Loading...
HomeMy WebLinkAboutBack-Up MDC ResolutionDATE: September 1, 2015 TO: Honorable Chairman Jean Monestime and Members, Board of County Commissioners FROM: Carlos A. Gim.enez Mayor SUBJECT: Resolution Adopting the Miami -Dade <. cal Mitigation. Strategy and Authorizing the County Mayor or County Mayor's Designee to Apply For, Receive, Expend and Sub - Award Mitigation Grant Project Funds Resolution No. R-683-15 RECOMMENDATION It is recommended that the Board of County Commissioners (Board) approve the attached resolution adopting the Miami -Dade Local Mitigation Strategy (LMS) that was approved by the State of Florida on May 5, 2015 pursuant to federal and state regulations. Additionally, the attached resolution requests approval to apply for, receive, expend and sub -award mitigation grant project funds. SCOPE The scope of the LMS is countywide. DELEGATION OF AUTHORITY Upon approval by the Board, the County Mayor or County Mayor's designee is authorized to apply for, receive, expend and sub -award mitigation grant project funds, FISCAL IMPACT/FUNDING SOURCE Funds related to the LMS come from both federal and state mitigation grant programs, and maybe provided to the County, its municipalities, and various eligible private entities. TRACK RECORD/MONITOR Miami -Dade Fire Rescue Department's Office of Emergency Management's (OEM) Division Director, Jonathan Lord, will review, revise, and monitor the LMS. BACKGROUND In 1998, the State of Florida funded an initiative to help communities develop local mitigation strategies to mitigate effects of natural disasters and to identify sources of funds to address those needs, The Board adopted Resolution No, R-362-98 which approved the execution of a Hazards Mitigation Strategy Agreement with the State. This action allowed the County, through OEM, to establish a working group to oversee the development of the LMS. The LMS working group includes county departments, municipalities, state and federal agencies, and various private entities, Federal and state regulations requires that the LMS be approved and adopted every five (5) years. Since 2000, the Board has adopted the LMS as required in the regulations. Federal Emergency Management Agency (FEMA), which provides the majority of mitigation funding, and the State of Florida require that projects be listed in Miami -Dade County's LMS in order to be eligible and considered for funding under a variety of mitigation grant programs. 1 Honorable Chairman Jean Monestime and Members, Board of County Commissioners Page 2 Since the inception of the LMS, over $260 million of hazard mitigation funds has been awarded for over 200 projects within Miami -Dade County. In the past two (2) years, over 75 mitigation projects totaling in excess of $85 million have been completed. Additionally, attached for your review is the letter from 'the State of Florida's Division of Emergency Management documenting the LMS's approval, pending adoption by the Board, Russell Benford Deputy Mayor Attachment O. — State of Florida Approval of LMS Attachment #2 — Miami -Dade Local Mitigation Strategy 2 MEMORANDUM (Revsed) TO: Honorable Chairman Joan Monestime and Members, Board of County Commissioners FROM: R. A. Cas, Jr. County Attorney DATE: September 1, 2015 SUBJECT: Agenda lten1 No. 3(B) (5) Please note any items checked. "3-Day Rule" for committees applicable if raised 6 weeks required between first reading and public bearing 4 weeks notification to municipal officials required prior to public hearing Decreases revenues or increases expenditures without balancing budget Budget required Statement of fiscal impact required Ordinance creating a new board requires detailed County Mayor's report for public hearing No committee review Applicable legislation requires more than a majority vote (Le., 2/3's 3/5's , unanimous ) to approve Current information regarding funding source, index code and available balance, and available capacity (if debt is contemplated) required 3 Approved Mayor Agenda Item No. 3 ( B) ( 5 ) Veto 9-1-15 Override RESOLUTION NO. R-683-15 RESOLUTION ADOPTING THE MIAMI-DADE LOCAL MITIGATION STRATEGY AND AUTHORIZING TI-TE COUNTY MAYOR OR COUNTY MAYOR'S DESIGNEE TO APPLY FOR, RECEIVE, EXPEND, AND SUB - AWARD, MITIGATION GRANT PROJECT FUNDS WHEREAS, in Resolution No. R362-98 the Board approved the initial execution of a Hazards Mitigation Strategy Agreement with the State of Florida; and WHEREAS, the State of Florida and Federal Emergency Management Agency require local governments to adopt an approved Miami -Dade Local Mitigation Strategy every five years, in order to apply for, receive, expend and sub -award, grant funds under various mitigation project grant funding programs; and WHEREAS, this Board desires to adopt the Miami -Dade Local Mitigation Strategy, which includes the participation of municipalities and other governmental units whose jurisdiction lies wholly within Miami -Dade County, NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MIAMI-DADE COUNTY, FLORIDA, that this Board hereby adopts the Miami -Dade Local Mitigation Strategy, in substantially the form attached hereto and made a part hereof; and authorizes the County Mayor or County Mayor's designee to apply for, receive, expend, and sub -award grant funds under various state and federal mitigation project funding programs under the purview of the Local Mitigation Strategy. 4 Agenda Item No. 3(B) (5) Page No. 2 The foregoing resolution was offered by Commissioner Xavier L. Suarez who moved its adoption. The motion was seconded by Commissioner Daniella Levine Cava and upon being put to a vote, the vote was as follows: Jean Monestirne, Chairman aye Esteban L. Bova, Jr„ Vice Chairman absent Bruno A. Barreiro absent Daniella Levine Cava aye Jose "Pepe" Diaz aye Audrey M. Edtnonson aye Sally A. Heyman absent Barbara J. Jordan aye Dennis C. Moss aye Rebeca Sosa aye Sen. Javier D, Santo absent Xavier L. Suarez aye Juan C. Zapata absent The Chairperson thereupon declared the resolution duly passed and adopted this 1st day of September, 2015. This resolution shall become effective upon the earlier of (1) 10 days after the date of its adoption unless vetoed by the County Mayor, and if vetoed, shall become effective only upon an override by this Board, or (2) approval by the County Mayor of this Resolution and the filing of this. approval with the Clerk of the Board. Approved by County Attorney as to form and legal sufficiency. Eric A. Rodriguez MIAMI-DADE COUNTY, FLORIDA BY ITS BOARD OF COUNTY COMMISSIONERS HARVEY RUV1N, CLERK Christopher >Agrippa By: Deputy Clerk 5 STATE OF FLORIDA DIVISION OF EMERGENCY MANAGEMENT RiCK SCOTT Governor May 5, 2015 Ms. Cathie Perkins Miami -Glade County Local Mitigation Strategy Chair 9300 Northwest 41 st Street Miami, Florida 33178 BRYAN W,KOON Directorr Re: Miami -Dade County Local Hazard Mitigation Plan Approved Pending Adoption Dear Ms. Perkins: This is to confirm that we have completed a State review of the Miami -Dade County Local Mitigation Strategy (LMS) update for compliance with the federal hazard mitigation planning standards contained in 44 CFR 201/6(b)-(d). Based on our review and comments, Miaml-Dade County developed and submitted all the necessary plan revisior7$ and our staff has reviewed and approved these revisions, We have determined that the Miami -Dade County LMS plan is compliant with federal standards, subject to formal community adoption, for the jurisdictions below: Miami -Dade County Upon submittal of a copy of all participating jurisdictions' documentation of their adoption resolutions to our office, we will send all necessary documentation to the Federal Emergency Management Agency (FEMA) who will issue formal approval of the Miami - Dade County LMS. if you have any questions regarding this matter, please contact David M. Block at 850-413-9959 or david.biock@em.myflorida,com.. Respectfully, Miles E. Anderson, Bureau Chief, Mitigation State Hazard Mitigation Officer MEA/dmb Attachments: MEMORADUM: State approval of LMS plans under Program Administration by States (PAS) QIVISION HEALQUARTER S Tel: ebb-413-Jo6O*Pax; 850-488•1016 2565 Silumard Oak Boulevard www,Florldaolsaster.ora Tallahassee, FL 32309.2100 STATE LOGISTICS RESPONSE CENTER 2702 Dlreotors Row Orlando, FL S2000.5631 6 Local Mitigation Strategy, Miami -Dad Whole Community Hazard Mitigation Part I : The Strategy April 20 15 7 ML.Lrni-Pov The Miami -Dade Local Mitigation Strategy Part 1— The Strategy This page left intentionally blank. April 2015 P I -H 8 MiamrD0ie The Miami -Dade Local Mitigation Strategy Part 1-- The Strategy INTRODUCTION 3 PURPOSE 3 HOW TO USETHIS PLAN 4 LMS ORGANIZATIONAL STRUCTURE. 5 LUIS COORDINATOR/CHAIR 5 LMS CO-CHAIR 8 STEERING COIVIM1TTEE 6 LMS WORKING GROUP (LMSWG) 6 Municipal Participation 7 LMS Su13-CoMM1TTEEs (LMSS-C) 7 MEETINGS 8 PLANNING PROCESS 8 Annual Updates 9 Monthly Updates (as needed) 9 Public Review and Comment 9 Five -Year Update 10 10 REVIEW AND REVISION CRITERIA 11 PROGRAM BENCHMARKS 12 LMS REVISIONS SINCE LAST ADOPTION 13 RECENTOEVELOPMENT/REDEVELOPMENT 20 MEASURING THE OVERALL EFFECTIVENESS OF THE LMS PROGRAM , 22 POLICIES, ORDINANCES AND PROGRAMS AFFECTING MITIGATION 24 FEDERAL 24 STATE 25 Federal, State and Regional Governmental Entities 25 COUNTY 27 County Programs 28 MUNICIPALITIES 30 Municipal Agencies and Their Mitigation Functions 30 ANALYSIS OF EXISTING POLICIES/ ORDINANCES AND PROGRAMS, 31 MUNICIPAL INTEGRATION OF MITIGATION MEASURES 33 Aventura 33 Bal Harbour 34 Bay Harbor Islands 34 Biscayne Park 37 Coral Gables 37 Cutler Bay 38 IJoral 40 El Portal ' 40 Florida City 41 Golden Beach 41 Hialeah 41 Hialeah Gardens 41 Homestead 42 Key Biscayne 42 Medley 44 Miami.,...._........................ Miami Beach 47 Miami Gardens 48 Miami Lakes 50 Miami Shores 50 PLAN ADOPTION -April 2015 Pi-i 9 UV'S Miarni-Oode The Miami -Dade Local Mitigation Strategy Part 1 — The Strategy Miami Springs 52 North Bay Village 52 North Miami 53 North Miami Beach 54 Opa-locka 60 Palmetto Bay 62 Pinecrest 62 South Miami 63 Sunny Isles Beach 63 Surfside 63 Sweetwater 84 Virginia Gardens 65 West Miami ......... 65 IVIETIGATION GOALS AND OBJECTIVES 66 GOALS 66 MITIGATION OPPORTUNITIES 68 HAZARD IDENTIFICATION & VULNERABILITY ASSESSMENT 70 Drought 81 Erosion 84 Flooding 87 Hurricanes and Tropical Storms 95 Saltwater Intrusion 106 Sea Level Rise 110 Severe Storm 121 Tornado 125 Wildfire 127 Winter Storm 130 NATURAL HAZARDS BY JURISDICTION 133 MIAMI-DADE COUNTY CRITICAL FACILITIES INVENTORY 135 DATA SOURCES IDENTIFIED 136 Federal Emergency Management Agency (FEMA) 136 Other U. S. Government Databases and Information Sources 136 State of Florida 136 Miami -Dade County 137 Municipal Agencies 137 Additional Resources 137 CONFLICT RESOLUTION PRO CED URES 137 April 2015 , Pl-ii 10 LMS The Miami -Dade Local Mitigation Strategy Part 1: The Strategy INTRODUCTION The Local Mitigation Strategy (LMS) is a whole community initiative designed to reduce or eliminate.the Tong -term risk to human life and property from hazards. The LMS plan is a multi -volume plan that documents the planning process and addresses mitigation measures in relation to the hazard risk and vulnerability assessment of Miami -Dade County. This is a living document that is updated to integrate and reflect current and projected issues as identified and track mitigation measures and actions that have oc- curred, are occurring, are planned for or are desired, This plan is a compendium of efforts of the whole community, integrating governmental and non -governmental agencies such as non-profit, private sector, educational and faith -based organizations as well as com- munities, families and individuals. A study conducted by the Multi -hazard Mitigation Council shows that there is a four dollar savings for every dollar invested into mitigation measures. This version of the plan is the five year update with inclusion of new initiatives including the integration of climate change, sea level rise and additional measures to address flood- ing and the Community Rating System. This plan was open for public review and com- ments received were integrated and then the plan was submitted to the Florida Division of Emergency Management (FDEM) and the Federal Emergency Management Agency (FEMA) for review and approval. Once this plan is approved at the federal level it will be submitted to the Miami -Dade Board of County Commissioners (BCC) far adoption. A review of the changes that have been made to the LMS since its last adoption in 2010 is provided in Part 1 under Section "LMS Revisions Since Last Adoption" and Part 4: Ap- pendix A. Purpose The purpose of the LMS is to develop a comprehensive approach to effectively reduce the impact of current and future hazards and risk faced by local communities within Miami- Dade County. 1 The LMS accomplishes this through the following measures: • A planning process that encourages whole community participation and input • Review and incorporation of community plans, iocal, state and federal regulations and guidance, studies, reports and technical information • Overview of past and present occurrences and projected future hazard events • Linkage of mitigation measures and actions to the Threat and Hazard Identification and Risk Assessment (THRRA) • Identification of measures and actions as LMS Projects that have begin accom- plished, are planned for implementation or identified as potential or future initia- tives • Identification _of_potential or actual_ funding sources 1 EMAP 4,4.1 April 2015 P1-3 11 LMS L.MS Miami -bade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy • integration of GIS to provide maps to illustrate hazard and risk areas, consequence analysis and mitigation measures • Semi-annual reviews and updates of all strategy components • Regular meetings,, informational bulletins, trainings and workshops to engage the mitigation participants • An identified process for monitoring the overall progress of mitigation strategies and documentation of completed initiatives This strategy will continuously evolve to address current and future risk and vulnerability. How to use this Plan The LMS is divided into seven parts: Part 1— The Strategy — Provides an overview of the LMS and identifies how the program is implemented, the integration and update of plans, identifies authorities and references that guide the program, and sets forth the goals and objectives for specific measures and actions to address the threats and hazards faced by our communities. Part 2 — The Projects - Contains the list of projects identified by Working Group members for mitigation measures/actions they have completed, are pursuing or one day hope to implement, and the methodology for how projects are initially prioritized. 2 Part 3 — Funding — Identifies potential funding sources for mitigation projects. Part 4 — Appendices —, This section contains a number of supportive documents includ- ing • List of Updates made to the plan since the last adoption • List of LMS members including Steering Committee, Working Group and Sub - Committees • Miami -Dade Resolution Adopting the LMS • State Letter approving the LMS • FEMA Letter approving the LMS • • Local Charter information for Metropolitan form of Government • Integration Document • THIRA -- Demographic • Economic Assessment • Maps • Community Survey Part 5 — Meeting Notes — Contains meeting notes and attendance since the beginning of the program - - 2 EMAP 4.4.4 April 2015 P 1-4 12 M.iarrni-pa L. The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Part 6 -• Completed Projects — Contains a description of some of the completed projects Part 7 - Flooding: The NFIP (National Flood Insurance Program) and CRS (Commu- nity Rating System) — Contains information specific to flood management plans and identifies activities in support of the CRS program All parts of the LMS are published separately to allow for intermittent updates: All of these sections are published on the LMS website and are open for public com- ment at any time, the plan is at http://www.miamidade.rpv/fire/mitigation.asp and com- ments can be sent to mdlmsC7a,miamidade,gov. LMS ORGANIZATIONAL STRUCTURE The LMS is a reflection of initiatives that are identified and supported by the LMS Coordi- nator, LMS Co -Chair, the LMS Steering Committee, the LMS Working Group (LMSWG) and LMS Sub -Committees (LMSS-C) and ultimately adopted by local elected officials. A complete listing of the participants of the LMS are listed in Part 4 Appendices B and C. LMS Coordinator/Chair The Whole Community Infrastructure Planner of the Miami -Dade Office of Emergency Management (OEM), serves as the LMS Coordinator/Chair. The LMS Coordinator is re- sponsible for the review, monitoring, update and maintenance of the LMS plan, coordina- tion of meetings, trainings, review and archiving of LMS Projects and dissemination of information pertinent to the mitigation goals and objectives set forth in the LMS. The LMS Coordinator participates in workshops, trainings and conferences throughout the year to benefit the LMS, The LMS Coordinator maintains a distribution list of persons interested in mitigation and is responsible for the website updates. April 2015 P1-5 13 MS Mi�l�-�a�de The Miami -Dade Local Mitigation Strategy Part 1: The Strategy LMS Co -Chair The LMS Co -Chair is an appointed position by the LMS Steering Committee and assists the Chair with review and development of documents, provides consultation to the Chair and is responsible to stand in for the Chair in case of any unforeseen absences. Steering Committee The Steering Committee acts as a "board -of -directors" and is responsible for the devel- opment of policy guidance. Members of the Steering Committee are representative of the organizations found within the larger Working Group (i.e. municipal, county, educa- tional, not -for -profit, private sectors and individuals). The Steering Committee acts as a review committee for the establishment of this LMS and the prioritization of the projects therein when a limited funding source is available. Membership on any committee shall be voluntary and subject to the review and approval of the LMSWG. A committee mem- ber who fails to attend a reasonable number of committee meetings may be dropped from participation in the committee by a majority vote of the other members of that committee. Currently, any planning and program development issues are addressed through as - needed Steering Committee meetings and inan open forum through the quarterly meet- ings. LMS Working Group (LMSWG) The LMSWG is composed of representatives from eight main groups: • Municipalities • County Departments • Colleges and Universities • Hospitals and Health Care • Private Non -Profit • Private Sector/Businesses • Regional, State and Federal Partners • Other Stakeholders, including private citizens The makeup of the LMSWG is not limited to any particular organization. or jurisdiction. Numerous others have expressed the desire to participate in the LMS and are welcome to do so. Each organization is encouraged to solicit participation and commentary from its citizens, employees and members.3 To be considered a participant of the LMS and receive the benefits thereof, a municipality, county department or any other organization must attend at least two of the four quarterly 3 EMAP 4,4,2 April 2015 P 1-6 14 The Miami -Dade Local Mitigation Strategy Miami -nod Part 1: The Strategy meetings held each year. The LMSWG endorsed this policy unanimously on September 20, 2001. However, any organization may substitute regular participation and attendance on an active LMS committee or subcommittee in lieu of attendance at the quarterly meet- ings. The agencies that are participating in the LMSWG are identified in Part 4 Appendix B4 Municipal Participation Within Miami -Dade County the following municipalities are active participants of the LMS. City of Aventura City of Hialeah Gardens City of North Miami Bel Harbour Village City of Homestead City of North Miami Beach Town of Bay Harbor Islands Village of Key Biscayne City of Opa-Iocka Village of Biscayne Park Town of Medley Village of Palmetto Bay City of Coral Gables City of Miami Village of Pinecrest Town of Cutler Bay City of Miami Beach City of South Miami City of Doral City of Miami Gardens City of Sunny Isles Beach Village of El Portal Town of Miami Lakes Town of Surfside City of Florida City Miami Shores Village City of Sweetwater Town of Golden Beach City of Miami Springs Village of Virginia Gardens City of Hialeah City of North Bay Village City of West Miami Indian Creek Village opted to leave the LMS and the City of Islandia is no longer consid- ered a municipality. For simplicity sake of the document, municipalities will be referred to by only the name and not the full title e.g. City of Coral Gables will be referred to as Coral Gables, LMS Sub -Committees (LMSS-C) In order to streamline the Working Group's activities, various sub -committees may be formed, each addressing an area of concern as needed. Initially, committees were formed to deal with flooding, evacuations, funding, community education, external policy, agriculture and wildfires. The formation and disbandment of sub -committees is done in correlation with the trending issues that need addressing and participation from the work- ing group members. The current listing of sub -committees may be found in Part 4 Ap- pendix C. A EMAP 4.4,2 April 2015 P1 -7 LMS Mond -Dade Meetings The Miami -Dade Local. Mitigation Strategy Part 1: The Strategy The Steering Committee and Sub -Committees meet as needed and the full Working Group meets once each calendar quarter. Meeting announcements are posted on the LMS webpage, announced in the LMS Information Bulletins (monthly) and emails are sent to a distribution group of representatives maintained in the LMS Contact list, maintained by the LMS Coordinator, The LMS Coordinator sends a meeting invitation for the quar- terly meetings via the LMS email distribution list at least one month in advance of the meeting. The representatives are encouraged to post meeting notifications prominently; on com- munity bulletin boards or in some other way, to notify the public or other interested parties at least thirty days prior to each meeting. Meeting times, dates and locations will also be posted on the LMS website: http://www.miamidadexiov/fire/mitioation.asp. A listing of meeting notes and attendance records are kept in Part 5, PLANNING PROCESS5 In the spring of 1998, the state of Florida contracted with and provided funding to each of the counties within the state to develop an LMS. Community members embraced the LMS as the devastation of Hurricane Andrew, was still fresh in their memories. The first meetings were set and development of the original strategy was begun. The plan has evolved over the years to encompass the changes in our communities and evolution of hazards and risks. The LMS Coordinator with the assistance of the LMS Steering Committee, and input from the LMSWG, LMSS-C and the general public, undertakes to incorporate updates and monitors the plan to keep it relevant and forward Looking, Updates will be based on fac- tors such as recent disaster events, changes in local, state, and federal policies and leg- islation, changes in development and comments and input provided on the plan. The LMS takes into consideration emerging issues such as aging infrastructure and housing stock and how new development and redevelopment projects impact our communities,' The elements listed within the "Review and Revision Criteria" section of the document will be used as monitoring criteria for this document. The LMS Coordinator includes a fisting of the revisions made to the plan in relation to these factors, as documented in the section entitled "LMS Revisions Since Last Adop- tion", 5 EMAP 4.4.5 April 20'I 5 P 1 -8 16 LMS Miarni�Gatle The Miami -Dade Local Mitigation Strategy Part 1:.The Strategy Annual Updates The LMS is updated on an annual basis and as part of a regular update and monitoring process. Any proposed changes will be reviewed and compared against LMS and CEMP Crosswalks provided by FDEM, the Emergency Management Accreditation Program (EMAP) Standards and the CRS Coordinator's Manual, An annual update to the LMS is provided to the State by January 31 st every year and the documents are subsequently posted on the local website. As of March 2015, the LMSWG voted to have the LMS Projects be updated one time per year. Updates are to be made by October 31 s1. Agen- cies that have not updated their projects will be notified that they must comply with the update by December 318E or their projects will be made Inactive. See Part 2: The Projects for more information on project updates and maintenance. Monthly Updates (as needed) Part 7 of the LMS may be utilized by CRS communities to post their Annual Activity 510 Progress Reports. CRS communities are responsible for sending this information to the LMS Coordinator for inclusion. An update to Part 7 will be posted on line by the last calendar day of any month during which time a 510 report was received. It is the respon- sibility of the CRS community to provide their reports to the LMS Coordinator at least 10 working days in advance of the end of the month to allow for incorporation and posting on the website. Public Review and Comment At all times, the latest published version of the LMS will be posted on the Miami -Dade County Internet website http:/lwww.miamidade.gov/fire/mitigation.asp — for public re- view and commentary. Any comments received through this medium will be incorporated through the revision process identified above, An email address, mdlms@Miami- dade.r ov, has been established for such commentary, which is strongly encouraged. The LMS Quarterly meetings are posted on our website and for the five-year review pro- cess, additional municipalities also advertised the meeting, review process and website. April 2015 P1-9 17 L h homi-vide The Miami -Dade Local Mitigation Strategy Part 1 The Strategy 4li 4x4akW>`u$Yrari "4ma lcK3,4�+t. wart 1 dlx +. .n7An, ^FbV �y+F Ki.YOk-Y•.:7N RY .l�A?R)Sil 4fx,♦+in/�y,., 2trl1 ;rar W4- I.:e�s}•.vnr r4wpVkk Uxataxl Y41 :Al.'b�r•�F+'•a'e f} q +l�SeN.•f W4i4 .'4'�-t hfA .�+'-44 V?m?uf.'�J'.t,•-'!vr,.A !'Nisi+. Y• Yr fit Ye !NF iM M ! ,, i< ;WOlm.id.F d.'FiN iH tn31 Y +je * .44l r�+shri f1P41.19 Y ✓"'�h:vnsF NM i:uw N411 FIN. �jYssri::i.•*}' h rv>fn m,.hb 'y vn..LN.wvv -Lae14 .44(74 440 S.1 4 1l 44 ,* $.w 4 ' \^9Mi^4'w' K Lbti v 4I44 4'...yas t46!'d4mtaa .w1A,H.lMMf xviapoot lAwimpA.ii q,M'F>:.wMY .ale+ !4,14E-3'a'9 ki s-9'LRP141l f'* s+ll 3144 .Mi:s ,: FUsh zi +re,+an,ljr r.Y piai:9tFn.�-,�.. +:.,<,t.,kW a =4U.<�;t.,..+�1. a.,e n.lr�.:!.°:•v',.2o- knJ.eN'ivJR Taj J.v el. tf 4241 {A.t,;TPl ... r•::7'. Fi V.-sree, .�..i'.rV,S•Y)!sau; { Ii'+?LY RY ls.lti4^:(x a ol"l't13.4.`<I'.m•'.'r:}e 4i4fl.*4 0'1 4h etj141% tiI'.niMei Z J {u h' \ S` `34 4144 r3Wf—Y'3N •1•\ Wr3w :E l 4 0...+M,'f,4 aa.. 1 .....q;eCzxY f' (413- ,ant tc..,rC'a4444'Y'nE'+�'wt�':nSS�. 44441 rin i.➢214M3344wC9:^FL91{ T.N•s'Sv —. d tW hy.,j;xa,chyr 1",21 'b 9Ri1Yr 4.(=i.. t`F rii-"`a.''' +.W�-34 43"44,,;Ssf. FK:-I Sw F,m.acn Fs.,�wt Yw*vT v�ij+as!-'! .�, A7!"P •1 �!. us '';tiM1 k.R ,;^.�: X'\5'M'•At[3�+rm'41M•Ccd'+ra?Y!Y4(444 nh..:.`44v.FS.r.!241 4.zS'.,Y',:*+H" t aM 3<)41411 fF9.m't*F":af.! 443T„'F Nywt3. Y S1`•-iF Yi .:..: 4144 f d. 4r+,�•w :vEl,.... ^Sw..u.. t... oR .. >F.. 1 h r--� • V,:!,.;,,ww,+,\Fl•�,v-lr�xr�.. Medw`r•�:r.+F�ti's•!•!t<:x 144 f I rqn:.., rur I a r�ry: . uy ,{Sv..iw'anik sot rrsia-vss I+ymmJmwvoryz 1r•1WI ntxw »v4W.! •;Y •i`•1 s •1 `n.La;F u.ir `ri*h yr4 1'e lltn lkd^i.= 4x 41 443n.tib f4as*ea:arfzy.4 ''b. 444 . `SA•4444.E'+ ; AE4lr'.a`34 1 )anFti+rJ+6-,bk•AKw•nGi)' a • In October 2014, OEM posted a message on our Facebook page and sent out tweets via Twitter to encourage community members to review and comment on the draft of the plan. Five -Year Update A complete state and federal review and approval of this plan and is conducted on a five- year cycle. The plan has undergone review and approval from FDEM and FEMA in 2000, 2005 and 2010. The five-year review process incorporates the annual updates and a review of the Local Mitigation Strategy Crosswalk as provided by FDEM. FDEM notifies the LMS Coordinator twelve months in advance of the plan expiration. The plan is up- dated and prepared for the third quarterly meeting of the fourth year for public review and comments on the plan. Once all comments are reviewed and incorporated as deemed appropriate, the updated plan will be submitted to the FDEM, by the LMS Coordinator, for review approximately six months prior to its expiration. FDEM will review the plan and provide comments, and if needed the LMS Coordinator will make revisions to satisfy any crosswalk deficiencies. Once the plan has been ap- proved by the state it is then sent to FEMA for review and a similar process occurs until it is approved by FEMA, Plan Adoption Once the plan has been approved by FEMA, the plan will be submitted to the Miami -Dade Board of County Commissioners (BCC) for adoption. Miami -Dade County has a metro- politan form of government with its own Home Rule Charter (see Part 4 Appendix G for additional information). When the BCC passes a resolution or ordinance, that action au- tomatically includes all the municipalities within the county. In the event a municipality does not wish to participate in the action, that municipality must, through their own reso- lution, opt out. For example, when the BCC adopted this LMS, the municipalities were automatically included and none opted out. April 2015 • P1-10 18 LMS The Miami -Dade Local Mitigation Strategy Mianii-vnte Part The Strategy Local communities that wish to utilize the LMS as their fioodplain management plan for credit under the CRS program must also do a local adoption of the LMS, Copies of the local adoption should be sent to the LMS Coordinator to be incorporated into Part Review and Revision Criteria This document will be updated by the LMS Coordinator with the assistance of the Steering Committee and input from the LMSWG. The majority of revisions made to each section of this document are based upon LMSWG meetings where comments are sought from participants. The public is also given an opportunity to review this document and provide comments through the Miami -Dade County websfte, Revisions may also be made based upon experience from any significant events such as a hurricane, destructive tornado, severe hazardous materials spill or any other occurrence where mitigation could benefit the community. Changes in federal, state, and local laws will also be reflected in the updated version of this document. The revisions will then be documented and posted on line and/or sent out via LMS Information Bulletins by the LMS Coordinator to all affected parties. The evaluation criteria includes: 1. Have there been any new mandates from federal, state or local agencies that require changes to the Local Mitigation Strategy? Any new or changing laws, policies or reg- ulations? 2, Are there any societal developments or significant changes in the community that must be added to the current LMS? Does the LMS still reflect the concerns of the community? Are the demographics the same? Has there been any growth or devel- opment in hazard areas? 3. Have there been any changes in funding sources or requirements? 4, Are there any recent technological developments that should be reviewed for inclusion in the LMS document? 5. Should the LMS be updated to include any new forms of hazards or areas of vulnera- bility within our community? 6. Have there been any changes in the Comprehensive Plan or any other form of stand- ard operating procedure? 7. Have any of the mitigation opportunities been implemented? Are the priorities for implementation the same? 8. What are the recommendations or lessons learned from any major incidents that have occurred during the past year? During the revision process, each criterion is addressed to determine if they are still valid and adjustments are made as necessary. When satisfied that the criteria are appropriate, each of the outstanding mitigation opportunities is then compared against the criteria. Al! existing mitigation opportunities that are determined to still be viable projects will remain on the project list. All those that are determined to be no longer workable will be set aside for further review and revision or, dropped as no longer feasible. April 2015 P1-11 19 LMS Mianif-Dode The Miami -Dade Local Mitigation Strategy Part 1: The Strategy PROGRAM BENCHMARKS This section provides an overview of the highlights of the plan as well as recent updates to the plan in relation to risk analysis and changes in development. A complete listing of all of the meeting minutes since the beginning of the LMS program may be found in Part 5. 1998 — Miami -Dade County began developing a LMS program through funding from the State of Florida. September 1999 - The Miami -Dade County LMSWG voted to continue the LMS program with or without state funding. March 2000 - The LMSWG determined that the LMS master document should be updated two to three times each year and the updates, including the project list for new, updated, completed and deferred projects would be updated twice a year. June 6, 2000 - The Miami -Dade BCC passed Resolution R-572-00 formally adopting the Local Mitigation Strategy as official county policy thus further promoting program continu- ity, September 13, 2000 - Miami -Dade County, along with its municipalities and other organ- izations was designated by FEMA and the Florida Department of Community Affairs to be a "Project Impact Community." December 6, 2000 - The LMSWG agreed that they would become the Project Impact Working Group and that the LMS would continue under the auspices of Project Impact. Henceforth, Project Impact and the LMS became synonymous, December 2000 - The LMSWG determined that the LMS Project List would be updated by June 30th and December 31st of each year. May 30, 2001 A formal "signing ceremony" took place at Vizcaya Museum and Gardens for members of the LMSWG to sign a proclamation for becoming a "Project Impact Part- ner." (Although FEMA no longer endorses Project Impact the LMSWG agreed that the Project Impact concept will continue in Miami -Dade County regardless of what it is called.) June 7, 2005 - The Miami -Dade BCC passed Resolution R-710-05, which states that grant applications filed under the auspices of the Miami -Dade Local Mitigation Strategy no longer have to go to the Commission for approval, but instead authorizes the county manager to "Apply for, receive, expend and amend applications for grant funds for pro- jects listed in the Miami -Dade County Local Mitigation Strategy." June 2008 — The LMSWG celebrated its 10th anniversary with aver 300 completed miti- gation projects at a value exceeding 250 million dollars. A listing of completed mitigation projects that have been tracked may be found in Part 6. April 2015 P1-12 20 LMS Miami-Paee The Miami -Dade Local Mitigation Strategy Part 1: The Strategy November 2009 - The County Mayor delegated signature authority to the Director of Emergency Management for contract and grant -related documents under the purview of the LMS Program. This was renewed in 2012. • April 10, 2010 — Adoption of the five-year update of the LMS by the BCC May 5, 2010 - FEMA approved the five-year update of the LMS LMS Revisions Since Last Adoption This section provides an overview of the achievements of the LMSWG to continue to promote and incorporate mitigation measures across the whole community concept and address changes to our risk profile and development and re -development. September 2010 • September 15 Quarterly Meeting open to the public • Climate Change considerations were presented at the Quarterly meeting and the County's publication Green Print is referenced regarding planning measures, It is recommended that the LMS incorporate Climate Change into the hazards and mit- igation measures. December 2010 • December 15 Quarterly Meeting open to the public • The International Hurricane Research Center has started a competition for high school students to design a mitigation project that is to be tested in front of the large fans of the Wall of Wind. This outreach project promotes the next generation to consider mitigation measures during design and development. January 2011 • Annual update to the FDEM submitted by the LMS Coordinator. February 2011 • OEM received the updated Florida Statewide Regional Evacuation Study Program results that included expanded storm surge areas that were modeled using the Sea Lake Overland Surge from Hurricanes (SLOSH), new Lidar data and slightly larger storms. From this an analysis of the potential areas for evacuation will be determined. March 2011 • March 16 Quarterly Meeting open to the public • SFWMD presented on their work in the C-4 (Tamiami Canal) Basin and the major mitigation work that was implemented there after heavy rain events in 1999 and 2000. This project continues to mitigate flooding in those areas, SFWMD contin- ues to plan and work with local jurisdictions on flooding concerns. April 2015 F1-13 21 L . Miarn-grade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy June 2011 • June 15 Quarterly Meeting open to the public • Funding opportunities were discussed, focusing on Pre -Disaster Mitigation monies and how to maximize the chances of getting funded. September 2011 • September 21 Quarterly Meeting open to the public • Presentation on the International Hurricane Research Center and the work being done in relation to wind research, social sciences, insurance finances, economic and coastal issues. The Wall of Wind is utilized locally to test new mitigation prod- ucts for compliance with wind impacts. December 2011 • December 14 Quarterly Meeting open to the public • The Community Rating System Coordinators Manual will be undergoing significant changes and the LMSWG was encouraged to review the documents and if they had any questions or concerns submit them to Mike Gambino, the LMS Co -Chair and Floodplain Manager for Miami Gardens. January 2012 • Annual update to the FDEM submitted by the LMS Coordinator. March 2012 • March 2012 Quarterly Meeting open to the public • Planning process for the Miami -Dade Post Disaster Redevelopment Plan begins and the LMSWG members are encouraged to participate in the development and have the LMS tie into the long-term recovery and redevelopment of the community after a disaster. May 2012 • State Department of Economic Opportunity distributes guidance on Adaptation Planning Considerations. June 2012 • June 2012 Quarterly Meeting open to the public • Public Works and Waste Management present on the County's Storrnwater Man- agement Plan and the ability of their department to monitor real time rain events through over 100 rain gauges, September 2012 • September 2012 Quarterly Meeting open to the public • Special presentation on the 20th Anniversary of Hurricane Andrew and how that event helped create many of themitigationinitiatives in Miami -Dade including the LMS, the Wall of Wind, the International Hurricane Research Center andtougher building codes. April 2015 P1-14 22 LMS .miarnii-c444 The Mianai-Dade Local Mitigation Strategy Part 1: The Strategy December 2012 • December 2012 Quarterly Meeting open to the public • Discussion and tour of the. new Camillus House Norwegian Cruise Line Campus, that Is a 31,000 square foot building with a 48-bed homeless shelter that is Gold LEED certified and can be used for emergency housing. January 20'13 • The THIRA plan was integrated into the LMS to replace having different hazards identified within the LMS arid Comprehensive Emergency Management Plan (CEMP). This will ensure continuity in addressing hazard preparedness, response, recovery and mitigation. • The Whole Community approach, as described by FEMA, was integrated into the LMS Program to illustrate how the work that is being done is representative of the entire community. • Annual update to the FDEM submitted by the LMS Coordinator. • The LMS Coordinator developed a monthly LMS Information Bulletin in order to convey information to LMS stakeholders on a regular basis. Topics include infor- mation on upcoming meetings, project requirements, funding and training oppor- tunities and notes from meetings and/or webinars and general items of interest for the group. The LMS Information Bulletins are posted on the LMS website and also sent out via the distribution list. • Notified LMSWG of the five year update and LMS Coordinator proposed ideas for updates to the plan for input by the LMSWG • Two new Steering Committee Members were identified: Nichole Hefty, Chief, Of- fice of Sustainability and Paul Vitro, Whole Community Recovery Coordinator and liaison with Emergency Support Function (ESF) 18 — Business Recovery. February 2013 • The LMS Coordinator met with the Steering Committee to discuss the vision of the program moving forward and identifying actions to be addressed in the 2015 up- date of the LMS. Items identified for action included: o Review and update of the project prioritization system and inclusion with pro- jects o Potential Sub -Committees that could work on identified initiatives o Incorporation of elements from the Community Rating System to obtain uniform credits for CRS communities and provide more information on flooding o Incorporation of Sea Level Rise into the THIRA and into the LMS, including mapping of future risk areas o Expanding the public outreach opportunities o Engaging elected officials o Identification of additional grant opportunities • LMS Information Bulletin highlights Sandy Recovery Improvement Act of 2013 March 2013 • March 20 Quarterly Meeting open to the public Ideas discussed for the 2016 Update of the plan are presented April 201.5 P1-15 23 The Miami -Dade Local Mitigation Strategy Part 1: The Strategy The following Sub -Committees were formed to work on identified areas o CRS User Group was adopted as an LMS Sub -Committee to. address NFIP/CRS and flooding issues o Extreme Weather Events to look at the current active cycle of tropical activity, 'sea level rise, climate change and other weather events that can increase the impact of hazards and vulnerabilities. o Education and Outreach to identify opportunities for training, seminars, work- shops and public' outreach for our participants and the community at large. o Structural Committee to look at best practices and new and upcoming prod- ucts, codes and rules that can improve mitigation measures. o Agricultural to look at hazards and mitigation measures for the agricultural and landscaping stakeholders. o Marine Interests to look at hazards and mitigation measures for the marine in- dustry and work on updating a brochure to educate the boating community. o Financial/Grants to look at opportunities for funding and grants and help identify best practices to assist stakeholders. • New Storm Surge Planning Zones were announced based upon the State Hurri- cane Evacuation Study done in 2010 based on new LIDAR data and increased hurricane size. ( See new map in Part 7) • Training sessions offered on new zones and public outreach campaign imple mented • Alliance for Response, a cultural community initiative, works with OEM and LMS Coordinator for outreach to agencies April 2013 • New Storm Surge Planning Zones available on line • Agriculture/Landscaping Sub -Committee Meeting Mav 2013 • Extreme Weather Events Sub- Committee Meeting • CRS/Flooding Sub -Committee Meeting • May 22, IHRC hosts Wall of Wind competition for local high schools June 2013 • Marine Interests Sub -Committee Meeting • The LMS Project list was converted from a word document to an Excel spread- sheet in order to standardize information submitted for projects and in anticipation of moving the entire system to an Internet based tracking system. • June 19 Quarterly Meeting open to the public • Steering Committee Meeting • Storm surge layer added to FLIPPER (online mapping system offered by OEM) • Alliance for Response conference July 2013 • LMS Information Bulletin with focus on insurance and webinar on surge impacts from Superstorm Sandy and mitigation measures April 2015 P1-16 24 _LINTS The Miami -Dade Local Mitigation Strategy Part 1: The Strategy August 2013 • Structural Sub -Committee Meeting • Grants/Finance Sub -Committee Meeting • Marine interests Sub -Committee Meeting • The Enhanced State of Florida Mitigation Plan approved by FEMA which increases the ceiling for the Public Assistance monies available through the Hazard Mitiga- tion Grant Program September 2013 • September 18 Quarterly Meeting open to the public • OEM provided access to the Public Works and Waste Management (PWWM) rain gauges that provide real time rain data from over 100 locations throughout the county. The Local NWS office requests this as well to help with local forecasting capabilities. • LMS Coordinator begins design and development of LMS Project Board for We- bEOC. October 2013 • The LMS Coordinator and the Steering Committee worked on updating the project prioritization tool for the project list. A proposed update was sent to the Steering Committee members and collectively they worked to modify the tool until it was agreed upon and adopted as the new Benefit Cost Review (BCR) process. The BCR was integrated into the WebEOC LMS Project Board and stakeholders were requested that all projects have a BCR score completed by June 30, 2014. The updated BCR tool may be found in Part 2- The Projects. • CRS/Flooding Sub -Committee Meeting • Fifth Annual Southeast Florida Regional Climate Leadership Summit November 2013 • Education and Outreach Sub -Committee Meeting • Miami -Dade Water and Sewer Department (WASD) provides a preview of a mod- eling tool developed in conjunction with the US Geological Service (USGS) that will assist local stakeholders in determining the potential risks of sea level rise based upon various inputs for levels of sea level rise and precipitation and evaluate how land use and water management inputs affect scenarios. December 2013 • All projects were migrated into WebEOC under the LMS Project Board. Active members of the Working Group were provided training; assistance and accounts to be able to input and update projects on the list. Additional information requested on projects included address specific information and flood basin information so that projects can -be -tracked geographically. -Part 2- The Projects provides