SAFE. CONVENIENT. RELIABLE.
RECONSTRUCTION
1-395 Reconstruction Project
MDX SR 836 Improvements
1-95 Concrete Pavement Reconstruction
SR 836 Westbound Connector
Financial Project No.: 251688-1-52-01, 423126-1-52-01, 423126-2-52-01, 429300-2-52-01
Cit of Miami, Miami -Dade Count
PROJECT CHARACTERISTICS
The project begins on SR 836 at NW 17 Avenue and
continues through the Midtown Interchange (I-
95/State Road 836/1-395) along 1-395 to the MacArthur
Causeway Bridge for approximately 3 miles in the east -
west direction. 1-395 is an Interstate Principal Arterial
and a major east -west connector for the beaches and
port; SR 836 is a Principal Urban Arterial that is also a
major east -west connection to the Midtown
Interchange. The project limits also include 1-95 from
NW 8 Street to NW 29 Street. SR 9A/I-95 is an Urban
Interstate Principal Arterial and major north -south
connector to downtown Miami. There are both dense
urban and residential areas within the project limits.
The project will address roadway safety, corridor
capacity, a variety of design issues, aesthetics, and
provide a Signature Bridge design over Biscayne
Boulevard.
1-395 RECONSTRUCTION PROJECT
1 SR 836
I-395
The 1-395 portion of the project involves the rebuilding of the 1-395 corridor
from the I-95/Midtown Interchange to the MacArthur Causeway.
Project improvements include
• Increasing capacity
• Improving safety by alleviating
existing operation and
geometric deficiencies
• Building new elevated ramps:
one eastbound and one westbound,
that will provide a direct link between 1-95 and 1-395
• Building a Signature Bridge over Biscayne Boulevard
• Building vertically higher structures that will improve the visual quality of the bridge and streetscape
• Improving the area underneath the expressway by providing pathways and common activity areas.
• Design/Build/Finance
For More Information: www.I-395miami.com
FDOT395
SAFE. CONVENIENT. RELIABLE.
RECON511 C11C N
1-95 CONCRETE PAVEMENT RECONSTRUCTION
The 1-95 portion of the project includes 1-95 from
NW 8 St to NW 29 St. The project improvements
include:
• Removal and replacement of the existing
mainline 1-95 concrete pavement
• Bridge railing retrofit
• Guardrail upgrade
MDX SR 836 IMPROVEMENTS
g (5B) 5R RA( l-95-
!g (NB/ 5R 9PI I-95
The MDX 836 Improvements Project limits are NW 17 Avenue Interchange to the Midtown Interchange. Project
improvements include:
• Adds capacity to SR 836 mainline by adding a
lane in each direction improving mobility and
safety
• Provides a new elevated eastbound ramp from
NW 12 Avenue for traffic destined to
northbound and southbound 1-95 and
eastbound 1-395 separating these movements
from the SR 836 mainline to the same
destinations
• Provides a new elevated ramp from
southbound 1-95 to westbound SR 836 with an
additional exit at NW North River Drive which
eliminates the traffic operational conflicts
between the westbound SR 836 exit to NW 12
Avenue and the 1-95 southbound entrance to
westbound SR 836
SR 836 WESTBOUND CONNECTOR
The SR 836 WB Connector project includes the construction of a 9A/I-95 southbound ramp to westbound SR 836.
PROJECT SCHEDULE AND COST
Project Segment
1-395 Reconstruction
MDX SR 836 Improvements
1-95 Pavement Reconstruction
WB Connector
Planned Construction Schedule Estimated Construction Cost
Begin Construction 2017
Estimated Construction time 5 years
i
$600M
$186M
$26M
$35M
For More Information: www.I-395miami.com