Loading...
HomeMy WebLinkAboutSummary FormAGENDA ITEM SUMMARY FORM FILE ID: 15-01440 Date: 10/19/2015 Commission Meeting Date: 12/10/15 Type: X Resolution n Ordinance n Other Requesting Department: Public Works District Impacted: All Emergency Ordinance n Discussion Item Law Department Matter ID No. Subject: Resolution amending JVA Engineering Contractor, Inc. "Citywide Storm Sewer Repair M- 0083 Resolution No. 12-0497 adopted December 13, 2012 to increase the contract amount to $2,000,000.00 per year for a total not to exceed $4,000,000.00 subject to available funding. Purpose of Item: To allocate funding and to amend existing contract Resolution No. 12-0497, to reflect the addition of funds to increase the annual contract amount from $995,855.00 to $2,000,000.00, for each of the remaining contract terms including any remaining options to renew for a total amount not to exceed $4,000,000.00 over the remaining 2 year duration of the contract term. Background Information: The Public Works Department is seeking approval to increase the contract amount for JVA Engineering Contractor, Inc. "Citywide Storm Sewer Repair M-0083 for the remaining contract terms including options to renew. This will give the City and the Public Works Department greater flexibility in expeditiously constructing the backlog of drainage improvement projects. The estimated remaining total contract amount is $4,000,000.00` (PREVIOUSLY FUNDED BY CAPITAL IMPROVEMENTS B-30262) (See attached Scope of Work) Budget Impact Analysis NO Is this item related to revenue? YES Is this item an expenditure? If so, please identify funding source below. General Account No: kia3 _i (2{ ccci Special Revenue Account No: tRa-3e3"LG2. �(11taauc' "k143 CIP Project No: B-30262 and others TBD NO Is this item funded by Homeland Defense/Neighborhood Improvement Bonds? Start Up Capital Cost: Maintenance Cost: Total Fiscal Impact: If using or receiving capital funds Grants JJ r Final Approvals (SIGN AND DATE) Budget Risk agem Purchasing Dept. Direct Chief / i , C'� .a1 ager Page 1 of 1 CITYWIDE STORM SEWER REPAIR CONTRACT, M-0083 Scope of Work: The project consists of the installation and repair of the storm sewer system at locations citywide. This project will alleviate severe flooding locations throughout the City with the installation of French Drains, cross pipes, manhole structures, catch basins, deep drainage well structures, flap valves, rock drains, regrading of the swale areas and incidental surface restoration including sidewalk, driveway, curb, C&G, handicap ramps and asphalt pavement. Also, this project includes the removal of collapsed open joint pipe systems and broken cross pipes, inlet structures and abandonment of auger hole structures with the installation of French Drains, concrete solid cross pipes and new storm sewer structures. A Certified Survey of the work will be required at the end of each contract term.