more details on this component. OEM sponsored the FEMA L-278 class on the NFIP CRS to assist local flood plain managers in learning about the new changes to the CRS Coordinator Manual. This April 2015 P1-17 25 LMS Miami-1:4We The Miami -Dade Local Mitigation Strategy Part 1: The Strategy class provided a foundation for the expansion of Part 7 of the LMS to support our local communities and help provide uniform credits to all of the CRS communities. The LMS Coordinator, 30 local and regional communities and a newly appointed State CRS Coordinator attended the weeklong session, • December 11 Quarterly Meeting open to the public • OEM sponsored FEMA Benefit Cost Analysis (BCA) training. January 2014 • Regional LMS Coordinators (Miami -Dade, Broward, Monroe and Palm Beach Counties) met in relation to the integration of sea level rise into their respective LMS plans and discuss measures moving forward, • Annual update of LMS submitted to FDEM February 2014 • Community Preparedness Study implemented to learn more about preparedness, response and mitigation behaviors of the community. March 2014 • March 19 Quarterly Meeting open to the public • LMSWG is requested to assist with continued plan updates for the five year update • Hydrology/Topology layers including canals, basins, contour lines, ground eleva- tion and FEMA flood maps put on FLIPPER • New Impact Assessment tool introduced, that can be utilized to track event dam- ages and flood impacts April 2014 • OEM sponsors a Whole Community Planning Workshop to cover topics such as Community Awareness, Emergency Sheltering, Climate Change, Private/Public Sector Planning, Post -Disaster Redevelopment Planning and Storm Surge. • LMS Information Bulletin announces homeowner readiness workshops that LMSWG members can sponsor in their jurisdictions, May 2014 • May 21, IHRC hosts Wall of Wind Competition for local high schools • Feel the Force Event with displays and personnel to address hurricanes, storm surge and flooding. June 2014 ▪ June 18 Quarterly Meeting open to the public • The LMS Coordinator began integrating the list of completed projects into the LMS Project Board so as to track the projects ail in one place. In 2015 the task of geocoding locations to be able to track on a map where projects have been com- pleted and are proposed to take place will begin. • The LMS Coordinator set up a meeting with MDWASD to continue working on presenting and rolling out the new model to forecast potential areas impacted by sea level rise April 2015 P1-18 26 Miar e.0ade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy • On June 24, 2014, FEMA (through a contractor, Baker AECom) held the discovery meeting for the Southeast Florida Coastal Study for an updated RtSKMap project. Ninety-three people attended the meeting including representatives from munici- palities, county departments, regional partners, and a state representative. The coastal maps identified 28 communities locally that could be impacted by this new study. The collection of data will occur over the next two years with an anticipated date of 2019 for the new maps to take effect. July 2014 • OEM, WASD, PWWM, Miami -Dade Regulatory and Economic Resources (RER) Office of Sustainability and Office of Metropolitan Planning — Long Range Planning met to discuss the integration of the Adaptation Action Areas into the 2017 Com- prehensive Development Management Plan (CDMP). • Part 2 of the LMS updated on line August 2014 • CRS/Flooding Sub -Committee Meeting • Drafts of Part 1 and 2 of the updated LMS Plan sent to Steering Committee Mem- bers for review. September 2014 • OEM cohorts meeting with WASD to demonstrate the new sea level rise model to a limited group of stakeholders, The presentation was developed to help explain the complex hydrogeology of Miami -Dade County and provide an understanding of the base information utilized in the modeling scenarios. OEM, WASD, PWWM and RER will continue to work together to identify the potential impacts and edu- cate the community. • Additional draft portions of the five-year update are sent out to LMS Steering Com- mittee members for initial review and comment. • September 17 Quarterly meeting open to the public • LMS five-year update open for public comment and posted on LMS website October 2014 • Sixth Annual Southeast Florida Regional Leadership Climate MBA Summit � • LMS named a Weather Ready Nation Ambassador by the Na- tional Weather Service • October 31 closing date for'public comment for five-year up- W A H R-R- Y f 1TIO'N date of LMS • OEM begins update of THIRA, LMS Coordinator actively engaged November 2014 . •- - Project list updated for plansubmittal • November 24 submittal of five year update to FDEM April 2015 P1-19 27 LMS Miami-P.a€1e The Miami -Dade Local Mitigation Strategy Part 1: The Strategy December 2014 • December 10 Quarterly LMS Meeting open to the public Meeting to include presentation from RER adaptation action areas and how to re mediate flood damages • Vulnerability Modeling Workgroup meeting to discuss WASD/USES model January 2015 • Comments received from the State for the five year update • Annual update submitted to FDEM • Updates made to plan per State comments March 2015 , • March 18 Quarterly LMS Meeting open to the public • Voted on annual update of projects to be complete by October 31 each year • Voted on projects not updated by December 31 to be made Inactive • Voted on inactive projects not updated by the first quarterly meeting of the year to be permanently deleted • March 18 CRS Subcommittee meeting — CRS webinar and development of PPi Recent Development/Redevelopment Miami -Dade County Regulatory and Environmental Resources (RER) maintains a Com- prehensive Development Master Plan (CDMP) to guide future development looking out to the year 2030. A copy of the elements of the CDMP may be found in Part 4, Appendix H with a review of how these elements support mitigation measures and areas for con- sideration. As identified in Land Use (LU) Element, Miami -Dade is looking to emphasize development around centers of activities, development of well -designed communities• containing variety of uses, renewal and rehabilitation of blighted areas and contiguous urban expansion when warranted, rather than sprawl. LU-3D identified that the County shall coordinate with municipalities in Coastal High Hazard Areas and areas with repeti- tive losses to minimize demand for facilities and services in areas that result in redevel- opment and increases inresidential densities. LU-3E addresses an analysis on climate change and the impacts on the built environment addressing development standards and regulations related to investments of infrastructure, development/redevelopment and public facilities in hazard prone areas, LU-3K identifies an initiative to determine the fea- sibility of designating Adaptation Action Areas, areas that may be vulnerable to storm surge and sea level rise impacts and LU-3L identifies that the County will work with the local municipalities to do the same. There are currently nine projects identified in Part 2 of the LMS that specifically address sea level rise, Recent years have also shown increased vulnerabilities as the modeling and mapping capabilities improve and as more information is gathered on the potential impacts of cli- mate change and sea -level -rise. This version of the plan integrates -updated -information --- on storm surge and sea level rise and climate change into our hazards, mitigation measures, mapping and project list. LMSWG members continue to identify LMS projects' Apri12015 P1-20 28 LMS MiarroFDade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy to address aging infrastructure to deal with current and emerging threats, There are cur- rently over 600 projects identified for infrastructure improvements identified in Part 2. As an example, Miami Beach has been very proactive in installing new drainage infrastruc- ture and pump systems to mitigate seasonal king tides, which are perhaps a preview of what sea level rise may bring to some of our coastal communities. In October 2014, the elements of the mitigation projects that had been installed were tested by the seasonal high tide and were very successful in limiting sea water from coming up through the storm drains. Our communities continue to include mitigation in their development and redevel- opment projects through inclusion in their Master Plans and Capital improvement plans. Agencies are proactively including mitigation projects into their internal funding and cap- ital improvement budgets, over 160 projects have been identified with these funding sources identified, A 2014 analysis of our housing stock shows that 48% of our housing stock was built before the first FIRM maps were developed and 22')/0 of our housing stock was built before there were any special elevation requirements implemented by Miami -Dade County. The continued efforts to identify flood mitigation projects is reflected by the 237 identified flood and storm surge projects in Part 2 of the LMS. The LMS Project Board allows us to track mitigation measures by flood basins with the intent that we can coordinate efforts in areas of RL and SRL. As the FEMA FIRM maps were updated in September 2009 and new Coastal Flood maps are currently being studied and developed, and with the proposals of changes to flood policy rates, the LMS has embraced additional measures to help' in- tegrate CRS initiatives to assist communities with maintaining or improving their rating. Hurricane Andrew brought about improved building code requirements and currently about 26% of our housing stock has been built to higher wind mitigation standards since they have been adopted. In the Community Survey conducted by OEM, 57% of the re- spondents said they do have adequate materials to protect their home from storms and hurricanes. When we compared those that had experienced previous damage to those who did not we saw that 67% of those that had experienced previous major or cata- strophic damage had materials to protect their home as compared to 41% who had never experienced any damage. As many of the areas of our county are already developed, new development and re- development provide opportunities for structures to be built to or retrofitted to higher build- ing code standards that include wind and flood mitigation considerations. The Beacon Council reported that in fiscal year 2012-13 that companies interested in doing business in Miami -Dade invested $535 million in new capital investment projects. According to the first quarter Analysis of Current Economic Trends, prepared by the Regulatory and Eco- nomic Resources Department, the construction sector has grown 11% since last year but still remains lower than the 2007 peak. Foreclosure rates have declined significantly since 2014, 55% less. More than 1 million square feet of new industrial space has been constructed over the year and 1.7 million additional square feet are under construction. Representatives from RER and other local and regional planning entities are involved in the Miami -Dade LMS and continue to provide input and guidance to our plan. April 2015 P1-21 29 L WPM i-#fade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Measuring the Overall Effectiveness of the LMS Program The Miami -Dade LMS strives to continue to evolve and address theissues, concerns and challenges identified and encountered by our participants. Changes in personnel,phifting and diminishing funding sources, emerging and increasing threats and risk, aging infra- structure and housing stock and an increasing, diverse and transient population base necessitate the LMS to continuously take stock, re-evaluate and update the strategy. Table t shows an overview of how we have increased our effectiveness, Table 1: LMS Program Effectiveness Hazard Assessment • Incorporation of the Mlaml-Dade Threat Hazard Identification and Risk As- sessment (THIRA) provides one source for hazard assessment for the Mi- ami -Dade CEMP, LMS and stakeholder agencies, to utilize in planning and coordination efforts. 6 • Research and incorporation of climate change and sea level rise identifies potential future risk into THIRA • Incorporation of new and updated maps • Added an Economic Analysis (Part 4 Appendix J) to better understand the employment sectors and potential impacts Analysis of housing stock to look at structures built before flood plain map- ping and regulations • Identification of tools and software to help stakeholders assess and under- stand risk. Precipitation Frequency estimates from NOAA (Part 7) • New impact assessment tool, ARM360, provided through OEM to local stakeholders to assist with damage assessment after an event to better track and document at risk hazard areas and impacts (Part 7) Collabora- tion Integration • Collaboration with PWWM to access rain gauges and linkage with local National Weather Service to be able to better tie forecasting with real time monitoring for flooding. • Collaboration with the Office of Sustainability and participation In the Southeast Florida Regional Climate Change Compact has increased the number of planning agencies we are working with. • Collaboration with WASD to utilize the ground and surface water model, developed with USGS. Stakeholders were offered training on the software so they can run analyses to better identify the potential impacts of sea level rise at a local level. • Engaging agencies for the update of the NF1P Coastal Study for FIRM maps for Discovery Meeting held June 24, 2014 • Engagement of Alliance for Response (cultural community) including work. shops and exercise • Identification of the LMS as a Whole Community initiative • Review of community planning documents and identifying areas to better integrate mitigation into comprehensive planning and capital improvement - (Part 4 Appendix H and added Municipal Integration to Part 1 6EMAP4.4.5 April 2015 P1 ,22 30 L The Miami -Dade Local Mitigation Strategy Part 1: The Strategy • The State of Florida hired a contractor who provided suggested language for the incorporation of climate change and sea level rise into the State Enhanced Mitigation Plan, Miami -Dade used this as a guide in updating the THIRA. • A review of the action items in the Regional Climate Action Plan Implemen- tation Guide was performed and supported. (Part 4 Appendix H) • Hosted L-278 class to assist local communities with the changes in the CRS manual and to identify opportunities to include elements into the LMS, included ISO personnel and newly appointed state CRS Coordinator. • LMS Coordinator active in 2015 update of THIRA including new maps and identification of vulnerable areas in alignment with Comprehensive Prepar- edness Guide 201. Project Identification and Track- Public Awareness • Improved project tracking system through creation of Internet based board and encouraged participants to also track any projects that they are doing mitigation on to illustrate all of the mitigation work being done locally (Part 2) • Updated the project prioritization process, Benefit Cost Review, and built It into the project submittal process to help identify benefit of projects based on Suitability, Risk Reduction and Cost and Time. (Part 2) • Began adding previously completed projects to the archive list to build his- tory of mitigation measures. (Part 5) • Added Appendix 2 to Part 2 to track Deleted/Deferred Projects • Annual Feel the Force event at Museum of Science discussing the haz- ards, risks and how to prepare for hurricanes and storm surge. • 2014 Feel the Force Event, added flood hazard information to the event • 2013 public information campaign for the new Storm Surge Planning Zones • 2014 Community Survey to gauge the public's awareness of hazards and risks and provide information to the community on storm surge planning zones, evacuation assistance programs, how to sign up for pet -friendly shelters and how to receive alerts. (Part 4, Appendix L) EMAP 4.4.5 April 2015 P1-23 31 l�� LM� . Miami -Dade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy POLICIES, ORDINANCES AND PROGRAMS AFFECTING MITIGATION s There are many federal, state and county laws and pblicies that affect hazard mitigation and all the members of the LMSWG, Some of those are: Federal 1, The Robert T. Stafford Disaster Relief and Emergency Assistance Act, P.L. 93-288 as amended (The Stafford Act) is interpreted by Title 44 of the Code of Federal Regula- tion (44 CFR) and governs FEMA and emergency management and sets forth the federal concepts for hazard mitigation. It also defines the Coastal Barriers Resources Act (44 CFR 206 subpart J) and describes floodplain and environmental management (Parts 9 and 10). 2. The Disaster Mitigation Act of 2000 (DMA-2K) has also redefined parts of The Stafford Act and those changes have been incorporated into this document, Much of FEMA has been further redefined by the "Post -Katrina Emergency Management Reform Act of 2006," which was enacted by Congress and signed into law by the President in the fall of 2006. 3. The National Flood Insurance Program (NFIP) and the Community Rating System (CRS) FLA-15, July 1996, sets up a community rating system for flood insurance of- fering incentives for communities and credits for identified floodplain management ac- tivities. 4. National Fire Code, 1993 and NFPA 101 Life Safety Code define uniform fire safety standards adopted by rule by the State Fire Marshal. 5, Title 15 of the Code of Federal Regulations, which defines the Coastal Zone Manage- ment Act (15 CFR Parts 923 and 930). 6. Title 40 of the Code of Federal Regulation which defines the National Environmental Policy Act including such mitigation measures as included in the National Emission Standards for Hazardous Air Pollutants (Part 61), Toxic Substances Control Act (Part 763), the Resource Conservation and Recovery Act and CERCLA (the Super - fund), 7. Title 29 of the Code of Federal Regulations that defines the Occupational Safety and Health Act containing many hazard mitigation measures. 8. Presidential Decision Directives 39 and 62 are the authorities directing the develop- ment of terrorism response. s EMAP 4.4.3 April 2015 P 1-24 32 LMS The Miami -Dade Local Mitigation Strategy Miami-0We Part 1: The Strategy 9. Presidential Policy Directive (PPD) 8: National Preparedness was released in March 2011. The goal of PPD 8 is to strengthen the Security and resilience of the US through five preparedness mission areas — Prevention, Protection, Mitigation, Response and Recovery. a. National Protection Framework follows the guiding principles of resilience and scalability, a risk informed culture and shared responsibility. b. National Mitigation Framework establishes a common platform for coordinating and addressing how the Nation manages risk through mitigation capabilities. c. National Response Framework includes establishing a safe and secure environ- ment moving towards recovery. d. National Disaster Recovery Framework focuses on how to best restore, rede- velop and revitalize the community and build a more resilient Nation. 10, National Infrastructure Protection Plan (NIPP): provides a framework for programs and initiatives for the protection of critical infrastructure and key resources (Cl/KR) and ensures that resources are applied where they offer the most benefit for mitigating risk, 11, PPD — 21 Critical Infrastructure and Resilience establishes a national policy on critical infrastructure security and resilience State 1, State of Florida Statutes which are pertinent to hazard mitigation include: a. Chapter 161 — Beach and Shore Preservation b. Chapter 163 — Conservation, Aquifer Recharge and Drainage Element c. Chapter 255 — Public Property and Public Buildings d. Chapter 373 — Water Resources e. Chapter 403 — Environment Controls 2. The South Florida Water Management District is a regional government agency that oversees the water resources in the southern half of the state through managing and protecting water resources including balancing and improving water quality, flood con- trol, natural systems and water supply. 3. South Florida Fire Prevention Code 1992-93 (adopted by the County Commission) defines standards for fire prevention and allows controlled burns as mitigation. Federal, State and Regional Governmental Entities The federal, state and local entities that perform hazard mitigation functions are almost too numerous to name. However, some of the more prominent ones are: FEMA, the April 2015 P1-25 33 LMI The Miami -Dade Local Mitigation Strategy Miarin-bad Part 1: The Strategy Environmental Protection Agency (EPA), the Occupational Safety and Health Administra- tion (OSHA), U. S. Army Corps of Engineers (USACE), Natural Resources Conservation Service (NRCS), FDEM, Florida Department Economic Opportunities, Florida Depart- ment of Transportation (FDOT), South Florida Water Management District (SFWMD) and many more. The government entities that are located in and affect Miami -Dade County and its munic- ipalities that perform hazard mitigation functions are varied and represent all levels of government: federal, state, county and local. The Federal Emergency Management Agency has funded hundreds of hazard mitigation projects following Hurricane Andrew and to a lesser extent following the 1993 March windstorm or "Storm of the Century," the February, 1998 "Groundhog Day" storms and more projects have been implemented fol- lowing Hurricane Irene in 1999 and the October 3, 2000 floods (pre -Tropical Storm Leslie), the tornados of March 27, 2003, the hurricanes of 2004 (Charley, Frances, Ivan and Jeanne) and most recently: Katrina, Rita 'and Wilma in 2005 and Tropical Storm Fay in 2008. FEMA also delves deeply into mitigation as administrator of the National Flood Insurance Program to which ail municipalities in Miami -Dade County are part. The USACE is responsible for restoration and renourishment of most of the county's beaches, maintenance of the Intracoastal Waterway, maintenance of Government Cut and the Miami Harbor entrance, and some shared responsibility with the South Florida Water Management District for the canal and levee systems throughout the county. Mit- igation functions in these areas by the Corps are multiple and varied. The South Florida Water Management District is responsible for the operations and maintenance of the primary canals system, on behalf of the USACE, performing flood control operations, throughout the county, based on a schedule of operations, which de- termined when control structures are opened and closed. Flood control mitigation oppor- tunities exist to benefit ail of South Florida through the placement of new and maintenance of existing structures. These structures, located throughout the county, also mitigate against saltwater intrusion into the Biscayne Aquifer from which Miami -Dade County's drinking water is supplied. The United States National Park Service controls Everglades National Park that covers one third of the land area of Miami -Dade County and Biscayne National Park that covers over half of Biscayne Bay. , The United States Department of Agriculture's Farm Service Agency provides assistance to the farming community similar to that which FEMA provides to counties and municipal- ities. Also, the Natural Resources Conservation Service (formerly Soil Conservation Ser- vice) helps with mitigation such as canal bank restoration and stabilization. The United States Forestry Service and the Florida Division of Forestry both keep fire trails and fire breaks open, conduct controlled or prescribed burns and assist with debris clearance, all of which mitigate and facilitate fire control by keeping fuel levels low. April 2015 P1-26 34 L. The Miami -Dade Local Mitigation Strategy Miarra—Dade Part 1: The Strategy The Florida Department of Transportation must be a major participant in any mitigation endeavors undertaken throughout the county. They, along with the Miami -Dade Express- way Authority, maintain and control our major thoroughfares including the expressway system. They also control, along with Miami -Dade County PWWM, Florida East Coast and CSX railroads and the Town of Bay Harbor Islands, the twenty-three movable bridges that cross the Miami River and the Intracoastal Waterway. County 1. Board of County Commission Resolutions a. R-572-00, which establishes the Miami -Dade Local Mitigation Strategy as official county policy b. R-710-05, which authorizes the county manager to apply for, receive, expend and amend applications for projects listed in the Miami -Dade Local Mitigation Strategy. c. R-45.1-14, which requires all County infrastructure projects to consider potential impacts of sea level rise during all project phases. 2. Pertinent Miami -Dade County laws include codes and ordinances that govern the un- incorporated and municipal activities, as follows: a. Chapter 8(b) of the county code, which deals with emergency management; b. Chapter 11(c) , covering Development within Flood Hazard Districts; c. Chapter 17, i.e, the Housing Code, focused on maintaining the housing stock in decent safe and sanitary conditions; d. Chapter 18b covering right-of-way landscaping; e. Chapter 24 covering the activities of the Miami -Dade Division Environmental Re- sources Management (DERM) for permitting hazardous materials; f. Chapter 28 of the county code which deals with subdivision regulations;. g. Chapter 33, covering zoning activities for approval of a development of regional impact h. Floodpiain Management Program sets the criteria for elevations and assesses the risks for flooding for different areas of the County; i. Miami -Dade County Comprehensive Emergency Management Plan (CEMP) man- dates that municipalities have emergency management plans, as well as recom- - mends the performance of hazard mitigation activities; April 2015 P1-27 35 �S Miami -Bade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Miami -Dade County Comprehensive Land Use Plan dictates current land use and controls future land use and growth throughout the county; k. The Public Works Manual, especially Section D5, concerning coastal construction; I. Dade County Environmental Protection Ordinance, Coastal and Freshwater Wet- lands Regulations, Sections 24-58 and 24-59. 3. Miami -Dade County. Landscape Maintenance Special Taxing Districts provide tree - trimming programs that prevent more severe damage during windstorms. 4. On March 1st 2002 the Florida Building Code (FBC), was adopted by Miami -Dade County and all the Municipalities, consequently replacing the South Florida Building Code. The High Velocity Hurricane Zone (HVHZ) portions of the code are applicable to Miami Dade and Broward Counties only, the HVHZ sections of the FBC in addition to the most current ASCE,- 7 standard contains a stricter design and construction measures, especially to protect windows, walls and roof from wind -born debris. In 2012, the FBC was amended to include flood protection measures and use of ASCE- 24. 5. The Local Law Enforcement Mutual Aid Agreement with Miami -Dade County designed to coordinate and supplement local resources. 6, The Statewide Mutual Aid Agreement for Catastrophic Disaster Response and Recov- ery establishes a local resource for all Working Group members that are presently signatories. 7. The Southeast Florida Regional Climate Change Compact set forth an agreement,be- tween Miami -Dade, Broward, Palm Beach and Monroe Counties to work in collabora- tion to address the impacts of climate change on Southeast Florida, The Climate Change Action Plan was subsequently developed to identify and pursue reduction and resiliency measures in the region, County Programs Stormwater Management Masterplan This program has the responsibility of the evaluation of flood protection levels of service. The Stormwater Management (Drainage) Level of Service (LOS) Standards for Miami - Dade County contains both a Flood Protection (FPLOS) and Water Quality (WQLOS) component, The minimum acceptable Flood Protection Level of Service (FPLOS) stand- ards for Miami -Dade County shall be protection from the degree of flooding that would result for a duration of one day from a ten-year storm, with exceptions in previously de- veloped -canal -basins, -where -additional developmenttothis-base-standard-would-pose a risk to existing development. All structures shall be constructed at, or above, the minimum floor elevation following the latest version of the Florida Building Code or as specified in April 2015 P1-28 36 LMS The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Chapter 11-C of the Miami -Dade County Code, whichever is higher. The incorporated areas of the county (municipalities) may have adopted stricter elevation standards. Subdivision and Other Regulations, Miami -Dade County Code imposes certain developmental requirements before land is platted. These relate to the provision of water and sewer facilities, local streets, sidewalks, drainage, and open space. Before use permits or certificates of occupancy can be issued Section 33-275 of the Miami -Dade County Code requires that adequate water, sewage and waste disposal facilities be provided. Shoreline Review. The Shoreline Development Review Ordinance was adopted in 1985 and prescribes min- imum standards for setbacks, visual corridors and, with its' accompanying resolutions, sets out a flexible review process through which architectural interest, building orientation, landscaping, shoreline use compatibility, access, and other design related elements can be negotiated with the developers and enforced by the local governing jurisdiction. Area Plan Report Since 1998, Area Plan Reports have emerged as a preferred planning technique for community visioning and helping to find answers to fundamental planning questions. An Area Plan Report is a practical planning technique, which blends public participation, detailed planning, and the development of implementation toois. Its principal focus is the creation of planning products (instead of processes, Public participation is indispensable for a successful Area Plan Report. The overriding objective is the creation of a detailed plan, which resolves areas of concern identified in the Area Plan Report study area; often these concerns involve capital improvements such as roads, sewers, sidewalks, parks and other community improvements. The Planning and Zoning Divisions of the Depart- ment of Regulatory and Economic Resources (RER) implements the Area Plan Report process as a collective planning effort that develops a small area plan which incorporates the priorities of a community, Coastal Management The Beach Restoration and Preservation Program is Miami -Dade County's mechanism for initiating and coordinating federal and/or State projects essential to the protection and recreational viability of Miami-Dade's ocean shoreline. Local participation in the determi- nation of activities pertaining to beach restoration and preservation is included in the pro- gram. The County has benefited from large federal and State funding contributions and the expertise obtained as a result of the program. Most notably, the Miami -Dade County Beach Restoration Project now provides hurricane and erosion control protection for up- land property and a vast recreational resource for public use. This project replaced a seriously eroded shoreline sustained only by bulkheads and seawalls, which offered little protective or recreational value. Implementation of erosion control projects is based on the following criteria: 1, Need for protection of public safety and property in areas threatened by coastal erosion. April 2015 P1-29 37 LIN/S The Miami -Dade Local Mitigation Strategy Part 1: The Strategy 2. To provide enhanced beach -related recreational opportunities for both visitors and Miami -Dade County residents. 3. To provide more effective and efficient long-term management of our natural and restored beach systems. The Biscayne Bay Restoration and Enhancement Program objectives are to maintain or improve ecological, recreational, and aesthetic values of Biscayne Bay, its shoreline, and coastal wetlands. Projects include shoreline stabilization, mangrove and wetland habitat restoration, and bay bottom community enhancement at parks and other public lands. These contribute to erosion control, water quality, and fisheries and wildlife re- sources. Future capital expenditures will be directed primarily towards maintaining and enhanc- ing durability of restored beaches and to environmental improvement of the Biscayne Bay ecosystem. All of these projects are developed and carried out based on the best scientific and technical information available to the agencies involved. Municipalities 1. The Basic Emergency Management Plan sets forth the procedure for all activities of the municipality before, during and after emergencies. 2. A Stormwater Management Plan, which is focused on flood -related hazards and de- fines the relevant mitigation goals, evaluates appropriate and feasible mitigation measures and prioritizes such measures into an Action Plan for systematic implemen- tation. 3. A Floodplain Management Plan manages development in the floodplain. All cities within the county are striving to establish a floodplain management plan and partic- ipate in the Community Rating System. NFIP has stated that the LMS may serve as a floodplain management plan for its participants. 4. A Comprehensive Land Use Plan controlling growth and development within the municipality. Municipal Agencies and Their Mitigation Functions The municipalities of Miami -Dade County each have within their structure certain depart- ments and agencies which affect and promote mitigation. While these agencies may have slightly different names from city to city, the role they perform in the mitigation func- tion remains the same (e.g. public works ortpublic services or community services, etc.). April 2015 P1-30 38 LMS tWi3rr�iwD�cie The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Miami -Dade Public Works operates and maintains and operates drainage systems and the secondary canals throughout the County, working with the SFWMD to implement flood control operations, when required. Police and fire rescue departments: Each of the municipalities except Miami Lakes, Pal- metto Bay and Cutter Bay maintains its own Police Department while the cities of Coral Gables, Hialeah, Key Biscayne, Miami and Miami Beach maintain their own fire depart- ments, with the balance of the cities using Miami -Dade Fire Rescue for this service. Emergency responders are essential for alert and notification, lifesaving response, pre- vention and protection activities that all contribute to lessening the impact of disasters, The police and fire departments also conduct educational seminars to residents to spread awareness on emergency preparedness. The building department (or building & zoning): The functions of this department relate extensively to a wide range of mitigation projects and on -going mitigation activities. In most of our cities, the Building Official is responsible for interpreting and enforcing all laws, codes, ordinances, regulations and municipal policies related to the construction, improvement, expansion, repair or rehabilitation of buildings within the city. This depart- ment ensures that all new construction complies with the Florida Building Code which in itself is a major contribution to hazard mitigation. The department usually is responsible for the management of development in Special Hazard Areas; preservation of open space; general control of land use intensities; and coordination between the capacity of public infrastructure in relation to proposals of private development. This department also ensures all proposed development in the city conforms to the city's comprehensive plan as it relates to urban design of public areas and buildings, infrastructure planning and maintenance of flood data and other statistical information. Planning and Development Department: Often is a part of the building department and even, at times, a part of public works, However, a number of our municipalities maintain planning and development as a separate entity which interacts within the mitigation strat- egy in many ways and must be part of the overall strategy especially in the area of urban land use. Public Works Department: In most of our cities this department is responsible for con- struction and maintenance of roads, bridges and waterways and storm water manage- ment including drainage system development, inspection and maintenance, all functions that relate in various ways to hazard mitigation. Public works activities are a major com- ponent of any mitigation strategy. Analysis of Existing Policies, Ordinances and Programs -In 2014 the 1-MS Coordinator performed a review of a number of local policies and plans to create an Integration Document (Part 4 Appendix H). Additional LMSWG members April 2015 P1-31 39 L.M> i iar i-Dacte The Miami -Dade Local Mitigation Strategy Part 1: The Strategy were invited to participate and assist by reviewing the Integration Document and identify- ing and reviewing other local policies, ordinance and programs so we may better identify areas where we are in alignment or areas for consideration where mitigation may be bet- ter aligned. As can be imagined, in a county as large and diverse as Miami -Dade, there are numerous planning agencies and documents that are developed. Each many times addresses the needs of their focus (e.g. transportation, emergency management) and each seems to have a different threshold for how often the plan is to be updated and the planning horizon to which it assesses the consideration of hazards and risks. The Integration Document included in this version should be viewed as a starting point for the LMSWG to discuss, review and identify areas were we as a whole community can be more effective in our approach to mitigation and resiliency. The Integration Document includes reviews of the following: • Southeast Florida Regional Climate Action Plan • Miami -Dade. Comprehensive Development Master Plan (CDMP) • Miami -Dade Emergency Management Recovery Plan • Miami -Dade 2035 Long Range Transportation Plan • Florida Administrative Code 9J-2.0256 As the population grows in Miami -Dade County, hazard mitigation laws must address new structures being bui[t in areas susceptible to unusual occurrences either through prohibi- tion, limitation or tougher code to reduce potential losses. For example, new building construction in low lying flood areas must be limited or built in such a manner to minimize impacts from flooding. Similarly, future construction sites of natural gas, electrical and nuclear power plants must have mechanisms in place that will self -contain, or significantly limit, effects of potential catastrophic incidents. As identified in the Integration Document the Miami Dade CDMP Plan addresses a number of planning and zoning issues and the prevention or limitation of development in risk areas. Adaptation Action Areas are being incorporated into the CDMP and they should also be considered in relation to recovery and post -disaster redevelopment. Local government and the private sector must provide ongoing training and information sessions for the public. Clear, unbiased knowledge is a key ingredient for safety en- hancement for the public. Ongoing training could include public information notices and continuous training sessions at local libraries, hospitals and schools, Part of the cost for this training should be borne by those private parties who ask or have businesses that may contribute to an unusual occurrence. For example, construction of a new electrical substation, a natural gas company building a new facility, a professional -dry cleaner es- tablishment, a new gas station, etc, would have impact fees assessed to offset the miti- gation training costs. April 2015 PI-32 40 LI JS ~9i4filli-made; The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Training and equipment to prepare for and subsequently resolve hazard situations are necessary and vital. Alternative financial resources must be assessed and located in addition to including these costs in all respective governmental budgets. Periodic review and revision of the local government ordinances, policies and programs must occur no less than once every other year, Each municipality that has not yet done so should adopt a floodplain management ordi- nance and participate in the community rating system program. At the present time, the Miami -Dade Local Mitigation Strategy will serve as a floodplain management plan if adopted by a municipality. Municipal integration of Mitigation Measures The following section identifies how the participating municipalities have incorporated mit- igation into their planning processes, policies and/or ordinances. The municipalities con- tinuously strive to expand and improve upon their mitigation measures as is illustrated below and with the extensive listing of mitigation projects identified in Part 2. Aventura ,r jYi ''rq �jy ry 1 UY i A�FZ 4 Xk b— t� { 111 it4 Y ,n? v 1-I F' }'v �1'"� 1 �yy �P-«^ ;/$- �x�i £ S� � 'h'fY N J r k1F"j7 tip' to k' Y ,,T. ��i"� �'� anto.L y. l SY � 2' <1,, dfji., v uYaF �r k `h` �i �^ ,z�T"'-ni"'a '{d } y d - . i1g UT 0f] �e !atr .;, r:: t. « .;rt..� ? r4 x'.� .. € juE: „ :r, a, �5 ri , r, n ,s � . K ;w policy 1,9: The City of Aventura, in consultation with the Florida Department of Transportation, shall evaluate the Impacts of proposed development and redevelopment on its transportation system, Strategic Intermodal System facilities, and the adopted level of service standards of transportation facilities, and identify strategies to alleviate or mitigate such impacts in coordination with the developer and other agencies as appropriate. The City shall coordinate with FDOT, Miami- Dade County, and 28 other Jurisdictions In the county in the develop- ment of common methodologies for measuring such impacts. t 1 h ff s V �{ E r me �' ,)J�y�,S,z asetCg�(> 1 a i 4 dI ,{/- �t�sx ?�rX, a2 Y` y..0 �i �1(� a rye _.# � �.. ^r ; '�' m }...11 i, �,+'• p,1l r{i , ,1t GCG C�a IG�T y Y $fL W rttr i> j{t ,. AL(�k 4 �a��� 1 i Je �y �x''. ,., p, -tY { -J7 ,. Objective 4: Aventura shall protect and preserve the biological and hydrological functions of the wetlands iden- tified in the Land Use Element, Future impacts to the biological functions of publicly and privately owned wet- lands shall be mitigated. Publicly acquired wetlands shall be restored and managed for their natural resource, habitat and hydrologic values. 4 L _ y ' V c.rF. Yy.' `' f SrJ 1fk hfi. GaRH„ e�� � h3 <'C'51 T f�<+. r -, '^I.,,J� ,,, F .l'7..^."7F' '$ fY'J' L'. T Y 4 NW h v � �S ieF J i _ .., ,. .._..- v��.t.. � � � .� :c �.-'c�� }�.di-�SFa��, v} Objective 3: Future development will be permitted only when the adopted level of service standards for those services listed in the CIE will be upgraded or maintained at adopted levels of service, or when demonstrated negative Impacts on.hurricane evacuation clearance times will be mitigated, by ensuring that adequate fiscal resources are made available including, the proportionate cost of Improvements necessitated by the develop- ment, j9J-5.0 t6(3)(b)3J g7y �-�Y t{1 }� y2�,. § ti.cT.p � ro}; 7}<� at--f r,rr n hL} �t ' rn,t FS{.,n,,.'.7tl N{,„10 �L1. � F k •'k �i� �.i` S'L �� L fi ,J i, 4 b. xi'v .W �$' .x uH . ..r _ .414010R. ?a a e� d}.rt, r ::F:t, n . _, . ,i... r„ i c-.., �+. .,i - Policy10.2: Structures which suffer recurring -damage to pilings, foundations or -load -bearing walls -shall -be re- quired to rebuild landward of their current location to modify the structure to structurally enhance the struc- ture, institute or mitigation measures or delete the areas rnost prone to damage„• April 2015 P1-33 41 S .Ll M. Miami -Fade The Miami -Dade Local Mitigation Strategy Part !: The Strategy ik8 tIf Policy 10.14: The City shall implement Its local mitigation strategy in accordance with the guidelines provided in the Local Mitigation Strategy: A Guidebook for Florida Cities and Counties In order to fulfill the requirements of Rule 9J 5,012, F,A.C. relating to post -disaster planning, repair, and reconstruction. Bal Harbour PLl�DG}.1 �� k3�i' X`?IPS�, �kj£ r,n3-Myi..l',�-r Yd i,i�4���'1 PrIr u�j{ 6 3 1-g. jy4t�j[{ ++ `/ a.,-L tt {7��^.�! ��} a.� ' C- ",-.. P;4.4,7 k rt,, w Yai �L � � t R� a�'7'.i''-n'l .rn� LU,(4 '� �{ryi 46 AY�V— �'4.7., �1F Y0. y '•r,F' 1,i.,C is y}, iY RA d 'SF'. .-'x1t �,1]'3�Y.�`. '� r i .•�,.Y' Yiy 1 \ .�A.-3_�. -, 3zrY�S. .4..,, 4. r.r{i i"", !# A,., .$ C��� ��,F.�;)t.��r�,.x„A!'p ��. * .L , c3'`_ �x S w �..��.i( I 7� �{ r n �F�3�"--`�it "� � ��ia 1 }�+.'"`� Objective 9J-5,006(3)(b)4: Protect natural and historical resources Policy: Developments and construction that adversely impact on the quality of the natural environment shall not be allowed. vA.an m&,t.+.emW_ .' -_."9 att,.,.,Zr`.,1F`FK?,"'-t _': .SRn?ury Objective 2,2 Hazard Mitigation and Coastal High -Hazard Areas: the Village of Bal Harbour shall ensure that building, development and redevelopment activities are carried out in a manner which minimizes the danger to life and property from hurricanes, Development within coastal high -hazard areas shall be restricted and public funding for facilities with coast high -hazard areas shall be curtailed. • Policy 2,2,01: The hazard mitigation section of the Dade County Hurricane Procedure Plan shall be reviewed and updated on a 5-year basis. In the rewrites, the Emergency Management Director shall identify specific actions that could be Implemented to reduce exposure to natural hazards. • Policy 2.3.06: The Recovery Task Force shall propose comprehensive plan amendments which reflect the recommendations in any interagency hazard mitigation reports or other reports prepared pursuant to Sec- tion 406 of the Disaster Relief Act of 1974 (PL 93-288), • Policy 2.3,07: If rebuilt, structures which suffer damage In excess of fifty (50) percent of their appraised value shall be rebuilt to meet all current requirements, including those enacted since construction of the structure, • Pollcy 2.3.08: Structures which suffer recurring damage to pilings, foundations, or 'loadbearing walls shall be required to rebuild landward of their current location, to modify the structure to structurally enhance areas most prone to damage. the structure, institute other mltigation measures or delet�eue. 6`_� �t1he ..:'''T,I^r+.-,. t i` +, ,�� ASU 'i x s °�`"'�i }1 ii; zk ttocr..'.' d;^�g, .r.