Loading...
HomeMy WebLinkAboutSubmittal-Jeremy Gauger-Presentation-2010 Virginia Key Master PlanVirginia Key Master Plan: 2010 A Forgotten Natural Wonder, A Community Planning Process by the Virginia Key Public Planning Coalition with City of Miami Planning Department r Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk July 22, 2010-Presentation to the City Commission, p1 16-00`6510, ft-00(VA- S\)\NA-a\- eceivvi v(ec Qcfe,n ‘o,n - 2-010 v)qvn',a\CN 0er °°`‘A J () Miami Marine Park NeWismose TriT.=•,•.• 40 :,7ig%%%1 •% f %•• - VIRGINIA KEY: MIAMI MARINE PARK July 22, 2010-Presentation, p50 • 07 ca;a wan �t 1j atTairii iy Nyt- 5. P =RIW MMMM + .+"a i 4 RICR[MIAZI U CAUESWAY •'• e ' 7. 1R[SNMMRT , i fRItNG 042IE11 COCA A fOUMNN 21J117?WA Whit 11 M]RNIYS RE<TAURAIIT 12. N17030E22 ANO RETAIL UWE It /t067RAM WALKWAY 14 GM STFOIS AWR ]S MM1E 1LN®RION CANTER 16, MIAMI MAAINL STAMWM 17 MARIE SUN MI OrAMICL PLATA .15.21lr 12A14116 iM2111iM 111. WMR MAUI W. OPEN GAM PtID .-..--•.• • • : • • : .gliga* • ys . W. NOM GYM 11101146E C1L11 A MAST AGAM#SY Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk 0 4116. �.�- r raw a �- • •ma, Nil +w...0 • .+I••• p•s M.M • pie • ... •I�eY M tee—,. Liatv ''l, NOTE: This is a Conceptual Plan. Site elements such as parking garage, marina design and surface parking area locations may change. July 22, 2010-ADOPTED Consensus Master Plan VIRGINIA KEY CONSENSUS MASTER PLAN Basin Area Properties This is a Conceptual Plan. Site elements such as parking garage, marina design and surface parking area locations may change NOTE: 1 JULY2010 Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk Miami Marine Park VIRGINIA KEY: MIAMI MARINE PARK July 22, 2010-Presentation, p50 July 22, 2010-ADOPTED Consensus Master Plan Identical master plans as presented by the public and adopted by the city. This is the tool we were guided by. VIROINIA KEY CONSENSUS Mr= PLUS Basin Ares Properties NOTE JULY 2010 Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk s Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk 1 1. -NM - •..•• TrT*t * ■„ Is• ♦ g,>r. s= .* ■ tr # ► •.. + + Jr.». r Jyp �f'•.: �. M`. .9. + jd �i .'''` 11 •� ,11 ■! i it +, haw 111110 •• --e•/. f/,it106,1 •w#: •*i • , Area of laid out by the RFP excludes: • Rusty Pelican Island • Miami Maritime Center and Island Orientation • Miami Marine Stadium • Public Green Space 0 • mop Stift- itY 111 4 a ~ * • Ili #(% .1111.1.1 I %3 .•.i., ,Y• •t s.. ... .'• RCI Proposal overlaid on Consensus Master Plan Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk Marina July 22, 2010-Presentation, p65 *Olasti* + Submitted into the public rewrd for items) SP.1 & SP.2 on 07/20/2016, City Clerk Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk ,ury „ l.'[) I li-F r€ s rrfcion, pb . RCI Proposal Substantially similar, but differences include: • Replacing deteriorating docks • Remaining within property • Avoiding buildings and fill in the bay • Reducing number of boats from 300 to 162 Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk Parking structure for 300 cars and state of the art dry dock storage July 22, 2010-Presentation, p69 Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk ■ )IaaIJ A !J'9i0Z/OZ/L0 uo Z'dS'8 i'dS (s)Luaa! JoJ paoDaa D!Ignd o1u! pall!wgnS • Dry Dock Storage Co rc Parking structure for 300 cars and state of the art dry dock storage July 22, 2010-Presentation, p69 Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk �IaaIJ A ij'9TOZ/OZ/L0 uo Z'dS'8 rdS (s)wal! .io} pima' Dlignd an Nu! papwgns saoods o600 1304 �Q IDpJGwwoJ vaIJ AID `9LOZ/OZ/L0 uo Z'dS'8 i'dS (s)waal ioj pio3ai i �ilgnd ay; owl pa;;iwgns 6 d 'uoRoluasaad-o lCZ V AInr a2eJols )pop AJp 1.Je aln� 4o alels pue SJED 00E ao4 aanpnals 2ui)lJEd � � � Submitted into the public record for hem(s) SPA 0&SP.2, Boat Dry Dock Storage storage Parking structure for 300 cars and state of the art dry dock storage July 22, 2010-Presentation, p69 Submitted into the public record for items) SP.1 & SP.2 on 07/20/2016, City Clerk 'pap 43 `9TOZ/OZ/L0 uo Z'dS'8 VdS (s)wall aoj paoaaa allgnd aye owl panlwgns - • Commercial Dry Dock Storage Spaces Parking structure for 300 cars and state of the art dry dock storage Commercial Dry Dock Storage Spaces i� oIY Proposal Substantially similar, but differences include: • Depth of retail increased to a desirable dimension • Reoriented pedestrian activity and commercial space to the bay • Raised the retail above flood elevation Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk Parking Dry Dock Storage Spaces Parking structure for 300 cars and state of the art dry dock storage Dry Dock Storage Spaces RCI Proposal Substantially similar, but differences include: • Improve flexibility and ability to serve the Marine Stadium with vehicle exits • Improve connectivity from garage to entirety of Virginia Key for pedestrians • Eliminate garage Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk Boat Dry Dock Storage Storage Parking structure for 300 cars and state of the art dry dock storage Dry Dock Storage Boat Storage RCI Proposal Substantially similar, but differences include: • RCI Proposal is based on existing boat lift technology • Eliminates limitations imposed by narrow canals • Eliminates choke points • Improves user access to boats Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk valp '9I0Z/OZ/Lo uo Z'dS I dS (s)wall Joi piopai D!IcInd ayl ow! pau!wcInS Marked Channel Rusty 7 Pelican staging dock d ning- ha'borrnaster Retain. existing Qommercial buildings bay walk dry slip boat launches boat ramp commercial space ct1ong buy w flk .., 4 'e Boat Shelter mixed use building n1Gai;iia Mixed -use path & 140' landscape buffer - Rickenbacker Causeway Descriptive Use Plan I Scale 1:250 I ©Arquitectonica International City of Miami Department of Real Estate & Asset Mar ageme rd Reg Jest for Proposals I RP PI No.12-14-077 Submitted into the public record for item(s) SP.1 & SP.2 on 07/20/2016, City Clerk 1111. 1