Loading...
HomeMy WebLinkAboutSummary Form-SUBCITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Daniel J. Alfon City Manager REFERENCES: DATE: September 1, 2016 SUBJECT: Substitution for RE.14 — September 8, 2016, Regular Agenda ENCLOSURES: The Office of the City Manager respectfully requests that the following item be substituted in the September 8, 2016 Regular Meeting: The item is RE.14, which is an agreement with Florida Power & Light to conduct an underground engineering study. Please substitute the four (4) maps that are attached to the Agenda Item Summary form, with the two (2) proposed maps enclosed. C: Nzeribe Ihekwaba, Assistant City Manager Ed Santamaria, Director of Public Works Juvenal Santana, Jr., Deputy Director of Public Works Anna M. Medina, Agenda Coordinator C'yf": C/) Fri fV l 0111 1=n2n-) -of 0143s S 2 RD 4T MIAMI SW 22 D TER 11 T-- IF AS_iEHRV SW ST W2. ST TER n J 1 SW 21eNT iglu „ AREA MAP LEGEND * Listed Plant location ® Listed Wildlife Location O FPL Substation — Streets East Preferred Corridor Q GAI Surveyed Land Cover" SFWMD Land Cover 0 Within 0 S Mile Area " —WAR b Flnt Faye tor Land Cover D. REFERENCES Municipal. L__ Boundary pa Turkey Paint Units 6 & 7 Site ricakTurkey Point Plant Property crlptlons FOOT, 1999; SFWMD, 2004; USDAMRCS. 200T: Miemibatle County 2007. 2008' 1Ac 200R FNAI, 2009 0 S00 1.000 :000 �G TURKEY POINT UNITS 6 & 7 PROJECT: TRANSMISSION LINES LAND COVERNEGETATION SHEET 18 OF 20 FPL .1...TDATE 111921101. FIGURE E9.1.0-4 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT THE END OF THIS DOCUMENT. SW23RD 1E11 sw TM ST 0 W StHsr. .ea 5 21TH ,R 0t5HER 0 S it No INSET TAF ONSET TABLE ++IS ',OWE RAY INSET TABLE A INSET TABLE B Burrowing Four-o'clock Bitter Bush Bitter Bush 'Florida Thatch Palm Tropical Ironwood Gulf Licarla ,Rain Lily AREA MAP LEGEND * Listed Plant Location Listed Wildlife Location O FPL Substation - Streets East Preferred Corridor GAI Surveyed Land Cover" ▪ SFWMG Land Cover • Within 0.5 Mile Area " "Rohr to Prat Plea for Land COwvr 0NtriptIons REFERENCES Municipal . Boundary Turkey Pant ® Units 8 & 7 Site Turkey Point F... Plant Property FOOT 1958; SFWMD, 2004; USDAMRCS. 2007; Mia181-0atls County, 2007, 2000; GAl. 2000; FNAI, 2009. o eoo 0 000 zoos I Irwt TURKEY POINT UNITS 6 & 7 PROJECT; TRANSMISSION LINES LAND COVERNEGETAl1ON SHEET 19 OF 20 FEE W. aMrarm REV e PLOT CRT si00000 FIGURE E9.1.0-4 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT THE END OF THIS DOCUMENT. Date: 08/29/2016 AGENDA ITEM SUMMARY FORM FILE ID: 16-01116 Requesting Department: City Manager Commission Meeting Date: 09/08/2016 District Impacted: City wide Type: ®Resolution ❑ Ordinance ❑ Emergency Ordinance Li Discussion Item (l Other Subject: An agreement with Florida Power & Light Company to conduct an underground engineering study. Purpose of Item: Law Department Matter ID No. An agreement with Florida Power & Light Company ("FPL") to conduct an underground engineering study not to exceed $250,000.00 in order to receive a binding engineering cost estimate from FPL for burying distribution and transmission lines in high load density areas as described in the attached schematic. Background Information: See attached. Budget Impact Analysis NO Is this item related to revenue? YES Is this item an expenditure? If so, General Account No: f-_9800 Special Revenue Account No: CIP Project No: NO Is this item funded by Homeland Defense/Neighborhood Improvement Bonds? Start Up Capital Cost: Maintenance Cost: Total Fiscal Impact: $ 250,000.00 lease identify funding source below. Final Approvals (SIGN AND DATE) CIP N/A Budget If using or receiving capital fi.uricls Grants N/A Purchasing N/A Chief Risk Management Dept. Director City Manage Page 1 of 1 N/A N/A P., er Engineers, Project: "miami route_b option.xyz" PL CADD Version 14.20, 9:24:23 AM Monday, August 22, 2016 Line le: 'Route Option B' FOR INFORMATIONAL PURPOSES ONLY RECEIVED AS -IS BY FP&L 08/26/2016 SUBSTITUTED TRANSMISSION POLE ROUTE FOR COCONUT GROVE SUBSTATION INJECTION Pow Engineers, Project: "miami route_b option.xyz" PLS-C • ND Version 14.20, 9:22:30 AM Monday, August 22, 2016 Line Title. 'Route Option E3' esemeno. cm am awammoismo es eat mrsesommicona.. ewer. omea=1•111M MU SW OINSIMINCIPM. OM MID 11.1.001011.111.14,111114111, 1 , , t 1 , ..,.. — .....1 \ I (I, .....,,,,,,........—_-_- -____-...-..........,_ , +..........-'-"°• I +1T,:2 1, I 1. l CITY OF MIAMI LIMITS FOR INFORMATIONAL PURPOSES ONLY RECEIVED AS -IS BY FP&L 08/26/2016 S U BSTITUTE D TRANSMISSION POLE ROUTE FOR COCONUT GROVE SUBSTATION INJECTION Po er Engineers, Project: "miami route_b option.xyz" PLS- ADD Version 14.20, 923:01 AM Monday, August 22, 2016 Line T e: 'Route Option B' FOR INFORMATIONAL PURPOSES ONLY RECEIVED AS -IS BY FP&L 08/26/2016 SUBSTITUTED A9 CONC1 TRANSMISSION POLE ROUTE FOR COCONUT GROVE SUBSTATION INJECTION / Pow Engineers, Project; "miami route_b option.xyz" PLS-C DD Version 14.20, 9:23:42 AM Monday, August 22, 2016 Line Titl- 'Route Option B' u T.... _. -1-7 ..... .w ._ &IM r*O TREE ORATETD BE AOOEO REMOVED T 0 POLE DECORATIVE LTONT POLE VCR BANDER. Tn'- DECORATIVE LRiHTPOLE 4NTN BANNER,TYP. pn4vNnr` G I :E ra,.:. w PEAcac ,..v �vi (',ONCRETE AVERB, FOR INFORMATIONAL PURPOSES ONLY RECEIVED AS -IS BY FP&L 08/26/2016 SUBSTITUTED TPk ATOLR NEXT TO BIKE RACK FORADA. T+T'• bVBAND SCORED W( wr MEOILF.1 9ANCBLA14f TY FlNIBN. T'I'P. x.T CLR NEXT TO DIKE RACK POE ADA,TVP a O b — _- TRANSMISSION POLE ROUTE FO COCONUT GROVE SUBSTATION INJECTION