��i�wi?,$rrjdV h i:.4 �• i }" �'" tY! y.�(fr %a ,?+ha ..,, ..,i,?�"6iiI,,�Fc;.E , i?;C ,�7r{+i?di,n.:�s:4. :t .. 1....Trti.i: ,.>.,.xl�r. z....1'�% .. * _; abyAi.;�..,. M1, '... fr`�h,,.6; 1; i;,rlv..; Bay Harbor Islands Sec. 11-5. - Seasonal and periodic flooding; protection of lives. (a)The regulation of areas subject to seasonal and periodic flooding as provided in the comprehensive plan, pol- icies 1,1(4) (page 35), 3.2 (page 36), 5.2 (page 37), and objectives 3 (page 36) and 5 (page 37) shall be imple- mented by the Code of Ordinances, including sections 5-17, 5-23,1(A)(3), (4) and sections 23-11(A)(5) and 23- 12(12). (b)While it is hereby declared that Dade County has retained the primary responsibility for seasonal and periodic flooding throughout the county as provided In county Ordinance Nos. 57-22 and 57-30, as amended, the town's Code of Ordinances shall further implement the goals and objectives of the county ordinances by re- quiring compliance with all minimum federal flood Insurance elevations for ail new construction and for which land use densities and intensities have been adopted in further support thereof. (c)The protection of lives as provided in the comprehensive plan, policy 5.2 (page 37), shall be implemented by the Code of Ordinances, including section 5-1, and by virtue of the Miami -Dade County retention of primary April 2015 P 1 -34 42 LM Pltarni-bade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy a g alebo i§tld i L� `4 '��,.Fax„ frif�yp' e` +y_�j i fs ..YG,};�Y�C .7 i f'^, responsibility for hurricane evacuation, including responses to (ifesaving and other types of emergency evac- uation. The town shall continue to coordinate and assist the county by providing minibus mass transportation to designated areas, information dissemination, and such other acts as shall complement the overall mass transit/public notice and evacuation procedures implemented by Miami -bade County, Florida. While the county has retained the right to regulate land subdividing through the subdivision regulations, nevertheless the town shall continue to coordinate its efforts with the appropriate county agencies, (d)The town has adopted and shall maintain in full force and effect written hurricane procedures, as amended from time to time, (e)Drainage facilities for flooding and a nonpoint pollution, as provided in the town's comprehensive plan, policies 1.1.1, 1,1,2 (page 58); 1,3.1(page 59); 2.1,1 and objective 2 (page 60); capital improvements policies 1.2, 1,3, 1.4 (page 19); and land use policy 1,3 (page 37) shall be implemented by the Code of Ordinances, including sections 5-1 and 5-17, in that the town collects and discharges stormwater runoff through inlets for the resi- dential districts and Into two drainage wells for the commerciai districts, The town shall continue to coordinate its efforts with Dade County, particularly with reference to protecting and preserving Biscayne Bay, The town shall continue to review its land development regulations to ensure the standards as indicated in the town's comprehensive plan, (Ord. No. 488, § 5, 5-29-90; Ord. No. 783, § 4, 12-8-03) 0,4 April 2015 P1-35 43 L.M$ f+ ?r Kal The Miami -Dade Local Mitigation Strategy Part 1; The Strategy 111 Sec. 7/2_26, - General standards, In all areas of spedal flood hazard, all development sites including new construction and substantial improve- ments shall be reasonably safe from flooding, and meet the following provisions: (1) New construction and substantial improvements shall be designed or modified and adequately an- chored to prevent flotation, collapse, and lateral movemerit of the structure resulting from hydrody- namic and hydrostatic loads, including the effects of buoyancy; (2) New construction and substantial improvements shall be constructed with materials and utility equip- ment resistant to flood damage; (3) New construction and substantial improvements shall be constructed by methods and practices that minimize flood damage; (4) Electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities, includ- ing duct work, shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; (5) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems; (6) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters; • (7) On -site waste disposal systems shall be located and constructed to avoid impairment to them or con- tamination from them during flooding; (8) Any alteration, repair, reconstruction or improvements to a building that Is in compliance with the pro- visions of this chapter shall meet the requirements of "new construction" as contained In this chapter; (9) Any alteration, repair, reconstruction or improvements to a building that is not in compliance with the provisions of this chapter, shall be undertaken only if said nonconformity is not furthered, extended, or replaced; (10) Ail applicable additional federal, state, and local permits shall be obtained and submitted to the fload- plain administrator along with the application for development permit. Copies of such permits shall be maintained on file with the development permit. State permits may include, but not be limited to, the following: (a) South Florida Water Management District: in accordance with FS, § 373,036(2)(a)—Flood protec- tion and fioodplain management; (b) Department of Community Affairs: in accordance with F,S, § 380,05— Areas of critical state con- cern, and F.S. ch, S53, part IV —Florida Building Code; (c) Department of Health: in accordance with F.S. § 381.0065—On-Site Sewage Treatment and Dis- posal Systems; and (d) Department of Environmental Protection, Coastal Construction Control Line: in accordance with F,S. § 161,053—Coastal Construction and Excavation, (11) Standards for subdivision proposals and other new proposed development (including manufactured homes): (a) Such proposals shall be consistent with the need to minimize flood damage; (b) Such shall have public utilities and facilities such as sewer, gas, electrical, and water systems lo- cated and constructed to minimize or eliminate flood damage; and (c) Such proposals shall have adequate drainage provided to reduce exposure to flood hazards, (12) When proposed new construction and substantial Improvements are partially located in an area of special flood hazard, the entire structure shall meet the standards for new construction, (13) When proposed new construction and substantial improvements are located In multiple flood hazard risk zones or in a flood hazard risk zone with multiple base flood elevations, the entire structure shall meet the standards for the most hazardous ffood hazard risk zone and the highest base flood elevation, April 2015 P1-36 44 L. The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Biscayne Park *16nAgimeiit 111 -,Ms, 1 Policy 4.2 The Village shall encourage the Implementation of low Impact development techniques and green building standards that reduce the negative environmental impacts of development and redevelopment by: re- ducing building footprints to the maximum extent feasible, and locating building sites away from environmentally sensitive areas; promoting the preservation of natural resources; providing for on -site mitigation of impacts (1.e, retention and treatment of stormwater runoff, water reuse, Master Stormwater Management Systems); promot- ing energy conservation through design, landscaping and building techniques (Le, solar power, increased tree canopies); promoting water conservation through landscaping and building design; ensuring environmentally friendly building practices (Le. use of environmentally friendly building materials, recycled materials), and; con- sidering the development of a and implementation of a green building certification program, with associated regulations, incentives and standards. FrA7bIjcFateEtementgadMISIM — - Rft-3200:51418.00WW-l'AM.:4 GOAL- DRAINAGE: THE GOAL FOR DRAINAGE IS FOR THE VILLAGE OF BISCAYNE PARK TO CONTINUE MAINTENANCE OF THE LOCAL DRAINAGE SYSTEM TO AFFORD REASONABLE PROTECTION FROM PREDICTABLE FLOODING. The drainage objectives to achieve the goals and which address the requirements of paragraphs 1633177 (6) (c), 5,S., and 9J-5.011 (2) F.A.C. are as follows: OBJECTIVES AND POLICIES Objective 1 To review on an annual basis information on the performance of stormwater drainage facilities, Policy 1.1 The Village will continue to comply with the 1 0 year design storm level of 10 year design storm level of service standard for stormwater drainage. Policy 1.2 The Village will continue to maintain and monitor local drainage, Coral Gables The City Manager is the Director of Emergency Management for the City. The City Man- ager has designated an Emergency Management Coordinator to head the Emergency Management Division. Emergency management functions are also part of the day-to-day functions of certain departments, such as the Police and Fire Departments, While the routine functions of most city departments are not of an emergency nature, the city may utilize all of its officers and employees in the city's efforts to respond and recover from emergencies. This responsibility entails a day-to-day obligation to assess and report the impact of an emergency event, It requires monitoring conditions and analyzing infor- mation that could signal the onset of an emergency event. The current overall city plan is documented in a Comprehensive Emergency Management Plan (CEMP). This CEMP describes the basic strategies, assumptions and mechanisms through which Coral Gables will mobilize resources and conduct activities to guide and support local emergency management efforts. The, CEMP also includes an annex dedi- cated specifically to mitigation, City of Coral Gables CEMP Annex 1, Mitigation. April 2015 F'1-37 45 4iang,riaale LMS The Miami -Dade Local Mitigation Strategy Part 1: The Strategy .. ,isle. -k y NGf A7� r "y.i'xF Y1.3 rS1 irz Gpi .'fti�T2.fy did* Q9i*,%riIyt "pdt,uS:Oti,s r,r.3iE�m.g nl' ��"'ia.: ,-,`, .•,..r�.,. r ��11Qi1rE# x7*fign. Yt ;'.'.:tr£ x.,:1.srrl."�. .t{rjn�a.•*r��,zx_.M.fi`a'`.". r'^-%sht'.r-= .i».'tf,.': Section B: Coral Gables Mitigation Programs and Department Responsibilities Note: Details and further information is contained in the Miami -Dade County Local Mitigation Strategy. (Page 3,) Section B: Coral Gabfes Mitigation Programs and Department Responsibilities 7, Mitigation Projects Completed. a The Clty's Local Mitigation Strategy identifies mitigation projects that have been completed and pro- vides a list of future projects to be implemented as fundinvgg becomes available. (Page 6.) S i1.j� ^,L �j��,�`��, } f�� 2Y^Tfat'Sh�'xf lj'3 h, h z �i{,x-S� 1���Y�, Lrf3.4 .�k��",d,.- `'. '.'".,,—,,,M' H1a§5"Y , P1.rt 4, .. ."i:.•'... y3'Q N, ..1 ;?�;,.. .t.l.Y,...i l,l :3J�:,...Y.. chi,,:; 3x hti.F�. .l.�., ... �:«cr. `_'.., .rC-.—w»'V. +,'�r'l .�in'a k p.•.);t'I'r.Ffi .,.-F'tr..4, Objective SAF-2.2: Assure that future development or redevelopment maintains or reduces hurricane evacuation times. The City establishes an out -of -county hurricane evacuation time for a category 5 hurricane of 16 hours, Mitigation is per- mitted to achieve and maintain these standards. Policy SAF-2.3.2: Annually incorporate recommendations of interagency hazard mitigation Into the Comprehen- sive Plan and Post -Disaster Redevelopment Plan. The redevelopment plan shall identify areas which may war- rant post -disaster redevelopment, including elimination of unsafe conditions and inappropriate land uses, and limitation of redevelopment in areas of likely repeated damage. Cutler Bay The Town of Cutler Bay passed Resolution No. 14-55 for adoption of the 2010 Miami - Dade County Local Mitigation Strategy; authorizing the Town Manager to identify and prioritize hazard mitigation grant program projects to become a part of the Local and Statewide hazard mitigation strategy. In addition the Town of Cutler Bay has integrated mitigation locally through the following plans: .::: .,.��;.r• ,:-e »fit: . c;rix ^ ix a J i S ( S `'�Y� -! _ � � .S : fU�� �fc-k,�9'L��,=C � �3 5'fp i 'S1� AtAln oqf t4ll>1 1� h2trt rra � fXf iyT �1 gyp& i# U !t`+�•r7i. i @ �� 5' `,i :.1. r F "t . �-rr x�'"'-yr >ia�S7�(". -i ?;t a-.,. 5;,, ln-; .. N .., , r,, .. t L•ciis QY , ,'r r! „5 1m-n, 1r,.:. r.. .-'�a7r+•'nr ,'„S..i Policy FLU-8C: Policy FLU-8C: New schools will Policy FLU-8C: minimize negative impacts on surrounding areas through site location, configuration, access and development. Conversely, new development and redevelopment shall minimize and/or mitigate negative Impacts on existing school facilities. Policy FLU-91V1: Policy FLU-9M: The Town shall Policy FLU-9M: require developers to identify and mitigate con- straints based on soils, topography, and floodplains. Policy FLU-11E: as appropriate and feasible, shall encourage the elimination or reduction of uses that are Incompatible with hazard mitigation goals and interagency hazard mitigation report recommendations. p �:,rw(F1 1iXp , `yy. , 1 4 % { Y t �. {'t.. .. rfIL •ryc . L'• n�r1 :E f Y .4 47 kx T,=.-� C �uki i �?'YR itil"F, '»'»��rv�.�I�Ri.i,�`��-,' �,. �k� /,Vu',�,f�ix3K di�..'m".'tRc�.. �YF .G. f.�:T.' ,4�....LS{C�', F`T'iL „�.��E r'.�.H,�). �'tti.`. ��{-.a .:r�J....h.aA.�R Y.'Y.lr1. i�.SAiF�Yn�"iZ'� —%. 1s: Monitoring Measures H2-1: 1, Land Development Regulations that mitigate regulatory barriers or provide incentives for the provision of a variety of housing types. 2. Number of cost burdened households by income, age, and special needs group and tenure 3. Housing costs � rt^ 1 il �' Cr S, � Yt`''Gz.rr rr � a t h �' �¢k 3�'t U'+i �,..�"�. x+ r-' x T� a:1y; `p tg,, n,[r"'..ui rg'.l�r,"ra3.-zar''. .F�;:Srt � sv. .Lr �"Yi� —...?<r,. „1 ix.1r d.. Q f.: nl- sT+,x ft^y,f::: K2fI ftf �:w `2',i Z. �I,� .. � � , ,.MS f!r G sr � r� � t'3 h .. a- ri 'Xr'�'^ >� � '� �i Policy CM-3C; Town will establish development standards In the Land Development Regulations for siting future water -related uses that address land use compatibility, availability of upland support services, existing protective status of ownership, hurricane contingency planning, protection of water quality, water depth, environmental disruptions, mitigation actions, availability for public use, economic need, and feasibility April 2015 P 1-38 46 S LM MianaieDade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy enA, entail Objective CM-4; Through compliance with Federal Emergency Management Agency (FEMA) regulations and by targeting repetitive flood loss and vulnerable properties for mitigation, the Town will reduce natural hazard im- pacts, Objective CM-7: The Town will coordinate with the Miami -Dade County Office of Emergency Management (OEM) to develop and implement post -disaster redevelopment and hazard mitigation plans that reduce or eliminate exposure of life and property to natural hazards towards the protection of health, safety, and welfare. Policy CM-7A: inconsistencies are found with the policies under this objective and the post disaster redevelop- ment and hazard mitigation plans of the Miami -Dade County Office of Emergency Management (OEM), the Town will notify and coordinate with OEM. Policy CM-711 Recovery Task Force shall review and decide upon emergency building permits; coordinate with Miami -Dade County, state and federal officials to prepare disaster assistance applications; analyze and recom- mend to the Town Council hazard mitigation options Including reconstruction or relocation of damaged public facilities; develop a redevelopment plan; and recommend amendments to the Growth Management Plan and other appropriate policies and procedures, Objective CM-8: The Town will reduce the exposure of life and property to hurricanes through the planning and implementation of pre -disaster hazard mitigation measures. Pre -disaster planning for post -disaster redevelop- ment shall direct population concentrations away from the undeveloped Identified high -risk areas during post disaster redevelopment, Policy CM-8C: During pre -disaster planning, hazard mitigation proposals shall be developed by the Town in con- junction with other agencies and, where appropriate, included in the Town's Emergency Response Plan or the Growth Management Plan. Policy CM-8D: Town locates facilities, the Town shall determine the feasibility and necessity of relocating public buildings away from high -risk areas. The Town shall develop a formai process and guidelines for evaluation alter- native to the replacement or repair of public facilities damaged by hurricanes such as abandonment, relocation, or repair and reconstruction with structural modifications, The costs; environmental impacts; mitigative effects; community impacts; economic development issues; employment effects; legal issues; consistency with local, re- gional and state plans; time period for implementation; and availability of funds should be evaluated for each alternative. Objective CM-9: During post -disaster recovery and redevelopment, the Town shall implement its Emergency Response Plan (ERP) and applicable Growth Management Plan policies and assist hurricane damaged areas with recovery and hazard mitigation measures that reduce the potential for future loss of Ilfe and property. Policy CM-9D: The Town will Policy CM-9D: enforce applicable recommendations of post -disaster hazard mitiga- tion plans required under Section 406 of the Disaster Relief Act of 1974, r„. 3l�1 erae Policy C-GA: Wetlands that are to he Policy C-6A: protected will be identified based on the type of wetland, func- tion, size, conditions, location, and overall resource value. The wetlands shall be used for purpose that are com- patible with their natural values and functions, and Land Development Regulations shall be adopted to provide these areas with the maximum feasible protection, by using such tools as compensatory wetland mitigation and dedication of conservation easements for preserving open space. All development with the potential to impact wetland areas shall be consistent with South Florida Water Management District (SFWMD) regulations. Activities in wetland areas may be permitted provided all applicable local, regional, state and federal external environmen- tal agency permits have been obtained and one of the following standards is satisfied: 1, Such an activity is necessary to prevent or eliminate a public hazard; 2. Such an activity would provide direct public benefit, which would exceed those lost as a result of the modifi- cation; 3 Such an activity is proposed for habitats in which the functions and values currently provided are significantly less than those typically associated with such habitats and cannot be reasonably restored; 4 Because of the unique geometry of the site, it is the unavoidable consequence of development for uses that are appropriate given site characteristics April 2015 P 1-39 47 1414.5 zie The Mia.nn.i-Dade Local Mitigation Strategy Part 1: The Strategy Doral On January 13, 2015, the City of Doral adopted Resolution 15-06 which adopts the cur- rent Miami -Dade County Local Mitigation Strategy in accordance with the National Flood Insurance Program Community Rating System Requirements as the city's Floodplain Management Plan. t { "4 i((``��ii'' i `"".c�t^¢yyH'.� $i tt dqV %tyy�p yt� Q[�l ^�(y�•1 " v", h Y 'u'R +�'ya' ±:.tiaY t,; t' 1 X r t f L 1 4 r V. p� 1.� Pl'rYC1 l�3Tr`Y 4 .^'L'i�}. ���i!IM' ,,T i F %' >ui %31 "1!''1} � �:!Y�^4 �W ....�u� � V1. ��� ,�� G'f fit:«}A�1YAf 900�. {4 {k•+a9 £s{ -r@Y� r`v.� { "3 �.FrtS.aW-e�iT9(�, �1biL 1✓ Viti 'i''i ':�:! 4Y �J. r. .t...�-. ,1„ G.,r„ Yk .. s.,. .l;u, iui"...' f;i„ft`l. r�}[=!i T�- y� �,(i'. . i'-5'frF .. �f�+'� 7tk�4. "�.�`&m..TuyS CSC .. . s•z�'i' Y�'w'S, Policy 2.6.1: Coordinate with Miam1-Dade County in implementing the approved Local Mitigation Strategy, by assessing the vulnerability of governmental, medical and public safety sites and structures in the City to storm damage, and in developing an action plan, if necessary, to address wind stability end flood protection for key buildings. Policy 2,6.4: All proposed large-scale amendments to this Comprehensive Plan and/or zoning applications shall be evaluated for their impact on hurricane evacuation routes and times, and effect on currently available off - site shelter capacities. Roadway improvements and shelter improvements shall be required, if deemed neces- sary, to mitigate negative impacts and phased with new residential development, tt frj,yy,'��y� +f PA Y. i i yy i ry,„,�. 1nR i-2'� �� -+� �''AnM.� A F f 'L 1, 1 }_ �3 �S &t �F^.•4 -9e. �=.t x'r h.�,, � • '� �� ��.W��'Fjt, OS� � �:£�Z-`` �,. D::'S%-'N.���u��%�I�n, 5'�5.f.r�+. P.1' L`�k7.�?t4 �-•Ar•H^; .�'..Fr3, l,u'�1i-T1.1'eaf.._,�_�: r. 'rsr �e �� e Y' E dsl y�^�'. �,l.�Y t,w .xe- l'}si,5 dlf 4ti. i�0- .; r^r etatt.* 4�• `. _ t ."' Policy 5E.2.5: Appropriate local planning, development design standards, and special construction practices shall be required to ensure both short and longterm mitigation of Impacts on groundwater created by activi- ties occurring in stream -to -sink basins and in areas where the Floridan Aquifer is unconfined or semi confined. The following provisions shall apply: • ,..... . .., Oft 4:'4.4 L. PYjirL.;'s3t1r7NWrn: aplF{ Policy 6.4.13: Consider preparing a stormwater master plan for the City to identify local priority stormwater problems areas and adopt mitigation methods to correct observed deficiencies. Policy 6.5.2: identify future wetlands to be protected based on the type of wetland, function, size, condi- tions/location, and overall resource value. These wetlands shall be used for purposes that are compatible. with their natural values and functions, and land development regulations shall be adopted to provide these areas with the maximum feasible protection, by using such tools as upland buffers, exotic vegetation removal, hydro period restoration, compensatory wetland mitigation and dedication of conservation easements. Activ- ities in wetland areas may be permitted provided all applicable federal, state, regional and local external envi- ronmental agency permits have been obtained. t•'77 0_ (1' PI AVOW , . SS..,l j d1; W.rf4af fka,..1 A{ , F:C#$?n4;IS7xaY!F..f'r " : tag Policy 9.1.19: Coordinate all disaster preparedness programs with the Miami••Dade County OEM to ensure consistency with the County's Comprehensive Emergency Management Plan and the Miami -Dade Local Miti- gation Strategy (LMS) and In updating hurricane evacuation shelter assignments. El Portal LPL 0 al S Policy 1.1.1. In conjunction with any redevelopment of the mobile home park Little Farm Trailer Park site, pre- serve (and mitigate where possible) the natural canal banks to further marine and wildlife habitat, Policy 9.1.20 Work with Miami -Dade County in implementing the approved Local Mitigation Strategy for hazard mitigation, and by January 2007, the City shall develop a City Emergency Plan to increase public safety and re- duce damages and public expenditures. April 2015 ,P1-40 48 LMS Miami-atle The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Florida City Policy1.1: Acquire and demolish dilapidated and unsafe structures while providing relocation programs for dis- placed families if necessary, Policy 7.1: Work with appropriate government agencies and utility companies to ensure provision of adequate services including potable water, storrnwater, sewer, gas, solid waste, television, and electricity, Golden Beach Policy: The Town will have an organized response to hurricanes and other severe weather related emergencies In order to mitigate the effects of severe weather and to return Town services and normal living conditions as soon as possible. Wherever practical; the Town's plan will use the same terminology and references as Miami - Dade County's (M-DC) plan. The Town Mayor and Manager or their designees are responsible for determining when this plan will be implemented. The determination to mobilize will be based upon information provided by the National Hurricane Center (NHC) and the Miami -Dade Emergency Operations Center (M-IJEOC), Additionally, It Is the policy of the Town of Golden Beach Police Department is to protect life, property, and maintain order within the community during a weather related emergency. Appropriate levels of police services will be main- tained before, during and after a hurricane or severe weather incident. Hialeah .:uv ,....r-..,r.. ::. �.... ��..r'.i .. .w .._........_-�_.^^.... ,u^a:'«•." '-;-b'. :N.'. �vtd>t"'.i: 11 }A"(f.;i'�j'(. q;} M 7 , i7'���% G{}(.., yl"'pk��{ ]q.,��7 n}b' �+tr- ' F{r �h'...7 . G.iy}� ,��ry$.�S i i :�L tiriL4,e.�i^55 T1..1Y f.R'.'t?'S, i' ,[, , 5` al'' S' iV d . 4V+?I �%.yrG'i]ICnl hliYCf Rf9 '�''nv) i ffL -Sr 'f+fi.Y 6�Y3 �'SG E`4'L T'T (i 1 L S--- 1 ;v Ft t Z'I Jf�'2i 'h l3{ l {t �'! Ifr c if a, i i,3>n -� ..x tj f 5 3! yr�5a3tk i-1.! :.Y.Y,r .; ' ! t1.v�u'r �? b r,' K f } , -,, :? i j x7�.'�` } i tF h ` - �`! JET' pit yiX Ix i i g,,k , eri 1 i, ;' s:=;,,,� ;.. a : Y# .,. Policy 1.2.14: Wetland Impacts on the Annexation area: The city will develop a wetland mitigation projection based on the on -site wetlands analysis and consistent with environmental requirements and development pro- jections I - fle 06t eck. `•nSY�in 4' ,.i,'' f.i^t 4K fA,;-:-�.4 ;,N. ,,-r'^m� fxi}i ' f r, The 100-year floodplain needs to be protected to help mitigate the damaging effects of flooding, Protection of these areas is assisted through the National Flood Insurance Program and local Code of Ordinances. Flood criteria must be met before the City will issue any building permits. a �y� 77kk yro arts d ent tt1 1f "�?- ,,' ^' i z �i ^W i, �'S4.! b1 s. Y9a n4 f auY }n-r.} „, `.: ',t � '. Y.tf.Y µG 'S9 aMdfi 4 1��L' �9�5i}. �`.'G,^ l finfryr}, *rr YbY .n ,'....r.. SiW :Yl W''] fS iy�i T�'� a tt f: ,Frd: +'Ak� IA'' Policy 1.4.2: The City shall continue to maintain an inventory of any existing hazards within the City by using the hazards analysis and hazards mitigation criteria established within the Miami -Dade County Comprehensive Emer- gency Management Plan and shall also identify any grant sources available to mitigate the hazards listed on the hazard inventory. Hialeah Gardens The City of Hialeah Gardens incorporates mitigation into its planning process as follows: faieoi,'G2 4�5`tCP, i?1�rg ;1e4ti rs(rer, V�Y } ti 5V 4 ,ems: �'inter�ouern i.''�i�f"Grei'rl��•�. i.�5+51�.....L1a:�Yi��y f.ilk: li1i�;tili�•;y . lw� i{155h ot. • Policy 1.1.10 The City shall implement the provisions of the Local Mitigation Strategy (LMS) Guidelines In accordance with the lnterlocal Agreement with Miami -Dade County, April 2015 P1-41 49 LM Miami -Dade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy • Objective 1.3 Coordinate the impact of development with other jurisdictions to define and implement mu- tually beneficial goals, ensure consistency among adjacent land uses, and mitigate negative development impacts. This objective shall be made measurable by implementation of its policies, The City of Hialeah Gardens has a Division of Emergency Management that is managed by Manuel Carrera, Mr, Carrera is responsible for coordinating disaster preparedness, response, recovery, and mitigation concerns for all City departments. Homestead t a V .,.Si' [ SA td>"it t A �jS i 1 i t(« "t�B R`1 1 tJ3�' �rIX 4 �' x�tiy 3" 0 pine t/ tve- i i ep(ari ofi" z�ia +11 :01 �hr �� �, r � hi i,. Cn 'prJ ^i' e'��ycyy �dM' �l� .k�'bj y�j2�14 1py�\¢i X �C 1 Yt.e, n��,, M.5 Ii 1�', -?':tXri'' •CxT{' � S ./2+.,t S f „ill S�.' iff. s 5 i :.=v1 jai Ha. .w�, '1»�T�.. i, y.U?lT?�'!hn'i rri f?� ry.>.4�i l�,q > it.'5.. C- ,? ?�.,.n,1�� 14ti,a -..I Objective 10: Hurricane Evacuation and Mitigation Ensure that development and redevelopment are consistent with hurricane evacuation plans. Measure 2:'Maintain hurricane mitigation measures that are consistent with the Mlaml-Dade County Local Miti- gation Strategy (LMS) and facilitate the approved evacuation plans. Policy 10.1: Development orders for new development and redevelopment shall be consistent with local and regional hurricane evacuation plans where applicable, Policy 10.2: Mitigate any identified deficiencies in storm damage. resistance of critical public facilities and con- struct new facilities, If needed, to assist In the City's evacuation plans. Objective 11: Hazard Mitigation and Post.Disaster Redevelopment To the extent financially feasible, incorporate all prudent hazard mitigation needs and post -disaster redevelop- ment procedures into the City's capital improvement planning and Land Development Code. Measure: Number of capital improvement projects and/or amendments to the land development code success- fully implemented to address hazardous mitigation needs and post disaster redevelopment procedures. �. *"h - >xtP„ .,,�, *--r, qt v^.�t f 4M 4 ' P ', � �u � . � ia! � �s��-rvr wr- -re3 �a: }fa l it i' qi [s/PP t ,1 �$ ri; dq +rt ` Wi' ElfAI OW.?5,r',_:_ i IP ,y, �n -�„ 5 ii ,. , � ....^r ., �, a> �...... ark . +.+i Policy 4.31 Participate in the preparation/modification of the 409 Hazard Mitigation Plan. Objective 6: implementation of the Local Mitigation Strategy (LMS) The City continues to work with the Miami -Dade EOC and other government agencies to Implement the policies, ordinances and programs outlined in the LMS. Measure: Coordinate efforts with state and county agencies to bring the community together as a single mitf- , gating entity, Policy 6.1: Participate in the improvements In the City's standing and classification in the Community Rating Sys- tem (CRS), with the related consequences of making flood insurance under the National Flood Insurance Pro- gram (NFIP) more affordable and reachable, while improving the effectiveness in coping with flood hazards, problems and emergencies. Policy 6.2: Disseminate information on a repetitive basis with respect to the existence of flood hazards and the availability of measures to mitigate the problems presented by'such hazards. Policy 6.3: Increase the level of coordlnation of mitigation management concerns, plans and activities at all lev- els of government.. Policy 6.4: Improve and maintain cutting edge, state-of-the-art, and effectiveness of the City's emergency pre- paredness and disaster response capacity. Policy 6.5: Continue our commitment to the review, update and im- plementation of the local hazard mitigation strategy. Key Biscayne The Village of Key Biscayne Office of Emergency Management (OEM) is responsible for coordinating disaster preparedness, response, recovery, and mitigation concerns for all Village departments. This section creates, updates, and administers the Village's Com- prehensive Emergency Management Plan (CEMP), which provides the procedures for April 2015 P1-42 50 LMS Miarai-Pale The Miami -Dade Local Mitigation Strategy Part 1: The Strategy the Village's response to all known hazards. The Village adopted the Miami -Dade County CEMP and developed their own municipal CEMP in 2006. This document is currently being updated, The OEM is headed by the Village Fire Rescue Department and collab- orates with the members of the Village Administration, and all other Village Departments, and other members of the community. Activities include planning for a wide range of dis- asters, identifying projects that will mitigate the effects of disasters, and working towards recovery post -disaster. The Village has a full time Certified Flood Plain Manager who is responsible for the im- plementation of the Community Rating System (CRS) and NFIP compliance with assis- tance from a CRS Coordinator and a Consultant. The Village of Key Biscayne has incor- porated mitigation into their planning processes to include the following plans: WNWHF I rr �-x su,�•.. I w•- a #+ s I L xr* ,Jl W -, a1 _1,i3 ill �4of Ern cppcJJI t o� plan � d O bg ti�U ^ °s4 igF foul xt; 4 .,.. ,v., .... «« .,... .. 1i.,, �'rn M -+Yrt r-.:u7:.}>i t� estt•..i e � ,. . _.. . �Py l� � ..tl.3S,', l Yu,,)1 Resolution No. 2010-53: Resolution of the Village Council Adopting the Miami -Dade County Local Mitigation Strategy _,-�t eFry"W'..• l}nsi ktl0.F !Ata< .."YTA>3rS + \'{A I, .Y44 •y Section 30.73-Site Plan Review Procedures Item (f)(6)g: Description of methods to be implemented during construction to mitigate adverse quantity or quality impacts off -site. 4t\/n;tj U ,+,.. ,r}y-t�� Y, 4l(�fi(��1 A�.j,��{`•7^id.{}n {�� `3(_�+ S �/� 5S +j.Y 6„ Y4� I� V1:lq 'G• ,y�4'A. i}.�2LI . r l-T � .LFkj TL1 ¢[J Y�$S ka vh_4 7 Y N '1 ' 4 x} !?g , t[� y �r `. 5'q"q �(}"�h�y)S4`�I .i ✓'f •y apt ikbe CK O06 1 '4Jf" etC' yF�S+.cyr' E$tt KY { +- 3 ^ ^� 4 " ryY. {� f i 7: T� 4 �Y` M.L.4,-1'2-r� t1 s� - Y' �,yt� C { 1"i.1'"L . 1Y�4y'akY J 3 ' tt � Lx'w'�.T .RC•c'Y 1 yy�� ,�y� 3 g'' a C � "�1-,i tF d ,g 'xl i"' � rTC�Rly"�\S'"� Ltt1T^'Sv.~ ����..sFt"�F[l��+��'���-=r'<. { (; 1� e N U.I. Yf yt -''V 5 ,�1 �f£.... ; •., IJ^" 1.} iY 1 ` .1_ t'O eKY; .) is rd (�ilftig t it 'f_= . A Jj1V {t t i,!Gr tf L=-, 1 F 1 l ,Y ¢$, { Comprehensive Emergency Management Plan The Village of Key Biscayne has adopted the Miami -Dade County by reference, 4Erktr 1,74 g.o.rLn.r.rtT�PIr.5 nao,i l' . F Progress on FMP Implementation, as required in Section X of the FMP, falls within the context of CRS compll- ance Action Plans followed by the Village, The Action Plan Items are included and tracked through the Miami- Dade County Local Mitigation Strategy (LMS) "g J 4q 'YX'k'f E my a JY 1 L f e i t y� 4 �1 }u ✓T1t '1 „t 1�9�{.��r�CG t{ -�[�At .:.. q�8 q���r� l.`.S�F.'4 g �{ � G fi C�'�+, S�_!ff ,E��� ��.+155]i�"ii1 ��^Fx'� u 'C� .,� S �� "'.4.I k Y {fit Et�� �i4 ll".. ..it ., S;C,,..b.,l, `7,Yv�>IY, ...��^Y�s�.».. �,l'��N`. ',r.��, i��..;,'c� s,.a,Y`?�±�� s ...� m-�1....,�-1 r4,�1r,:.Ss��_y�,.__. x _ f ¢ n; S't4: 13y'c i.: 2.3.3: Repetitive Loss Properties One of the activities involved with the Annual NFIP CRS Re -Certification process is the analysis of Repetitive Loss Areas iRLAs), The purpose of the analysis is to determine possible mitigation solutions to minimize the flood claims. .,:-i'",' !. 4S br t z,-sy p'x; �c x 3, x ate+ i,� J 1ltal�e. of , r ea Yte M s'eiU� �}j7 $ wti� �� �T 11 !' } r�T.IF,$Y WSbrF'F�F '� a x! t r '9' p n P] �� � t S tI�C�iTkyF,' �1-,1I,�I FCC1w',7lFw.x may' f, `"Y[E ij 'BUY 1 XA �T fi (TI = t X 1 �L14. 44 i a�C3�.f." e�kE Ie. ?t } -r�.;S 4tYT �:J• a1�t v+a YeiT•. X -srwc ri J-y ^'"l2FiU1'We rF '{i-E, s, " x�a E, it�iTk�, 5 ak -6, y e' �.�. ,, e. . K, a t n"'i�, f'F: "''��'�a4., . n � ., ,F�'E ��.v�,7, 6 y„a +�d, t .r »?,i�cs•s �`. r.-�,�,i Objective 2.4 Hurricane Evacuation 9J-5.006 (3) (b) 5 Eliminate or reduce land uses which are inconsistent with applicable interagency hazard mitigation report rec- ommendations and enhance the efforts of the Metro -Dade Office of Emergency Management by providing It with all relevant information. Policy 2,4.1: The Village shall regulate all future development within its jurisdiction in accordance with the Fu- ture Land Use Map which is consistent with the Interagency Hazard Mitigation Team Report, FEMA 955-DR-FL, August 1992. The Village shall periodically review and revise the Future Land use Map in light of future inter- agency hazard mitigation reports in order to reduce or eliminate uses which are Inconsistent therewith. ...',yr.�..i ,., .1......,..55J.:.,,,�» t�j .-.:_':....�.,.Ey. � F:....�y... �r; ....... R.x..e ...;;..Y, ,y ) �y hfrtaf Vu }EIenvient �'A T,el �dYXk} d_ l• ;ll .�i5'Y�.t �js�Y f.2"zF_ t 'ti iCT...�; y i4 1 V `.it y, , Y T ��� `n Ct 3'i`G�{1il ''. C, " xi' z1F � .}� �. c� �y i�� �i S.� I `°a .' $) ! Lry.;Fh� �� ly N �{al x��,��i .,._.__ ,,..,.... ..M _ t. ?7n. 1 .., _r.: Lr'.1.. .�,1. s. ,: r .,... <nn ? Y "Z � C . � `..». ..,.":.T� x a < utk ^� y �. �..3.SYr G,�s$lY ,.t, �i �rT.'$.` $ -�'-7 __ Policy 1.1.2 9J-S.011-(2) (c) 1: During the firstphaseof drainage master plan Implementation(tobe Initiated in 1994), the Village shall begin to mitigate to the extent technically and economically feasible directstormwater outfalls into the canals and Biscayne Bay, Anticipated improvements include a series of catch basins, manholes and pipes for the collection of the stormwater and routing to pollution control structures and drainage wells April 2015 P1-43. 51 LMS f�io.rili-lpatle The Miatai-Dade Local Mitigation Strategy Part 1: The Strategy ��...., ;ryl_+����,v,;�j: � y♦ yjeY\{�p}�`tyt�-..rxU�kAjF. 1! is S sjz xr %r{1i�'li Pnhp?T§e" Li. C^�+4'i?SuX S I°"i �t'T s � t X � ./l� r k^'r�+�'t ��i'�tt��f ». ' u�,,i1f.'y�' ,r,� `' •�]�... ,1t1 St` ^L i �I he ri :v ,v yyii� e 1 Ag�3i .T.Sriar y 1' 11 -, , l �+ „r prk, H. 4- 'T k'l , ( v'�ry l'A VS i 7.^.� 7J- k w3 ik�_ �, �iLt .',7d7'.?�. 7, 5�ris.3` !�. ?t' 4s.t£Y 1td'�i�fi�'.� J� � with emergency overflows. The pollution control devises (grease and oil separator) are to be provided before each drainage well to prevent contamination from entering, Emergency overflow structures are to be con- structed at the existing outfalis and would discharge only when the storm events generates more than one inch of runoff, These improvements shall be designed to fully meet the specific standards set forth in Objective 1,1 above. $i 1 4 �j4 a� > .� � .�}� F Cl� yy , 'i 4j y�'S � � chi'y„uC,rS;e,iia � 1ti4:„:1: WO' - .**1: i?' 014eek l eu .. .,.. e a-s-,:�'; .; ,42.4%, '.,,ry Policy 1.3,14 By the date required by state statute or sooner, the Village shall enact and enforce estuarine wa- terfront protection provisions in the land development code, The provisions will be drafted to assure that all applicable development permit applications are reviewed in the context of the mangrove protection policies of the State DEP and the waterfront policies of DERM, in particular, DERM Class 1 Permits pursuant to Section 24- 58 of the Dade County Code shall be required for all construction seaward of the mean high water line, Such construction shall be designed to minimize environmental impacts and mitigate unavoidable impacts. This provi- sion shall be interpreted to protect sensitive lands from sea wall and other related construction, but it shall not be interpreted as permitting construction seaward .of the State Coastal Construction Control Line in violation of other policies of this Comprehensive Plan, Policy 1.7.14; The Village hereby designates DERM mangrove Jurisdictional areas In the Village as environmen- tally sensitive lands which shall be protected from development unless their ecological value is replaced via miti- gation. These DERM areas are mapped in Figure V-1 of the Data and Analysis of this Plan, Policy 3.3.3: During post -disaster recovery periods, after damaged areas and infrastructure requiring rehabilita- tion or redevelopment have been identified, appropriate Village departments shall use the post -disaster rede- velopment plan to reduce or eliminate the future exposure of life and property to hurricanes; incorporate rec- ommendations of interagency hazard mitigation reports; analyze and recommended to the Village Council haz- ard mitigation options for damaged public facilities; and recommend amendments, if required, to the Village Master Plan, Medley pi .�i IYT F�I +ri �Y. Sec, 30-71, - General standards, In all areas of special flood hazard, all development sites including new construction and substantial Improve- ments shall be reasonably safe from flooding, and meet the following provisions: (1)New construction and substantial improvements shall be designed or modified and adequately anchored to prevent flotation, collapse, and lateral movement of the structure resulting from hydrodynamic and hydro- static loads, including the effects of buoyancy; (2)Manufactured homes shall be anchored to prevent flotation, collapse, and lateral movement. Methods of anchoring may Include, but are not limited to, use of over -the -top or frame ties to ground anchors..This standard shall be in addition to and consistent with applicable State of Florida requirements for resisting wind forces; (3)New construction and substantial Improvements shall be constructed with materials and utility equipment resistant to flood damage; (4)New construction and substantial improvements shall be constructed by methods and practices that mini- mize flood damage; (5)Electrical, heating, ventilation, plumbing, air conditloning equipment and other service_facilities, Including duct work, shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; April 2015 P1-44 52 L S Mfamfi-vode The Miami -Dade Local Mitigation Strategy Part 1; The Strategy (6)New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the systems; (7)New and replacement sanitary sewage systems shalt be designed to minimize or eliminate infiltration of flood waters ihto the systems and discharges from the systems Into flood waters; (8)On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamina- tion from them during flooding; (9)Any alteration, repair, reconstruction or Improvements to a building that is in compliance with the provisions of this chapter shall meet the requirements of "new construction" as contained in this chapter; (10)Any alteration, repair, reconstruction or Improvements to a building that is not in compliance with the pro- visions of this chapter, shall be undertaken only if said non -conformity Is not furthered, extended, or re- . placed; (11)Ail applicable additional federal, State of Florida, and local permits shall be obtained and submitted to the Floodpialn Administrator along with the application for development permit. Copies of such permits shall be maintained on fife with the development permit. State of Florida permits may include, but not be limited to, the following: a.South Florida Water Management District; in accordance with Chapter 373.036 Florida Statutes, Section (2)(a)--Flood Protection and Floodpialn Management; b,Department of Community Affairs: in accordance with Chapter 380.05 F.S. Areas of Critical State Concern, and Chapter 553, Part IV F.S., Florida Building Code; c. Department of Health; in accordance with Chapter 381.0065 F.S. Onsite Sewage Treatment and Disposal Sys- tems; and (12)Standards for subdivision proposals and other new proposed development (including manufactured homes); a. Such proposals shall be consistent with the need to minimize flood damage; b. Such shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and con- structed to minimize or eliminate flood damage; and c. Such proposals shall have adequate drainage provided to reduce exposure to flood hazards. (13)When proposed new construction and substantial improvements are partially located in an area of special flood hazard, the entire structure shall meet the standards for new construction. (14)When proposed new construction and substantial Improvements are located in multiple flood hazard risk zones or in a flood hazard risk zone with multiple base flood elevations, the entire structure shall meet the standards for the most hazardous flood hazard risk zone and the highest base flood elevation. Miami The City of Miami has a Division of Emergency Management that is responsible for coor- dinating disaster preparedness, response, recovery, and mitigation concerns forailCity departments. This section creates, updates, and administers the City's Comprehensive April 2015 P1-45 53 LMS. Erar,a`#��de Part 1: The Strategy The Miai-Dade Local Mitigation Strategy Emergency Management Plan (CEMP), which provides the blueprint for the City's re- sponse to all disasters whether natural or manmade. Every year the City exercises the CEMP by conducting a disaster exercise. The Division is composed of four branches, Hazard Mitigation and Disaster Recovery, FEMA Urban Search and Rescue (USAR), Ur- ban Areas Security Initiative (UASI) Grant Administration, and Public Education. The Haz- ard Mitigation and Disaster Recovery branch is responsible for all -hazards preparedness, mitigation, and recovery. Activities include planning for a wide range of disasters, identi- fying projects that will mitigate the effects of disasters, and working towards recovery post -disaster, The City has a full time Flood Plain Manager who is responsible for the implementation of the Community Rating System compliance and NFIP compliance. The City also has an Office of Sustainable Initiatives that is responsible for environmentally -focused pro- jects, including but not limited to the creation of the City's Climate Action Plan, energy efficiency partnerships, and the adoption of green building initiatives. The City of Miami has incorporated mitigation into their planning processes to include the following plans: w 53 1 �1f ,Rl 'd�il �l'11l'l 1`[i@fl l si10 et X ��'�llaii �t `F,.'.",',s �1f 14 t'i .�j� s diT iN ,r, C �y err e �4 .. < M'' �, Fary 4��(: --1 h 3 '. '- �'.>n,. a�; ,a `. .�`x+,a r�x � �.' 3 }r s`�' i i tC£ x^`M , �S a C 4[�5. t yyc s fil?,r' A'rA...-.�. �. i�3?V` lh�Tf +al .3Yd Lh. �:C'•S.e� Policy 111,B,1: City departments will enforce all public safety mandates of the Miami City Code to include land use management and building codes; and recommend to the Mayor and City Commission, legislation required to improve the "disaster resistance" of the community. Policy III.M.2: When an emergency/disaster has occurred or Is imminent, the Mayor may declare a state of emergency, activating the emergency response, recovery, and mitigation aspects of the Miami CEMP that apply to the affected area. Policy III.P.2: Immediately after an incident, local Jurisdictions respond using available resources and notify State response elements. As information emerges, they also assess the situation and the need for State assis- tance,..At this point, an initial assessment is also conducted of losses avoided based on previous mitigation ef- forts. Policy III.P.9: As immediate response priorities are met, recovery activities begin. Federal and State agencies assisting with recovery and mitigation activities convene to discuss State needs. Policy III.P.11: Throughout response and recovery, mitigation staff at the JFO will examine ways to maximize mitigation measures in accordance with State hazard mitigation administrative plans. �y�.y-' ` �{:[ 'k ».iTce4t n"-Y. -3 6APtW! 4 p 0 .. itM aI�iiY.