Parking & Drives
• Sidewalk Improvements
• Perimeter Fencing with Powered Gates
• Landscaping
• New Playground f ind Site Lighting
U New Metal Roofing with 40ear Life
*"7 Impact"esistant Windows and D9prs'
❑ Site Improvements
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
What Are We Doing?
• Drainage System Repairs/Replacement
• New Water & Sewer Lines Throughout
• New Individual Water Metering
• New Asphalt Parking & Drives
• Sidewalk Improvements
• Perimeter Fencing with Powered Gates
• Landscaping a
• New Playground end Site Lighting
❑ New Metal Roofing with 40" gear Life
"t Impact esistant Windows and Doors
❑ Facade rovements to ttovide New Look
set
Irp
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
Site Improvements
• Drainage System Repairs/Replacement
• New Water & Sewer Lines Throughout
What Are We Doing?
• New Individual Water Metering
• New Asphalt Parking & Drives
• Sidewalk Improvements
•
• Perimeter Fencing with Powered Gates
• Landscaping
• New Playground ,and 'Site Lighting
• • *
CI New Metal Roofing with 40-n(ear Life
Impe Fsistant Windows and Doors
Facade provemeits lo provide New Look
.""*
ffiterior G t\Repnevatem
• tAsbest tmaval
❑ Site Improvements
• Drainage System Repairs/Replacement
• New Water & Sewer Lines Throughout
• New Individual Water Metering
• New Asphalt Parking & Drives
• Sidewalk Improvements
What Are We Doing?
• Perimeter Fencing with Powered Gates
• Landscaping "' 4
•
New Playground ,and Site Lighting
❑ New Metal Roofing with 40--`Year Life
'° ] Impac(esistant Windo\vs and Doors
❑ Facade provemerits to ovide New Look
Alb
U Interior G tR Renova it n
• Asbestos. Remckwal
• 1\retv Electrical Wiring & Lighting
• "New PlumbOorines and Plxtures
• tNewraming
ta
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
❑ Site Improvements
• Drainage System Repairs/Replacement
• New Water & Sewer Lines Throughout
• New Individual Water Metering
New spa ariA h It P Parking & Drives
•
Sidewalk Improvements
•
What Are We Doing?
• Perimeter Fencing with Powered Gates
• Landscaping
• New PlaygroundPlaygrouridnd Site LiKhting
CINew Metal Roofing with 40'`Year Life
I '"' Impact; esistant Windows and Doers
❑ Facade rovements toxtiovide New Look
❑ Interior G t, Renovation
• Asbestc RtinQval
• 'Ate'E1eet'rcal Wiring & Lighting
• view Plumb eines and Pixtures
• tNew,Framing
• New A/C Units, Ductwork, & Hot Water
k
•
• New Framing
• New A/C Units, Ductwork, & Hot Water
• New Drywall and Finishes
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
❑ Site Improvements What Are We Doing?
• Drainage System Repairs/Replacement
• New Water & Sewer Lines Throughout
• New Individual Water Metering
• New Asphalt Parking & Drives
• Sidewalk Improvements
• Perimeter Fencing with Powered Gates
4 lo•
410
• Landscaping
• New Playground end Site Lighting
❑ New Metal Roofing with 40-"Year Life
"15 Impacf esistant Windows and Dpors
❑ Facade ro'Jements to Provide New Look
❑ Interior G t Renovation
• Asbestos, Removal
• Nsecv Electrical Wiring & Lighting
• ,New Plumbing Lines and Fixtures
Submitted into the public
record inconnection with
Item z on 6'26'17
Todd o.Hannon
Clerk nfthe Board
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
Where Are We Now?
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
Where Are We Now?
Site Improvements:
• Water/sewer/utilitynfrastructure for 50%
of main campus is complete
Where Are We Now?
Site Improvements:
• Water/sewer/utility infrastructure for 50%
of main campus is complete
Roof Replacement:
• Fully completed on all 21 buil hn s
g
NIA/ 20th-S
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
N n-^,U1,CE.i
Where Are We Now?
Site Improvements: 1111.11M2
• Water/sewer/utility infrastructure for 50%
of main campus is complete
Roof Replacement:
• Fully completed on all 21 buildings
Exterior Impact Wind&ws & Doors:
Fu completed on all,21 buildings
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
VVWGCI ft-SL
Roof Replacement:
• Fully completed on all 21 buildings'
Exterior Impact VVindOw s& Doors:
• tVI.Iy completed on all 21 buildings
Irtterior ut genovations:
• •2t uirding are fully completed
Where Are We Now?
Site Improvements:
ft
NW 20(11 ST
of main campus is complete
• Water/sewer/utility infrastructure for 50% .,;1,
Dior!
,
qpmRlete
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
NW L9Lty'st"-
Where Are We Now?
Site Improvements: v\
• Water/sewer/utility infrastructure for 50% .11
of main campus is complete
Roof Replacement:
• Fully completed on all 21 buildings
Exterior Impact VVind6 'Ws & Doors:
• Fax completed on all 21 buildings
"*.
Interior t ribvations:
• f2t1iuitdingg are fully completed
• 4 Buildings In Progress - To be complete
Aligustiet#ptember 2017
041,
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
='Under Construction
Where Are We Now?
Site Improvements:
• Water/sewer/utility infrastructure for 50%
of main campus is complete
Roof Replacement:
• Fully completed on all 21 buildings
Exterior Impact Wind6ws & Doors:
• Fuy completed on all 21 buildings
Interior Wit. renovations:
• •20buitdingg are fully completed
4 Buildings n Progress - To be complete
.
in'Augue 2017
111*buildings yet to be started- (plans and
Ipermits are complete)
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
Submitted into the public
record in connection with
Item 1 on 6-26-17
Todd B. Hannon
Clerk of the Board
Town Park Plaza
North Rehabilitation
Progress Update — June 2017