Loading...
HomeMy WebLinkAbout1852 BackupFDDT SAFE. CONVENIENT. RELIABLE. RECONSTRUCTION 1-395 Reconstruction Project MDX SR 836 Improvements 1-95 Concrete Pavement Reconstruction SR 836 Westbound Connector Financial Project No.: 251688-1-52-01, 423126-1-52-01, 423126-2-52-01, 429300-2-52-01 Cit of Miami, Miami -Dade Count PROJECT CHARACTERISTICS The project begins on SR 836 at NW 17 Avenue and continues through the Midtown Interchange (I- 95/State Road 836/1-395) along 1-395 to the MacArthur Causeway Bridge for approximately 3 miles in the east - west direction. 1-395 is an Interstate Principal Arterial and a major east -west connector for the beaches and port; SR 836 is a Principal Urban Arterial that is also a major east -west connection to the Midtown Interchange. The project limits also include 1-95 from NW 8 Street to NW 29 Street. SR 9A/I-95 is an Urban Interstate Principal Arterial and major north -south connector to downtown Miami. There are both dense urban and residential areas within the project limits. The project will address roadway safety, corridor capacity, a variety of design issues, aesthetics, and provide a Signature Bridge design over Biscayne Boulevard. 1-395 RECONSTRUCTION PROJECT 1 SR 836 I-395 The 1-395 portion of the project involves the rebuilding of the 1-395 corridor from the I-95/Midtown Interchange to the MacArthur Causeway. Project improvements include • Increasing capacity • Improving safety by alleviating existing operation and geometric deficiencies • Building new elevated ramps: one eastbound and one westbound, that will provide a direct link between 1-95 and 1-395 • Building a Signature Bridge over Biscayne Boulevard • Building vertically higher structures that will improve the visual quality of the bridge and streetscape • Improving the area underneath the expressway by providing pathways and common activity areas. • Design/Build/Finance For More Information: www.I-395miami.com FDOT395 SAFE. CONVENIENT. RELIABLE. RECON511 C11C N 1-95 CONCRETE PAVEMENT RECONSTRUCTION The 1-95 portion of the project includes 1-95 from NW 8 St to NW 29 St. The project improvements include: • Removal and replacement of the existing mainline 1-95 concrete pavement • Bridge railing retrofit • Guardrail upgrade MDX SR 836 IMPROVEMENTS g (5B) 5R RA( l-95- !g (NB/ 5R 9PI I-95 The MDX 836 Improvements Project limits are NW 17 Avenue Interchange to the Midtown Interchange. Project improvements include: • Adds capacity to SR 836 mainline by adding a lane in each direction improving mobility and safety • Provides a new elevated eastbound ramp from NW 12 Avenue for traffic destined to northbound and southbound 1-95 and eastbound 1-395 separating these movements from the SR 836 mainline to the same destinations • Provides a new elevated ramp from southbound 1-95 to westbound SR 836 with an additional exit at NW North River Drive which eliminates the traffic operational conflicts between the westbound SR 836 exit to NW 12 Avenue and the 1-95 southbound entrance to westbound SR 836 SR 836 WESTBOUND CONNECTOR The SR 836 WB Connector project includes the construction of a 9A/I-95 southbound ramp to westbound SR 836. PROJECT SCHEDULE AND COST Project Segment 1-395 Reconstruction MDX SR 836 Improvements 1-95 Pavement Reconstruction WB Connector Planned Construction Schedule Estimated Construction Cost Begin Construction 2017 Estimated Construction time 5 years i $600M $186M $26M $35M For More Information: www.I-395miami.com