$jerf, tt.1 r �. �y#14. j nrA� tia(1,' Policy I.G,7: The responsibilities of the [Recovery Action Team (RAT)] are: • Oversee the recovery and reconstruction process and to serve as an advisory body to the City Manager. • Identify mitigation opportunities and identify recovery resources. • Ensure coordination of the recovery process. Attachment E.G.1: Receive and review damage reports and other analyses of post-dlsaster circumstances and to corn -pare these circumstances with mitigation opportunities identified prior to the disaster in order to Iden- tify areas for post -disaster change and innovation. Where needed, the RAT may review alternative mechanisms for achieving these changes and recommend the coordination of internal and external resources for achieving these ends. Attachment E,G,3: Review damage reports and other analyses of post disaster circumstances and to compare these circumstances with mitigation opportunities and identify areas for post disaster development changes. Attachment E.i.2: Identify funding sources for mitigation and recovery projects including state and federal assis- tance programs, private sector funding and public donations. April 2015 P1-46 54 S pt�ami-lPa�eLM The Miami -Dade Local Mitigation Strategy Part 1: The Strategy t a e! encY a s 'efft °4 �t � )1 .�.i. „ } �£kW � wI.: Attachment EJ.RF [Recovery Function] #19 Mitigation: To prepare a post -disaster hazard mitigation plan that will define actions during the recovery period that help prevent repeated future losses and reduce the City's vulnerability to natural hazards. } ,�• Spa r i . yr yii0 fr'" s£fl�" 'in'�' J � r x.•ilk, A 7rYx- , t i.". a K1{r a=d1 ��k'�Q�.!tt(��!�u!!���a�t*r3�_:E41���� ?i� �'3.rG r.1ln�F t�`�",.i �� t+.. �, I'`is��`'fsc� Fr���t$`,�i �^��t � e, � �'...,i The Miami -Fort Lauderdale UASI THIRA addresses mitigation needs through the recovery and protection core capabilities. ,rpf ������iG��, t�a!t1y/�����C�I�Y�44�i•��f6f�CIPFi�tii,l.�`I SYI ��l��(1� i* �c4i vj , yhyai pt��� 84:' giNc � y.�yzylk 4'% i d, g•A , t 2` , ;-- +Sr j"• �i��iQG�ulal,T��31�F �f�f 1Pv:htr.�..-.-iz"[ a.enfli`4J 4L'�Ctc,- =fill`^' ,ttJ;`tn: 1.Purpose.Vision. Mission: Increase preparedness, prevention, protection, mitigation, response, and recovery capabilities within the Urban Areas and the Southeast Florida Region for all hazards, Including terrorism. 1. Purpose. Effort. Based on the capability assessment and strategy review, implementation steps are in- cluded and updated under each core capability and linked to regional Initiatives and activities intended to en- hance the preparedness, prevention, protection, mitigation, response, and recovery capabilities of the South Florida metropolitan areas either by: , Current, proposed, or future funding to enhance or sustain a capability or capacity needed within the juris- dictions or the region; ar, . By reference to existing capabilities where no enhancement is required or cur- rently planned, but access to those capabilities is needed to fulfill the full range of preparedness, prevention, protection, mitigation, response and recovery actions for incidents of all types. Goal: Protect Critical Infrastructure & Key Resources, Objective: Physical Protective Measures, Step: Establish a joint CIP workgroup to include the private sector to set security goals, identify assets, systems and net- works; assess risks and threats annually; implement protective programs; and measure the effectiveness of risk -mitigation efforts, Goal; Protect Critical Infrastructure & Key Resources, Objective; Risk Management for Protection Programs & Activities- State, regional, local, tribal and private sector entitles, in coordination with Federal participation, Identify and assess risks, prioritize and select appropriate protection, prevention, and mitigation solutions based on reduction of risk, monitor the outcomes of allocation decisions, and undertake corrective actions, Step: Implement and assess the risk management model within the region and develop a plan to imp[ement appropriate risk mitigation strategies using UASI funds. Goal: Respond to Disasters- CBRNE, Objective: Infrastructure Systdms, Step: Encourage and assist jurisdictions In developing or enhancing recovery and mitigation efforts and plans. Step; Maintain liaison with county Local Mitigation Strategy (LMS) coordinators. Step: Ensure that lifeline facilities are incorporated into mitigation and recovery planning. Goal: Recover from Terrorism & Other Disasters, Objective: Natural and Cultural Resources- Protect natural and cultural resources and historic properties through appropriate planning, mitigation, response, and recov- ery actions to preserve, conserve, rehabilitate, and restore them consistent with post -disaster community priorities and best practices and in compliance with appropriate environmental and historical preservation laws and executive orders. Miami Beach flrecte"�iil�y: #ay` 3 Fa Isla. Objective No. 8: Provide recommendations for seawalls to mitigate the effects of sea level increases over the next 50 years. As a complement to the engineering evaluation, CDM Smith utilized the FEMA's Hazards United States (HAZUS) tool designed to estimate hazard -Induced losses for use by federal, state, regional and local governments, and private enterprises in planning for risk mitigation, emergency preparedness, response and recovery, By using a standard FEMA tool, the City will benefit in the coordination of future activities related to flood proofing, grant assistance, and management of repetitive loss properties. The analysis, which was performed for South Beach, incorporated existing elevations, structure and land use data along with information from the detailed flood April 2015 P1-47 55 Miami -Pad The Miami -Dade Local Mitigation Strategy Part 1: The Strategy model (SWMM). The HAZUS model generates an output that consists of a damage amount in dollars that is based on the percentage of total value loss a structure incurs during a flood event, like the statistically calculated once- in-5-year storm (5.9 Inches of rainfall in 24 hours). Objective Number S: Provide recommendations for seawalls to mitigate the effects of sea level increases over the 50 years; SWMMP Solution; Preliminary inspection and elevation standards for seawalls have been made with considera- tion of SLC, based on USAGE guidance documents. Arecommendation of a minimum seawall height of 3.2 ft NAVD provides a means to protect against projected spring tidal conditions over the next 50 years, based on intermedi- ate SLC projections. Miami Gardens The City of Miami Gardens incorporates mitigation actively through Drainage improve- ment Projects. The City of Miami Gardens budgets $100,000 per year for drainage im- provement projects. This is shown in the Comprehensive Development Master Plan. The projects funded through this appropriation are tracked continually during the year. The City also continually seeks grant funds to assist in constructing drainage improvements, and leverages budgeted money as matches to increase the number of projects funded. Drainage improvement projects are also tracked through the City's Stormwater Manage- ment Master Plan. This plan prioritizes projects based on need in the City, and their degree of flood protection and water quality improvement. The City tracks the projects by coordinating the yearly budget, the Stormwater Management Master Plan, and pro- jects listed in the Local Mitigation Strategy working group. A future goal of the City is to review the Stormwater Management Master Plan to update the priority projects, delete those projects completed, add projects as needed, and model the City again with the completed projects to determine future flood protection and storm - water quality needs. Another item in the City budget is drainage maintenance. This in- cludes street sweeping, canal bank maintenance, litter control on land and in the surface waters, and mechanical and biological controls in the canals. These activities are con- sidered mitigationin that they reduce potential obstructions in the event of a storm, and ensure capacity is present if a storm occurs. T�i zn *� / ` ... a� 3 �x ...•' .C.. 4a�yEa�fii *?#i{ris4 �� e ert3+d r�expPu U,Mstar fk �-id ! i i ..-""k'-v - '� !:.xi?r�";_ir. i.,c�Y � 4 - '^iity"r�r ix} kG ire 4E, ]. -'�.� — �..,�� - 7.�',fi � � it�it. �`,-rid. , -a S r.�j. w.. ' ri,. i x.x« yx'�'..,h 'fix i �.3"Y 7t� y-# j�..ri' hj£+. e� E _ + + a. t? ar ' ' u'' i � i? s� rJw''ywV 4lr5n''t 'x`S}- i(.�-,�, f hMsx7 IrxY�t.,!sr-t s} 7k -�T QbS�r�kt'8g}•i` M. 4 .t-l'. Y�F '.�..ri.,. ye-s l� i... u`` yS i . Kti, t L� } t er eht , , ��r£Td'i ��a ,, 5. aU.�.c;_13�f` C� a. t: .¢ y , ry- S Y { r� jt.l - n: y,Pifttt�'?;R..';�..s ?dy�ryur' Objective 2,6: Land Use Compatibility The City shall ensure that the land development regulations contain criteria to mitigate negative Impacts that Incompatible land uses may have on the neighboring areas, Objective 2.12: Hazard Mitigation and Disaster -Preparedness Coordinate the City's Emergency Response Plan with Miami -Dade mitigation and disaster -preparedness for the safety of residents Policy 2.12.1: The City Public Works Department and City Manager's County Emergency Management Operations Center for the safety Policy 2.12.2: The Public Works Department shall prepare a City dress emergency/hazard/disaster mitigation program for the safety County and State of Florida to address hazard and property in Miami Gardens. office shall coordinate with the Miami Dade of its citizens. Emergency Response Plan to appropriately ad- of Miami Gardens' residents, April 2015 P 1-48 56 MS The Miami -Dade Local Mitigation Strategy Part 1: The Strategy r Poiicy 2.12.3: Coordinate with Miami -Dade County In developing and Implementing a_ n Action Plan If necessary, to address flood protection, storm damage precautions Policy 2,12.4: The City's Emergency Response Plan shall include but not be limited to an incident command system structure, delegation of responsibilities for incidents, a medical procedure and ma- terials plan, outreach to the community through Identified forums and public information systems, and post dis- aster mitigation plans that Includes designated debris sites and personnel needs, April 2015 PI-49 57 The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Miami Lakes Policy 1.2,4: Develop a code enforcement system in the new Code that Is proactive ih ensuring that the high standards, which are the hallmark ofMiami Lakes, are mointained/and the personnel are very responsive to resident and business owner Inquiries. {naddition, ensure thu the system allows for the mitigation and/or cor- rection ofadvemanuisonou|mpocts,suchaxnoioe,odoran6/or6uytonnmidentia|ne|ghborhoods.cauoedby any ex|ut|n r|| and|6ut|i operations. affiv Objective 1.6; Hazard Mitigation and Disaster Preparedness Coordinate with Miami -Dade County and tfie_�tate of Florida In addressing the hazard mitigation and disaster- preparedneuunamdzqfM|am}Lakes,anJonoouro8|ngthawUndnwUonond/orredudjonof|anduvao|nuona|stent with the r�oommandmionuof any public agencies charged with managing hazard mitigation and disaster -pre- paredness. Policy 16.1: Coordinate with K4|om|'padoCounty inimp|amentngthe approved Local Mitigation strategy, in assessing the vulnerability of governmental, medical and public safety sites and structures in the Town to storm damage, and develop anaction plan, |fnecessary, tnaddress wind stability and flood protection for key build- ings.Policy 6.7.1. Wetlands that are to be protected will be Identified based on the type of wetland, function, size, conditions/location, and overall resource value, These wetlands shall be used for purposes that are compatible with their nwtura(values and functions, and land development regulations shall 6eadopted toprovide these areas with the maximum feasible protection, by using such tools as compensatory wetland mitigation and dedl- cation of conservation casements for preserving open space. All development with the potential to impact wet- landaeaaoho||b000nm|xton:w|thsouthFlor|daVvaterK8anagemonnD|otrictmygu|otionn. Miami Shores Hazard mitigation and disaster recovery is incorporated #lpoUghoW[ the Miami Shores Coastal Management Element, The Miami Shores Village Hurricane Plan, 2014ODU|De8 indetail the city and employee activities, duties and responsibilities tDheconducted prior and after G hurricane event. The focus is DD preparedness prior to 2 hurricane event and detailed recovery plan post hurricane event. 58 The Miami -Dade Local Mitigation Strategy Part 1: The Strategy objective 4: Direct population concentrations away from the coastal high hazard areas, hurrican nerabi zone and limit coastal high hazard area, hurricane vulnerability zooe|nfrastructu,eexpenditueo Direct population concentrations away from the coastal high hazard areas, hurricane vulnerability zone and limit theexpand|turenfV|Uu8mfun6oun|nfroatructorew|thinthoCpamo|HighHaxardA^aa,hurdoaneyu(nerabi||ty zone If such Infrastructure would have the effect of directly subsidizing development which Is significantly more Intensive than authorized bythis Nn.[9j`S.Ol2(3)(6)5and 6] The Coastal High Hazard Area is'defined as the area below the elevation of the category I storm surge line as established byoSea, Lake, and overland Surges from Hurricanes (SU]SH)computerized storm surge model. Monitoring and Evaluation: Annual record of Village actions to direct away or reduce the population of the hurri- cane vulnerability zone. Pu|hy4.1! The Village shall restrict development In accordance with the Future Land Use Map of the plan. It is the legislative judgment of the Village that the Future Land Use Map provide,& the most appropriate way to limit development (nthe coastal high hazard areas, hurricane vulnerability zone consistent with reasonable property rights and long- established |onduaepettemy.[B'5,O12(3)(d9\ Policy 72 The Village shall monitor the need for drainage system Improvements. Policy 7.3: The Village shall design Infrastructure with due consIderation to the potential rise In sea level. Policy 7.4: The Village shall deny any Future Land Use Map density increases In the hurricane vulnerability zone, Objective S.,Hazard mitigation. |ngeneral, the Village shall regulate development ooa;tominimize and mitigate hazards resulting from hurri- canes. In particular, the Village shall ensure that all construction and reconstruction complies with eppUou6|o regulations designed tom!nimbahurr|none1mpa i ctonbuildings and their occupants, Monitoring and Evaluatlon: Record of participation in MlarnI-Dade County Emergency Preparedness meetings, activities and programs, Annual record of development permits Issued In the hurricane vulnerability zone, demon- stratingthuapp||outionofspao|ficstondan6thatreyu|tinqreduotionInthauxpuuureofhumanUfeon6proparty to natural dbmnte,x Policy 11.2/ The Land Development Code shall be amended to require Special Approval for the repair or replacement of hur- ricanedomagedbui|dinQo|nthmFEMAVEVa|noityZone`Thacritedaforgran1|nOsuohappmvo|shaU6exofo|/owu: 1) repair or replacement shall be authorized for principal buildings and their associated accessory buildings and structures when the principal bo|{6lng suffers minor or major damage/ and 2)rnpu|r or replacement ohoU be authorized for principal buildings and their assoclated accessory buildings and structures when the principal build- Ing is destroyed provided that the setback from the FEMA VE Zone Is the maximum possible consistent with the authorized floor area, other setback requirements and reasonable design standards, but In no case less than 15 feet from the seawall, and provided further that the applicable requirements of Policy 11.3 are also met, Policy 113/ The Land Development Code shall be amended to require Special Approval for the repair or replacement of hur- ricaneJmma8edbuUd|ngs|nthaHun1oonoVu|nerebU|tyZonm(eno o/Biscayne Bou|amn6).The criteria for grant- ing such approval shall be as follows: 1) repair shall be authorized for principal bW|6|nOn and their associated accessory buildings and structures when the principal building suffers only minor damage; 2) repair or replace- meritahaUbnauthorizadforpdnn/paibu||dingsaodtho|raaoodatmdauoammrybW|dingynndstructureswhentha principal building suffers major JnmuBdorbdestroyed, provided that the resulting buildings fp|hmeet the F|op |daBu|�|ngCo6eendeUMiami development than ground floor elevations conform with the FEMA map, Historic buildings shall be exempt from thispolicy. April 2015 P1-51' MiamiLMS -batty The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Miami Springs 3 Objective 1.6: Hurricane Evacuation Coordinate future land uses by encouraging the elimination or reduction of land uses which are inconsistent with applicable interagency hazard mitigation' report recommendations and enhance the efforts of the Miami - Dade Office of Emergency Management by providing It with all relevant information. This objective shall be measured by implementation of its supporting policies: Policy 1.6.1: The City shall regulate all future development within its jurisdiction in accordance with the Future Land Use Map. it shall also consider the most current interagency Hazard Mitigation Team Report as part of the development regulations. The City shall periodically review and revise the Future Land Use Map in light of future interagency hazard mitigation reports in order to reduce or eliminate uses which are inconsistent therewith. North Bay Village � (__r, '''''" {� ii 6ro .p� , s ht ��, + gZ..yyyy_i�, �pi+,a _ .mwe/ :._Y-�3 ^.y� +. .� .i. `. ^1 .>r"f.'„-.ai' uf�. i1$uhGJl,d� �t �j�ycGn �Y�..�.. gfl"9� GY 1 j'R Z4.Sr kt .+ .; ��'l..�. = ..:...r7•i .A-h`-er n ..s:'u,,..... .zf'�r�s k5..C1 ��JLg �3±r .r.�,n .t,..{k' ".54a..:':.5.'q'';t,N.i,f'^P,...cl.�?rr Policy 2.2,9: Require property owners who lease berths to houseboat owners to provide a storm emergency plan to mitigate damage to public waterways during and after storm events and require such owners to demon- strate the financial capability to remove sunken or damaged houseboats and houseboat debris from the public waterways subsequent to storm events in which such damage may occur, key "' 1x S n.S,"i i it, ,c N�aa an t Y ±.r 1 ,y a ` Grf lSr t g On'j, 1G'riJ,L' yf uf'YaY ;Y l{q tRVr w .,> ,l,S ar it{t,, '}`'--irryi-f7 -. ° �-'4': T' "y� .w ' ' !, M � � � �7 i p��� tLL{{ r.n., YY� �' t�� } .. qy r. .... � �. .d;�;?s.+'i Ccr..,' ;�.�r van.„e. .. —�. . .. . t ..3ja,{I .ii t�:4,.Y i�, �tJl'"�...... F}Y:�'. sYl�ia f"-, �x k.LN 1. .F. i�i"kx�� .+^n• Policy 3.2.5: Require that new development and redevelopment plans Identify, by means of a traffic -way Impact study, and mitigate any negative impacts the plans may have upon streets and walkways to ensure the mainte- nance of levels of service and safety within the City. Mitigation shall be mandatory to the extent that a develop- ment or redevelopment contributes to the identified impact. No development or redevelopment plan shall be permitted without an approved traffic -way impact study and mitigation plan. Policy 3.3,2: The City shall require all potential development on the. Kennedy Causeway to demonstrate that the anticipated traffic impact will not cause the Causeway to fall below the required Level of Service, or to mitigate any impacts to maintain or improve the required Level of Service. S `. ?+ „_r:TP ta�I�h $ a n nt ElG {.y�o�1.N.>`'I' 1, ��,�'$: .. .{1j1�l „ �d`, 'i r "t...h. x1 £"�" q{ 1'� . Y'`f"f—.Y , 4,,�,,.2i (, i^,2 7• r Y ,,..-.....,. 'Y F?'¢,s ,.i�,�, .„, ..x .7�r:.> ., .. .3,..{C,.:ey�hsy2�.4.5,`. r. .S3Y:is<r.�?�`v;§"!`.^ t?H iN'.`�i4� rh ..,,nEs. !,r_fi« 7?2s�frfr?�h� h;�"x. 'sr.,(�„,a��`�,hN `.i se;* ..,:,i:,.l"�a�;ror::.,a. GOAL: Protect human life and the environment and limit destruction In areas subject to natural disaster through implementation of hazard mitigation strategies. Policy 8.5.2: The City shall Inventory and identify all reimbursable improvements in the coastal area eligible for funding under provisions of the Federal Disaster Assistance Plan and include this Information in the City's local mitigation strategy plan. Policy 8.8.3: The Recovery Task Force shall review and decide upon emergency building permits; coordinate with Miami -Dade County, State and Federal Officials to prepare disaster assistance applications; analyze and recommend to the City Commission hazard mitigation options Including reconstruction or relocation of darn - aged public facliities; develop are development plan; and recommend amendments to the City's Comprehensive Plan, Miami -Dade County Hurricane Procedure Plan, and other appropriate policies and procedures. Policy 8.8.5: The Recovery Task Force shall propose Comprehensive Plan amendments which reflect the recom- mendations in any interagency hazard mitigation reports or other reports prepared pursuant to Section 406 of the Disaster Relief Act of 1974 (PL93-288). - Policy 8.8.7: Structures which suffer recurring damage to pilings, foundations, or load -bearing walls shall be re- quired to rebuild landward of their current location to modify the structure to structurally enhance the struc- ture, Institute other mitigation measures, or delete the areas most prone to damage,_ April 2015 P1-52 60 The Miami -Dade Local Mitigation Strategy Part 1: The Strategy North Miami Policy 1.8.1:The City shall coordinate with the Mlaml-Dade County and the South Florida Regional PlanningCoun- nU|nImplementing the approved Local Mitigation Strategy, by assessing the vulnerability ofgovern mmntoimed- ical andpub|boafmtyuMo and structures inthe City tostorm damage, and |ndeveloping onaction plan, ifmacae aarKtnnddnsavJndutubNtyandOuodpmteoUonforkaybuUcUngs. Policy 1.8.5, All proposed large-scale amendm�nts to this Comprehensive Plan and/or zoning applications shall be evaluated for their Impact on hurricane evacuation routes and times, and effect on currently available off-sIte shelter capacities, Roadway Improvements and shelter improvements shall be required, Ifdeemed necessary, to mItIgate negative impacts and phased with new residential development, Strat- egy Program to assist with post -disaster repairs and encourage the timely repair of homes damaged as a result of disaster ctivi Objective 5A.2: The City shall Implement programs and policies in conjunction with Mlarnl-Dade County to protect residents and business from disasters and mitigate hazards. Policy SA.2.2: As part of on -going monitoring and updating procedures, the city shall ensure that all applicable provisions of the hazard mItIgation annex of the Mlaml-Dade County rmergency Operations Plan, and the Miami - Dade County Local Mitigation Strategy (LMS) are incorporated and/or addressed In local hazard mU1gadnnprouo- dureu. . Policy SA,2.4: The City shall Implement the provisions included in the Local Mitigation Strategy to provide for debris clearance as well as Immediate repair and replacement of public infrastructure required to protect public health and safety, Policy 5A.2,10: The City shall promote and educate the public on strengthening their structures against natural d1sasters bypromotIngthe hardening of structures In accordancewith the Florida Comprehensive Hurricane Dam- age&1|t(gnt|unPrngrano(My3afeF|or|6aHorne). Policy 5A.3.3: The City shall relieve deficiencies identified In the hurricane evacuation analysis and endeavor to integrate regional and local preparation and evacuation procedures Into the City's hazard mitigation measures. Policy 5A.4.2: Incorporate recommendations found In Interagency hazard mitigation reports into the comprehen- sivep|moandpout-d|oautorredmva|opmentp|on. Policy 512124:Institute marina siting criteria that address exbt|n8protective status ofownership, hurricane con- tingency p|onninQ,proueoUonofvvuterquo||ty,wnterdopdtmva|lab||itynfup|nnd.xoppprtsem<cas,|onduyecom- patIbility, environmental disruptions and mitigation actions, availability for public use, and economic need and feasibility. Objective613.1 Through the permitting process continue tnpreserve and maintain Identified wetlands and water quality from the Impacts ofnew development orredevelopment, Monitoring and Evaluation; "The City shall evaluate its permitting process to ensure that proof of mitigation Is obtained prior to the release ofbuilding permits, ' Pu|\uy613J.1: The City shall deny permit @ppilcations for new development or redevelopment projects which may adversely impact existing wetlands and water quality or quantity until satisfactory mitigation and protection measures are p.erformancebonded bythe developer. -Policy 6.B.�.xkTheC|tyahuU cont|nuub`-prov|dn education-pm8rumo-toe6uuatensidnntoaboutthp-po||uGng e�n�unthe Bay and other natural bodies of water In the City, of run-off containing grass clippings, lawn fertiliz- ers, and other similar type material, and present techniques that can be Implemented by residents to mltigat$ April 2015 61 L �Miar�aIb�� The Miami -Dade Local Mitigation Strategy Part 1: The Strategy n= this problem. In addition, the City shall continue to coordinate with the SFRPC's Strategic Regional Policy Plan (Policy 14,14 and 14,17} to educate the public. North Miami Beach The City of North Miami Beach is responsible for natural disaster preparedness and emer- gency management that is addressed in the Comprehensive Plan. This includes re- sponse, recovery, and mitigation procedures that are acknowledge throughout all City departments. The City has a Certified Floodplain Manager that administers the Commu- nity Rating System (CRS) to reduce flood damage to insurable property, strengthen and support the insurance aspects of the NFIP, and encourage a comprehensive approach to floodplain management. The primary duties of the Building Official shall be to intake and process permit applica- tions and associated fees; ensure permits are routed for flood elevation review; conduct the review of building permit applications for compliance with structural and technical code requirements for flood -proofing and resistance of combined dynamic, hydrostatic and wind loads; and provide backup certified personnel as needed to assist in the flood elevation review. These duties may be clarified, and other duties may be assigned in memoranda of understanding or in interdepartmental procedures for the administration of the National Flood Insurance Program and Article X of the City North Miami Beach Ordi- nance (SUBDIVISION AND FLOODPLAIN STANDARDS). The Building Official ensures that of record of the actual elevation, in relation to mean sea level, of the lowest floor, including basement, of all new or substantially improved structures, flood proof from a registered professional engineer or architect, helps maintain all records pertaining to the provisions of this section and keep them open for public inspection and keeps a file of as - built drawings. Interagency Coordination: The City Building Official and Director of Public Services are hereby appointed to assist and cooperate with the Director of Community Development or designee in carrying out the requirements of the National Flood insurance Program, and in the administration of this article. The Director of Community Development shall develop interagency memoranda of understanding and procedures which shall describe the duties and responsibilities of each agency involved in the administration of this article. The Director of Public Services, the Building Official, and the Chief Code Enforcement Officer of the City shall cooperate with the Director of Community Development in the creation of memoranda of understanding and interdepartmental procedures which shall be approved by the City Manager. Each agency shall properly execute its duties and responsibilities as set forth in this article and in the memoranda of understanding and published procedures. In the absence of any interdepartmental guidance regarding any particular incident or program action, the Director of Community Development shall direct immediate or interim action to be taken when time is of the essence, which direction may 'be reviewed and amended by the City Manager. April 2015 P1-54 62 SL ..1: ► �. Mia!mi�:oade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy The Police Department's Crime Prevention Division has a Community Emergency Re- sponse Team (CERT) that receives special training for the purpose of enhancing their ability to recognize, respond to, and recover from a major emergency or disaster situation. The CERT basic training that is offered at the City of North Miami Beach's Police.Depart- ment, issues a training course that helps residents identify hazards that affects the home, workplace, and neighborhood, The program helps to understand the function of CERTs and their roles in immediate disaster response. For example, the course utilizes preven- tion techniques such as basic fire suppression strategies and fire safety measures in or- der to eliminate natural and man-made disasters. The City of North Miami Beach has incorporated mitigation into their planning processes to include the following plans: 9 st + l,�ya �si� kYj��.s.( apy .{ 'u s q ro ti s j�+� f,E'�. s. y� �. -s^.. ki t4l?s .i?�`2" 1). , i,. x{:aka �'..T S H��)''sii � �;2., �ili U ^�i F �et ,gy k� � 6 �yS j L rrrk e cement iar tt '?�•i - T%V5.2'�p.na�,�, ski{5 ��'� � xi }ry�c �kp l'T {'s'? 5 .$.i{a 1}js1 .i ce" .9i hr u#ur,.. r. t,s,,at.c �� Objective 1.2: Detail a redevelopment strategy for potential redevelopment areas, Including those cited In this plan (see Map 1.16, Volume Four). Redevelopment could include Future Land Use Map designation changes as necessary to facilitate enhancement of these areas. Policy 1.2.18: The City should encourage the use of Crime Prevention Through Environmental Design (CPTED) standards in the redevelopment of the City and formalize these standards within the Zoning and Land Devel- opment Code, enhancing the safety of the City by limiting design factors which abet crime, Objective 1.3: Encourage elimination of uses incompatible with this land use plan. Policy 1.3.4: Continue to regulate the use of land in the flood zones in accordance with FEMA requirements and the Land Development Regulations, including not permitting variances from required finished floor eleva- tions. Continue to Implement programs and procedures which improve FEMA's Community Rating System score for the City In order to reduce the cost of homeowner's insurance by 5% annually. Continue to annually reduce the number of existing structures which do not comply with these requirements and regulations. Objective 1.4: Ensure reasonable protection of natural resources and environmentally sensitive land as new development occurs, Policy 1.4.1: Continue to enforce the oleta River overlay zoning district to achieve maximum reasonable pro- tection of the natural waterfront habitat as development applications are reviewed. Policy 1,4.2: The City shall protect and maintain natural resources and environmentally sensitive lands through the Implementation of this comprehensive plan and the land development regulations. Policy 1,4.3: Coordinate the Ciity's land uses, development, and redevelopment activities with the South Florida Water Management District's Biscayne Bay Surface Water Improvement Plan. Objective 1.5: The City shall coordinate with Miami -Dade County, the South Florida Regional Planning Council and the State of Florida in evaluating the Impacts of development and redevelopment on hurricane evacuation clearance times, structural integrity, and disaster -preparedness needs. Policy 1.5.3: The City shall coordinate with the Miami -Dade County and the South Florida Regional Planning Council in implementing the approved Local Mitigation Strategy by: assessing the vulnerability of governmen- tal, medical and public safety sites and structures In the City to storm damage, and; developing an action plan, if necessary, to address wind stability and flood protection far key buildings. Policy 1.5.4: The City shall continue to work with Miami -Dade County to ensure that City employees are well - trained in the programs, procedures andpollcies required during a disaster emergency and the longer -term_-._ post -disaster redevelopment process. Policy 1.5.5: The City shall evaluate all proposed large-scale amendments to the Comprehensive Plan and/or zoning applications to determine their impact on hurricane evacuation routes and times, and affect on currently April 2015 P1-55 63 LM The Miami -Dade Local Mitigation Strategy Part 1'9[boS available off -site shelter capacities. Roadway improvements and shelter Improvements ohoU be required to mitigate negative impacts, ifdeemed necessary, and phased with new residential development. Objective 1.1, Continue to provide new or Improved sewer collection, drainage and/or potable water, systems |nnccorduncewiththe Capital Improvements Schedule, as|t|sannually updated, Policy 1.1.2 :The City shall continue Its drainage Improvement program and continue the supporting catch basln cleaning program so that adequate street drainage can be achieved and maintained. Objective 1.4: Protect the City's natural drainage and recharge areas by retaining all existing lakesand prohlb- itingonynmwJovelopmentvWth1QOpermantknpenAouoomvarage. policy 1.4,1: Through land development code techniques, protect the existing lakes and assure adequate per- viousareao/noprUunctionw|thnewdeve|opment. es- tuarine areas |nthe City, Policy 1.1.%:Aodevelopers apply for permits vnthe few remaining waterfront sites, the City, |ncoordination with Miami -Dade Cuunty'o Shoreline Review Committee when naooauorA aho|| carefully review site plans In order to minimize impacts upon the natural waterfront (and thus the estuary and wildlife), particularly their drainage and tree protecdonplans; uwaterfront zoning overlay district may, insome cases, require mid8adon of disturbed natural features through the planting, dp-rap replacement of seawalls, etc, For aesthetic —and consistency reasons, seawalls shall continue tmbethe required shoreline stabilization method for residential areas |nEastern Shores. ' Objective 1.3: Achieve a net increase in the environmental quality of the estuary; see policies for measurability. Policy 13.1. City officials shall coordinate with appropriate local, regional and state agencies to monitor the commercial marinas and assure avoidance of pollution sources by reporting any violations to those agencies, The City shall also assure review of any proposed marina, coastal drainage project, or waterfrontdeve|opment by the County Shoreline Development Review Committee and Florida DE15 to assure conformance with the Biscayne Bay Surface Water Improvement and Management (SWIM) Plan (South Florida Water Management District, 1884). Policy 1.3,2. Continue the City's street drainage improvement projects In order to minimize pollution from stormwater run-off; take special care in reviewing drainage plans for private development, projects located near waterways toassure that adequate on-s|teretention |oprovided Policy 1.3.3: Annually review the development code to assure adequate protection Is provided ag2inst negative Impacts that may result from potential new uses in the coastal area and In any flood hazard areas, Policy 1.3,5: The City, through its regulatory processes and coordination with appropriate agencies, shall limit specific and cumulative Impacts of development or redevelopment upon wetlands.water quality, water quan- tity, surface water runoff, and exposure to natural hazards, wildlife habitat, and living marine resources, Objective 1.4: The amountof shoreline devoted to waterdependent and water related uses shall be maintained at 3,500 llnear feet along the Cleta River system and Snake Creek Canal or Increased in conformance with the criteria Inthe following policies. Note that North Miami Beach has very limited vacant privately owned frontage nnthe estuary, Policy 1,4.1!Existing Lwater dependent uses and new uwater dependent uses ('e,uses \which cannot exist or _ occur without estuarine association) should be maintained and should be regulated through zoning policies which 'insure environmental compatibility, New uses which increase access orpreserve and protect shoreline resources should beencouraged, L S. Miarni-Oude The Miami -Dade Local Mitigation Strategy Part 1: The Strategy 0. airR?% i�— iF..n.w &r, i..,....... TYfH t".ARkZ.+`k.? FtiacL�fc�_iae�� -.i?ffia:.a� u _rc5ft,?� Polley 1.4.7: Acquire natural areas and natural habitat for conservation through County, State, or Federal Grants If possible. Objective 1.6: The City shall enforce the minimum floodplain management regulations of the Federal Emer- gency Management Agency (FEMA) and the City's Floodpiain Standards Ordinance for new and substantially improved buildings, Policy 1.6,4: The City shall continue to participate in the Community Rating System (CRS) and the National Flood insurance Programs (NFIP), and distribute information relative to Its provisions. Policy 1.6,5: In an effort to minimize flood insurance premium rates for North Miami Beach residents, the City shall endeavor to maintain or improve its Class 8 rating to a Class 7 or better by performing floodpiain manage- ment activities that exceed the minimum NFIP requirements of the Community Rating System. Policy 1.6.6: To prevent further additions to the listof Repetitive Loss (RL) properties published by FEMA, the City shall remain committed to working on eliminatiing RL properties within the City to a point that qualifies as a category A or 13 Community, . Policy 1.6.7: The City shall continue to enforce Chapter XXiV Zoning and Land Development Code, in an effort to eliminate an increase in the number of RL properties. Policy 1.6,8: The City should attempt to promote the acquisition, or retrofit of RL properties. Policy 1.6,9: The Coastal High Hazard Area is defined as the area below the elevation of the Category 1 storm surge line as established by a Sea, Lake and Overland Surges from Hurricanes (SLOSH) computerized storm surge model. The Coastal High Hazard Area is identified on the Future Land Use Map, Objective 2.1: The City shall maintain or mitigate the impacts of development on the prescribed hurricane evac- uation clearance times identified in the South Florida Regional Planning hurricane evacuation model update, Policy 2.1.2: Continue to cooperate with Miami' Dade Police and the County Fire Department's Office of Emer- gency Management, the Red Cross and FEMA through evacuation planning meetings and policies, and in other ways conform to the Metro -Dade Emergency Operations Pian for a Hurricane. Policy 2.1.3: In order to reduce the potential for loss of life and severe property damage, encourage the reduction of densities and intensities in areas likely to be Inundated by flooding resulting from hurricane surge as shown by Map 5.3, Volume Four, implement a building code consistent with FEMA requirements, and when possible through grant funding eliminate the potential for Increased residential and urban densities in those areas by pur- chasing such lands for use as public open space and shoreline access, Policy 2.1.4: The City shall participate in regional solutions that aim to reduce overall evacuation clearance times. Policy 2.1.5: The City shall address deficiencies Identified in the hurricane evacuation analysis and endeavor to integrate regional and local preparation and evacuation procedures into the City's hazard mitigation measures. Apr112015 P 1-57 65 LM,. miami.badv The Miami -Dade Local Mitigation Strategy Part 1: The Strategy N C �'�:1, �„'iM"aWp. N'^x 'ryt, {.j (cf '•, i Y r., /id+'n si"f•�3ry. ...,,J1kY iti�iQ: Q F3f �ii I1�.�{y' -p.^l 44e ;n� r�'E 4if.�lt�l�l/Lw• i'/•�r 1.G.p$y�� �y�t 1�.'11t `'ky V�"'SSit. Sli 4 ..{, I' ��.I; v-.-..GS''ia S-l-C`�1f'�'3 itMHt�n ll.i"�i: i43{:' 4f?aY ��' �rya 'a..lFf li4'v -'+�,yu.,tiy�-��� Tj a�IN.Yn �'�ry iY'�ti $1 �] �(;Y(..IY1Lft1aV,:1 pli�x, rea'F.Nr `yX. �.�411J 1 i �L� C 'v •4Y. Yt 31y� � y�Ci I t«. �. '"T' Pa aFA:+X -R e�JR. nfRI. TC 3`'N:•» i, YT . ''0,6wi�•1M1jiW..T.z-•� AE(:SF„ qx_ .�.�T..^�fC. VA .�^4; 3vw - 1S Objective 2,2: The City of North Miami Beach shall provide immediate response to post -hurricane situations in concert with a post -disaster redevelopment plan, which will reduce or eliminate the exposure of human life and public and private property to natural hazards, Measure: This objective shall be measured by progress in imple- menting its policies. • Policy 2.2.3: The Recovery Task Force shall include the City Manager, Police Chief, Emergency Management DI - rector, Community Development Director, Development Services Director, Building Official, Public Services Direc- tor, Parks & Recreation Director and other City staff members as directed by the City Council. Staff shall be pro- vided by the departments whose directors sit on the Task Force. The Task Force shall be terminated after imple- menting its responsibility under Policy 2,2,6. Policy 2.2.4: The Recovery Task Force shall review and decide upon emergency building permits; coordinate with Miami .Dade County, State and Federal Officials to prepare disaster assistance applications; analyze and recom- mend to the City Council hazard mitigation options including reconstruction or relocation of damaged public fa- cilities; develop a redevelopment plan; and recommend amendments to the comprehensive plan, Miami -Dade County Hurricane Procedure Plan and other appropriate policies and procedures. Policy2.2.5: immediate repair and dean -up actions needed to protect the public health and safety include repairs to potable water, wastewater and power facilities; removal of building and/or vegetable debris; stabilization or removal of structures about to collapse; and minimal repairs to make dwellings habitable such as minor roof repairs and other weatherproofing/security measures. These actions shall receive first priority in permitting de- cisions, Long-term development activities shall be postponed until the Recovery Task Force has completed its tasks, Policy 2.2,6: The. Recovery Task Force shall propose comprehensive plan amendments which reflect the recom- mendations in any interagency hazard mitigation reports or other reports prepared pursuant to Section 406 of the Disaster Relief Act of 1974 (PL93-288). Policy 2.2.7: If rebuilt, structures which suffer damages in excess of fifty (50) percent of their appraised value shall be rebuilt to meet all current requirements, including those enacted since construction of the structure. Policy 2.2.8; Repair or reconstruction of the existing seawalls within the City shall be done using only pre -fabri- cated concrete or cement, which may be augmented at the base only by decorative material (rip -rap), shall be similar in height and appearance to adjoining lots; pursuant to the Land Development Regulations. Policy 2.2.9; Following a natural disaster and prior to the implementation of long-term redevelopment, the City shall do the following:Based upon the damage assessment report prepared by the Miami -Dade Public Works Department, the City shall consult with its Public Services officials and consultant engineer to evaluate options for damaged public facilities including abandonment, repair in place, relocation and repair with structural modi- fication, to determine the most strategic approach to long-term development. The evaluation shall include, but not be limited to, issues pertaining to damage caused by hatural disaster, cost to construct repairs, cost to relo- cate, cost to structurally modify, limitations of right-of-way, and maintenance costs. Objective 2.4:The City's Emergency Preparedness Committee shall review its hurricane preparation plans and post -disaster redevelopment plans annually to insure that risks are mitigated to the furthest extent possible and that its plans are in conformance with the most recent Objectives and Procedures developed by the Mlarrnl- Dade County Evacuation Planning Task Force. The City shall annually review its Hurricane Procedures in March of each year Policy 2.4.1: Continue to enforce building codes, floodplain regulations, design criteria, and zoning regulations established to protect new structures, reduce redevelopment costs, and mitigate hurricane hazards. Policy 2.4.2: Zoning district boundaries and land development regulations shall be maintained or revised as necessary to insure that no new hospitals or mobile homes that do not meet the criteria for manufactured housing are constructed in the coastal area. Objective 2.6: Tho City shall take measures towardshurricanepreparatlon, hazard mitigation and -plan -for- post - disaster redevelopment. April 2015 P1-58 66 LMS Tilami-aade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy � r ✓"� 7 • , f 7 Fi+ N ,gyp . r. ...t -.� ) . PC( ,alp, a ttls d i P. sv 'P % a p 6 m26 " - -�e..!#_•.nL4G')'�Ct.'1?...._..,...--1,''.- .._. a, M;^rx.. " t``;n��..k :r^:,t.. Policy 2.6,2: Encourage public awareness and education regarding appropriate responses to a variety of emer- gencies as feasible and appropriate utilizing such mechanisms as websites, public access television stations, and newsletters. Policy 2.6.3: Coordinate with the County to ensure the availability of emergency shelter for residents required to evacuate areas adversely affected by natural disasters. Policy 2,6,4: Work with the South Florida Regional Planning Council in its role as the region's Economic Devel- opment District Coordinator to seek hazard mitigation funding from the U.S. Department of Commerce, Eco- nomic Development Administration to fund the organizational and training activities of the Business Disaster Mitigation and Recovery Assistance Program. Policy 2.6.5: Consider reducing building permit application fees for disaster resistant shutters, doors, windows, and roof dips for businesses participating in the Business Disaster Mitigation and Recovery Assistance Program Policy 2.6.6: The City shall ensure that all applicable provisions of the hazard mitigation annex of the Miami - Dade County Emergency Operations Plan, and the Miami -Dade County Local Mitigation Strategy (LMS), are Incorporated and/or addressed In local hazard mitigation procedures. Policy 2.6.7: The City shall monitor problems and life -threatening situations resulting from natural disaster events and take the necessary steps to ensure that the potential for such problems and situations are minimized in the future. Policy 2.6.8: The City shall implement the Local Mitigation Strategy and Post -Disaster Redevelopment Plan to provide for debris clearance as well as Immediate repair and replacement of public infrastructure required to protect public health and safety, Policy 2.6.9: The City shall make every effort to support and implement the initiatives and projects listed in the Local Mitigation Strategy, Including both countywide initiatives and the proposed hazard mitigation projects located in the City, Policy 2.6.10: The City will promote the hardening of structures to increase resistance against natural disasters pursuant to the Fiorida Comprehensive Hurricane Damage Mitigation Program (My Safe Florida Home). /�, 4}j�,Yq. tI 1 T �` � i���irY FMM.1..L..��k�=C"i. 1.{IF?!{� l r'1 7 ..ti'.�.vV�4Sr.� "xib ti Gy ..r 3rL.,.ti) f .c. )-M `} .Sii 'li.1 J' t %, �'� yn. �} ( , { � Y4 !"''S3 4rgl }r'R " ''cl' 4r,..1 `§..,,r_b''�i-=e�iL^ tVAS^•?bl;; )ye l+H rz u.;, . ilhfiWT 54��.. U r -r�3}f t�+?,'*x'r�v:�;iYir,r'�Vp ifi... t'Y' cti. Objective 1.2: Continue to pursue drainage practices and programs that minimize ground and surface water pollution, including pollution to the Biscayne Aquifer; experience no Increase in the amount of properties, de- velopments, or facilities polluting ground water or surface water as the result of non -implementation of such practices and programs. Measure: Number of properties developed or redeveloped without technical review insuring that proposed drainage at the site minimizes ground and surface water pollution. Policy 1.2.1: Continue to make street drainage improvements City-wide. Objective 1,3: Protect existing rare or threatened vegetative communities, naturai ecosystems, listed animal species and their habitat, sensitive soils, and estuarine communities against any further degradation. Achieve 0 net loss of the 2,000 lineal feet of natural shoreline bordering the estuary. Policy 1.3,4: Further landscape and extend the linear park along the Snake Creek Canal in an effort to assist wildlife and riverine habitat conservation, including the removal of invasive, nuisance vegetation. Policy 1,5.6: Continue to restrict activities known to adversely affect endangered and threatened wild life, and require mitigation measures for activities Impacting native vegetative communities. Objective 1.6: The City shall seek to reduce greenhouse gas emissions to the maximum extent feasible and conserve energy resources. In developing the 2012 Evaluation and Appraisal Report and associated amend- ments, the City shall establish and adopt a percentage goal for greenhouse gas reduction consistent with Mi- ami -Dade County's greenhouse gas reduction goal. Measure: The number of specific programs initiated to reduce greenhouse gas emissions, percentage reduction of greenhouse gas emissions, acres of mixed use de velopment as a percentage of total development, and the estimated reduction of vehicle miles travelled as a result of these efforts, April 2015 P1-59 67 S L. Miimi-Cade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy 7I Policy 1.6.2: The City shall require low Impact development techniques and green building standards that re- duce the negative environmental impacts of development and redevelopment by; reducing building footprints to the maximum extent feasible, and locating building sites away from environmentally sensitive areas; pro- moting the preservation of natural resources; providing for on -site mitigation of impacts (i.e. retention and treatment of stormwater runoff, water reuse, Master Stormwater Management Systems); promoting energy conservation through design, landscaping and building techniques (i.e. solar power, Increased tree canopies); promoting water conservation through landscaping and building design; ensuring environmentally friendly building practices (Le, use of environmentally friendly building materials, recycled materials), and; considering the development and implementation of a green building certification program, with associated regulations, Incentives and standards, Opa-lccka Sec. 7-75. - Purpose. This article is to Insure the continued availability of flood insurance through the National Flood Insurance Pro- gram; to comply with federally imposed requirements; and to protect the public health, safety and general wel- fare, by minimizing flood losses in the flood hazard areas of the City of Opa-locka, and to require that uses vul- nerable to floods, including facilities which serve such uses, be protected against flood damage at the time of Initial construction and substantial improvement; control the alteration of natural floodplains, stream channels, and natural protective barriers which are involved In the accommodation of flood waters; control filling, grad- ing, dredging and other development which may increase erosion or flood damage, and; to insure that potential home buyers are notified that property is In a flood area. Sec. 7-78. - Standards for development within special flood hazard (SFH) areas, (a) No new construction and substantial improvement of any residential structure or manufactured home shall be permitted in SFH Areas, and no development permit referred to in section 7-77 of this chapter shall be Issued therefore, unless said new construction and substantial Improvement has the lowest floor (including basement) elevated to or above the regulatory flood (100-year flood) elevation. Electrical, plumbing, air conditioning and other attendant utilities must be constructed, designed, and/or located so as to prevent water from entering or accumulating within their components during conditions of flooding. (b) No new construction and substantial improvement of any nonresidential structure shall be permitted In SFH Areas, and no development permit referred to in section 7-77 of this chapter shall be issued therefore, unless said development has the lowest floor (including basement) elevated to or above the level of the base flood (100-year flood). If the lowest permitted floor level of such nonresidential structure (including basement) Is below the regulatory flood level then such nonresidential structure together with attendant utility and sanitary facilities shall be flood -proofed to one (1) foot above the level of the base flood; pro- vided that the lowest floor level of such nonresidential structure (Including basement) shall be not more than ten (10) feet below the base flood level. Where flood proofing Is utilized for a -particular structure, a registered professional engineer or architect shall certify that the floodproofing methods are adequate to withstand the flood depth, pressures, velocities, impact and uplift forces associated with the base flood, and a record of such certificates indicating the specific elevation (in relation to mean sea level) to which such structure is f[oodproofed shall be maintained with the designated official. (c) Ail manufactured homes placed, or substantially Improved, on individual lots or parcels, in expansions to existing•manufactured home parks or subdivisions, in new manufactured home parks, in substantially Im- proved manufactured home parks, shall meet all of the requirements for "new construction", including elevation In accordance with section 7-•78(a) and anchoring requirement of section 7-77(c)(2). April 2015 P1-60 68 LMS Miarni-D'ade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy x i .5 Baal (d) All manufactured homes placed, or substantially improved In an existing manufactured home park or sub division shall be elevated so that: (1) The lowest floor of the manufactured home is elevated no lower than the base flood elevation; or (2) The manufactured home chassis is supported by reinforced piers or other foundation elements of at feast an equivalent strength, of no less than thirty-six (36) inches in height above grade. (3) The manufactured home shall be securely anchored to the adequately anchored foundation system to resist flotation, collapse and lateral movement. (4) In an existing manufactured home park or subdivision in which a manufactured home has Incurred 'substantial damage as the result of a flood, any manufactured home placed or substantially improved shall meet the standards of section 7-78(a) and 7-77(3). (e) .All recreational vehicles placed within this area shall either: (1) Be on site for fewer than one hundred eighty (180) consecutive days; (2) Be fully licensed and ready for highway use; or (3) The recreational vehicle shall meet all the requirements for new construction, including anchoring and elevation requirements of section 7-78(c), (4) Be on the site for fewer than one hundred eighty (180) consecutive days. A recreational vehicle is ready for highway use if it Is on its wheels or jacking system, is attached to the site only by quick dis- connecttype utilities and security devices and has no permanently attached structures. Elevated buildings. New construction and substantial Improvements of elevated buildings that include fully enclosed areas formed by foundations and other exterior walls below the lowest floor shall be de- signed to preclude finished living space except allowable uses (i.e. parking, limited storage and building access) and shall be designed to allow for the entry and exit of floodwaters to automatically equalize hy- drostatic flood forces on exterior walls. Designs for complying with this requirement must either meet or exceed the following minimum criteria or be certified by a professional engineer or architect: (1) Provide a minimum of two (2) openings having a total net area of not less than one (1) square inch for every square foot of enclosed area subject to flooding; (2) The bottom of all openings shall be no higher than one (1) foot above grade; and (3) Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwaters In both directions; Electrical, plumbing, air conditioning and other utility connections must be constructed, designed, and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. Access to the enclosed area shall be the minimum necessary to arrow for parking of vehicles (garage door), (standard exterior door), or entry to the living area (stairway or elevator); the interior portion of such enclosed area shall not be finished or partitioned Into separate rooms or air conditioned. (g) Notify, in river line situations, adjacent communities and the Florida NFIP Coordinating Office to any al- teration or relocation of a watercourse, and submit copies of such notifications to FEMA; (h) The flood carrying capacity within the altered or relocated portion of any watercourse shall be main- tained. (f) (Ord. No. 12-09, § 2, 4-.Z1-12) April 2015 . P 1-61 69 LMS Miarni4Pade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Palmetto Bay Palmetto Bay is joining the Community Rating System program and integrating addi- tional activities to benefit their residents by reducing the risks of flooding. The FY 2104- 2015 Budget contains budgeting for canal drainage systems and for on -going preven- tative maintenance to maximized the efficiency of the system and reduce roadway pond - in a and flooding, j0, tt . ilOh 4 7„i1$ % ,,if " fir° f �3s>, t, t' t E� `i e -4. — h.-i .'''' J tt �{ F : 4. �'2t 1 * T -^afi,1 �.' ' "°ai '¢k 4'i -' err `", .fti�; i' `Nd t �.1 aS{xl, F P h:11. % 'r' �t F, }, �'' �y �'���kt7", Fure d ll; se FIe n�� M,7n i yrs i l f !r�- Ct t t E'zldF' e �k ady th/Ld * Tl. �1i!{wj �'1 1Lti ti ... ;.x h_ca'r��'SV'.SMiYl'�1C.fr�1�:�.r� nHtil4 i i#erjMt r l j� 1�`9 k"F lv.� i h�� rti -'•{{j' e •�L�"� i� f t'N .b�'� Dili r k .AV f��}.).f.{ ' �..{,�u+ �{ �..i1�4,.� kr'.1S.i. objective 1.6 Coastal High Hazard and Disaster Preparedness Coordinate with Miatni-Dade County and the State of Florida in addressing the land use planning, evacuation, structural Integrity, and disaster -preparedness needs of Palmetto Bay. Policy 1,6.2 Coordinate with Miami -Dade County in implementing the approved Local Mitigation Strategy, by assessing the vulnerability of governmental, medical, and public safety sites and structures in the Village to storm damage, and In developing an action plan, if necessary, to address wind stability and flood protection for key buildings i1 e1rp n �:'jk.` .: u f.Aj(Kj� ';N nk 4 i4— S 1 ;4 ..r1 y i { �: %5 L.`, i, -�tjf, f l :a ''' s 1,L Objective 5.3 Flood Protection with federal Emergency Management and vulnerable properties for mitigation. The Village will reduce natural hazard impacts through compliance Agency (FEMA) regulations and by targeting repetitive flood loss Objective 5.8 Past Disaster Redevelopment and Hazard Mitigation Coordinate with the Miami -Dade County office of Emergency Management (OEM) to develop and implement post -disaster redevelopment and hazard mitigation plans that reduce or eliminate exposure of life and property to natural hazards towards the protection of health, safety, and welfare within the Village. Policy 5.8,2 The Village shall enforce applicable recommendations of post disaster hazard mitigation plans re- quired under Section 405 of the Disaster Relief Act of 1974, Pinecrest The Village of Pinecrest is currently working on a Stormwater Basin Master Plan to eval- uate the existing stormwater infrastructure and look at the current level of Service and identify and prioritize any problem areas, The Plan will mode.i and look at current and future conditions for 24-hour, 2-year, 10-year, 25-year, 50-year and 100-year storm events including consideration for sea level rise. Pinecrest is also going through the pro- cess to become a Community Rating System Community. WHEREAS, pursuant to section 163,08, Florida Statutes, the Improved property that has been retrofitted with energy -related qualifying Improvements receive special benefit of alleviating the property's burden from energy consumption and assists in the fulfillment of the state's energy and hurricane mitigation policies; and ... WHEREAS, the -Village -Council -wishes to enter Into an interlocal agreement -with -the Town of Cutler Bay and other municipalities to participate In the District In order to provide financing for qualifying improvements as provided for In F.S. 163.08; April 2015 P 1-62 70 LNES Mlamd�l��de The MLianii-Dade Local Mitigation Strategy Part 1: The Strategy South Miami ...:._:. ,,.,..,y..., ..,,.. .....:: r�:ucb.:. �. ..,ab �.*s3.. ry..,:,,•-�,•..,...,, n:.:r,..- a sf,t":.d.: , Y f�cM : - ,.:.,w.=.., �� _ '� .,,,:,. •.:,, i bx., .. yy V 1*`+ ;, f A i 6 `2 'S§ 'k 4 .� -u'a �L ti }`x'S •yt T{r` Ac' `Y t ^`i )}4 =t�' i1�? �'��" �S �"i �"� r{j t o�'.JU'rl'�h�+G�S?�'r��������� �/fie.^ tti�`��'fr"k l�"ResCh"Y A3- 4 S,i ,y�A .i •"J�A.�'r7'% {1'ee • �-e-3w Fffgjl{$' YSF A i k{.�'`''' u,` {'dyeiC i"'�.• b �'',f ,,,„ ` � V1 1! "Ii l is Ci „y?,i'n � '� ��Lvd��S i 7 'y:�'.sr%}"iii Si ,ti 't la �S'Y: t-e 5+-31r, d' ni �j�gli ,t ', Policy 1.3,7 The City will coordinate with the emergency management program of Miami -Dade County y notify- ing the County of any. current or future land use policies or population changes which would affect hurricane shelters or emergency evacuation routes. Policy 1.3,11 The City will participate with Miami -Dade County In the planning and implementation of the County's Hazard Mitigation Plan, as it impacts the City of South Miarrii, u-,•,�,.y.. _...=.: . ,,. ,.�r..,...�..,.,;u„w.•-�:. kn':::n.w�,,: ., r�. :. •: a,,., . ,., r. :,,,�;..>:.q: :. .......a:w..:.f,�. .,>.;...:. ..�,,c .:,:�.... . _ 1. Gtn�i%;\fir, .�igti,tt.! a+'Y:='$: ,�.,,�.�, ....,:. b..k y,.Y :: :1t _,i f)CF. .1 .. �..v i.,... �... iii:& '�Y..:Yy ., U: ;..: .3a. ...,•..,.,ags�rv`'t. t:«u. t`:viA ViFg ar 4Jµ a j� p��' r a�,. P S�'1k } .! �. �r Cfi ;,,��1 . ' i i }� W r �S ,„..,, Sy! i p. li ,1,,1 .�tA:,-... t' � .:' 4�^'�;k�,`:-,�iN',�- 1�T.f.�.!;<+ 1r.. 'f r ?z,..{�4 4S.r. ��'F�.1�.,+k;1Vn4 '�iv5,it. � }.�4 l fts�nlezL. sr viYslt;, v:: OBJECTIVE 4.4 Preserve floodplain areas via floodplain management and limiting development within the special Flood Hazard Area. Policy 4.4.1 in coordination with the Transit -Oriented Development District, permit more Intense development only In those areas which are located outside of the Special Flood Hazard Area. Policy 4.4.2 Building density and intensity may be transferred from areas within the Special Flood Hazard Area, In order to permit development within the Transit -Oriented Development District, while reducing the permitted Intensities within the Special Flood Hazard Areas. Sunny isles Beach �N �,.] ��' ,�,� �v.. r a„�'', 3{t lc crnt ils g h t7orr re(te i ex ' E atnliGAF 0 �'� a t< t � k.aitl� nirCy,^.yiir+! iai w e t.acl,.,Hn.z k'irtxF.a'iL3p'r�t<jr"k�' ^<Y,!.o},,f.�.a ,',w,fa'txs�F`��G.,, Far Y,-�z3•fr„fi•y'K'-{In„"i,+,'��zs�:''-�s_ ,'i.uA��1o4 : tfiY if„tP'.1. 's', i7�c L�s Ss�r..;14.!. Policy 3P; Applications for rezoning, zoning variances or subdivision approvals for all new development in areas subject to coastal flooding shall be reviewed for emergency evacuation, sheltering, hazard mitigation, and post - disaster recovery and redevelopment. Tha J)ptortatio`nE SPy i'9:k. ?;`4 -3 t� Ln. ` S{4, C^ ' �tl i�aY rF4 ltuy Y�� i�' fytii itl. d"y:. ,, �y) Jft.(,1(f. .J •f !! `j�t k7 .—..r-`-. � , �. ..I"AiP , �Ft'. t+ Objective 3: Transportation Network Safety & Efficiency The City shall Improve the safety, and efficiency of the City's roadway system through transportation system man- agement (ISM) techniques, includingr access management (Policies 3A-D), improved Intersection operations (Pol- icy 3E), traffic calming along residential streets (Policy BF), mitigation by developers (Policy 3G), accident analysis (Policy 3H, 31), and maintaining visibility for pedestrians, vehicles, and cyclists (Policy 31). Surfside r rl!slrftcWW l' Nair Fe 3iy Objective 7: Coordination of population with hurricane evacuation plans; Coordinate population densities with the applica- ble local or regional coastal evacuation plan [9J-5.O06 (3) (b) 5] and coordinate future land uses by encouraging the elimination or reduction of land uses which are inconsistent with applicable Interagency hazard mitigation report recommendations (9J-5.0O6 (3) (b) 6]. This objective shall be measured by Implementation of its support- ing policies. [9J5,006 (3) (b) 5 and 6]. Policy 7.2: The Town shall regulate all future development within its jurisdiction In accordance with the goals and objectives of the "The Local Mitigation Strategy for Miami -Dade County and Its Municipalities, Departments and Private Sector Partners" (June 2008), The Town shall periodically review and revise the Future Land Use April 2015 P1-63 71 LMS Miami -bade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy 4,461101. Map in light of future interagency hazard mitigation reports En order to reduce or eliminate uses which are in- consistent therewith. Policy 5.5: Consideration for the relocation, mitigation or replacement of any of the existing infrastructure in the Coastal High 1-Lazard Area, as may be deemed appropriate by the Town, shall be coordinate with the state when state funding is anticipated to be needed for implementation of the project. al Management Element Policy 6.5: The Town shall adopt a Comprehensive Emergency Management Plan in order to prepare for, re- spond to, recover from and mitigate potential hazard by December 2011, Objective 11: Hazard mitigation In general, the Town shall regulate development so as to minimize and mitigate hazard resulting ffrorn hurri- canes, in particular, the Town shall ensure that all construction and reconstruction compiles with applicable reg- ulations designed to minimize hurricane impact on buildings and their occupants. Policy 11.5: The Town shall continue to enforce regulations and codes which provide for hazard mitigation, in- cluding but not limited to, land use, building construction, placement of fill, flood elevation, sewer, water and power infrastructure, and stormwater facilities. These regulations shall be applied to eliminate unsafe condi tions, inappropriate uses and reduce hazard potentials, Policy 11.6: The Town shall Increase public awareness of hazards and their impacts by providing hazard mitiga- tion information to the public. Information shall address evacuation, sheltering, building techniques to reduce hazards as well as other hazard mitigation issues that could help prevent loss of life and property. Policy 11.9: The Town shall, as deemed appropriate, incorporate the recommendation of the hazard mitigation annex of the local emergency management plan and shall analyze and consider the recommendations from in- teragency hazard mitigation reports. Policy 11.10: The Town shall include criteria in the five (5) year schedule of Capital Improvement projects to in- clude consideration for and prioritization for projects that are hazard mitigation initiatives. Sweetwater e 14.J Cy�r {v�i4 p .n{rrrrrr,,, i��'tf`-.} xHs-.THs��4,n "'[Gv 5 TJ h t{it�tf SISJ' E`� y� S.tt{I Z tF3P� h'�J fi { \ 11, ldo^�'tF_<.'di L��l �'G�jY U�t 1 {l }T 4'V� 1 S� fri 1 -`„ Ci , �[�...l�r '., v � -Ii ,ing �n isrt i^ { r s , yat �!- A di l-, ;'6:4*1 5pOT it 10; ( ?? The areas of special flood hazard identified by the Federal Emergency Management Agency in the flood insurance study (FIS) adopted by Mlaml-Dade County on July 21, 2009, with the accompanying maps and other supporting data, and any subsequent revisions thereto, are adopted by reference and declared to be a part of this chapter, The flood insurance study are on file at the Mlami-Dada County Department of Planning and Zoning and the Department of Environmental Resources Management and the flood insurance rate maps are on file at the City of Sweetwater clerk's office that are availablela�to the public. ,y(n . 3 4 r: �'.£ -+?+_�.r3�Fc�����rc`�^�YLi f 7hr } ' L }R 1 0}}`1 C �i -Gh A rl�".1. - S �![.!{�{� f A tt J' }�,7. A" �? Y'k� �f;, t indard .,Y#'7 � �h�.�-i iY `�. S� rs+ , S'!r'i,i� �� Y.�'L�,t �'l'�P.� ''F,,��??At �t ' { C`�"k?1`ilt���1 a� k,.� �� f "ib } .F.rF 1srr� w,i�Y X E,}t.. } n.i>.i;�x rlF c.. a.....e �..h PN gin4 in all Atones where base flood elevation data have been provided (zones AE, Ai-30, A (with base flood elevation), and Ali), as set forth in section 35-32, the following provisions, in additlon to those set forth in section 35-81, shall apply: (1) Residential construction. AEI new construction and substantial improvement of any residential building (in- cluding manufactured home) shall have the lowest floor, including basement,•elevated to no lower than one foot the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, there must be a minimum of two openings on different sides of each enclosed area sufficient to facilitate automatic equalization of flood hydrostatic forces in accordance with standards of subsection 35-82(3). (2) Nonresidential construction. All new construction and substantial improvement of any commercial, industrial, or nonresidential building (including manufactured home) shall have the lowest floor, including basement, elevated to no lower than one foot above the base flood elevation. All buildings located in A zones may be flood proofed, in lieu of being elevated, provided that all areas of the building components, together with attendant utilities and sanitary facilities, below the base flood elevation plus one foot are watertight with walls substantially impermeable to the passage of water, and use structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy. A registered professional engi- neer or architect shall certify that the standards of this subsection are satisfied using the FEMA flood proofing April 2015 P1-64 72 LIM miarni-Patle The Miami -Dade Local Mitigation Strategy Part 1: The Strategy certificate. Such certification along with the corresponding engineering data, and the operational and mainte- nance plans shall be provided to the rloodpiain administrator. (3) Enclosures below the lowest floor, New construction and substantial improvements that include fully -en- closed areas formed by foundation and other exterior walls below the lowest floor shall be designed to pre- clude finished living space and designed to allow for the entry and exit of floodwaters to automatically equal- ize hydrostatic flood forces on exterior walls. Virginia Gardens A F I ..'}, th'r �f b Yee" T• 002,f l'>r o . rE� s` . (ins o 4�� did K..a.. i •lt''Z X GG,..r' "u-.ice S. .f T3�r SE .'� — - S � OY C iJIM ttilJ�i y� n a f� 'u k i Tr a avt�+Y s,'ft Mij@hF $ 4 1 1 S 4i.11 �^^u'.IYkG N'b"fi i 4 Srt'2- (( �, i )7 } ki'xi l 9^it H 4 ] i 44y{,){ 4t^Ylcsl.kb U s E 31 ,1,r'L .1 �����( { k . �E]"'r'i,� �SNoSi F �Sx 3- "'i... j1���Rg��;'+cl.�i�y nn; kv.-ii.>cS. �rt'e �T�..�.,...��.l > aM -IIj .i le, . T.'� JYS Ip �tt �`{t� . rS 1 ,:,.. �' t'i S" r'1L b.��i-. 1 $f ;. �q 1h.v�...� �kY. ,i' 7.0.1 Administration: Duties of the Administrator shall Include, but are not be limited to; Verify and record the actual elevation (in relation to mean sea level) of the lowest floor (A -zones) or bottom of the lowest horizontal structural member of the lowest floor (V-Zones) of all new and substantially improved build- ings, in accordance with Article 5, Section B (1) and (2) and Section E (2), respectively; Verify and record the actual elevation (In relation to mean sea level) to which the new and substantially improved buildings have been flood -proofed, in accordance with Article 5, Section B (2); 6. `FStortnw terM:,n gementl`Code of drdfhaYYe ,fig � xf , , F ' . , ,r {�y1, t AA'ss °` r`' b.., � 'C .- �� i''F.t^^.uli1�.v-r..-..-,. F21., 6.11.3 Design Standards To comply with the foregoing performance standards, the proposed storm water management system shall con- forrn to the following standards: A. To the maximum extent practicable, natural systems shall be used to accommodate stormwater. B, The proposed stormwater management system shall be designed to accommodate the stormwater that origi- nates within the development and stormwater that flows onto or across the development from adjacent lands. The proposed stormwater management system shall be designed to function properly for a minimum twenty (20) year life. C. The design and construction of the proposed stormwater management system shall be certified as meeting the requirements of this Code by a professional engineer registered, in the State of Florida. D. No surface water may be channeled or directed into a sanitary sewer, West Miami Objective 7 As per 9J-5 .016 (2) (c), this section of the Capital Improvements Element provides a cost analysis of the capital Improvements identified for mitigation of existing deficiencies, replacement and new growth needs pursuant to the Future Land Use Element. April 2015 PI-65 73 L MS, The Miami -Dade Local Mitigation Strategy Miami-aade Part 1: The Strategy MITIGATION GOALS AND OBJECTIVES' Mitigation goals and objectives must be consistent with the goals and objectives of the county and the individual municipalities' master plans, their codes and ordinances, as well as other endeavors that reflect the aspirations for the welfare, safety and quality of fife of their citizens. Goals 1, Reduce Miami-Dade's vulnerability to natural and man-made hazards Objectives: 1.1. Incorporate new and more accurate data, studies and maps that demonstrate the evolution of risk in the county 1.2. Identify new and emerging mitigation methods and products for new and retro- fitting construction 1.3. Identify projects that mitigate expected impacts from hazards identified in the TH I RA 1.4, Promote mitigation measures to the Whole Community through outreach and education 1,5. Harden building envelope protection — including ail openings — and inclusion of a continuous Toad path from roof to foundation on all structures within the county 1.6. Reduce flooding from rainfall events 1.7. Reduce storm surge hazards and effects by encouraging greater setbacks from shorelines for new developments of waterfront properties, encouraging retrofit- ting and elevation of structures with high priority consideration for those built on waterfront properties, seeking opportunities to acquire, exchange or otherwise secure limited control of waterfront real estate 2. Minimize future losses from all hazard impacts by reducing the risk to people and property Objectives: 2.1. Adopt land use policies that limit, prohibit or mandate development and con- struction standards to promote resiliency and reduce risk 2.2. Adopt building codes leading to building design criteria based on site -specific evolving and future risk 2.3. Identify mitigation projects that reduce risk to vulnerable populations that are at greater risk from hazards 2,4. Integrate mitigation into existing structures during regular maintenance and re- placement cycles 3. Implement mitigation projects that meet or exceed current codes 9 EMAP 4.4,5 April 2015 P1-66 74 LMS The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Objectives 3,1 . Design and develop projects that address both current and future risk 3.2. Identify projects to address potential threats from climate change such as sea level rise and the impacts of storm surge and breaking waves exacerbated by sea level rise 4. Prevent flood related repetitive losses from natural disaster through education and regulation Objectives 4.1. Map repetitive and severe repetitive loss (RL) areas, 4.2. identify projects that will mitigate flood risk in these the RL areas 4.3. Track mitigation projects by flood basin to see past, current and future projects and compare to flooding data 5. Promote and support the Community Rating System (CRS) for all communities in Miami -Dade. Objectives 5,1. Incorporate measures into the LMS to help obtain uniform credit for all CRS communities 5.2. Identify and track projects in the LMS to demonstrate the role of mitigation measures in reducing flood risk 5.3. Provide outreach and educational opportunities 5.4. Develop and implement a Program for Public Information (PP1) 6. Promote mitigation measures for critical facilities Objectives 6.1. Continue to invite and work with critical facility stakeholders 6.2. Identify and track mitigation measures for existing critical facilities 6,3, Assess alternate facilities as identified in continuity of operations plans to deter• - mine if the sites are appropriately mitigated 6.4. Identify additional sites for emergency sheltering 6.5. Integrate sea level rise modeling to project and characterize expected impacts during the expected service -life of critical facilities Protect expressways, major highways and other thoroughfares and, bridges and causeways to provide for continuous, free flowing traffic and circulation as needed for the effective and unencumbered provision of emergency services and evacuation operations 7. Provide whole community planning Objectives 7,1. • Continue to engage additional local community stakeholders to participate in the LMSWG meetings April 2015 P1-67 75 LMS Mirarni-P e 7,2, 7.3. The Miami -.Dade Local Mitigation Strategy Part 1: The Strategy Host mitigation workshops to educate stakeholders and community members Initiate organizational, managerial and administrative goals to make mitigation a mainstream function of government affairs; spread the responsibilities throughout many departments and agencies to ensure continuity and a full in- tegration of mitigation management functions in the operations of government 7.4. Enhance public information and engagement to increase awareness of hazards and problems and to educate through a widespread program of general infor- mation, media coverage and participatory involvement Mitigation Opportunities Though some may link mitigation with post -disaster initiatives, opportunities to integrate and promote mitigation are available before, during and after development and construc- tion occurs. The following tables list some opportunities both for pre and post disaster. Pre -Disaster Mitigation Opportunities/Promoting Mitigation Budget Process (VI years in advance. gruleral project 2.8 years •epaolilo project) — dlvlsian LaVel (Capital Improvement Funds} Include on Capital Project Justlticat(an Form New oonsfrucllon will be built to code — • DeloimIne use of facility (critical/essential funalon) • Is this die outside offloodprone areas, climate change ask areas, high wind areas? • Determine if additional hardening measures should be Incorporated • Freeboard considerations installation/elevation of generators Elevation of AC units • Redundant systems • Protection of openings • Hazard friendly landscaping • Include additional mitigation measures Into estimated budget 'Checkwilh !ha Insrrance company to see If they will provide input on howto reduce the risk and other mitigation opportunities • Include requlrementsanoentivesfar respondents to Izilld in mitigation measures • Offer additonal points when mitigation measures incorporated into the bid/proposal When a project is complete April 2015 • Publicize mitigation projects the oourty has engaged In Highlight Insurance benefits • Provide Incentives/maintenance saving bark to Dlvislon/Department MaIntenance/Renovation 'series (out of contingency funds? • Identify projects such as roof replacement/major equipment replacement/landscape replacement • Budget In addilivtal mitigation measures • Determine use of facility (critical/essential function) • Is this site outside of floadprone areas, dlmale change flak areas, high wind areas? • Determine If additional hardening measures should be Incorporated • Installation/elevation of generators • Elevel•[on of AG units • Redundant systems • Preteadon of openings Hazard friendly landscaping • Include additional mltigulon measures into estimated bgdget Expedited permitting Incentive forincarporating mitigation measures can be ekpedtied permitting P1-68 76 LM M7ami-??ads The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Post -Disaster Mitigation Opportunities Review of Project Worksheets far possible 406 mitigation funding Is there a mitigation prefect that would protect the damaged element from future events? Possible projects may be; • Adding a cul Vert for washer( out roads • Protecting openings that have been destroyed (not just the windows that have bean destroyed but the other WindoWs/doors too) • Not just replace a destroyed generator or Ai C butelevate too Not just replace landscaping with Whet was there but with Hazard friendly landscaping • If facility has an essential COOP function, consider building back b higher standards ▪ Double up the vapor barrier • Preeboard ocnsidcrations Is there a like building to the damaged facility that was not damaged this time? • Is there anything currently under construction/ordue to start that could be Included (e,g„ elevate road)? See mitigation Matrix far additional opportunities `Check With the file to see if any mitigation has prevtousiy been recommended by the Insurance company + Publicize mitigation projects the county has engaged in • Highlight insurance benefits • Provide Incentives/melntenancesaving back to Division/Department Expedited permitting • Incentive forincorporatng mitigation measures can be expedited permitting Benefits • Sy increasing 406 projects, will Increase the amount assigned in HMOP money, April 2015 P1-69 77 LMS Miami -Dade The Miami -Dade Local Mitigation Strategy Part 1; The Strategy HAZARD IDENTIFICATION & VULNERABILITY ASSESSMENT1° As was touched upon in the introduction to the LMS, metropolitan Miami -Dade County is a large and diverse place and therefore vulnerable to many hazards. Each of these types of hazard is unique and produces distinct impacts to a community. Miami -Dade County developed a Threat and Hazard Ident➢fication and Risk Assessment (THIRA) that in- cludes numerous natural, technological, crime/terrorism and public health hazards that Miami -Dade County could experience. The 2015 THIRA was under development during the time of the writing of the 5-year LMS update and the information contained in here is based on the final draft of the THIRA. Each hazard was looked at in terms of a general description, location, extent, previous occurrence and vulnerability in the THIRA. Table 2 provides a listing of all of the hazards profiled in the THIRA, including ones that are not further analyzed for purposes of the LMS. Persons interested in seeing a complete review of all of the hazards listed in Table 2 may request to see the complete THIRA. To determine which natural hazards would be included in the LMS a review of the anal- yses from the THIRA was conducted. For purposes of this analysis, risk is defined as a relative measure of the probability that a hazard event will occur in comparison to the consequences or impacts of that event. That is, if a hazard event occurs frequently, and has very high consequences, then that hazard is considered to pose a very high risk to the affected communities. In comparison, if a hazard event is not expected to occur fre- quently, and even if it did, the consequences would be minimal, then that hazard is con- sidered to pose a very low risk. The determination to further consider hazards is also based on current available information including modeling that may indicate future risk. Some hazards such as windstorms, in and of themselves have not occurred very often nor had a high impact on the physical environment and mitigation measures that would cover these events include mitigation that is being done for hurricanes and tropical storms. Though we may not currently be considering a hazard for future consideration at this time, with new information, technology or modeling we may include it at a later time. We have identified potential mitigation measures, as able for all of the hazards, The Miami -Dade LMS welcomes our participating agencies to identify mitigation measures for all hazards and not just those that the LMS focuses on. The Community Profile (de- mographics) as developed for the 2015 THIRA is located in Part 4 Appendix I. Though we are vulnerable to many different natural hazards, one of the reasons we spend a lot of time talking about hurricanes and tropical storms and mitigation measures in re- lation to them, is that though they account for only 8% of the actual number of hazard events, they account for 81% of the losses, as illustrated in Figure 1. 10 EMAP 4,4,5 April 2015 P1-70 78 LMS The Miami -Dade Local Mitigations Strategy Part I: The Strategy Figure 1: Hazard Losses from 1960-2009 in Florida" OtlYttsuhofL'd'VJS' Wt: }'kh'lpf(d 3��kd 17).Wii.;;liun40107ml Cxcrils FEMA also maintains a website entitled Mitigation Best Practices that can be utilized to search for mitigation projects that other communities have embarked upon by hazard type, state and FEMA Regions. These projects also identify the funding source that may assist local communities in finding funding for like projects. https://www,liis.dhs.gov/bestpracticeslist 12 11 Source: National Weather Service Miami presentation 2015 12 EMAP 4,4.5 April 2015 P1-71 79 L• The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Table 2: Analysis of All Hazards from THIRA -',,, :',- ,,.'" , _ , — --' FerCo1idra - -, ---]',3'i -'-', ‘:, itfoY - --.,-,,L- giiiiitliS:i4ItifOIdsTrEriVeritiii : -:: - : '------ :;:1-7 .iit',•--i ::-.-.:•;;-ai,:".:::E.:'.,:;"::7-5,..:;. ' — - s'-:;-. - =..,;. ..2,-... - --..' gl',:P.'-e.--25:4W51145,-4 .-, '''' :ir'...:;:;lf,:-.ff-'''''''''. -.- - Nut' A ifgyimazzif Tic --'-''''''''''; '''','-'''-:,-;'ML-5-W,'--)Pl-V swzi-j,: pi'::',-5,n:Mi*M1,:m.54,-,q,..,--,&,,,,,,,,f,,,,,,.,,,_.q,zw,,,,,,,:i.t.,-,„ i'-.----76,-.FF--,,,,, 'Fr'-',...',Ir'd,:',V-q-iW''.-','-''''''-'''''':,',•:'::'-'.'n''','''''t,--,,,,-;*;.- Animal and Plant Disease X Historically there have not been any occurrences of ma- jor animal disease in Miami -Dade County. There have been three new plant disease outbreaks in the last 20 years (15% probability in any one year) that have im- pacted the agricultural communities but have not had any impact on the physical environment. Due to the low occurrence and limited impact, this hazard will not be further evaluated for the LMS at this time. • For plant diseases pesticides, separation/distancing, eradication of infected plants • For animal diseases, vaccinations, vector control, mosquito control, eradication of breeding grounds (e.g. standing water), public health education Dam/Dike/ Levee Failure X Miami -Dade County does not have any dams or levees on our NFIP maps. There are several water conservation areas that have a berm of about 4feet around them that are dry most of the year. Historicallithere have been no occurrences of dam, dike or levee failures in Miami -Dade County. Modeling performed by Miami -Dade Public Works and Waste Management shows that there are no populated areas near these locations that could be neg- atively impacted if the levees were breached. Therefore this plan will not include a further evaluation of this haz- ard at this time. • Maintenance of structures • Rechice/mtnimize construction dose to structures, where possible I • Fortify structures where risks are identified Drought X Historic -ally there has been 46 drought events recorded between 1950 and 2014 (therefore there is a 71% prob- ability of having a drought in any one year). There there has been no reported dollar losses to either physical structures or crops. This hazard is considered further for the LMS due to the high probability. • Water conservation • Public education and outreach . Regulatory fines . National Drought Mitigation Center 1 http://drought unLedui • Drought Resources for Miami -Dade htto://rrilami- dade.ifas.ufl.edujuveather issues/broughtPi-epard- ness.shtml 1 Earthquake X There have been no earthquakes in Miami -Dade County. South Florida does not have any documented faultlines. The USGS shows there is a 0_219% chance of a major earthquake within 50 kilometers of Miami in the next 50 years. Therefore this plan will not include a further eval- uation of this hazard at this time. • No Current Recommendations April 2015 P1-72 The Miami -Dade Local Mitigation Strategy Part 1: The Strategy TL, -,.. YEic-e IIZtie ilfe igatiptv ea stir taa __t,"-,:',, --.-ri,ip to r-aisimeo-,-;_aa .--;:;-,f;;;','',,,7--:,..,,,,,,,,7=.;M•61,E.:::KV:-4,:g1.,17-:.,,,5:2,4,;,-7g yigi,,,,,y0::$t, -:,;,:;:•;P:35eg---,2---c,i -r.-4•241,-3-7:i .7-45:%fgEf:,',:f_t:-,f'.IZ.4',;s,:,;:;',-:'.:-S':,,Z;,'=:f.-!':;J'Zr.,q'-'=:f.-.-- Epidemic/Pan- demic There have been no instances of an epidemic only affect- ing Miami -Dade County.- In 2009, Miami -Dade had 38 confirmed cases of Swine Flu - H1N1. There were not recorded deaths and no impact to the physical environ- rnent_ Miami -Dade has profiled this as a natural hazard, though the State does not. Due to the limited impacts to the physic -al environment this hazard will not be con- sidered further for the IJVIS at this time_ - • Public education and outreach- • Vaccinations . Fortify pharmacetitical supplies • Surveillance, monitoring and reporting mechanisms . Quarantine/Isolation as needed Erosion X Coastal Erosion is an continuous problem for Miami- Dade County coastal beaches are the county's natural barriers that can help protect us from the impacts of storm surge and sea level rise. The most severe erosion occurs in relation to hurricanes and tropical storm, from June to November . There are 20.8 miles of beaches in Miami -Dade County at risk for erosion and SOO parcels that sit adjacent to the shoreline that could be at risk if erosion became severe. This hazard is considered fur- ther for the LMS. . Fortify beaches through renourishment • Fortify dunes with vegetation or structural compo- vents • Natural barriers such as mangroves and coral reefs • Limit construction dose to coastal areas prone to erosion , • Limit re -development after disasters in coastal areas prone to erosion • Implement/enforce building code to fortify struc- tures in coastal areas Extreme Heat X There has been one extreme heat event, a heat index above 105, between 1950 and 2014 (2% chance of oc- currence per year). During the extreme heat event there was one death but no reported damages to property or crops_ Due to the efficient air conditioning systems of homes in South Florida, Florida Power and Light said that even with high usage of AJC there is not a surge of de- mend for power that would cause a concern for power outages. Due to the low impact this hazard will not be further considered for the LIVIS at this time. • Public Education and Outreach 1 • Identification, designation and opening of cooling centers for vulnerable populations, as needed_ . . Flooding X Much of Miami -Dade County is susceptible to localized flooding, particularly during the rainy season of June through October_ The mean elevation of Miami -Dade County is a relatively flat 11 feet. The County's fiat ter- . Public education and outreach on FEMA Rood Zones, storm surge planning zones and general flood risks. • Education on Flood Insurance • • Participation in NFIP and CRS • Drainage projects to address RL and SRL areas April 2015 P1-73 The Nfiani-Dade Local Mfigation Strategy Part 1: The Strategy rain causes extensive "ponding" due to the lack of eleva- tion gradients 10facilitate ~mo-off'' OfyNiami-Dades z,zsO,2u7acres, /m.6z%ufthat $ within the flood plain (55(871 acres)- There have been 7 recorded flood events and zsflash flood events since zss0'mmin asop� m chance of flooding occurrence every year. Localized flooding and pomUnmoccurs frequently during the rainy season. Property damages nfover $S4oxnand crop damages ofover $7z]Kxhave been reo,dedfrom flood- mgfor incidents from z9so-2o14-This hazard isconsid- emdfurther for the Ums' a Freeboard requirements for elevation of structures abvve8FE * Monitoring and coordination for maintenance and mitigation projects along canal areas � � Monitoring maintenance ofstunndrams�, d ° Design for larger stqnxdn,ios � � ° Swale and open space protection � ^ Participation mthe development ofgEK4AFIRM maps tahelp identify :¢ risk areas and areas that have been mitigated � � ' Hall . X There has been an increase in hail activity since the 1980s in Miami -Dade. Between 1988 and 1889 there were z7reported hall events [oMiami-Dade (average of z-7events/yca,).This was followed byaslight decrease between z99Vand z99ywith only z0events (average z evan1*year), however between 2008 and 2009that number moretbanquadrupled toosevents (average 8s events/year). Between 2Vz8and z014,there were a] - ready 46 even(amrageg.2 events/year). The an|yre- ported damageaoodotedwh6hai|vn, for about $sK, but this was more likely due tnotree limb that had fallen pnacar durimothesame event. Due tuthe low impacts nfthis hazard uwill not brconsidered further for the LmSmtthis time. a Alert and notification ofpublic to seek safety inside ° muother current recommendations � � � *urrivaoc/ Tropical Storm X Miami -Dade isvery vulnerable and has a1in' 6(z7%) chance peryea/ofgetting impacted byatropical storm or hurricane- Duetothcbighimpactsthisbazard-isfur therconsidered for theL&xs ° Public education and outreach � ° Designation of storm surge risk areas i ° Supportive services (evacuation and shelg)for at risk populations � ^ Hardened faCt|rtiesfpruse asevacuation centers ° See also recommendations under winds and floods, Landslides X Due to Miami-oade's imwaverage elevation, landslides an, not likely to occur. There have been no reported ^ Nocurrent recommendations April 2015 Miami -Dad LIVIS The Miami -Dade Local Mitigation Strategy Part 1: The Strategy hazard A Farther£onsidera tPrtJ9. ,LMS lnclusion7Eidusion-Criteria r P, lViiftga'tioa ea[5tfsyres- r Naturah ,.:.. ;... �, Yes Nor , ; --.-. .:,. ., T .-;` rC:- ... ... - . . -. . . ...: _.._ ... ...... _... :r E , ..- .. .-. landslides in Miami -Dade. Due to the low probability and low risk this hazard is notfurther considered forthe LMS_ Lightning X From 1950 — 2014 there were 51 reported lightning events in Miami -Dade County for a 78% chance of a lighting event occurring every year. Though the probe- bility is high the recorded impacts of these events is low with the highest single impact being about $50K for an incident at Miami international Airportthat caused dam- agestothe runway and several commercial aircraft. Due to the low impact of this hazard it will not be considered further for the LMS at this time. • Surge protection for electrical, computer and phone systems ' • Lightning detection and warning devices • Public education and outreach Saltwater Intru- sion Saltwater intrusion is an continuous problem that has been occurring every since the Everglades were drained to provide dry land for urban development and agricul- ture. Long periods of drought and storm surge inunda- tion are hazards that have been attributed to increases in saltwater intrusion. It poses a threat to the drinking water supply and requires close coordination of local agencies to continuously monitor intrusion, determine appropriate pumping rates and the coordination with South Florida Water Management District for mainte- nance of ground water levels . This hazard is included in the LMS for further consideration. . Continue practices of monitoring levels, gauging pumping levels and determining future impacts and need for deeper wells Sea Level Rise - X Sea level rise is likely to increase coastal flooding during high tides and storm surge events. Sea level rise will likely impact the ability of the canals and low lying areas to drain standing water after rainfall events and impact the ground water elevation. Gravity based outfalls that• lie below sea level will be impacted and as has been seen will allow salt water to flow up through the outfall sys- tem into the streets in several local communities. It is estimated that the total number of acres within Ur- ban Miami -Dade to be impacted by sea level rise for a 1 foot scenario is 121,378 acres (12%), for 2 foot 150,142 . Designation of Adaptation Action Areas . Additional modeling/mapping to determine areas at risk Build with sea level rise considerations to increase future resiliency as determined by the useful' lifespan of a project • Minimize development in future risk areas April 2015 P1-75 Mia€ua "-Dacia The Miami -Dade Local Mitigation Strategy Part 1: The Strategy klkard 4->.> > a# Weilaiiiera ati for W9S` fnclusflonJEacciusaon Cnter[a -- ilTir glair. 6 = r. te17;r_ w=, -�I�15-_Fr.-... .'PS -� �- .--.- -- -.x-.._. a-_ ...'"' - ..�. -z.... .- ... - ._ --ol . _ -Z _ _ .._. �- ,. -� _ ff acres (16%) and for the 3 foot scenario it could be 168,896 acres (18%) of the county. This hazard is included in the LMS for additional consid- eration_ - Severe Storm X From 1950-2014there have been 313 occurrences of se- vere storms in Miami -Dade, averaging about five occur- rences per year. Over $6M in damages have been rec orded during that time. Due to the high probability and impact, this hazard is further considered in the LMS. • Practices to mitigate against hurricanes are also ap- placable to severe storms. • Also see recommendations under floods • Review Model Storm analyses and identify mitiga- tion initiatives for the hardest impacted areas • Track heavy rain and subsequent flooding to identify areasforpotential mitigation measures Sinkholes X - There is no official record of all sinkholes in Miami -Dade. The Florida Geological Survey maintains a database of all "subsidence incidents," however this only includes events that have been officially reported and includes many events that are not sinkholes_ Between 1948 & 2014, only one subsidence incident was reported in Mi- ami -Dade to the Florida Geological Survey. Within the State of Florida for insurance claims, Miami -Dade County represented 1.45% of all sinkhole claims between 2006 and 2009. In 1973 a sinkhole recorded by the Florida Ge- ological Survey measured three feet by three feet in Mi- ami-Dade County, most reported instances are small in extent and have not significantly impacted the built en- vironment. Additional instances of sinkholes claims have been reported through insurance claim reporting data but the magnitude of each respective claim was not made available. Due to the low impact of this hazard it is not considered further for the LMS at this time. • Assessment hardening and replacement of aging in - frastructure. April 2015 PI-76 The Miami -Dade Local Mitigation Strategy Part 1: The Strategy '.'Eazard etligeCOWSTii§i iaiiggii E*Iii iiiii-,Ci," - -: , -,, itiOitforilVieastiret,- - --2:,. , _ ..,—,,,_ V. -- -- - - - --”--; -.4.1:6---T.7,--,-,..--,31,gi:15:-,-:, Space X There have been no space weather events specific to Miami -Dade County that have caused interference with technological components of communication or electri- cal systems. Due to the low probability of this hazard it is riot considered further for the LMS at this time. • Identifying redundant or alternate systems in case of outages. • Hardening of Cl/KR Tornado X There have been 125 occurrences of tornadoes in Mi- ami-Dade County from 1950-2014, averaging about 2 times a year. Recorded damages from tornadoes for property exceeds $202M. Due tothe hi gh probability and high impact, this hazard is included in the LMS for further consideration. 4 Hardening of structures. • Identification of safe rooms and structures. Follow FEMA Safe Room Guidance • Increased public awareness . Signing up for existing alert and notification systems. Tsunami X There have been no tsunamis every occurring in Miami- Dade County. The risk of a tsunami striking Florida is con- sidered to be relatively low by the National Oceano- graphic and Atmosp h eric Administration. Due to the low probability of this hazard it will not be considered further at this time_ • Education for risk can be also tied to coastal Commu- nities currently at risk for Storm Surge. Volcano (Ash/Dust) X There are no volcanoes in Miami -Dade County and no recorded impacts to the physical environment from vel- canoes. Due to our distance to anyvolcanoes there is no projected impact. The biggest concern in relation to an active volcano outside of our area would be volcanic ash that may be carried by trade winds that could limit avia- tion operations or possible compromise the air quality. There are no expected impacts to physical infrastruc- ture. Due to the low probability and low impacts, this hazard will not be considered furtherfor the LMS at this time. • Implementation of Sheltering in Place as identified in the Miami -Dade All Hazards Protective Measures Plan_ Wildfires X There have been 13 wildfires recorded from 1950-2014, giving a 20% chance of a wildfire occurring every year_ Though historically there has not been a high impact on property, about $180K on record it is estimated that about 613,453 people or 25% of our area population live • Prescribed buming programs_ e Cutting brush or other fuel away from structures, • Follow National Fire Protection Association (NFPA) Firewise Communities Program April 2015 P1-77 MiamiHriade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy - — 1 i to ea't gig'...iaafgwg;* .,& :''"'''ff- — - :IZIRS-g-g::;.'' ,, ' , --: _ ".' - within the Wildland Urban interface and could be at risk_ This hazard is included for further consideration in the LMS. 0 Roles in Fire -Adapted Communities http://www.usfa.ferna.govidownloads/pdf/publica- tionsifire adapted communities.pdf Windstorms X There were 10 high wind and 2 strong wind events on record from 1950 to 2014, giving an 18% chance of an event occurring every year. Recorded property dam- ages total about $18K. Mitigation strategies that ad - dress -tropical storms and hurricanes would also help protect the built environment from high wind events. Due to the low impact of these events, this hazard will not be considered further for the LMS at this time. . . • Building opening and glazing protection. Hardening of roof structures. Securing roof top equipment. ' Winter Storm X There have been 25 occurrences of winter storm related events from 1950-2014, giving about a 40% chance of an event occurring in any given year. Though there has not - been any recorded property damages, there has been over SWUM in crop damages during these events. Dur- ing these events, a demand for electricity will increase and many homes in South Florida do not have efficient heating systems, unlike their air conditioning systems, and therefore the demand on electricity can be much higher. This hazard is included in the LMS for further consideration. • • . Identification, designation, construction of cold weather shelters for homeless and other vulnerable populations, and opening of the same during cold weather events. Public education and outreach Agriculture Extension works with local growers for educational material for mitigation of crop losses_ httrajmiami-dade.ifas.uff_edu/weather is - sues/cold%20preparedness.shtml April 2015 P1-78 The Aliami-Dade Lwcat NMgation Strategy Part 1: The Strategy The following non -natural hazards are included in the THiFA and we have included suggested mitigation measures, but they --=-are not currently` �o�ma|OOsp� � Vessel inspections �-Compliance with safety regulations ° Emergency Generators ° Alternate enen: sources Electric Utility Failure ° Hardened utility lines and structures p Emergency Evacuation and Assistance Program run by the OEM to assist vulnerable populations ° Public Outreach and Education ° Regular onsitcinspections ofhazard nus,mater ials facilities � Hardening offacilities with hazardous materials Hazardous Materials Release ° Emergency shut off valves a Public Outreach and Education ° Implementation ufAll Hazards Protective Measures Plan ° Hardened facilities Nuclear Power Plant Release ° ° Public sducanin�Outreach and Alert and mnoficauonprocess Protective Actions toshut down facility ° Turkey Point Response Plan and annual exercises ° Fire suppression safety systems Structural Fire ° Alert and notifica-tivnsystems ° Regular Fire Drills and Inspections Transportation Incident Ke'Highway an�orKaUlmjden� � � |rspwr�onand maintenance ofuao,po�a�oncen1don, auO��^oin�a�mcturatpfuture r�kand oapachvneeds ° |nspectionand maintenance oftrains, planes, automobiles and vessels Vvatec/wastewanermcident " 0 inspection and maintenance ofinfrastructure Building infrastructure tofuture risk and capacity needs Active Shooter ' ° See Something, -- Something campaign Security screening procedures ° Intel gathering and sharing Civil Disturbance/ Civil .Unrest ° ° Community gather[nmpoints toallow for peaceful demonstrations Public Outreach and Education . 0 increased law enforcement presence asadeterrence 8ectmyNagneticvu|se 0 Shielding ianii-bade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy • Back up systems for communications and power . ' Surge protection Food Borne Illness Incident • Follow Public Health guidelines • Reporting systems Mass Migration • intel gathering and sharing • Surveillance and reporting • Follow Public Health guidance Terrrorism — Biological (Category A, B• and C Agents) • Personal Protective Equipment All Hazards Protective Measures Plan — implementation of Isolation/Quarantine • • Public Education and Outreach • Intel gathering and sharing Terrorism - Chemical • See Something, Say Something campaign • Surveillance/monitoring of Cl/KR sites • Intel gathering and sharing • Security procedures and passwords Terrorism — Cyber . - • Firewalls • Tamper proof infrastructure • Surveillance/monitoring of Cl/KR sites Terrorism — Explosive • Protective barriers (bollards, cement barriers, bullet proof glass, metal/chemical detection) • • Surveillance/monitoring of Cl/KR sites Terrorism —Radiological • Intel gathering and sharing • See Something, Say Something campaign • Intel gathering and sharing Terrorism Small Arms • See Something, Say Something campaign Surveillance/monitoring of CIJKR sites • • Security screening procedures April 2015 Pi--B0 MS Miitimi-►ado The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Drought Description A drought is characterized as an extended period of time with persistent dry weather conditions in a geographic area that typically has rain fall. A drought can however be defined in several different ways depending on the geographical region and situation: • Meteorological drought: When the normal level of precipitation has a significant measurable drop, • Agricultural drought: When the level of soil moisture drops below the suitable range for agricultural growth. • Hydrological drought: When the surface water and underground water supply falls below normal. • Socioeconomic drought When water shortages seriously interferes with human activity. The Palmer Index, developed by Wayne Palmer in the 1960s, uses temperature and rainfall information to formulate dryness. It has become the semi-official drought index. The index is effective in determining long term drought conditions of several months. The index sets normal conditions at 0 with drought conditions in negative values. The index can also be reversed showing the excess of precipitation where the normal condi- tions at 0 and positive values for amount of rainfall, The advantage of the Palmer Index is that it is standardized to local climate, so it can be applied to any part of the country to demonstrate relative drought or rainfall conditions. NATIONAL INTEGRATED DROUGHT INFORMATION SYSTEM ALERTS FOR DROUGHTS - Alert Criteria .: Palmer Drought In-.. d ex DO Alanor many Dry Going into drought: short-term dryness slowing planting, growth of crops or pastures. Coming out of drought: some fingering water deficits; pas- tures or crops not fully recovered, -1.0to -1.9 Di Moderate Drought Some damage to crops, pastures, streams, reservoirs, or wells low, some water shortages developing or Imminent, and voluntary water -use re- strictions requested. -2.0 to -2.9 D2 Severe Drought, Crop or pasture losses are likely, water shortages common and water re- strictions imposed. _3 0 to 3 9 D3 Extreme Drought. Major crop and pasture losses with widespread water shortages or re - strictions, 4.0 to 4.9 D4 Excep banal Drought Exceptional and widespread crop and pasture loss, shortages of water in reservoirs, streams, and wells creating water emergencies, -S,0 or less Source: US, Drought Monitor Classification Scheme, From the United States Drought Monitor April 2015 P1-81 89 LMS Miarni-Pade The Miarni-Dade Local Mitigation Strategy Part 1: The Strategy Location The entire County is vulnerable to drought conditions. Extent D4 on the Palmer Drought Scale. Impactma The Drought Center reports that the direct impacts of a drought can include reduced crop productivity; increased fire hazards; reduced water levels; increased wildlife mortality rates; damage tc wildlife and fish habitat; increased problems with insects and diseases to plants and trees; and reduced growth, Indirect results can lead to financial hardships for farmers and "increased prices for food and timber, unemployment, reduced tax reve- nues because of reduced expenditures, increased crime, foreclosures on bank loans to farmers and businesses, migration, and disaster relief programs." During times of drought, crop irrigation can lower the water table, exposing it to salt water (please see the Salt Water Intrusion section for more information). Water restrictions were put in place for Miami -Dade County that impacted both residential and agricultural communities. No definitive dollar amounts of damages were found during a review of the literature, Previous Occurrences 2013 — 2014 — No occurrences March — early April, 2012 - Very dry conditions continued into early April over all of Flor- ida. There were no reported damages. Ground water levels led to the continuation of severe drought conditions. January August 2011 - Rainfall totals in January were near to below normal over most of southeast Florida. This resulted in the expansion of severe drought (02) conditions over inland sections of Miami -Dade counties. Rainfall deficits since October over these areas ranged anywhere from 8 to 11 inches. Most wells across the area were running at around 10 percent of normal water levels, The level of Lake Okeechobee remained steady at about 12.5 feet, which is 2.2 feet below normal. The Keetch-Byram Drought Index (KBDI) was in the 500 to 600 range, which reflects a high fire danger and low soil moisture values. 1 February was a very dry month over south Florida as high pressure dominated the re- glon's weather pattern. Over most of Miami -Dade February rainfall totals were less than a tenth of an inch. As a result, February 2011 was among the top 10 driest Februaries on record at Miami and Miami Beach. This led to severe drought conditions aver most of South Florida, with extreme drought conditions over portions of the southeast coast. The level of Lake Okeechobee fell about a half -foot during February, from around 12.5 feet to near 12 feet. Forestry officials reported double the number of wildfires during the winter months of 2010-2011 compared to the previous year. The period of October 2010 April 2015 P1-82 90 TT � L M�arninti�ide . - The Miami -Dade LocalMitigationStrategy Part 1: The Strategy to February 2011 was the driest on record in the 80-year history of the South Florida Water Management District's records. Conditions remained dry and by the end of May, most of southern Florida was in an ex- treme (D3) drought status, except for an area of exceptional (D4) drought over eastern Palm Beach and Broward counties. This is the first time in well over a decade that any part of south Florida has been designated as being under exceptional drought conditions. June continued the streak of below normal rainfall over most of South Florida. Little rain fell during the first 10 days of the month, with the rainy season not starting until around June 8th. Almost ail the rain across the area fell in the last 2 weeks of the months. Total rainfall were only in the 2 to 4 inch range over the east coast metro areas as well as the Gulf coast areas. Miami Beach recorded its driest June on record with only 1.15 inches of rain. Inland areas of South Florida received about 6 to 8 inches, with isolated 9 to 11 inch amounts south and west of Lake Okeechobee. The level of Lake Okeechobee dropped from around 10 feet at the beginning of June to a minimum of around 9.6 feet in late June before recovering by the end of the month. Wells and underground reservoirs remained at the lowest 10 percent of normal levels. Exceptional (D4) drought conditions extended over most of Palm Beach and Broward counties as well as far northern Miami -Dade County. Extreme (D3) drought conditions extended all the way to the southwest Florida coast of Collier County, with severe (D2) drought conditions elsewhere over South Florida. Several wildfires broke out over South Florida in June, including a large wildfire in the Everglades of Miami -Dade County near the Miccosukee Resort and several wildfires in north -central Palm Beach County and eastern Collier County. July and August brought much needed rains. Overall, rainfall averaged near to above average over most areas, leading to gradually improving drought conditions. Lake Okeechobee remained over 3 feet below the normal level for this time of year. Underground water levels remained below normal over much of south Florida, especially over the metro east coast sections.13 No data was available to determine the economic impacts of this event, Source: National Oceanic and Atmospheric Administration, National Climatic Data Center, Storm Events Database Vulnerability Physical Vulnerabilities Drought is not anticipated to have any impact on the built environment (Critical Infrastruc- ture, Key Resources, and Building Stock). It may cause economic losses to agriculture and aquaculture due to loss of crops or water restrictions that inhibit normal operations. Crops most vulnerable to drought are the ones that are grown during the winter months, our dry season, and harvested in the spring months including cantaloupe, carambola, celery, cucumbers, dragon fruit, eggplant, fennel, guava, greenbeens, herbs, jackfruit, is Source: National Oceanic and Atmospheric Administration, National Climatic Data Center, Storm Events Database April 2015 P1-83 91 LS The Miami -Dade Local Mitigation Strategy Miamt-cosl Part 1: The Strategy longan, lychee, mushrooms, onions, papaya, passion fruit, plantains, radishes, sapodilla, spinach, squash, strawberries, sweetcorn, thyme, tomatoes and zucchini. Social Vulnerabilities This hazard may impact persons employed by the agricultural community including mi- grant farm workers. In terms of the general population, it does not tend to affect, one population over another, however the social vulnerability section should be reviewed for more information on how these types of circumstances may affect populations differently. Erosion Description Erosion is the wearing away of land or the removal of beach or dune sediments by wave action, tidal currents, wave currents, or drainage; the wearing away of land by the action of natural forces; on a beach, the carrying away of beach material by wave action, tidal currents, littoral currents or by deflation. Waves generated by storms cause coastal ero- sion, which may take the form of long-term losses of sediment and rocks, or merely in the temporary redistribution of coastal sediments. Riverine and canal erosion are minimal within Miami -Dade County and will not be further analyzed. Coastal erosion is of greater concern and is expanded upon below. Longshore currents move water in a direction par- allel to the shoreline. Sand is moved parallel to most beaches in Florida by longshore drift and currents. Ideally the movement of sand functions like a balanced budget. Sand is continually removed by longshore currents in some areas but it is also continually re- placed by sand carried in by the same type of currents. Structures such as piers or sea walls, jetties, and navigational inlets may interrupt the movement of sand. Sand can be- come "trapped" in one place by these types of structures. The currents will, of course, continue to flow, though depleted of sand trapped elsewhere. With significant amounts of sand trapped in the system, the continuing motion of currents (now deficient in sand) results in erosion. in this way, human construction activities that result in the unnatural trapping of sand have the potential to result in significant coastal erosion. Beach Erosion Beach erosion occurs when waves and currents remove sand from the beach system. The narrowing of the beach threatens coastal properties and tourism rev- enue in coastal counties throughout the United States. Dune Erosion Dune erosion occurs when waves attack the front face of the sand dune, reducing the volume and elevation of the dune. Erosion of the sand dune leaves coastal properties more vulnerable to future storms. Overwash When waves exceed the elevation of the dune, sand is transported across island in a process known as overwash. When overwash occurs, it often results in signif- icant damage to coastal property. April 2015 P1-84 92 LMS Miami-P de The Miami -Dade Local Mitigation Strategy - Part 1: The Strategy Inundation and island Breaching Inundation occurs when the beach system, or the sandy profile located between the most seaward (primary) dune and the shoreline, is completely submerged under the rising storm surge. Strong currents may carve a channel in the island in a process known as island breaching. Location The coastal areas indicated in the map are at highest risk for coastal erosion. Extent 25,000 cubic yards of sand. Impact Miami -Dade beaches provide storm surge protection and coastal erosion can diminish this natural buffer. .Sea turtles can also be impacted as their nesting grounds may be impacted and the beaches are a big draw for tourism, Miami-Dade's shoreline is highly developed with an estimated beachfront value in excess of $13.5 billion, not including infrastructure. Previous Occurrences Coastal erosion has been occurring for years, the first study was done in 1930 and a restudy was done in 1961. As a result, from 1975-1982 the US Army Corps of Engineers implemented the Miami -Dade County Beach Erosion control and Hurricane Surge Pro- tection project that cost about $48 Million. It Is estimated for every $1 that is invested in beach nourishment that there is a return of about $700 foreign, primarily tourism impacts, In October 2012, Hurricane Sandy, never made landfall, but paralleled the coast causing coastal erosion with reports of waves up to 10 feet in Miami -Dade. There was no Presi- dential Declaration for damages within Miami -Dade. 14 Hurricane Sandy in 2012 was estimated to cause over $2M in damages to beaches including the following: • Miami Beach 26tt'-29th Street approximately 10,000 cubic yards • Miami Beach 44th -46th Street — approximately 2,500 cubic yards • Miami Beach 53rd -- 56th Street approximately 3,000 cubic yards 14 Miami -Dade County EOC Activation Archive April 2015 P1-85 93 LMS Miami -Ode The Miami -Dade Local Mitigation Strategy Part 1: The Strategy * Miami Beach 63rd — 66th Street — approximately 5,000 cubic yards • Bal Harbour 99610 103 Street — approximately 2,600cubic yards • Key Biscayne — unknown cubic yards estimated at $1,2 M15 Hurricane Wilma in 2005 caused in general only minor beach (Con- dition 1) erosion to the majority of beaches in Miami -Dade but dune erosion (Condition II) occurred at the Bill Beggs Cape Florida State Park, 18 Picture at right shows damage to Bill Beggs. No major struc- tural damage was observed seaward of the coastal construction con- trol line or within the coastal building zone, The majority of the damage near the coast occurred north of Bakers Haulover Inlet, At Cape Florida, a concrete sea- wall and rock revetment sustained level three damage Hurricane Rita in 2005 caused only minor beach erosion (Condition 1) north of Govern- ment Cut from Miami Beach to Broward County, Virginia Key also had minor beach ero- sion (Condition I) but also experienced overtopping, resulting in a wash over deposit of sand. Portions of Key Biscayne experience moderate beach and dune erosion (Condition 111) and south of Sonesta Beach Resort had minor dune erosion (Condition II). No struc- tural damages were sustained along the Miami -Dade County coast seaward of the Coastal Construction Control Line (COOL) or within the Coastal Building Zone (CBZ) dur- ing the passage of Hurricane Rita. Hurricane Katrina in 2005 caused minor beach erosion (Condition I) to the northern beaches in Miami -Dade. No structural damages were sustained along the Dade County coast seaward of the coastal construction control line or within the coastal building zone; however, a. number of single-family dwellings were flooded on Key Biscayne forcing their evacuation. Vulnerability Physical Vulnerabilities The entire built environment (Critical Infrastructure, Key Resources, Building Stock) and natural environment (beaches) are vulnerable to erosion primarily along coastal areas according to a GIS analysis there are approximately 500 parcels in the property appraiser database that intersect with the Coastal Construction Line. Though the beaches have been fortified over the years and are much wider than they used to be (see pictures), constant erosion could put structures, in these areas at risk. The map to the right shows the status of erosion classifications for Miami -Dade County's coastal areas. Severe ero- sion can exacerbate storm surge inundation by minimizing the protection offered by beaches and seawalls as they are compromised. Structures such as boardwalks or piers that are have pilings in coastal areas may suffer collapse or complete destruction. Beaches in Miami -Dade such as South Beach and Biscayne National Park are cited as 15 Miami — Dade Emergency Operations Center Damages Report Florida Department of Environmental Protection Post - Storm Reports April 2015 P1-86 94 L. Miami -Fade VIS The Miawi-Dade Local MitigationStrategy Part 1: The Strategy the number one reason tourists come to Miami -Dade, which is estimated at about $18.5 B annually. There are two piers in Miami -Dade County that extends into the Atlantic Ocean and Government Cut, they are the Newport Beach Fishing Pier in Sunny Isles Beach and the South Pointe Pier in Miami Beach, The Newport Beach Pier was rebuilt and re- opened in 2013 after being destroyed by Hurricane Wilma in 2005 and the South Point Pier was rebuilt and reopened in 2014 after being closed In 2004 due to deteriora- tion. Social Vulnerabilities This hazard does not tend to affect one population over another, Flooding Description Flooding is an overflowing of water onto land that is normally dry. It can happen dur- ing heavy rains, when ocean waves come onshore, and when regular drainage capa- bilities are compromised. Flooding may happen with only a few inches of water, or it may happen with several feet of water. Flooding can affect many different communities cover- ing several states during a single flooding event. Sunny day flooding and tidal flooding are discussed in the Sea Level Rise section. River or Canal Over - bank Flooding s TABLE. 6A-8 COMMON FLOOD TYPES It When water levels rise in a river due to excessive rain from tropical systems making landfall, persistent thunderstorms over the same area for extended periods of time When water levels rise In a land locked area, lake or detention basin due to excessive rain from tropical systems making landfall, persistent thunderstorms over the same area for ex- tended periods of time. In South Florida, some of the severe localized thunderstorms fre- quently exceed 3 inches/h, exhausting the storage and infiltration capacity of the drainage system, . April 2015 PI-87 95 LINIS mono-y.1e The Miami -Dade Local Mitigation Strategy Part The Strategy • Category Coasta Flooding Criteria When a hurricane, tropical storm, or tropical depression produces a deadly storm surge that overwhelms coastal areas as it makes landfall. Storm surge is water pushed on shore by the force of the winds swirling around the storm. This advancing surge combines with the nor- mal tides to create the hurricane storm tide, which can increase the average water level 15 feet or more. The greatest natural disaster in the United States, in terms of loss of life, was caused by a storm surge and associated coastal flooding from the great Galveston, Texas, hurricane of 1900. At least 8,000 people lost their lives. Inland or Riverine Flooding When tropical cyclones move inland, they are typically accompanied by torrential rain. if the decaying storm moves slowly over land, It can produce rainfall amounts of 20 to 40 Inches over several days. Widespread flash flooding and river flooding can result. In the 19705,180s, and '90s, inland flooding was responsible for more than half of the deaths associated with tropical cyclones in the United States. The state of Florida has nearly 121,000 census blocks potentially threatened by riverine flooding, translating to nearly $880 billion in property. Flash Flooding A rapid rise of water along a stream or low-lying urban area. Flash flooding occurs within six hours of a significant rain event and is usually caused by Intense storms that produce heavy rainfall In a short amount of time. Excessive rainfall that causes rivers and streams to swell rapidly and overflow their banks is frequently associated with hurricanes and tropical storms, large clusters of thunderstorms, supercells, or squall fines, Other types of flash floods can occur from dam or levee failures. Source: National Weather Service Location Much of Miami -Dade County is susceptible to localized flooding, particularly during the rainy season of June through October, see the map on next page. One area in particular experiences flooding on a regular basis. Known as the 8% square mile area, it is located west of the L-31N Levee, between SW 104th Street on the north and SW 168th Street on the south. The mean elevation of Miami -Dade County is a relatively flat 11 feet, The County's flat terrain causes extensive "ponding" due to the lack of elevation gradients to facilitate "run-off'. Of Miami-Dade's 1,250,287 acres, 44.62°A of that is within the flood plain (557,871 acres). Our community is interlaced with an intricate system of canals that play an integral role in our groundwater saturation levels. When the levels are too high or the canal structures cannot be opened this can lead to localized flooding during rain events. Agricultural interests can be impacted by levels that are too high or too low. If the control structures release the fresh water at a rapid rate this can also lead to environ- mental concerns where the fresh water is released. When the control structures fail or are damaged and cannot be operated, alleviation of the any localized flooding may re- quire pumping until the canal structures can be re -opened or fixed. Inability to be able to close the salinity structures within the canals could also increase the risk of salt water intrusion during high tide and storm surge. Part 7 of the LMS provide greater detail as to the canal system within the county and the relation to drainage basins. April 2015 P1-88 96 L.M. Miar i-Dede The Miami -Dade Local Mitigation Strategy Part 1: The Strategy LOOD.PR N A ` A, ,. CLA,SSIPIED ' Not. OF R Pb11T;VE LOSS- '$ AN:Di. FLOOD'. ,ONtIPLAINTt.REPORTEi TO THE 311.ST TEM Type of, F1 flni Ftbritiffil krtot4ln7klfls� Extent Two feet of flooding. Impact In 1999 and 2000 Miami Dade experienced two major flooding incidents, Hurricane Irene and the "No Name Storm". The damages from the 1999 storm were reported as $100 M in property and $200M in crop damages and the 2000 storm caused $440M in property April 2015 P 1-89 97 LM Miami -Dade - The Miami -Dade Local Mitigation Strategy Part 1: The strategy damage and $500 M in crop damages,17 Though the flooding in this area was not directly attributed to a failure of the canal system, it was acknowledged that the original drainage system for the Tamiami Canal Basin was not designed to accommodate the population that resided in that area and the water managers recognized a need for major system improvements. A $42 million multi -phase project that included a 900-acre emergency detention basin, and the S-25B Forward Pump Station and S-26 Pump Station and dredg- ing project. This project improved flood protection for 500,000 residents and to 5,000 homes and businesses. 18 After Hurricane Irene, 1999, areas of Miami Dade had standing water for long periods of time as is reflected in the foilowinp chart.19 1 \ I tlk APea , , , 1 tt \ Y Yf,t I - 7 1`l xF � •.lit �I;Y.... .•. P 1 1 .• Yhi ii t\ lI �$'E1r11atIdn of the Y (��g�3yu jy�^���'y4 (�tf�Ir rr.. yy11�,yY II xl F4l �.. e',I1. G'SRI PTGr it fit. 6 �. 1 \1 1 Pi'obleinsa } i. ``Zk} Jl;� SS t > j ttt .'�. .\I-{.. .�It �. .. .. }fi. .4.�.��•1 �. i 1' 4 1d t{. Estimatedtlmelttootfot< `� ;.,44 /Do. 1 �t.�{'i' tj \ p l f: .• ti] Gl.!'/{+�8�i1,0, 113.4: IC I.)1L East Everglades 2 feet Impassable roads and minimal home Intrusion 1 month Sweetwater 2 feet • Impassable roads and ex- tensive home Intrusion 1 week West Miami 18 inches Impassable roads and ex- tensive home intrusion 2 weeks Homestead (near Harris Field) 2 feet Impassable roads and some home Intrusion 1 week NW 127 Avenue between Tamiami canal and NW 8th Street 1 foot Impassable roads 2 weeks NW 97 Avenue between 25th Street and 30th Street (Vanderbilt Park) 1-2 feet Severe home intrusion 1 week NW 41 Street west of the Turnpike 2 feet impassable roads 2 weeks Previous Occurrences October 20, 2014, localized flooding and rainfall amounts of 4 to 7inches were measured in the south Miami -Dade County communities of Cutler Bay and Palmetto Bay. No addi- tional data was available on this event. June 18, 2013 4 Persistent heavy rains from slow moving showers and thunderstorms produced an isolated area of flash flooding near the Falls Shopping Mall in Miami -Dade 17Source: National Oceanic and Atmospheric Administration, National Climatic Data Center, Storm Events Database 18 South Florida Water Management District Tamiami Canal (G-4) Flood Protection Project, July 2008, June 15, 2012.- 19 Miami -Dade Emergency Operations Center Activation Archives, After Action Report Hurricane Irene April 2015 P 1 -90 98 _The Miami -Dade Local Mitigation Strategy Miarni-bpde Part 1: The Strategy County during the late afternoon and early evening. Measured rainfall amounts were in the range of 7 to 10 inches in the matter of just a few hours, The first report of flooding was received at 5:10 PM EDT with streets nearly impassable and the Falls parking lot almost completely under water. Several cars were also reported to have been flooded. Water entered structures in the Village at the Falls Condo development with the Oak Ridge Residential Community also reporting water intrusion into a vehicle which caused a total loss of the car. Estimated damages $5K. June 7, 2013 -,Severe flooding from a nearly stationary thunderstorm across the north- east portion of Miami -Dade County extending northward into the Hollywood area of south- east Broward County. Over 50 vehicles were reported as being stranded in impassable roads in Aventura and additional roads had similar problems in North Miami and Golden Beach, A South Florida Water Management District rain gauge recorded 13.15 inches of rain in North Miami Beach at 5:53 PM EDT with storm total at the same gauge by 9 PM EDT recording 13.94 inches, Other rainfall reports received were 11,71 inches at the FIU Biscayne Campus in North Miami Beach and 9.89 inches at North Miami/Keystone Point, April 30, 2013 - A nearly stationary thunderstorm over Coral Gables produced torrential rainfall over a period of about two hours with rainfall estimates in excess of six inches and an unofficial, measured report just west of Coral Gables of 7.56 inches. Law enforcement reported water was entering garages along Anderson Rd, between Palermo Ave. and Camilo Ave. Water was also reported to be entering businesses along Miracle Mile near Gallen° St, A parking lot was flooded along Biltmore Way with water reported to be up to the bottom of car doors. May 22, 2012 - A band of showers and a few thunderstorms along with torrential rainfall developed over the far western portions of the Miami -Dade County metropolitan area and moved east through the area from Kendall to Doral and Miami Springs. Miami Interna- tional Airport recorded 4.40 inches of rainfall between 1245 and 2 PM EDT, Standing water was reported on numeroUs streets and several vehicles stalled out in the waters. Other rainfall reports received in this event were 3.64 inches at the National Weather Service Forecast Office on the FIU South Campus and 4,03 inches at Ruben Dario Middle School in Sweetwater, Damage totals for this event are included in the event which oc- curred later in the evening over the same area, estimated at $75K. A second band of numerous showers and a few thunderstorms accompanied with intense rainfall moved through the same area of Miami -Dade County that received very heavy rainfall earlier in the clay, The first significant report of flooding with this event was received at 810 PM EDT in Doral by the media stating that the canal running along NW 25th Street near NVV 107th Avenue had overflowed its banks and flooded a nearby police department parking lot. Many roads in Doral were under several feet of water,. resulting in stalled cars and water entering businesses in warehouse districts. Miami International Airport re- ceived an additional three plus inches of rainfall making the total for the calendar day to 9.7 inches which was a record daily amount. This also made it the second wettest day recorded in Miami for the month of May with continuous records back to 1895. Storm total April 2015 P1-91 99 LMS Miami-cimN The Miami -Dade Local Mitigation Strategy Part 1: The Strategy rainfall amounts in the Sweetwater and Doral areas ranged from 8 to 10 inches, with an area of 4 to 7 inches extending from the FIU area to near the Dolphin Mall. In October 1999, Hurricane Irene (DR-1306) developed and started a path towards South Florida. Initial projections were correct in stating the hurricane would impact the west coast of Florida, and Irene traveled through the state and, on October 15, passed just to the west of Miami -Dade County. Although the hurricane did not pass directly through the county and no exceptionally high winds were experienced, the heavy rainfall associated with this storm did hit Miami -Dade County, and the impacts were severe, Some roads were impassible for weeks, electricity was out in certain areas, and residents and busi- nesses suffered heavy losses. On October 3, 2000, a low-pressure system, later to become Tropical Storm Leslie, de- veloped off the west coast of Cuba, and headed toward South Florida (DR-1345). Water managers and weather officials closely tracked the storm, and preemptive measures were taken to start moving water out of the canals. Weather forecasts called for 4-8 inches of rainfall from this storm, and unfortunately, once the storm passed over south Florida, it dropped 14 tol 8 inches of rainfall over a linear area in the center of the county. Equally as unfortunate were residents and businesses that experienced a similar result as in Irene. Vulnerability Physical Vulnerabilities The entire built environment (Critical Infrastructure, Key Resources, Building Stock) may be vulnerable to flooding especially in low lying, storm surge planning zones, areas close to canals and structures that were built prior to flood plain regulations, Structures in areas where there has been repetitive losses and no mitigation may also be at higher risk but past flooding events do not necessarily indicate future flooding problems. Part 7 provides additional analysis of residential structures by date of flood regulations within Miami -Dade County. Below is a chart showing how many structures within each jurisdiction are within FEMA Flood Zones. Number of Buildings by Jurisdiction in FEIVMA Flood Zones iTe:° fk,£*Fir Aventura :t,, rf F.11 f±♦ 24,149 `..., _ C .. : x_ ..... , . 4.... 52 31 Bal Harbour 738 955 2250 Bay Harbor 2576 Biscayne park 991 42 42 Coral Gables 2770 1209 58 13209 1466 Cutler Bay 8840 1871 3886 Doral 93 3768 16746 El Portal 6 97 566 92 Florida City 3 2 1097 396 817 Golden Beach 262 98' Hialeah Gardens 133 271 5802• April 2015 P1-92 100 LIYL. Miami- lade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Hialeah 1304 18513 36496 Homestead 222 8824 9098 746 Indian Creek Vii- [age 33 4 1 Key Biscayne 7056 Medley 19 251 578 Miami Beach 51049 4381 123 Miami Gardens 12103 9083 8638 Miami Lakes 0 8317 1263 Miami Shores 843 3 19 2470 552 Miami Springs 11 2029 2125 21 Miami 43094 6441 3897 68535 2215 North Bay Village 3872 North Miami Beach 5650.. 7212 653 North Miami 8190 261 5637 1995 Opa-locka 714 543 1319 1275 Palmetto Bay 4701 41 3590 80 Pinecrest 2168 268 3563 260 South Miami 2 784 3660 Sunny isles Beach 11351 1 7647 0 Surfside 1560 1878 Sweetwater 1 582 367 Virginia Gardens 122 445 86 West Miami 960 768 Unincorporated 582 44750 105,976 2 28 169059 20053 Total: 585 247,570 152,649 2 4305 381122 42164 Heavy rainfall events tend to be measured by the amount of rain during a certain duration to give you what would equate to the chances of this type of storm which is typically categorized by terminology such as a 100- yr or 500 year storm. To help local communities determine if a rain event is considered significant the following site and chart from the National Oceanic and Atmospheric Administration (NOAA) Hydro - meteorological Design Studies Center maintains the Precipitation Frequency Data Server (PFDS) which is a point -and -click interface developed to deliver NOAA Atlas 14 precipi- tation frequency estimates and associated information. To determine the amounts and rates of rain that could create a various internal rain event (e.g 100 yr or 500 yr) this website provides local information. http://hdsc,nws.noaa.gov/hdsc/pfds/pfds map cont.html?bkmrk=fl Using a location in Miami -Dade County with a 7 foot elevation, the following chart depicts the rainfall amounts per an interval of time that could determine if a significant rain event has occurred. April 2015 P1-93 101 LMS mvi-vev The Miand-Dade Load Mitigation Strategy Part 1: The Strategy NOAA.Atios' i4„Voltune 9-. Vetsicin 2 Locatfon name: Want F10ridaUS'' Latitude::25,8204% Longitude-410,2930' E6V60-Orl: 7 ft' s,-,urag POINT PRECIF! lTATIONTREQUEll CY E5T1MATE! Sala PEIka, Deborah ilartini Sandra Fa005,10; Malt Ray, MIthaskSt Laurent, GariTripskik, Dale ,`444[6j.e/ Yekts,6,eo6ery 6gtan8t Natinnaftar nridic,e;.611m Spring, 1,14ryfand PF -tabtilar PF nr31141011:k126 PF tabular PDS-bseti.Ooint precipitatio:nfrequency est:Notes With 90%: 00E1fidell De Di nt Is (in inches).1. Durati ji Averag9 Tech el u.E'sinterva (years} • • [ 2 16 25 SO 100 200 IC9 1) 10110 5-rnin • 0.6T8 (0471-11,710) 0,6.31 0.63E-0.1116) 9.79:1 (0,o47-tr_vse) .911 m.7364.1.13) 1.07 (0'.aa-1.30] 1.19' (1114967,-1',5t6 1.32 (6.067-1.77 • 1,44 (1.M-1-96) 1.81 (1'.90-2.20) 1,7,4 (1.15-2.624 ,,,1„ tC1--“'''' ------ 'COM, , (0.909-1:04) - - 0,967 (0765- I ,16) - -. -,- 1.17. (D:946:-1,45). - .1.33 0 (1,98-IA ---....- 1.67 (1.22-,91) 1.76 (1,3372.28) 103 ,(1.42,1,561, .2.11 (140-2.92; 2,38 ,.63-1, 1,9Ct-4M 2.64 0 09 1-5-min 1.63: 146, (0.0014-).16) (.42. (1,16-176), I 1.63 1 1•,,31-2.11.3) 1.91 (140722,,F8) 2.13 (162-2.78) ' 2.35 (173,415) 2,07 (1813.56 2.87 1.05-4,09 3,10, (r,,,98-4.001' ,,,,t, -" 1.50 . (4.20-1,0) .1.31 (1.46-2,24) 2,20 ().79-2.73)• 2-.52. (104-8,14) 2,97 (2,i2-9.82i 132. (2-53-.432) '. 3,67 . (2.70-4.97> ' 4.02 p...69-8,68)f{3.04.6,:. i 4,49 , 4,6,5 (8.20- .34: 60-mln • " ; (t 71-2.69_ ,(.1,95-?05) 4,37E3.§,2)1 f•,2:787422) '4:97 (3,2074,m „6.-4 _.(6.05-3;1 i ;5.24 0.,E17-700 6,A7 (446:6:16; 7-67711 (A:4,8O-131.69 7.4t .--- 2-11r 260 , (2,13A. 19) 2,97 (1-1_4•3:-3,66), a,e4 (2.07-4.43) 4.25 (3,45-5,20 • 6,16 (4, 1.13-8:73) 5,96 4,89-7..94 6.131 (6_)Ef-coe) 7.72 (6.51--10.7 y R6,10-12.0) .(4.087I0: (6.76-14.5; 3-r h 4' 2.69 Z3•' .53) '7--3 3.29. (tz_70-4.01) 4.05 N.32-4.07) 4.76 3..69-5.1901,"(4.73--7'?2) 6,92 6.91 59 .36r0.•I 6.00 (6.93-10.3) 920 (5.60.•12.11 '.''7.93-16.6) ,tk 10,911 12.4 8.24-17,3 39 _„ i:-..,, 1-7) ),'637"-- , ...1-4,2" 7J 14k 471-,li 14,01-5 0 l 11/21,- ' r4.77-7,•15) 1.311''' (8.98,,9.30 6.74 (060-11.4) 7-T8:72 " 1 (1.38)-1174 . TO , 1e.z7-18.4 r 143-:.-i 091.7.2,9,q (10.9-20..2 12-hr*F 3'5* (3.29-4.77) 4.63 (904-_5(9 5.01 (4.89-7.15) ,! 713 ' (.5.00-8,07) 9.04 (730-11.7) 19.7 (SAO- 3.0 12.5 (9.0-16_7) 14,6 (10,6,20.0) 17.0 ,,(12.2-24.6 19.9 (53.44-2.8:11 24_11r ,4162 2.0-5.53) 16.47 (4.96-6154 , 7,04 (5,39-9.47): 8.81 (7.1:13-no), .10.6 (8.73-13.9) 12:7 (100=10.4) 14.8 4{1 taa lg. d: 17.1 1: VI 5 '23:a .-20.4 {14.4-t-20. 0 23,2 (15.V•32„ffi 24iny ir .6.82 . '4 54-5 4,5 648. ct3,o6-7.63) 819 0.64-17 s 85 (S.17-0,1-15.71 11,01 Tin (10) 146 S11.5-11.11 16.6 02,9-22-1) 1. 142:26..2 i 2300 pa 2:alit 259- 07 22311 3.:1 345Y 8,0a (6.97-7.)9) , 7.03 (8_93-8.97 6,01 (7.46-10,8)„ 10,6 (6,63-127) -13.2 1..10.3-13.9) 16.4 (122-19.3) . 47.3 .(1287.-3.2) , 20,3 (15.64.1.94 1 -24,0 N17_0-63:-2 27..0 (10.6-37:6: 4-4°Y- 6.69 • (6,65-7.70) T.po• (6A0-8, 90) 9,43 (7.01,11.2) 11-1 (9,26-4a,m 13.7 (11,2-17..1) 15.9, (126-212) ' 18.2 (114.0-230 . .26,8 (15.4-27.0. 4, 27 17:4,--aa.7 1 27.5 (19.9-36.2, .. - 74,/,,,,, - 0,06 ' • (3,89-9.911) - 6.97 ' 0,68-(9.81. ' 0,6 (6.?8,;.12.6); " , 2.2 .09.2-14.8) 14, ' 02)-22.3) 6:8:" 134-21-2) r, , 19..1 '(448-24,6) 21.) (151-89.0: l, 5.4 {1/2-34,6 ---I64 (19,7413! 10do --y 9,34- ' 10.2 (9,67-12.0) 1.9; 1. v (i-14.o) 13:5.: (1.12-15,0 13.0 (13.1-ile) 18,1 (.14,8-22. ;20,4 (16,8-26.3) 23,0 - . 0.7.1-.18, 23.7 i is: -16A . 20.7 0 L,21,1,7-40.' •20-1:16V 1247 (163-147 144 (120-114) 16,4 (139-192) 13.6 (156-217} 07.5-25.0) 214.. 2,1.7t.7 , 161.20W .232 (203-02) 28.7 1i (11.4-376)1132-434) .12,2 .35.9 241-47,6 ` 30-d '., :,„.•- -047kq , . 1f"3 ,,. 14f4i 204 „17?-W) 229 ,•,::.,, 11q11871 264- (.7>..3:6)1(238,:9813) ,. 31.4 (244-4PM 339 .4,1P0.g. 37 4p.,ts.., 307 po„-:*,,,,t, 26,3 (215-20.3); 26,3 (24 ,0,-82.9) 32,2 26.3428.3i r 36.0 I (231742.4) 87„8 . (.29,70.0 402 i:30,1.-11,6: 413 '614,•57,4 45.5 ! 32.2,-01.6:. • 45-43y . 19,1 ' - . (19.4.1.2,9} 2 .6 ( 16.4-24.,m• 8o-ciey •-,• 22'3' (.19.2-25.7) 26:1. 21. 29.9) 29,3 (28.1,-31...9) 32,7 (17.8-3 _9) 1-3;9 (10:2-43.3) 39.9' (32.4,4.2) 42.6 (32,2-52-9) • 46,2. (33.9-6711, 48,2 -04,9,016 • 50.2 (36.6-69.13) 1 Pit41131Ladon frequar,Gy (PF) estIrnateiln Ullt toble•are based co frequi.rtoy analyls di partial duration selies(VO4 0.41111ers*Tri ii,i,ishes•Is a* 14 eiemateF,sk laive,rancl up Ozt 6oupdi dr lhe RN onr,ficierxe intervall'he,kutlabillty:that pre4p1Lallon Treqiienciy estnatee gar a glverfduratlan and avaraqa c.notternnte inierval) will be- ureatar, tan tlw 1.!,par bound (or lase-than-61i !dryer. bound) 14 VI_ 91s6rn-afss-, al upper bounds are. nn4 aileaketl'agelos ni134ahle maxirnkun ptEatilkitintr I8)5319 898rrpia and may 0ililg4ier,t13r1 currentiy,ial/d F',IP val!,Jes, ' __•' Neasa'refer•to 140AA Atlas 14 doainigal: for Mare friforrna9orl, . Social Vulnerabilities People who live in areas prone to flooding and whom may be uninsured or underinsured are at greatest risk. Thp cost of insurance may be prohibitive and people who live outside April 2015 Pl -94 102 S Miami -Pads The Miami -Dade Local Mitigation Strategy Part 1: The Strategy of a flood zone may believe they are not at risk. People who rent properties may not be aware of their flood risk as it may not be disclosed by the owner or they may not know the history of the area. Hurricanes and Tropical Storms Description A tropical cyclone is a collection of weather systems classified by the varying wind speeds and intensities, including tropical depression, tropical storm, and hurricane. Tropical weather systems form over subtropical or tropical waters with lowered pressure and the combination of wind circulation at the center. A tropical depression is a weather system with a defined surface circulation and maximum sustained surface winds between 23 mph — 38 mph. A tropical storm develops from a tropical depression, and has a well-defined surface circulation and maximum sustained surface winds of 39 mph — 73 mph. A hurricane develops from a tropical storm. The term hurricane is used for tropical cy- clones in the Northern Hemisphere and east of the International Dateline. A hurricane is a weather system with well-defined surface circulation and maximum sustained surface winds of 74 mph or higher, Winds The Saffir-Simpson Hurricane Wind Scale was first developed in the early 1970s to cate- gorize hurricanes by intensity. The scale used to include storm surge projections by category of storm, but it was determined that there was not a direct correlation between wind speeds and storm surge amounts. Hurricanes with wind fields which are very large in size can produce storm surge heights that are much higher than is average for a given category. Conversely, very compact hurri- canes, even if extremely strong wind -wise and with very low central pressures can produce surges substantially lower than what was in- cluded in the original scale, Today, the Saffir-Simpson Hurricane Wind Scale is a 1 to 5 categorization based on the hurricane's intensity at the indicated time. The scale provides examples of the type of damage and impacts in the United States associated with winds of the indicated intensity. In gen- eral, damage rises by about a factor of four for every category increase. Miami -Dade has experience sustained winds of up 150 mph and storm surge of 16.9 feet at the Burger King International Headquarters. Hurricanes are considered one of the most damaging and deadly weather events that occur in the United States, with violent winds, waves reaching heights of 40 feet, torrential rains, and flooding. According to the National Oceanic and Atmospheric Administration (NOAA) there are an average 11 tropical storms that form over the Atlantic Ocean, Car- ibbean Sea, and Gulf of Mexico regions each year, and on average 6 of the tropical storms April 2015 P1-95 103 MiLMS alT111-45tte The Miami -Dade Local Mitigation Strategy Part 1: The Strategy develop into hurricanes, The United States experiences a hurricane strike on land about once every year and a half. The strike zone can potentially extend anywhere from Maine and south to Texas. Storm Surge Predictions for storm surge are made through a variety of means, including the Sea Lake Overland Storm from Hurricanes (SLOSH). Storm surge inundation is modeled in two zones: the high -velocity zone where wave ac- tion and debris can severely damage structures, and farther inland, where the primary concern is flooding as opposed to structural damage. Storm surge can create flooding that can destroy buildings and carry debris miles inland, into canals and rivers, the inter - coastal waterways and out to sea. The water can also pool in low lying areas impeding response and recovery activities. Damages associated with storm surge include but are not limited to: • Extreme flooding in coastal areas • Inundation along rivers and canals • Beach erosion • Undermining of foundations of structures or roadways along the coastline (erosion or scour) • In confined harbors and rivers, severely damaged marinas and boats • Sunken vessels or underwater hazards in navigable waterways Location Hurricanes and Tropical Storms can impact the entire county. The map on the left shows the 50-year return for maximum winds and on the left shows potential storm surge for storms modeled within the Biscayne Bay Basin. The following two maps show the location for winds and storm surge based model runs by HAZUS and SLOSH. A `,W kir N:Ar4PA entte.roldi 1 In 8 Alad14cliltalit 1 In 17 Yampa Etay , 1 In 26 Fort Sisfero, ITIll thvonville In 1.80 Dayton* ill I. Im 88 4'11'frr111)1" Pah 8fAaeh Koy w.5Nt iri FLORIDA HURRICANE IMPACT CHANCES Source: floridahurrIcane,nefLocation April 2015 P1-96 104 LMS Miarni-OPtle The Miami -Dade Local Mitigation Strategy Part 1: The Strategy • •••.••• VirmiVIA gmizimgmt iter)g )4A214-401 4.4.44 -wrtgo.A.00,4444, " • -•, Extent 7 ^: Se! 0171 Pi -QM CIA figGloti &TORM,TIckE MP tilsq,lyrot Bay kfAarn Category 5 Hurricane with storm surge of 16.9 feet. Impact Historical observations from types of impacts and damages associated with the winds of hurricanes are included in Table 2. All of these have been experiencpd in Miami -Dade. • April 2015 P1-97 105 LMS Miami -made 'The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Table 2: Potential Impacts of Hurricanes by Category of Storm kSgki,' rN rr �I 41 A Ir jai • People, livestock, and pets struck by flying or falling debris could be injured or killed, • Extensive damage to power lines and poles will likely result in power outages that could last a few to several days. • Pre-1994 mobile homes may be damaged or destroyed, especially if they are not anchored properly • Damage to newer mobile homes anchored properly involving the removal of shingle or metal roof coverings, loss of vinyl siding and damage to carports, sunrooms or lanais • Poorly constructed frame homes may have major damage — loss of roof covering, damage to gable ends and removal of porch coverings and awnings • Unprotected windows may be broken by flying debris • Masonry chimneys can be toppled • Well -constructed frame homes could have damage to roof shingles, vinyl siding, soffit panels and gutters. • Failure of aluminum, screened -in, swimming pool enclosures can occur, • Some apartment building and shopping center roof coverings could be partially removed. + industrial buildings can lose roofing and siding especially from windward corners, rakes, and eaves. + Failures to overhead doors and unprotected windows will be common. • Windows in high-rise buildings can be broken by flying debris. • Occasional damage to commercial signage, fences, and canopies. • Large branches of trees will snap and shallow rooted trees can be toppled. • There is a substantial risk of injury or death to people, livestock, and pets due to flying and falling debris, • Near -total power loss is expected with outages that could last from several days to weeks. • Potable water could become scarce as filtration systems begin to fall. • Older (mainly pre-1994 construction) mobile homes have a very high chance of being destroyed and the flying debris generated can shred nearby mobile homes. Newer mobile homes can also be destroyed. Poorly constructed frame homes have a high chance of having their roof structures removed espe- cially If they are not anchored properly. • Unprotected windows will have a high probability of being broken by flying debris. + Well -constructed frame homes could sustain major roof and siding damage, • Failure of aluminum, screened-ln, swimming pool enclosures will be common. • There will be a substantial percentage of roof and siding damage to apartment buildings and in- dustrial buildings. • Unreinforced masonry walls can collapse. • Windows in high-rise buildings can be broken by flying debris. • Commercial signage, fences, and canopies will be damaged and often destroyed. • Many shallowly rooted trees will be snapped or uprooted and block numerous roads. April 2015 P1 -98 106 TT L The Miami -Dade Local Mitigation Strategy Part 1: The Strategy There Is a high risk of Injury or death to people, livestock, and pets due to flying and falling debris Electricity and water will be unavailable for several days to a few weeks after the storm passes. Nearly all older (pre-1994) mobile homes will be destroyed. Most newer mobile homes will sustain severe damage with potential for complete roof failure and wall collapse. Poorly constructed frame homes can be destroyed by the removal of the roof and exterior walls. Unprotected windows will be broken by flying debris. Well-built frame homes can experience major damage Involving the removal of roof decking and gable ends. There will be a high percentage of roof covering and siding damage to apartment buildings and Industrial buildings. lsotated structural damage to wood or steel framing can occur, Complete failure of older metal buildings Is possible, and older unrelnforced masonry buildings can collapse. Most commercial signage, fences, and canopies will be destroyed. Many trees will be snapped or uprooted, • There is a very high risk of injury or death to people, livestock, and pets due to flying and falling debris. Power outages will last for weeks to possibly months, Long-term water shortages will increase hu- man suffering. Most of the area will be uninhabitable for weeks or months, Nearly ail older (pre-1994) mobile homes will be destroyed. A high percentage of newer mobile homes also will be destroyed. Poorly constructed homes can sustain complete collapse of all walls as well as the loss of the roof structure. Well-built homes also can sustain severe damage with loss of most of the roof structure and/or some exterior walls. Extensive damage to roof coverings, windows, and doors will occur. Large amounts of windborne debris will be lofted Into the air. Windborne debris damage will break most unprotected windows and penetrate some protected windows. There will be a high percentage of structural damage to the top floors of apartment buildings, • Steel frames in older industrial bulidfngs can collapse. There will be a high percentage of collapse to older unreinforced masonry buildings, * Most windows will be blown out of high-rise buildings. • Nearly all commercial signage, fences, and canopies will be destroyed. Most trees will be snapped or uprooted and power poles downed. April 2015 P1-99 107 LMS ;Mfami-Oada The Miami -Dade Local Mitigation Strategy Part 1: The Strategy • People, livestock, and pets are at very high risk of injury or death from flying or falling debris, even If Indoors in mobile homes or framed homes • Power outages will last for weeks to possibly months. • Long-term water shortages will Increase human suffering, • Most of the area will be uninhabitable for weeks or months. • Almost complete destruction of all mobile homes will occur, regardless of age or construction, • A high percentage of frame homes will be destroyed, with total roof failure and wall collapse, • Extensive damage to roof covers, windows, and doors will occur, • Large amounts of windborne debris will be lofted Into the air. • Windborne debris damage will occur to nearly all unprotected windows and many protected win- dows, • Significant damage to wood roof commercial buildings will occur due to loss of roof sheathing. • Complete collapse of many older metal buildings can occur. • Most unreinforced masonry walls will fall which can lead to the collapse of the buildings. • A high percentage of Industrial buildings and low-rise apartment buildings will be destroyed. • Nearly all windows will be blown out of high-rise buildings resulting in failing glass, • Nearly ail commercial signage, fences, and canopies will be destroyed, • Nearly all trees will be snapped or uprooted and power poles downed, Source.' National Hurricane Center Previous Occurrences Since the last LMS update, only two storms have impacted Miami -Dade. In August of 2012, Tropical Storm Isaac moved across the Florida Keys and Miami -Dade experienced a storm surge measured at 1.3 feet and sustained winds measuring 29 mph at MIA. In a 72-hour period portions of the county received from 2-10" of rain, Wind damage in southern Florida was minor and mostly limited to downed trees and power lines. 20 Ap- proximately 26,000 customers lost power in Miami -Dade. There was no Presidential Declaration for damages within Miami -Dade, Miami -Dade agencies and municipalities estimated $5.5 M for public assistance eligible categories,21 in October 2012, Hurricane Sandy, never made landfall locally, but paralleled the coast causing coastal erosion with reports of waves up to 10 feet in Miami -Dade, There was no Presidential Declaration for damages within Miami -Dade. It was estimated by the Mi- ami -Dade Regulatory and Economic Resources Department that there was approxi- mately $2 M in damages from coastal erosion,22 Hurricane Wilma, October 23 2005, caused structural damage by hurricane force winds out of the west and southwest. Widespread light to moderate wind damage was sustained throughout the county. In downtown Miami, numerous high-rise office buildings were se- verely impacted by hurricane force winds. The Miami Metromover was closed due to fall- ing debris from a neighboring high rise building, Power outages occurred county -wide for three weeks due to damaged power lines and utility poles. Power losses to service station fuel pumps caused a major but temporary impact on recovery operations. Wind damage 20 National Hurricane Center, Tropical Cyclone Report Hurricane Isaac (AL092012) 21 Miami -Dade County EOC Activation Archive 2? Miami -Dade County EOC Activation Archive April 2015 P1 -100 108 Li VI The Miami -Dade Local Mitigation Strategy Miami -Dade Part 1: The Strategy to trees and shrubs (native and ornamental) was extensive throughout the county, Ficus trees and Australian Pines sustained the majority of the tree damage, while palms ap- peared to fare well. Throughout the Biscayne Bay area there was significant marine damage. Many boats were blown up into bulkheads, docks, and overpasses. Some ves- sels were freed from their moorings and deposited hundreds of feet from where they were originally docked. The Port of Miami sustained damage to roughly 2,000 feet of bulkheads and a cruise terminal lost a section of its roof, The Sunny Isles Marina dry storage facility collapsed, damaging close to 300 vessels. Numerous docks and pilings throughout the county were severely damaged by the battering of vessels that were moored to them. On the barrier islands, there was sporadic minor to moderate wind damage to ocean front high-rise condominiums, low-rise motels, commercial buildings, and single-family dwell- ings The typical wind damages were broken windows, damaged hurricane shutters, and minor roofing losses. Hurricane Katrina, August 25, 2005, caused flooding to about 50 single-family dwellings from a measured 12,25 inches of rain, but no major structural damage was reported in south Miami -Dade. Adjacent Homestead to the south, storm water flooding was also sustained in Florida City, In addition, an overpass under construction in Miami collapsed onto the Dolphin Expressway between 87ih and 97wAvenues, Katrina did cause significant tree damage at Cape Florida State Park, Hurricane Andrew, which was classified as a Category 5 Impacted Miami -Dade in August of 1992. Damage was estimated at $25 billion, with 25,524 homes destroyed and 101,241 damaged. 90% of ail mobile homes in the southern portion of the county were totally destroyed. The Miami Herald reported $.5 billion losses for boats, The powerful seas extensively damages offshore structures, including the artificial reef system. 23 The last Presidential Disaster Declarations for Hurricanes for Miami -Dade occurred in 2005. Hurricane Wilma impacted Miami -Dade in October 2005 and caused widespread power outages for more than 6 million people in the southern portions of Florida that lasted in some areas for weeks. The figures represented below are for overall damages associated with the storms and includes damages that could be attributed to winds, rainfall and storm surge associated with the events. South Florida Hurricanes & Storms 1906-2014 Date': Name: ; Cate , Wind Surge Deaths: Damage 6/17/1906 Hurricane #2 1 80 Unk 0 Unk 10/18/1906 Hurricane #8 3 120 Unk 164 160,000 10/11/1909 Hurricane #9 2 100 Unk 0 Unk 10/21/1924 Hurricane #7 TS 70 Unk 0 Unk 9/18/1926 Hurricane #6 4 138 13.2' 243 1,4 Billion 23 Source National Hurricane Center Preliminary Report Hurricane Andrew April 2015 P1-101 109 Yi . I M4nii-Psde The Miami -Dade Local Mitigation Strategy Part 1: The Strategy 10/21/1926 Hurricane #10 2 110 Unk 0 Unk 26,000,0001 9/17/1928 Hurricane #4 4 132 10-15' 2,500* 9/28/1929 Hurricane #2 2 100 Unk 0 Unk 9/3/1935 Hurricane #2 5 160 20+ 408 6,000,000 11/4/1935 Hurricane #6 1 75 6' 19 5,500,000 10/6/1941 ' . Hurricane #5 3 120 8' 5 700,000 91/16/1945 Hurricane #9 4 138 13.7' 4 540,000,000 9/22/1948 Hurricane #7 2 98 8' 0 Unk 10/6/1948 Hurricane #8 2 105 6.2' 0 5,500,000 8/27/1949 Hurricane #2 4 130 Unk 2 52,000,000 10/18/1950 King 2 105 14' 3 28,000,000 9/10/1960 Donna 4 136 13' 50 1.8 Billion 8/27/1964 Cleo 2 105 6' 3 28,000,000 9/8/1965 Betsy 3 125 9 75 6.4 Billion 10/4/1966 Inez 1 85 15.5' 48 5,000,000 9/3/1979 2 98 3-5' 5 10,000,000 8/24/1992 _David Andrew 5t 155 16.9' 48 30 Billion 11/16/1994 Gordon TS 52 3-5' 0 90,000,000 9/25/98 Georges 2 98 5-6' 0 12,500,000 11/5/98 Mitch TS 65 3-4' 0 100,000 10/15/1999 Irene 1 75 3-5' 4 800,000,000 10/3/2000 To become Leslie TD 35 2-4' 0 500,000,000 9/3/2004 Frances 1 75 2-4' 0 33,000,000 9/25/2004 Jeanne TS 50 2-4' 0 10,400,000 8/25/2005 Katrina 1 80 2-4' 0 800,000,000 9/18/2005 Rita TS 50 2-3' 0 12,000,000 10/24/05 Wilma 2 110 5-6' 0 1,5 billion 08/27/2012 Isaac TS 29 1-2' 0 Unk 10/26/2012 Sandy 1 60 1-2' 0 Unk Note: The date listed is the date of landfall in South Florida and the category of storm shown is the highest category that existed when the storm passed aver or near Miami -Dade County. t Hurricane Andrew was reclassified from a Cat 4 storm to Cat 51n 2002 by the National Hurricane Center, Sources: National Weather Service, Miami Forecast Office NOAA National Hurricane Center/Tropical Prediction Center Florida State University Meteorology Department Florida Hurricanes and Tropical Storms (Williams 8( Duedall) Vulnerability Physical Vulnerabilities The entire built environment (Critical Infrastructure, Key Resources, Building Stock) may be vulnerable to hurricanes and tropical storms due to wind, rain and/or storm surge dam • - ages. Structures that do not have impact resistant features or protection that can be installed may be more vulnerable to winds. Homes that were built under older building April 2015 P'1 - 102 110 L 'S m101'014)40+4 The Miami -Dade Local Mitigation Strategy Part 1A The Strategy codes and standards may be more vulnerable to wind damages. Per the HAZUS con- ducted by the State of Florida in November 2014, Miami -Dade has the following physical vulnerabilities. Hazus estimates that there are 474,701 buildings in the region which have an aggregate total replacement value of 160,576 million (2006 dollars). Table 1 presents the relative distribution of the value with respect to the general occupancies. Tablet Building Bxposure by Occupancy Type Occupancy Exposure (11000) Residential 996,079,569 Commercial Percent of Tot 59.8% 32,520,658 20.3% industrial 2,309,791 1.4% Agricultural • 695,334 0.4% Religious 2,773,756 1.7% Government. 19,659,626 12.2% Education 6,537,256 4.1 % Total 160,676,990 100.0°l4 Essential Facility Inventory For essential facilities, there are 35 hospitals in the region with a total bed capacity of 12,147 beds. There are 501 schools, 102 fire stations, 100 police stations and 6 emer- gency operation facilities. Mobile/manufactured homes and high rise buildings may also be more vulnerable to wind impacts, a listing of sites below. Coastal areas and areas along canals and rivers, as depicted in the storm surge map, may be more vulnerable to surge. Coastal areas are at greater risk for high velocity surge and erosion, Low lying areas are more vulnerable to flooding if a storm brings a lot of rain. Uprooted trees can cause damages to underground and overhead utilities. Hurricanes and tropical storms may also cause flying debris that cause additional damages. These storms can also impact the natural and agricultural resources as well, causing severe coastal erosion and flooding or wind damage to agri- cultural assets. The extent of debris and infrastructure outages and restoration times can complicate and increase response and recovery timelines. Part 7 provides tables that show how many Commercial, Industrial, Residential and Other types of structures are within Storm Surge Planning Zones. 3.,.,.t?�� �,. ak°�. F+. �'"r � <...�.. AI, xpt �•�,.�c �A.— {nZEI•�.F t IS '" h?ff' + ALL STAR 36 STREET 3010NW36THST MIAMIDADE 33142 30S-S57.1122 73 MHP AMERICANA VILLAGE CONDO ASSOC, MHP 19800 SW 180TH AVE MIAMI-DADE 33187 305-253-6025 528 MHP AQUARIUS MOBILE HOME PARK 451 SE 8TH 57 HOMESTEAD 33030 305-248-9383 187 MHP April 2015 P1-103 111 LMS Miami -Dade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy 1'��0j2� �w+. iF Y!5�3�.4-v';".,.a:. �.-. C c .yy i t r ,i; .x-�.M9 Qv32, +u4�4.E` ¢a5. .'�1�5 BISCAYNE BREEZE PARK 11380 BISCAYNE BLVD MIAMI-I]ADE 33181 305-895-0112 60 MHP BLUE BELLE TRAILER PARK 3586 NW 415T ST MIAMI-DADE 33142 305-635-1755 150 MHP BOARDWALK MHP 100 NE 6TH AVE HOMESTEAD 33030 305-248-2487 318 MHP CARLEY'S MHP 4111 NW 37TH AVE MIAMI-DADE 33142 305-635-5134 70 MHP COCOWALK ESTATES 220 NE 12TH AVE HOMESTEAD 33030 305-245-8125 223 MHP COLONIAL ACRES MOBILE HOME PARK 9674 NW 10TH AVE MIAMI-DADE 33150 305-696-6231 296 MHP COURTLY MANOR MOBILE HOME PARK 12401 W OKEECHO- BEE RD HIALEAH GARDENS 33018 305-821-1400 525 MHP DIXIE MOBILE COURT 19640 W DIXIE HWY MIAMI-DADE 33180 305-933-4219 47 MHP FLAGAMI PARADISE TRAILER PARK 2750 NW SOUTH RIVER DR MIAMI 33125 305-788-0985 100 MHP FLORIDA CITY CAMP SITE & RV PARK 601 NW 3RD AVE FLORIDA CITY 33034 305-248-7889 145 MHP FRONTON TRAILER PARK 3617 NW 36TH ST MIAMI-DADE 33142 305-634-4211 57 MHP GABLES TRAILER PARK 825 SW 44TH AVE MIAMI-DADE 33134 305-542-1199 93 MHP GATEWAY ESTATES MHP 35250 SW 177TH CT MIAMI-DADE 33034 305-247-8500 220 MHP GATEWAY WEST MHP 35303 SW 180TH AVE MIAMI-DADE 33034' 305-246-0435 111 MHP GATOR PARK MHP 24050 SW 8TH ST MIAMI-DADE 33194 305-559-2255 20 RV GOLD COASTER TRAILER PARK 34850 SW 1.87TH AVE MIAMI-DADE 33034 305-248-5462 430 MHP HIALEAH TRAILER PARK 425 E 33RD ST HIALEAH 33013 305-696-2278 32 MHP HIBISCUS MOBILE HOME PARK INC 3131 W 16TH AVE HIALEAH 33012 $08.822-2612 34 MHP HIGHLAND VILLAGE MO- BILE HOME PARK 13565 NE 21STAVE NORTH MI- AMI BEACH 33181 500 MHP HOLIDAY ACRES MOBILE HOME PARK INC 1401 W 29TH ST HIALEAH 33012 305-822-4611 84 MHP HOMESTEAD TRAILER PARK 31 SE 2ND RD HOMESTEAD 33030 305-247-4021 50 MHP HONEY HILL MOBILE HOME PARK 4955 NW 199TH ST MIAMI-DADE 33055 305-625-9255 438 MHP J. BAR J, 2980 NW 79TH ST MIAMI-DADE 33147 305-691-2432 97 MHP JONES FISHING CAMP TRAILER 1,4601 NW 185TH ST MIAMI-DADE 33018 786-308-7597 and 954-536- 7400 57 MHP LARRY/PENNY THOMPSON 12451 SW 184TH ST MIAMI-DADE 33177 305-232-1049 240 RV LEISURE EAST (PALM GAR- DENS RV PARK) 28300 SW 147TH AVE MIAMI-DADE 33033 305-247-8915 39 MHP LILABNER MOBILE HOME PARK 11239 NW 4TH TER MIAMI-DADE 33172 305.221-7411 908 MHP LITTLE FARM MOBILE • COURT 8500 BISCAYNE BLVD . EL PORTAL 33138 305-759-1283 210 MHP LITTLE RIVER MOBILE HOME PARK 215 NW 79TH ST MIAMI-DADE 331.50 305-758-8888 76 MHP MAGIC CITY TRAILER PARK 6001 NE 2ND AVE MIAMI 33137 305-759-0336 95 MHP MEDLEY LAKESIDE RETIRE- MENTPARK 10601 NW 105TH WAY MEDLEY 33178 305-888-3322 86 MHP April 2015 P1-104 112 LMS The Miami -Dade Local Mitigation Strategy Part I. The Strategy k „ • ,-,! vc ' 7,...; MEDLEY MOBILE HOME PARK 8181 NW SOUTH ' RIVER DR MEDLEY 33166 305-885-7070 217 MHP MIAMI HEIGHTS TRAILER PARK 3520 NW 79TH ST MIAMI-DADE 33147 305-696-0121 127 MHP MIAMI TERRACE MOBILE HOME PARK 1040 SW 70TH AVE MIAMI-DADE 33144 305-261-0551 89 MHP MIAMI-EVERGLADES KAMPGROUND 20675 SW 162ND AVE MIAMI-DADE 33187 305..233-5300 298 RV NEW AVOCADO TRAILER PARK 1170 NW 79TH ST MIAMI-DADE 33150 305-262-5755 73 MHP PALM GARDENS MOBILE HOME PARK 28501 SW 152ND AVE MIAMI-DADE 33033 305-247-8915 275 MHP PALM LAKE MOBILE HOME PARK 7600 NW 27TH AVE MIAMI-DADE 33147 305-696-1920 118 MHP PALMETTO TRAILER ES- TATES 3205 W 16TH AVE HIALEAH 33012 95 RV PINE ISLE MOBILE HOME PARK 28600 SW 132ND AVE MIAMI-DADE 33033 305-248-0783 282 MHP PRINCETONIAN MOBILE HOME PARK 12900 SW 253rd Ter MIAMI-DADE 33032 (305) 257-3251 190 MHP REDLAND MOBILE HOME PARK 17360 SW 232ND ST MIAMI-DADE 33170 305-247-7707 80 MHP RIVER PARK TRAILER 2260 NW 27TH AVE MIAMI-DADE 33142 305-635-4803 88 MHP RIVIERA MOBILE HOME PARK 19900 NW 37TH AVE MIAMI GAR- DENS 33055 305-624-5888 155 MHP ROVELL TRAILER PARK 939 NW 81ST ST MIAMI-DADE 33150 305-693-4396 1.38 . MHP ROYAL, COUNTRY MOBILE HOME PARK 3555 NW 202ND TER MIAMI-DADE 33055 305-621-2270 864 MHP ROYAL DUKE . 3620 NW 30TH AVE MIAMI-DADE 33142 305-633-2001 99 MHP SHADY OAK TRAILER PARK 14701 NE 6TH AVE MIAMI-DADE 33161 954-922-8803 25 MHP SILVER COURT TRAILER PARK 3170 SW 8THST MIAMI 33135 305-649-8941 236 MHP SILVER PALM MOBILE HOME PARK 17350 SW 232ND ST MIAMI-DADE 33170 305-248-8443 112 MHP SIX AVENUE TRAILER PARK 14752 NE 6TH AVE MIAMI-DADE 33161 305-835-9627 14 MHP SOUTHERN COMFORT R V RESORT LLC 345 E PALM DR FLORIDA CITY 33034 305-248-6909 359 RV STRAWBERRY VILLAGE TRAILER PARK 1451 W 297H ST HIALEAH 33012 305-821-0628 39 MHP SUNNY GARDENS TRAILER PARK 2901 W 16TH AVE HIALEAH 33012 305-822-5921 93 MHP SUNNYLAND TRAILER PARK 129 NW 79TH ST MIAMI-DADE 33150 786-505-5239 1.05 MI-1P SUNNYSIDE MOTEL & TRAILER PK INC 6024 SW 8TH ST WEST MIAMI 33144 305-266-1727 21 MHP TRINIDAD COURT . 7930 NW MIAMI CT MIAMI-DADE. 33150 786-505-5239 173 MHP TROPICAL VILLAGE 1398 NW 79TH ST MIAMI-DADE 33147 305-696-0059 108 MHP UNIVERSITY LAKES MOBILE HOME 12850 SW 14TH ST MIAMI-DADE 33184 305-226-4251 1153 MHP WESTHAVEN TRAILER PARK 6020 SW 8TH ST WEST MIAMI 33144 305-266-0488 105 MHP WESTLAND MOBILE HOME PARK 1175 NW 79TH ST MIAMI-DADE 33150 305-876-1440 114 MHP April 2015 P1-105 113 LM The Miami -Dade Local Mitigation Strategy Part 1: The Strategy r- g7„3,•-_, , , ..,-, . --.t.,,,,,,,,,,a.- , 1 ,,,4 446.4':' rr IgrIr V' — sli `.' S"?, I f',,c, _ WYNKEN BLYNKEN & NOD 2775 W OKEECHO- HIALEAH 33010 305-887-6570 206 MHP MOBILE HOME PARK BEE RD Social Vulnerabilities Mobile/manufactured home residents, electric dependent, functional needs and persons who may not have adequate resources to protect their homes or access to evacuation resources are at greatest risk for this hazard. Visitors and persons who are new to this area may also be more vulnerable as they may not be familiar with what to do in case an evacuation order is given. Prolonged power outages and gas shortages cause additional challenges to businesses and service providers and can disproportionately impact per- sons whom rely upon regular home services such as medical services or food delivery, Saltwater Intrusion Description According to the United States Geological Survey (USGS) saltwater intrusion is generic term referring to an influx of saltwater through various pathways into an aquifer and is a major threat to the freshwater resources ,„-r; of the coastal areas in southeastern ' Florida. The South Florida Water Man- agement District defines it as chloride concentrations exceeding drinking wa- ter standards of 250 mg/1.24 There are three primary mechanisms by which saltwater contaminates the freshwater reservoir in the unconfined, surficial aq- uifers of the region: (1) encroachment of saltwater from the ocean along the base of the aquifer; (2) infiltration of saltwater from coastal saltwater mangrove marshes: and (3) the floW of saltwater inland through canals where it leaked into the aquifer. Per the USGS paper referenced below, "Saltwater intrusion of the Biscayne aquifer began when the Everglades were drained to provide dry land for urban development and agricul- ture." • L--I1. hViaWn Ivreiorrlf0TrY,rr/,.re, V.3A114-,, VA400,), 24 Miami -Dade Water and Sewer Department, 20-year Water Supply Facilities Work Plan (2014-2033), Support Data, November 2014 htto://www.mlamidade.gov/water/library/20-vear-water-supnlv-lacilities- work-nlan.pdf April 2015 P1-106 114 LMS miami•nad The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Location This map from a 2014, publication by USGS shows the areas of Miami -Dade that are experiencing saltwater intrusion. Extent USGS and Miami -Dade Water and Sewer Department actively monitor saltwater intrusion, As of 2011, ap- proximately 1,200 square kilometers of the mainland part of the Biscayne Aquifer were intruded by saltwa ter.25 The map to the right shows future salt water in- trusion impacted by projected sea level rise for year 2040, with projected pumpage rates for year 2030. The red line indicates the expected minimal change to the salt front. Impact There is concern that saltwater intrusion can threaten the coastal drinking water supply wellfields. Shallow - water marine organisms are very sensitive to environ- mental changes in salinity, temperature, nutrient input, and dissolved oxygen. Temporal and spatial salinity patterns in Biscayne Bay have profoundly affected the marine ecosystem caused by water -management 4r.:.7t1r.-Lta driven changes in surface- and ground -water dis- "" "a `qr + charge. In addition to those changes caused by natural �PIAiON. glut awl #aur ktavm a f..u;tl3��,c§I016t events, long-term change in land and water uses dur- r "ttl oltr,�g,�F ,9lwai�am vinis oa knobrs ing the 20th century in the bay watershed contributed 4111 I a s `' a,aaF" greatly to the deterioration of marine conditions. Water 4pa #i,T't quality has been greatly degraded by increased nutri- ent loads, trace metals, and other pollutants. 26 An increase in mangrove areas and re- duction in sawgrass habitat have been recorded in the Everglades. Less salt -tolerant plants like sawgrass, spike rush and tropical hardwood hammocks are retreating as salt - loving mangroves expand. 27 Previous Occurrences Saltwater intrusion has been monitored by the USGS since 1939. Per the USGS "in 1904 (prior to any human -induced drainage), the saltwater interface was estimated to be at or 25 USGS, Origins and Delineation of Saltwater Intrusion in the Biscayne Aquifer and Changes in the Dis- tribution of Saltwater in Miami -Dade County, Florida. Scientific Investigations Report 2014-5025 28 http://sofia.usgs,gov/publications/circular/1275/changebb.htmi 27 http://www.miaml,edu/index.php/features/rising sea levels threaten everglades freshwater plants/ April 2015 P1-107 115 L Miami-04de Part 1: The Strategy The Miami -Dade Local Mitigation Strategy near the coast because of the very high water levels which occurred naturally in the Ev- erglades. Freshwater was reported to seep,from the Biscayne aquifer offshore Into Bis- cayne Bay in sufficient quantities to be used as a supply of freshwater for ships. Beginning in 1909 with the extension of the Miami River and continuing through the 1930's, con- struction of drainage canals (with no control structures) and pumpage from coastal well fields resulted in the lowering of water levels in the Biscayne aquifer, thereby inducing the inland movement of saltwater into the aquifer. Additionally, seawater driven by tides flowed inland in the drainage canals, resulting in the seepage of saltwater into the Bis- cayne aquifer from the canals. By 1946, salinity -control structures had been installed in ail primary canals as far seaward as possible. These controls prevented saltwater driven by tidal changes from moving upstream in the canals beyond the controls. The controls also served to backup freshwater which maintained higher water levels in the Biscayne aquifer near the coastline. These water levels are higher than those that occurred during the period of uncontrolled drainage. The inland migration of saltwater in northern Dade County slowed or reversed in some areas as a result of the effects of these controls on water levels. In the early 1960's, the existing canal system in southern Dade County was expanded to provide for flood control. The canals were equipped with flow -regulation structures both rrear the coast and inland, allowing water levels to be stepped down from structure to structure to prevent excessive drainage. However, the design and operation of this sys- tem lowered freshwater levels in the Biscayne aquifer, especially near the coast, allowing for the inland movement of saltwater during the drought years of 1970 and 1971. In 1976, additional water was routed to southern Dade County, raising water levels along the coast and slowing or reversing the inland movement of the saltwater interface Klein and Waller (1985). Since 1984, additional events have occurred which have affected water levels in the Bis- cayne aquifer and, hence, the movement of the saltwater interface. Among these events are the initial operation of the Northwest Well Field and a consequent reduction in pump- ing from the Hialeah -Miami Springs Well Field, expansion of the Southwest Well Field, and changes in the delivery schedule of water to southern Dade County and Everglades National Park (fig. 1). Future changes in water levels might occur as a result of changes in the management of the ecosystem of south Florida. These changes will be based on the results of studies being conducted as part of the U.S. Geological Survey South Florida Ecosystem Program (McPherson and others, 1995) and other studies. 28 Per the USGS paper referenced below, saltwater likely leaked from canals prior to. the installation of water control structures. Near the Miami Canal northwest of the water control structure S-26, this saltwater is gradually mixing with the groundwater and salinity is gradually decreasing. Modern leakage of saltwater likely is occurring along the Card Sound Road canal and upstream of salinity control structures in the Biscayne, Black Creek and Snapper Creek Canals, Saltwater also may have leaked from the Princeton 2a http://ftwater.usgs.gov/Miami/onlIne_reports/wrI964285 April 2015 P1-108 116 LMS M1l am -Dade The Miami -Dade Local Mitigation Strategy Parr 1: The Strategy Canal and the canal adjacent to well G-3698, although this leakage could not be con- firmed or refuted with available information," Vulnerability Physical Vulnerabilities The SFWMD has identified "Utilities at Risk" for salt water intrusion, which include utilities with weilfields near the saltwater/freshwater interface that do not have an inland wellfield, have not developed adequate alternative sources of water, and have limited ability to meet user needs through in- terconnects with other utilities; and "Utilities of Concern", which include utilities having wellfields near the salt water/freshwater interface, the ability to shift pumpages to an inland well - field, or an alternative source that is not impacted by the drought (SFWMD, 2007), Miami -Dade WASD wellfields included as "Utility at Risk" are South Miami -Dade Wellfields Newton, Elevated Tank, Naranja, Lei- sure City, Roberta Hunter- Caribbean Park). MDWASD Utilities of Concern include the North and Central Miami - Dade Wellfields ( Hialeah -Preston and Alexander Orr) nr.+nla Igd Nh akAIJ klt4'p?Igi, l4t1156{I4G I' 5rtlrinwr.11P'rtglM O,Pm,<nl.l rytnlmlre+n i Utilities at Rlak,l Utllillea.af Cancwn' 1n Mlupn[aDade county IUIN-r+ndh uiSudntrunr,'eu' d 4.4 T 14" Well fields are at risk and as such protection areas have been delineated and are moni- tored. Saltwater intrusion can impact the rates at which groundwater is pumped to sup- ply drinking water supplies and also may require deeper wells to be drilled. Agricultural crops may be impacted by the salinity levels. Saltwater intrusion can also displace the fresh groundwater thereby impacting the water -table elevations in urban areas levels that could increase localized flooding. Social Vulnerabilities This hazard does not tend to affect one population over another. April 2015 P1-109 117 LMS Miarni-bade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Sea Level Rise Description Sea Level Rise refers to the increase currently observed in the average Global Sea Level Trend, which is primarily attributed to changes in ocean volume due to two factors: ice melt and thermal expansion. Melting of glaciers and continental ice masses, such as the Greenland ice sheet, which are linked to changes in atmospheric temperature, can .con- tribute significant amounts of freshwater input to the Earth's oceans. Additionally, a steady increase in global atmospheric temperature creates an expansion of saline sea water (i.e., salt water) molecules (called thermal expansion), thereby increasing ocean volume. Sea level rise is occurring due to three main factors, all of which are occurring due to global climate change: • Thermal Expansion: As with all water, when the ocean heats up, it expands. About 50% of the sea level rise in the past 100 years is because the ocean is warmer, and therefore takes up more space. • Glacier and Polar Ice Cap Melting: Although glaciers and polar ice caps naturally melt a little each summer, they usually regain lost area during the winter. However, warmer winters have meant less opportunity to regrow this ice, resulting in more melted water remaining in the oceans, contributing to sea level rise. Greenland and West Antarctic Ice Loss: Similar to what is happening with glaciers and the polar ice cap, the huge ice sheets that cover Greenland and Antarctica are melting. Location Mapping developed for the South- east Florida Climate Change Com- pact (the Compact) illustrates po- tential areas of Miami -Dade County that may be impacted by sea level rise. Extent Based on the Compact's sea level rise projection a one foot scenario could occur between 2040-2070, the two foot scenario from 2060- 2115 and the three foot scenario from 2075-2150. "Vakt-'",3g.V.,-0 yxri. rsu;�"�5�F!uMSfiuta is AiP Wo, LA-EKt rd_t�X ar..20it ,p164„yi. Mia0.110L F.,rgra,?t .1A47d�)AELlj:BvwM �!X' April 2015 • P1-110 118 LMS Miarni-De The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Impact Sea level rise is likely to increase coastal flooding during high tides and storm surge events. Sea level rise will likely impact the ability of the canals and low lying areas to drain standing water after rainfall events and impact the ground water elevation. Gravity based autfalls that lie below sea level will be impacted and as has been seen will allow salt water to flow up through the outfall system into the streets. In terms of the amount of land which may be vulnerable, the number of acres impacted in Miami -Dade is three times greater than that experienced in Monroe County for the two and three foot scenarios. Nearly 80% of the lands affected regionally in the one foot sce- nario are conservation lands especially coastal wetlands. Low lying natural systems made up of buttonwood, mangrove, scrub mangrove, and herbaceous coastal saline and fresh- water wetlands are significantly impacted in ail SLR scenarios. In terms of the critical infrastructure reviewed, inundation is often confined to marginal areas of the properties or impacting existing drainage infrastructure on site. This is generally true for the region's ports, airports, schools, landfills and hospitals. Within Miami -Dade these are mainly im- pacted at the 3 foot scenario, Power plants properties in Miami -Dade and Broward as well as energy transmission facilities in Monroe are vulnerable at the one foot scenario. While railroads are negligibly at risk, more than 81 miles of roadway from Miami -Dade through Palm Beach are at elevations below sea level at the one foot scenario, increasing to more than 893 miles at the three foot scenario." Upper estimates of taxable property values vulnerable across the region is greater than $4 billion with values rising to over $31 billion at the 3 foot scenario. The following table is taken from the Compact and illustrates Land Use and Property Values in Miami -Dade County vulnerable to Impacts from Sea Level Rise at 1, 2 and 3 feet scenarios. Acres of Fu- ture Land Use Top Three Categories Impacted 1 Foot Conservation 107,988 acres Electrical Generation 5,332 acres Agricultural 2,994 acres 2 Foot Conservation 126,809 acres Electrical Generation 5,999 acres Agricultural 7,746 acres • 3 Foot Conservation 133,088 acres Electrical Generation 7,000 acres Agricultural 10,890 The Compact estimated that the total number of acres within Urban Miami -Dade to be impacted by sea level rise for a 1.foot scenario is 121,378 acres (12%), for 2 foot 150,142 acres (16%) and for the 3 foot scenario it could be 168,896 acres (18%) of the county. 29 littp://www.southeastfloridaclimatecompactorewp-content/uproads/2014/09/vulnerability-assess- ment.pdf April 2015 P1-111 119 LMS Miami -Dade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Previous Occurrences Astronomical high tides have in recent years caused localized flooding with salt water being Gushed back up through storm drain outfalls that use gravity to function. According to the National Weather Service Miami, the greatest impacts for astronomical high tides were in combination with Superstorm Sandy "from October 27-30, 2012. On October 20, 2012 Key Biscayne issued a high tide alert to residents regarding water flowing out of the drainage system that was causing flooding on local stress and adjacent areas, especially in low lying areas.30 There was also an extended period from November 21-27, 2012 with some street flooding in the South Beach areas of Miami Beach (Alton Road area south of 17th Street). There were also some minor street flooding (to the curb level) from astro- nomical high tides that occurred April 26-27, 2013, October 17-20, 2013 and December 3 2013 in the same South Beach areas. Certain areas of Miami Beach can flood when the tide reaches an elevation of 0.5 feet, typical high tide in Miami Beach reach about 0.3 feet, but in October and November 2012 levels reached as high as 2.2 feet. Sea Level Rise is an emerging and future threat and with high tides occurring about two times a year (April and November) as sea levels rise more communities could be at risk from seasonal high tides as well as general sea level rise, Vulnerability Physical Vulnerabilities The built environment (Critical infrastructure, Key Resources, and Building Stock) and natural environment are vulnerable to sea level rise and though some preliminary map- ping shows southern portions of the county at highest risk there is risk to other portions as well. Coastal communities, such as Miami Beach, have already begun to experience sunny day flooding in relation to high and king tides that limit the gravitational drainage that drains to the bay. Additional mapping is being done to determine ail areas that may be at risk. The following information is excerpted from the Compact. Analysis of Physical Features Ports and Airports One area determined by the group to be critical is Homestead Air Reserve Base. The County has already met with planners developing the long termuse of the base and pro- vided input on sea level rise. Opa Locks Westis vulnerable, but this airport is only a land- ing strip used for training and so is not considered critical. Below are tables that represent the area that may be below mean high high water sea level with a 1-, 2-, or 3-foot sea level rise. 30 http://keybiscayne.fl.gov/index.php?src=news&refno=339&category=News April 2015 P1-112 120 L MS miorni4iatie The Miami -Dade Local Mitigation Strategy Part 1: The Strategy 1-fo9t See Level ••'•••:;.". A4141006: ',,•!:••••;•,,.:::•;: • : .... ,,..,,;.........! . . .. ,...,,•,•...... ;!;•.•;mF;•:::ii :; . :•• . ;•.,:i ,!•••iiirdiellii4i.,...! • ' ..i'it.":‘,., ,..•.•.,.:ri,•,:::,..........,... ..:;;..•:;rc.:]!:;,.,.:.:.';.;4.•F, :::pdirnie•;;•:',.?: ";' ' ''''''F'- .i.„ ,. .,....,q0:.•,!,.i.'...,.. cratir" ' '''' • - '.i• .:•• ;:, .,..::, ,!'.iiii'il"idatili1);;:. 'ij .;;!.4:::..4:&....,:;..i4i'‘.6.44,,:-:-',;•• "i:Taltal.Aits;.:;•.;; ..:•:•:.,-;::...'.1-',...J',' ' :,.,64-iiii.ii:'',•,i, 'iii•':;'i'"."' . i;;;,..,q..:,•;.F.i;;,1,Y- piLi7vt-r4.'nt...', ,,;.:',7!;-•-••••,-. N.:•:,:;.i' . .......... Homeste:ad. General Aviation 0 4.92 4.92 770_71 0.6% Kendall-Tarniami 22.86 2,97 .--, 25.25 1,428.48 1.8% Miami International' 36.01 2.98 38,39 2,731.06 1.4% Opa Locke Executive 16.87 4_71 21.58 1,640.89 Opa Locke West 12.08 1.46 13.54 412.03 53% Port ofMiami (seaport) 0.51 0.16 0.77 .534.5 0.1% Port of Miami (river pOrt) 2.92 1.26 338 136.23 2.6% USA Homestead Air Base 195.43 89,4 275.83 1,979.96 14.0% 2-fopt Sea Level !Ilse.' ..:.{.!1,'.::i' .'i..,:•V, ..,,,... .%:;;;.!....; Fit.-i)° a01,:r.i,r•••••• t.:: -:' . ....,. . •'''':.'":71:'''...F::.:::..:: '..,' ',1';!;::-,.1'',":;-•••:;:, ".'iWit:Orelii i':,: !•••••;•-•;;.-., 2:' !.:'..;'..::::::':' : L' ::... i.:. !.',:".',.: L'• ;!: ••• '':•.0'Oisiiii*.L: .::.:.:::: , : i.',:''::.. , l.4'... :,...c.'i:"?:' Totali'i:4;'i .......... .,,•-•••.;• :•„,,,.''''.••••.'„;''''..'i ... triaria0 io.ili Total Area : •., ; ; . , • - ,,i'. ''. :iiiiiiiN''-''' ,..... ,,,..• : • ,...,.. 1 - .... . 7,-,k•:, Pericin.' :....,•••,,•-•••.t;!t:•,,, . :. ,'IriqigettOrr Homestead General Aviatioil 5.5 0.66 6.26 770,71 0.8% Kende 11-,Ta rniarrki 26.37 1.6 28_47 1,423.48 2,036 Miami internatio na I 42.54 5.63 47.97 . 2,731_06 1.8% 0;pa Locke beciitive 30.53 15,93 46.51 1,640.89 2_8% Op a Lock a West 24.2 69,55 92.75 412.03 22,526 Port of Miami (seapor0 G.89 0.22 1.11 534.5 0.2% Port of Miami (river port) 4.63 3.61 8_24 156_29 6.0% USA Homestead Air Base 327.73 1 is.r 447 1,970.96 22.7% 5-foot Sea 'Level Rise: '-i..;!'',. ':',•.,.,.:i,'k-:.. ' p h: .. ' • atli Ili ' - ,..,-,,..:•:: ',.' Kiiii:ii. 0 '• ,: ,-...,: ',, '!.',.. ','.:',. 'i.:'i'..:,,,..„ . ':! . :,:,fkc4ii0f, '.,,i' ..•:, ,:,,: ,,. !::. , !i-ldr:ifitkiadil; i.',-,:•:'•,,,,,.,.",;' : :Tht91.A ::., 4 .F6diiti':.• ;., .., ,!i•,- .:.......: •".:.:1.'(..PC4*,:. y411.i:•:;::.. !-:.!'.: .,.;.i..'1]i Inundetuiri, f....;;k ..',..;..,,;.:!•,',i'. : 1.0% Homestead General Aviation 6.58 G.83 7.41 770,71 Kendall:Fa Miami 31,01. 2.82 5183 1,428.48 2.4% Miami international 57.47 24.24 91..71 2,791.06 3.0% 0pa Locka Executive 65.51 76,22 141.73 1,640.89 8-6% Ope Lock u West 212.09 95,59 308_68 412.03 74_9% Port of Miami (seaport) 1.63 0.5 2.13 534_5 0.4%. Port of Miami (river port) 14.73 11.47 26.2 136.23 19.2% USA Homestead Air Base 573.64 202.52 --- 776_16 1,970,96 99.4% April 2015 P1-113 121 LMS Mia�w�l�a�� The Miami -.Dade Local Mitigation Strategy Part 1: The Strategy ` .. OVNTY PS AND, 1f:•, tea-.—`S'.d a.. April 2015 P1-114 122 LMS Miarni-Dacie Power plants The Mianii-Dade Local Mitigation Strategy Part 1: The Strategy Miami -Dade County has one nuclear power and one coal generation power plant The generation facilities are not directly impacted. This data below includes impact to the Tur- key Point Nuclear Power Plant cooling canals, the coastal wetlands at the Cutler Plant, and some scattered power transfer stations throughout western Miami -Dade County. .3: ::•••• 04Yr an .;. . , ;T:13F341.41i'efi,:::' '3•••3' tik y - - ::.'.L.,...'c:':;13•.. i,i:';',3i,ap,rf,c1):!..i! , i - 13;•:3-:.••i.: ' • . ' qM.•',..-••• : ,. •-,:::,....,......-, ,.., ' ':''''L.'' Tad' 'f ....,: l'.',i3::..,:..,1:,...3•,•';,g;:.:,:•,],. (;.n3•31.:33.:.:!:•.3 - .„:i6g.iit:.• ., . - . ,. .,...i,of,,„ '3.1.:Ogatht.;,3,• ,:.'•';'• •3:','',23'''; -* '-''' " • ''''';'. v 03" - •••,,.•,:;„ ., -•... , ;q1/•••,-'''' i• ,..-.,;.3......,‘:•11;:.i.:.•: 3. •Pefe0:t3,`:"3 „i3.`.a.:;:...33',33,..•••i:.,; hi1nrLfIUInti, ,I.,1•.,2,3...313,1,.-,,,f3.:;3,„3,•,.•:: !•33- -- - - 1-foet Sea Leval '•Eita' : 4.,81.2 247 5,059 7,223.77 .70N L 2-foat Sea evel Ri5a 9, -32593 238 5,492. 7,22778. 76% 3-foot Sea Leveffthe 5;707 233 5,940. 7,228.77 82% Railroads Railroads did not seem to be particularly affected, perhaps due to the fact that most of the rail beds in Mianni-Dade County are elevated above the road and surrounding surfaces, The Impact reported is limited to FEC Railroad in the northeast coast of Miami -Dade County and to the portion of the CSX railroad serving the rockmine lakes along NW 12 ST in the western portion of the County, This data is reported in miles. ,...':,:', :.,, : :.:, , • ..... .• •• • • ., tEE.'3.*.nitiCSRaill:•6tide,' ; • • 3.3, .-..:3, • •-• ' • .•..;. :;:-..i, i:-... • . ...„ ...- • ]:•3. .3 griti'Ll6N. 3. ; .3- .3; • .'•;:tilliffe'sk :... i.i.:.:::. ,. • . : -- , . ':.. :-:3::• :,-;...:' Po340iile'',:',::',. )••• - •-• ..,....i'. •„',: • riii:i3O'Z•.....•••?: ,• , • • 3.;...•• ...i!,:3.•.;..33: ...... Tote:,11:ii : ...,.• . . . ?H': ::....fitiOtiiiitim ..,:3;....,•• ....,, Iihileaj" •" :,TCAtOi isetiy• ...::::, . . • ,. ...?..i... .!.•.,1.. of 1§4.•:3.3.3r..• •;.,.!:-• ;3: .. : ... -• 3, ....:.: '.'•3:.. (rillie4i'.•::- .. .:, .:. ..:, , :. :'i Peratat •.3i.! ,•-33, ; ;i'.3.-. ; ••• ': -, IlcOtiott; :.• .;•.i. 1-foot. Sea Level RI5e 0,71 0,09 0.8 320.9 al% 2-foot Sea Level fil5e 0.91 0,23 1 320.9 0.4% 3-foot Sea Level R.l5e 1.65 0.79 2 820.9 0.7% Water and Wastewater Treatment Plants Miami -Dade has three major water and three major wastewater treatment plants within the County boundary, The analysis was performed by land use category as provided by the Department of Planning and Zoning. The results, therefore, do not include the names of the facilities, only the area possibly or more likely affected by the inundation scenario. A more specific analysis is needed to determine if any equipment would be affected or not. •,,,-:„.,...,1.1i,:•••••-,.,.. ::., •.•:::'..:..f°i.:•3• itik:'N0416ii " -.,.13,....],N.:t.3,..3•••.,,,...•••:.-;!,3;.....;.!;,, '' yi.,::'•.,.,'. 1•186t5i,•,..1,,;,,,;,:, (..- • , '1.1,.•:,,....,,I,S,•!•••,•,'6'..., .,3,•:,.,3.1,1a;-ei..,.... 3.3(.!:' . 3.- - .3,.....:: . : ,:::;•I'1.14A -• • ',,.,:,;',4,,,;' ,. ..,,,•,...; re, ,,,‘ 3- •••-'3•• .,.,*•••:•,, ;.kii.i'stiiii.ii k;:.;:.i...1,3;•••••V' ..,.!(,!,,W0p:.,- ?,..,,,•:,,,,,..:, p,..3. lrj:OL:-.31'3;' •.-3.:.i3' -.3, ,..•..:::•4.;•,: -•*:.thiliiciiitibek' i, - •• ,,,,,,,...-,,...,,•,.,1"... 1..,..;,..r4,:e;g• Tufa! t.,4,freavgithin,. :•3_.,;:, •••...,.. ,:3. ,,3•33;.:133., ..-33i,3. (.1...0iiiiiiii..9;ticii=,;(•,. ,;...,, ,.-,,...;!...: ,•:., L-,,,,....;:.,,,,,..:: ,3.,•,•;;.,, puteW..; ;3•...*.*.;;;:'1;.:...,!..3.......•...-.•.;.3...3;.,3','c • :.3-33.!i '.'3.3.3:3::3.3 'i.!r'•':. ;'..3.::,..0•6•t&rt.,,:',3;.•' ..,:•:?1;•,'..,!•::4,,...,;• .,-„,.•;P:',.!....- i','1,§1.1-riastipttp 1--foot Sea Level Rise 0.38 0.16 0.54 210.37 0.26 2-foot Se •a Level Rise 0.35 0.64 1.49 210.37 0.71% 3-foot Sea Level Rine 2.58 1.6 4.13 210.37 1.99% • ,1,,r...'+,4, Tr.4.*.4i6..Pai..,:L; 1.-iiiii.: 7 ; .1; Ma h:'. '1k.?:..2,F,i.i.i..,,,..: t .:::,,!,,j4k,,t1;:.:;,::; *! ;iii..;•:.i. ;r1i134110g,.,: (.i4;..3i12!-. :•-'i!--,'. ;, ' .'ii.iiii. atm. ., .:-. ':. ' ' ','...j.'.' i:::l'i 6i070 ' xar •giiiivittiiii, ,.:-.•,..',,,•.:g., : I ,•,,,. ' tAt0.115e C,9"7: :.:.i .:'.'il'.4)5::;!::4: .1 , '.26 . . eVrit :: ,,,,r.,;:;:i,.%.y.,i•04 riloottr,r0',..,;::, 1--foot Sea Level 1115e 11.1 16.42 460.14 ')-foot Sea Level Rise 19.91 6,15 26,,Cia 46014 5.66% 5-foot• Se. Leli'd Risr_, 5.,.47 8.33 44.3 460.14 . April 2015 P1-115 123 miau.o.ve LMS The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Landfills Inundation for all levels of sea level rise were primarily in retention or natural areas sur- rounding landfills since the landfills themselves are elevated (see graphic on next page). The South Dade Landfill, Munisport, and Dade Recycling are surrounded by low lying ar- eas. .,.. .,,, :,'''''''''"::,'., '!* ,, SdIA,.:Pk :,:,i...10411:(04-.141j.° 04464•*rckiliii;C,.IMiii,.:.-. , ,,,, `',' .t,:;!.--i.:::i'&:Iti.ii.,';,,,. .;li.000.:::14* t .!:!11,4id0fiqi,Aici. i::;:.,.%.;:,s,:;,;i,,!, ,,,,,,,,,,,, 1•;!;.,04.!•#iJ l..}:i.-.C.60.61::,.: .1'04,:1,1.:;.:::,•:'1'',,,.:. .*0iijqt1'.6iij:-!.1.: • 1-forit8en Lev.elkiSE 154 BD 234. 2-,fact See Levet Rise 26,6 58 299 5,-fcvat 5:63 Levet Rise 333 BO B63 •,•,!••••• • ,; 1\41AIVIDADE COUNTY VULNERABILITY ANALYSIS LANDFILLS 00,pmdel yr , ; • Ina itwie 9...T4:1,01/4/SlaN, P.V0 !.p,itkinctiVei V Hospitals No hospitals in Unincorporated Miami -Dade County were impacted. Of the 34 total hos- pitals within the county boundaries, only three hospitals were affected in municipalities in the 3-foot sea level rise scenario, April 2015 P1-116. 124 LMS Miami -Dade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy • Selected Specialty Hospital , 955.NW 3rd ST, City of Miami, 33128 • Mount Sinai Medical Center, 4300 Alton Road, City of Miami Beach, 33140 • 31South Beach Community Hospital, 630 Alton Road, City of Miami Beach, 33139 Schools No schools in Unincorporated Miami -Dade County were impacted. Only three of the 867 schools were affected in municipalities in the 3-foot sea level rise scenario. However, we need more specific survey information on all affected schools, such as elevation certifi- cates and topographic survey to determine if those would be actually impacted. • Student Services & Attendance, 489 East Drive, Miami Springs 33166 • School Board Administrative — Annex, 1500 Biscayne Boulevard,Miami 33132 • Biscayne Elementary, 800 77th Street, Miami Beach 33141 Emergency Shelters None of the 69 emergency shelters in Miami -Dade County were impacted. However, more specific survey information and finished floor elevation certificates on all shelters are needed to determine actual impacts. 31 This facility Is no longer a hospital, It is now the Miami Beach Community Health Center. April 2015 P1-117 125 L S MfOciti-Oacie MIAMI-DADECOUNTY VULNERABILITY'ANALYSIS EMERGENCY SHELTERS • 4 - Evacuation Routes 1:Aitlend Oreigitttq,nitOnfl VaLPAT.40 The Miatni-Dade Local Mitigation Strategy Part 1: The Strategy 1101srumItIgnn iwp* 1/41'401a91M1 Miami -Dade determined there are at most four miles of impact to all evacuation routes even at the 3-Foot inundation because these routes are built at elevations to provide ser- vice in a 100-year storm. US1 Overseas Highway to the Florida Keys and the Ricken- backer Causeway to Key Biscayne have been improved in the past two years. Therefore, the 4 miles of impact are probably an over estimation. The concern for the evacuation routes is flooding of the local access roads leading to them. This information is summa- rized in the section Roads by FDOT Category. April 2015 P1-118 126 LMS Miaimi-mode The Miami -Dade Local Mitigation Strategy Part The Strategy MAW-DADE COUNTY VULNERAP.ILITY ANALYSES EVACUATION ROUTS 4.10ViRti r434.L t4'13,,r)!e,,,,,V,,,,4.w.,,,• (.I:) Marinas Marine facilities were analyzed using land use category maps provided by the Department of Planning and Zoning. Marine complexes and marine commercial land uses were com- bined. All marina facilities are located on or next to water features, east of all salinity control structures to give easy access to the ocean. The assumption is that all will be affected in some way, although the extent is only estimated by this current analysis. It is assumed that those docks with fixed infrastructure will be inundated while floating docks will rise with sea levels, ":R.:7.,:,;1'i:',;,:.'i , •!?..•:: , '! . '.: . :...i Mrhe00 ii"''' ,'. . ifi'' . :.;•::',.. '46 Irnmd3tJ !61ri, 1-fbat Sea L6e1 Rise al 7.-faqt Se a Lee[ Rif., 75 ,,famt Sea Level:Rise 1,50 Results of Analysis' Geographic analysis was done based on the following criteria: Miles of road by Florida Department of Transportation category April 2015 P1-119 127 LMS The Miarni-Dade Local Mitigation Strategy Part 1: The Strategy • Future Land Use • Habitat / Land Use Land Cover Taxable Value of Property Miami -Dade County has chosen not to estimate the taxable value of potentially impacted property until such time as the mapping and analytical methods are more robust. Miami - Dade, through the Stormwater Master Planning Process, has determined that the current assessment tools probably underestimate potential impacts. Roads by FOOT Category Roadways are summarized by Functional Class in miles. High volume categories include sections of roadway where bridges were removed from the LIDAR data and represented bare earth rather than the actual roadways. i-rocit Sea Level Ri5Q Assumption:5f% Percent Inundation Whole Segment Affected iC4ti1 Ciaa:- . i ... - - ........... . ':Y•1'.15.:01.c10.1iiiatiC(11,- I •:::: Totatairage, .....:,:••iiiiiiii:iiedfI•;.H 1 — high volume, maximum speed 108% 2 — highspeed, chfifirlels traffic to FC1 4 3 — high speed, lower FTECIbility, connects to FC.2 3 4 —moderate speed„ through neighborhoods 62 .; 5 —km voturne, Le. access roads, parking lanes Not assessed totark ::•:; .. :::.. :;•,:';•i0•;;I'ii:i'ii•:::.;II .... I.;:': II' *' 72h :!;...:!..•;:I; 2-Foot Sea Level Rise — Assumption; 50% Percent Inundation = Whale Segment Affected . ,;„ : • firridtiia biteltsa ; .. : :: ;. ;,!:: ,:;: : Y-:::•.•;; : •::: . : ,: -•••••• •-: •-; , ; : , ' :.)::!•'; 1 s..;:;, .INII: Jolt /0„te,qtatici4, '''1';'i:!!..i.:Ilii: ! .Tot4COV:era4e: ...:•:::!:Jiiiiiiii)a.aer4;:r', 1— high volume, maximoni speed 6 3% 2 — high speed, channels traffic to FC1 11 3 — high speed, lower mobility, con nects to FC2 8 4— rrioderate speed, through neighborhoods 232 5 —low volume, i.e. access roads, perking lanes Not assessed 1;o*I';:::j,;Ii:;II;I': . ';'-':1;;`:',:;'.I,: • :;•:::',.: ; I . : r .':'::i:I'! I;,';;':;:;g:: 3- foot Sea Level Rise — Assumption: 50% Percent •Inun dation —Whoie Segment Affected • ;; ' :•..I:;',;;;,:',:;;,'ii,': ., . , .. , ,. ,•kiil..i,iibil..40 • ' • . ,, 11 ,.: .,,., `.. •:, . • .1.::!!" ' :,,,i; id ftiniik1 „ ,. ... .....,.,. --. . .. ]::,.,.i,i, q,-; .. I:iItitaftlyirerrige.:: .viv;sdifgenw:r.; 1. - high volume,: maximum speed 12.18 2 — highspeed, channels traffic to FC1 26.33 3— high 5peed, lower mobility, connects to FC2 . 21.22 4 —moderate speed, through neighborhoods 496.21 5 — iow volume, 1, access roa:ds, parking lanes Ilot assessed fdtatII:;•gf.;]: . ..:::.::••...'•.:..'. ' . • .. '''''.•'.; ;:':•.:-• 2,,': '' '-2.:i..?;-II,liP:::.$55i111Hii:: Soda/ Vulnerabilities This hazard does not tend to affect one population over another, April 2015 P1-120 128 LMS Miariti,20ade The Mianrti-Dade Local Mitigation Strategy Part 1: The Strategy Severe Storm Description Severe storms often combine a number of meteorological events, including lightning, hail, tornadoes, and flooding, Each of these are covered in their own hazard profile. This profile will focus on what qualifies as a thunderstorms and heavy rain. A thunderstorm is a meteorological event generated by atmospheric imbalance and tur- bulence caused by unstable warm air that rises rapidly,Thea•vy moisture, and upward lift of air currents that can bring a combination of heavy rains, strong winds, hail, lightning, and tornadoes. The Southern Florida Rainy season is defined as the time of year when most of the yearly rainfall occurs. The median start date of the rainy season is May 20th and the median end date is October 17t1'. During this nearly five -month period, South Florida receives about 70% of the rainfall for the entire year. The rainy season usually has three phases: • Late May through early July ("stormiest" part of the season). • Early July through mid -August (hotter with dry periods) • Late August through mid -October (higher rainfall variability due to potential tropi- cal systems and early -fall cold fronts) Heavy rainfall events tend to be measured by the amount of rain during a certain duration to give you what would equate to the chances of this type of storm which is typically categorized by terminology such as a 100- yr or 500 year storm. To help local communities determine if a rain event is considered significant the following site and chart from the National Oceanic and Atmospheric Administration (NOAA) Hydro - meteorological Design Studies Center maintains the Precipitation Frequency Data Server (PFDS) which is a point -and -click interface developed to deliver NOAA Atlas 14 precipi- tation frequency estimates and associated information. To determine the amounts and rates of rain that could create a various internal rain event (e.g 100 yr or 500 yr) this website provides local information, http://hdsc.nws.n oaagOvihdschofds/pfds map cont.html?bkmrk=f1 Using a location in Miami -Dade County with a 7 foot elevation, the following chart depicts the rainfall amounts per an interval of time that could determine if a significant rain event has occurred. April 2015 P1-121 129 LMS Miami -Pe The Miatni-Dade Local Mitigation Strategy Part 1: The Strategy VtOrne V&rao2 Loadon name; Mitiniiy FlapritlarUS*. Laiittide: 25.8204?;.Lortgitizie; -0(1.2930° Elpyati0IR Tft ''acticast•Gowli POINT PREC1MATION FREQUENCY ESTIMATES Sattia.Pee'eaMobarait Martin. Sandia Saftio, Ishant 'Roy, Michael a Laurent, Ca0iryro0U0, Ude Iftetti,,Mlatial `Witt, Geolery 8nratin (IOAA, National Weather-SWae,311s'ar Spring., h6.ryk,an_oi PF tshukrj PF Rns01-q4l01.i Mns &.• aefials PF tabular TaDS-baettl 0pInt procipitation frettuenPy eattidtes,wi,tn10.% confftlence lrietvais (in inchis)1 DuratIon AV9rne,recurTer1c5 Intermit (Ye0c9). ‘I, 2 5 10 25 i '50 100 200 500 1000 5.411 n .. 0,.g7a 1A71-0.718, 0.604. 49.639-9, Ole) -7-u 0797 (0,6474.280119.130-0. o,pii MI 1.07. • ([1,832-1.30) . • 1.10 (5.937-1,50) 1.32, 0.1.467-1.7.4 1,44, U15,2, I.,30 1.61 1.89-2,29) 1.74 (0.1572.52 - ' 1041 itr- a'84s , (0.M-1.04) ei (0.780-),80) 1L17 (3.948-1,48) 1,33 .(1.09-f.581 1.67, (1 2.01) 1.75 (1.33;2,204 i.9.3 (1.42,28E9 2,11 LI .441,1111 2.50 (1.804.0) 2.54 (1,53-3:09 15 -11111' , 1.03 (0.041-1.27) 1A8 A01,-1.40) - 1,42 (1,t5-1.78) 1.03' 0.31,-3.03) 1191 ( (.40-2.49) . 2.13 (1,82-2.70) 2,35. {1.73-3,15) 2.57 {It81-'84 . 2,87 1-83'-4,99) 1.10 {2.09-4 60 30-min • . , • 1.65 V At (.48-2.2 ) ,2,20 (178-273) 262. (124‘3.14) 2.97 (132-3.02) 3.32 .034.33) 70-4.02) =. 4.02' (2.83-858; 4.49 (3.04-43,49 4,56 0.,26-7,04) :50.-Mirl ,. (1717-13) 2.39 1.06-341) 192 (231-2.0.02) 3.39 (2.73-4.29L 4.07' (4:2078/,?0}. 4.04 (0,3781 9 5.24 ' (9.07,704 ' 5.87 8,75, ' 7:47 493r19 Zhi 2.80 (2,19-9.10) 2,97 . (2,43455) 1,84- (2.07-448) 4,26 045-8.2o 646 (4.i[1 575) 6.90 (4.00-7,84) 0,01 (0.08-8,18) ,c5152.11,0_1400-.060 /al' (0:5)-937;,{8.19-12.9J 9.03 10,1: e.741-14,0ihr: 2.39 (227-8821 3.za (2-70-4:03) 4.a.5 . : (3.32-4.27) 4.7a ' (i,80-6.alH 5.92 .71-7, ) 5.91 (5,35-9.113(. 831) (5-28-10.8) 9,20 . (11.60,113 10.9" .{7.53-15 9 114 " I G-P.1.00;-349- 12 (-"Or-- au-4,7) +4,A:-w) r''.''' -415u , (0,0jup-114) '"FT:fi",- 1mr 7744*7; • _7.-S15,•",.4lvi"0 0T1-o20.9 ,{824-17.83 g,2r2.2 i)1 - 3.56 (530--1.77.) 4.63 _ (3.84-6.5.0) . 5,91 (4,80,7.15) 7.13 (9.30{-3,07) 9,04 . 1,789-(1:7) . 10,7' (SAD-13A 12.6 . (0.45-10.7) 14.1. (19.5'-2.0.9! 17.6 1.2:2-24,8) 1(14 12-4-0012' 24-hr 4,82 {3,05-6.53) 5-,47 (4:3)0-0,60) 7,04 (6,80-3.47), 5.61 (703-31).3;. 10.1) (5.23-13.11) 12..7. (10.9-15.4) 44.8 11.3- 0.0) 17,1 • (12.5-213)• 20,41 4,4223.91 23.2 15.8-32.9 • 2410y ..---, 642 .,-."4"...6:411, 5.40 (1V-751)- 8.19. . . • .,.Q14.7,§1.79LA,,1.7711:1.11- tea 124 ' 10-171.57.( 14.6 .(135168) 1,58 4--.5.;231) 184 i4;2-1,11.41€1.-1.,:o 11 23.0; 26.9 17•0-833 343°1 9.03 4 (5,97-7..15) 7,06' (5.96-8.27) 6.21 7,40--10.9) 14,6' (883-117) 13.2 16,4' (10.5-,00.9) 02.2-39,8 17,0 (13.9-23.2} 20.3' (10.0-27.3 ' ,24.6 17.0-8.9.2) 27,6 18,5-37,9; 6.60 (555-7-75) .7",50 , (5-.10”a09) 9.43 (7.91- 11.2).. 11.1. •(1'39-12-3) 131 . 15,9 { t1.2-17.(2 1025-20.2) 16.2 (14.0-263) 20,6', (.10.4-27.0 , 24,5 (17.4-317) 27.5 { 8,1083.2 7-day 0.00 , , .... ... (5.93-8.601. 8.9/ (7.567:i0.5) 171I M1-y2A) '---izx : 11921411..) 147 'KG 11;11-1/1.2) (12.4-21.2) ' 'OM (114-34,8). 21.7 {10.1-:10..9, 25.4 00.2.34 0j ,4. (3--V.3 -1649' 9'34 V (7-Q2.- (0..i., ) 19.2 14.9 13.87-12.0) (10.1-14,0) 13.5 (11.8-18.0) 150 18.4 ('l3A-9it) 04:6-2.2.7) . 2)14 (199,25.:3) '23.0 (17,1L318' ; 257 110,1-30:41, 29,7 120.7- . . lir • ----''. 0.8-14.7) F14,1;1 164 02.0-10:4 03.0-iezh 18,6 (46,9-21.7) 214 23.7 (17.9-20.9) fica-28,33 r 26.2 (20:5-33.2) 2E= 21A-17.5 • •52.2 . {2.3_43,4 3r„571 24 5-47.8 • 30.ti y iq4": a- (13.2-17,4 . . 21)4 t4.020.1 (702237) . 229 09..4497), ,.. 262 185- (21,5-81.6) (S3.1-852.1 ' 314 (2,14-N,41 31.6- 03-4z14, 3 .2 29.0'740.1' ar' (27g454.t IDA 4541W , . . (194-22.1:9 2 ,5 25,3 1 (114,24.3)! (41,8728,8) 26.3, 1(24.0.32.0) 32,2 ---, (38.3-38.3) (284-42.4) I 37,6' (2.9.8-40.9) 40,2 (30_1,-81.5: i '45,3 • 481:3,8741 455. (31.2.7111. nn 4,,,- 22.3 ''''-'• tica-15.7j .25.1 20,3 (115-29,c9 (28.1-814 32.7' .(17.3-37.41) 119 39.9. (30.243:8) 1311-48_2) 42.6 Os.2-52,4) 45.2 (63.15:/..T, 46,2. 34.843,0) 50.2 i 0.0--Enif.o, -,„.... ,... - . - ........ 'P ranlp I kallon frequerioy )PF) .estianataa- In thts talals are based ,142, itetleartay -analysts a r *531 duradon aeries (PDS). Numbers it) parenthe_sis are FF estanales at fnwer and tipper totindsartha.00% our.5danaa inteNal, lba prob4b181y4hal preolpitationfrequernd ssilipmq (rpe.a igIvs9 ourstiodandayeraurrepea (*rya() will begreatar03ant04 upppi- bind (or bass lhon Oa Inerer betin00 Is 5%, SArmates at uppar bauntra are Oen* apinst.probrnxle oLle eeze precio(alion (PMP) akfmntas ....id eeiey be hIgheriaan currently yalid 19,1P.sayes, . rik Fires f--erla. TOM,Aff00.14' ifozunt4t for mare Wartneke,. • . 14 NOD 41 rrIhrl Location The entire County is vulnerable to severe storms. Extent Winds of up to 100 mph during a severe storm and rain amounts of 14" in a few hours. April 2015 P1-122 130 LMS The Mianti-Dade Local Mitigation Strategy Part 1: The Strategy Impact In February 1995, a severe storm caused $5 million in damages. A twisting downdraft damaged four commercial jets, several loading platforms, and a catering truck at con- course G at Miami International Airport. It is estimated that the winds at the site were 100 mph.32 On October 9, 2011 we experienced a heavy rain event in Miami -Dade with over 1 0"of rain falling at the West KendalllTamiami Airport. The top graphic illustrates the rain fall amounts for a 48-hour period. From October 28-31, 2011 another heavy rain event oc- curred with the greatest, impacts being felt in Miami Beach. The areas of heaviest showers and thunder- storms were over Pinecrest, Coral Gables and Coconut Grove and remained over that area for another few hours. This area of rainfall produced anywhere from 6 to 10 inches of rain in only a few hours from Cutler Bay to Co- conut Grove, leading to severe street flooding and intru- sion of water into dozens of homes across this area, Es- timates from the South Florida Water Management Dis- trict indicate that isolated areas in Coconut Grove may have received in excess of 12 inches during this time span. Portions of Miami -Dade County experienced 3-7 inches of rain in a few hours causing significant street flooding. In June of 2013 as Tropical Storm Andrea passed across north Florida, south Florida was on the receiving end of torrential rains over northeastern Dade as the tail of the storm moved across the area. Up to 14" of rain was measured in North Miami Beach in only a few hours and 8-12" from North Miami to the southern portion of Broward County. The event caused severe street flooding and flooding of buildings. Previous Occurrences June 20, 2014 Miami City Hall reported a thunderstorm with a gust of up to 64 mph, June 13, 2014 —A thunderstorm near Kendale Lakes records a wind gust of 62 mph and multiple trees reported down at the Miccosukee Golf and Country Club. 32 National Climatic Data Center, Storm Events Database April 2015 P1423 131 _S The Miami -Dade Local Mitigation Strategy pliamt.-Dade Part 1: The Strategy April 19, 2014 Cold front produces showers and thunderstorms with a gust reported up tO 61 mph. February 12, 2014 Strong cold front cased thunderstorms with wind gust of 70 mph. September 15, 2013 — Strong to severe level winds cause power outages. Reports of a wind gust of 58 mph and a tree down. April 15, 2013 — Afternoon thunderstorms with wind gusts up to 61 mph reported with damage to a carport. September 19, 2012 - Scattered thunderstorms over South Florida caused a thunder- storm in Kendall that causes large tree branches to break. June 6, 2012 — Severe thunderstorm with high wind gusts and hail occurred in Miami - Dade. Reports of numerous trees downed reported in Leisure City, South Miami Heights and Princeton. Wind gusts were estimated at 60 mph. In Perrine several signs from businesses were blown off a building. May 20, 2012 — Tree branches in 3-4 inches in diameter were snapped in Miami Lakes due to a severe storm. May 18, 2012 - Large tree branches were snapped and broken off in a two -square -block area near the intersection of SW 8th Street and SW 142th Avenue, resulting from a down- burst associated with a severe thunderstorm. Trees were also reported down in Sweet- water and Doral, Winds were estimated between 60-70 mph and large trees were up- rooted and a light pole was downed in Doral. May 8, 2012 - A strong thunderstorm produced a wind gust of 59 knots,..or 68 mph, measured by a mesonet site at Sun Life Stadium. Vulnerability Physical Vulnerabilities The entire built environment (Critical Infrastructure, Key Resources, Building Stock) may be vulnerable to severe storms due to wind or rain damages. These types of events could cause power outages or some structural damages to mobile/manufactured homes (see Hurricanes/Tropical Storms for a listing), communications towers, or damage trees and overhead utilities. Underground utilities could be impacted if trees topple and uproot these systems. Severe weather may also cause flying debris to cause additional dam- ages.. Structures in areas where there has been repetitive losses and no mitigation may also be at higher risk but past flooding events do not necessarily indicate future flooding problems. Areas with ongoing construction or drainage problems may also be at greater risk. Parks and open spaces where people congregate outside are vulnerable to severe weather that may roll in with little notice, this includes coastal beaches, Crandon Park, all April 2015 P1-124 132 LMS The Miamt-Dade Local Mitigation Strategy Pliarni.bade Part 1: The Strategy County and State parks, large venues such as the Homestead- Miami Speedway, Sunlife Stadium, and Marlins Park. Social Vulnerabilities People who live in areas prone to flooding and may be uninsured or underinsured are at greatest risk. The cost of insurance may be prohibitive and people who live outside of a flood zone may believe they are not at risk. People who rent properties may not be aware of their flood risk as it may not be disclosed by the owner or they may not know the history of the area, Electrio dependent and persons living in mobile/manufactured homes may be at greater risk when it occurs in their areas. Tornado Description A tornado is a violently rotating column of air extending from a thunderstorm to the ground. The most violent tornadoes are capable of tremendous destruction with wind speeds of 250 mph or more. Damage paths can be in excess of one mile wide and 50 miles long. A majority of tornadoes, however, have wind speeds of 112 mph or less. Florida tornadoes occur in the greatest number during June, July and August. These are typically small, short- lived events that can produce minor damage and seldom take lives. Florida's most deadly tornado outbreaks occur in the spring. Waterspouts are common along the southeast U.S. coast — especially off Southern Flor- ida and the Keys -- and can happen overseas, bays and lakes. They are smaller and weaker than the most intense tornadoes, but still can be quite dangerous. Waterspouts can overturn small boats, damage ships, create significant damage when hitting land, and kill people. Location The entire county is equally vulnerable to tornadoes. Extent EF-3 tornado could be experienced. Impact Miami -Dade ranks fourth in the state with eighty-six (86) reported tornadoes from 1971 to 2002. Based on data from 1950,—2011, there has been 31 tornado events in Miami -Dade that have resulted in 158 injuries, 1 death and $202 million in damage. The tornado in 1959 touched down in Coral Gables and moved over the Miami business district and Biscayne Bay and impacted Sunny Isles, Most injuries were from flying and broken glass, Another occurrence on March 27, 2003 had a tornado that peaked as an F-2 that hit the Brownsville/Liberty City neighborhood, One person was killed in their home by tree debris' April 2015 P1-125 133 LVIS MiarnrR-padel The Mianti-Bade Local Mitigation Strategy Part 1: The Strategy and fourteen people were injured. FEMA damage estimates included $2,2M for housing assistance and $6.2M for other assistance, totaling $8.4M.33 Previous Occurrences May 16, 2014 — Miami International Airport tower officials reported a tornado 1 mile west of them. Minor damage consistent with an EF-0 with maximum winds estimated at 65 mph damaging .trees, street signs and a vehicle. July 20, 2013 — A funnel cloud east of Kendal Regional Medical Center was reported.' May 22, 2013 — A funnel cloud was reported near Princeton. January 4, 2013 — Several funnel clouds were reported in areas of Kendall, Cutler Bay, near Zoo Miami' and the Dolphin Mall in Sweetwater. No reports of touchdowns, August 3, 2012 -- A tropical Wave in the northern Bahamas and western Caribbean pro- duces thunderstorms in South Florida and a funnel cloud was reported in the Richmond Heights area. July 28, 2012 — A tiny funnel cloud was reported near Homestead General Airport. No reported damages. July 16, 2012 A rope -like funnel cloud was reported over the Redlands, west of Krome, No known damages. June 29, 2012 7 Homestead General Aviation reported a funnel cloud west of Homestead, it did not touch down or cause damage. June 24, 2012 — Golden Beach Police reported a waterspout moving onshore moving north. The path was approximately 0.5 miles and it was estimated as a n EF-0. Beach chairs were tossed about 30 feet in the air and there was damage to trees and a hut. One residence also had damage to a metal gate and trees, Damages about $10K, Vulnerability Physical Vulnerabilities The entire built environment is vulnerable to tornadoes depending on where it hits (may be directly or indirectly impacted). Mobile and manufactured homes tend to sustain the most damage from a tornado due to their lighter weight building materials. A list of mobile home parks in Miami -Dade is provided in the Hurricane/Tropical Storm section. Unrein- 33 National Weather Service Miami s- South Florida, Series of Tornadoes Hit South Florida Including Mi- arni and Mlami-Dade County. April 2015 P1-126 134 LMS Miarni-pade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy forced concrete buildings and wood structures may be more vulnerable to tornado dam- age. Power lines and trees may be downed or underground utilities may be uprooted when trees topple. Social Vulnerabilities People with disabilities such as decreased vision or hearing may not be aware of the tornado warnings, Electrically dependent individuals may rely on life -sustaining medical equipment and may be at greater risk due to power outages. Wildfire Description Wildfire is defined by the Florida Forest Service (FFS) as any fire that does not meet management objectives or is out of control. Wildfires occur in Florida every year and are part of the natural cycle of Florida's fire -adapted ecosystems. Many of these fires are quickly suppressed before they can damage or destroy property, homes and lives. There are four types of wildfires: • Surface Fires: Burn along the forest floor consuming the litter layer and small branches on or near the ground. • Ground Fires: Smolder or creep slowly underground. These fires usually occur during periods of prolonged drought and may burn for weeks or months until suf- ficient rainfall extinguishes the fire, or it runs out of fuel. 6 Crown Fires: Spread rapidly by the wind, moving through the tops of the trees, • Wildland/Urban Interface Fires: Fires occurring within the WUI in areas where structures and other human developments meet or intermingle with wildlands or vegetative fuels. Homes and other flammable structures can become fuel for WUI fires. April 2015 P1-127 135 LMS Miami Dame The Miami -Dade Local. Mitigation Strategy Part is The Strategy A wildfire is a naturally occurring event, often ignited by lightning or discarded cigarettes, and/or unattended camp fires and fueled by grasses, brush, and trees. *oh Fictrida avglori 4111011 Wildfires help to control the buildup of Niroos atIJIVA4P, 01101f1, woody debris, improve soil conditions, i,'`: ;;;:.:r:. "' ..,,.._....,_....; :". ....... reduce weedy and invasive plants, re- duceplant disease, and maintain the habitat conditions thus providing a healthy ecosystem. Fires in the Ever- glades tend to happen annually, with rapid wet -season fires, often started by lightning. Dry -season fires are less com- mon, but can be more damaging, Location Wildfires are most likely to occur in the western portions of Miami -Dade County within one mile of the Urban Wildland interface and the Everglades, Extent 2000 acres. Impact In previous events homes have been threatened by wildfire, the Turnpike Ex- tension and the Don Shuia Expressway were closed due to heavy smoke, and acres of farmland and fields of grasses were destroyed. FIRE DANGER LEVELS Criteria. Low Ignition: Fuels do not ignite readily from small firebrands although a more intense heat source, such as lightning, may start fires. Spread: Fires In open cured grasslands may burn freely a few hours after rain, but woods fires spread slowly by creeping or smoldering, and burn in irregular fingers,. Spotting: There is little danger of spotting, Control: Easy Mod- erate ignition. Fires can start from most accidental causes, but with the'exception of lightning fires in some areas, the number of starts is generally low, Spread: Fires in open cured grasslands will burn briskly and spread rapidly on windy days. Tim- ber fires spread slowly to moderately fast The average fire is of moderate intensity, although heavy concentrations of fuel, especially draped fuel, may burn hot, Spotting: Short -distance spotting may occur, but is not persistent. Control: Fires are not likely to become serious and control Is relatively easy, April 2015 P1-128 136 LMS mleimi-Dnte The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Level - High Criteria • Ignition: All fine dead fuels Ignite readily and fires start easily from most causes. Unattended brush and campfires are likely to escape, Spread: Fires spread rapidly. HIgh-intensity burning may develop on slopes or in concentrations of fine fuels. Spotting: Short -distance spotting is common. Control: Fires may become serious and their control difficult unless they are attacked success- fully while smail. Very High Ignition: Fires start easily from all causes. Spread: Immediately after Ignition, spread rapidly and Increase quickly in intensity. Fires burn- ing in light fuels may quickly develop high intensity characteristics such as long-distance spot- ting and fire whirlwinds when they burn Into heavier fuels. spotting: Spot fires are a constant danger; long distance spotting likely. Control: Direct attack at the head of such fires Is rarely possible after they have been burning more than a few minutes, ignition: Fires start quickly and burn intensely. Ail fires are potentially serious. Spread: Furious spread likely, along with intense burning. Development into high intensity burning will usually be faster and occur from smaller fires than In the very high fire danger Eclass. - Spotting: Spot fires are a constant danger; long distance spotting occurs easily. Vernex Control: Direct attack Is rarely possible and may be dangerous except immediately after igni- tion. Fires that develop headway in heavy slash or in conifer stands may be unmanageable while the extreme burning condition lasts. Under these conditions the only effective and safe control action is on the flanks until the weather changes or the fuel supply lessens. Source: National Fire Danger Rating System Previous Occurrences There have been no wildfires since the last LMS update in 2009. May 7, 2008 — Redland area a large grass fire ignited on a form and burned some farm equipment and 20 acres. April 5, 2000 — Homestead a 50-acre wildfire destroyed two mobile homes and two boats, estimated damages $100K. March 3, 1999 - Redland area about a dozen wildfires burned as winds gusting near 30 mph quickly spread the flames,None of the fires exceeded 100 acres but a plant nursery was destroyed and several homes were threatened, Smoke closed the Florida Turnpike Extension and the Don Shula Expressway for several hours. There have been four federally declared wildfire events. PRESIDENTIALLY DECLARED WILDFIRE EVENTS IN MIAMI-DADE April 2015 P1-129 137 LMIS Miaff*.tiatie The Miarni-Dade Local Mitigation Strategy Part 1: The Strategy Disaster Type Disaster Number Title incident Begin Date • Declaration Date - Incident End Date - Disaster Close Out Date FS 2359 FL . E•VERGLADES FIRE COMPLEX - 04/25/01 4/17/2001 4/25/2001 9/16/2003 EM 3139 FL -FIRES 04/15/99 4/15/1999 4/27/1999 5/25/1999 4/14/2004 FS 2256 FL -FIRES 04/13/99 4/13/1999 4/18/1999 7/26/2002 DR 1223 EXTREME FIRE HAZARD 5/25/1998 6/18/1998 7/22/1998 6/21/2011 Vulnerability. Physical Vulnerabilities The built environment (Critical Infrastructure, Key Resources and Building Stock) and natural environment that are closest to the Everglades, agricultural areas or large open spaces are at a higher risk for exposure from wildfires. Critical facilities would include the Homestead Correction Institute, Dade Correctional Institution, Dade Juvenile Resi- dential Facility, Everglades Correctional Institution, Krome North Service Processing Center, South Florida Reception Center, and Metro -West Detention Center, Residential areas of concern would include the Everglades Labor Camp, Gator Park Mobile Home Park, and Jones Fishing Camp Trailer Park, Visibility on roads may be compromised due to smoke and this may lead to the need for road closures or increased traffic accidents, Social Vulnerabilities Populations with respiratory complications may be at greater risk due to air quality issues in relation to wildfires. The social vulnerability section should be reviewed for more infor- mation 00 how these types of circumstances may affect populations differently, Winter Storm Description Severe winter weather includes extreme cold, snowfall, ice storms, winter storms, and/or strong winds, and affects every state in the continental United States, Areas where such weather is uncommon, such as Florida, are typically affected more by severe winter weather than regions that experience this weather more frequently, For Miami -Dade, win- ter weather hazard events occur when high winds, and cold temperatures occur. In Miami - Dade, most winter concerns revolve around protecting crops from cold temperatures and providing shelter for vulnerable populations such as the homeless, Extreme cold condi- tions in Florida are considered to be slightly above freezing, Location The entire county is vulnerable to winter weather, inland portions tend to see colder tem- peratures by a few degrees, These areas tend to be south of Kendall Drive and west of the Florida Turnpike, primarily the Redland area and areas west of Homestead and Flor- ida City, April-2015 P1-130 138 LMS The Miami -Dade Local Mitigation Strategy Part I The Strategy Extent 26 degrees F with cold weather shelters open for over 10 consecutive days. AVERAGE FREEZE DATES FOR SOUTH FLORIDA34 LOCATION EARLIEST FREEZE AVG FIRST FREEZE AVG LAST FREEZE LATEST FREEZE I*,: 'e' g, ' HOMESTEAD DECEMBER 28 DECEMBER 21-31 JANUARY 21-31 JANUARY 31 eA3';:rk.71:k1 2 140 -' ' ':. .' : * OA ORPTA "Pift. D li -,•;, ' "CaNWIAtilik; M IA M I , r;,..1 , DECEMBER 11 DECEMBER 21-31 JANUARY 21-31 MARCH 3 Impact In January 2010, Miami -Dade experienced two back to back cold fronts, with tempera- tures below freezing in the interior portions of the county. Crop damage was extensive and severe , with estimates in excess of $500M in the region. Thousands of customers experienced intermittent power outages due to record -setting usage demands. Hazards such as carbon monoxide poisoning and household fires are increased in improperly ven- tilated homes during severe winter weather events. The loss of utilities stress resources and puts vulnerable populations at risk. Two fatalities were noted from exposure to cold, a homeless man in Fort Lauderdale and an elderly man in an unheated apartment in Miami. Cold weather shelters were open for over 10 consecutive nights in many areas of South Florida. Previous Occurrences 2013.2014 - None January, 3, 2012 - Temperatures dropped to the freezing mark over parts of inland Mi- ami -Dade County on the night of January 3rd and early morning of January 4th, with temperatures at these values for 2-4 hours. Areas most affected were the Redland and Homestead areas, Damage to most sensitive crops (beans, herbs, squash, and Asian vegetables) was about 15-20%. A few wind -protected fields suffered near -total losses. Early January 2010 . Very cold air of arctic origin in the wake of a front produced freezing temperatures and very low wind chills to all of south Florida. Freezing temperatures were noted aver almost ail of south Florida on the mornings of January 10th and Ilth. Four consecutive nights of below freezing temperatures occurred over interior sections of south Florida from January 10th through January 13th. The combination of this episode and the first one between January 1 and January 7 produced the coldest 12-day period of temperatures on record at several south Florida locations. Crop damage was extensive and severe, with total damage estimates in excess of $51 million dollars in Miami -Dade. Thousands of customers experienced intermittent power outages during this period due to record -setting usage demands. Wind chills dropped below 35 degrees and remained mostly in the 20s from the evening hours of January 9th through midday on January 10th. 34 National Weather Service Miami Offite April 2015 P1-131 139 LIS/1S Miand-Pode The Miami -Dade Local Mitigation Strategy Part 1: The Strategy January 5, 2001 - A freeze occurred throughout the interior sections of south Florida, causing damage to certain crops. Hardest hit were certain vegetable crops with 30% losses in the farming areas of south Miami -Dade County. Other crops that were damaged included newly planted sugar cane, ornamentals, and tropical fruits. A heavy frost oc- curred in the western suburbs of Miami -Dade. PRESIDENTIALLY DECLARED FREEZE EVENTS IN MIAMI-DADE Disaster Type Disaster , Number , Title Incident Begin Date Declaration Date Incident End Date Disaster Close Out Date OR 1359 1SEVERE FREEZE ' 12/1/2000 2/5/2001 • 1/25/2001 „ . 5/14/2010 DR 851 "SEVERE FREEZE '12/23/1989 1/15/1990 12/25/1989 4/23/1996 r DR 732 SEVERE FREEZE 3/18/1985 3/18/1985 3/18/1985 10/27/1988 DR 526 EVERE WHITER WEATHER 1/31/1977 1/31/1977 1/31/1977 12/18/1978 DR 304 [FREEZE. 3/15/1971 3/15/1971 3/15/1971]6/18/1973 ource: datagov, F MA Disaster Declarations Summary Vulnerability Physical Vulnerabilities Little of the built environment (Critical Infrastructure, Key Resources and Building Stock) is vulnerable to winter storms. Pipes carrying water to households could freeze and expand causing pipes to burst. Inadequately heated or insulated homes may resort to heating by kerosene heaters or stoves. These methods of heating are dangerous and contribute to carbon monoxide poisoning and household fires. Agricultural interests are more vulnerable to winter storms and frost can destroy crops. Crops most vulnerable to winterstorms and freezes are the ones that are grown during the winter months and har- vested in the spring months including cantaloupe, carambola, celery, cucumbers, dragon fruit, eggplant, fennel, guava, greenbeens, herbs, jackfruit, longan, lychee, mushrooms, onions, papaya, passion fruit, plantains, radishes, sapodilla, spinach, squash, strawber- ries, sweetcorn, thyme, tomatoes and zucchini. Social Vulnerabilities Extreme cold weather is a particularly dangerous hazard for at risk populations such as the homeless, elderly, low income or people living in homes without heating or means to keep warm. These populations include those who have a difficult time keeping warm or. finding a heat source during an extreme cold event. The homeless are particularly at risk. Age groups such as the elderly and infants have limited physiological capability to keep warm. It is estimated that there are about 4,150 homeless people in Miami -Dade County. Larger concentrations of homeless tend to be near the downtown Miami and Miami Beach areas. Body warming mechanisms such as "goose bumps" and shivering are restricted in these groups. Outdoor animals and pets are also at risk of extreme cold temperatures. April 2015 P1-132 140 LMS Marni-Ode The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Natural Hazards by Jurisdiction The following chart depicts the probability risk by location of all of the natural hazards. The estimate of risk is based on the judgment of local planners and the LMS Working Group regarding the likely frequency of occurrence of the hazard event based on the location of the jurisdiction to the hazard potentially occurring. Sea Level Rise probabilities were determined by potential future risk as identified in the map in the Sea Level Rise section, The rankings are Low (L), Medium (M) and High (H). April 2015 P1-133 141 LMS Miami -Dade • The Miaini-Dade Local Mitigation Strategy Part 1: The Strategy Jurisdiction z 2. ca 'ril 2 LLi -a 0 0 Hurricane/ Tropical Storm Saltwater intrusion Sea Level Rise Severe Storm Tornado LP Winter Storms Aventura M H H H ..'Bi.':.4arliO`tt'';'':)Iii,;,.....'....,..,:i"!: '; •H I:i;'..1, ;-;H, 14 i4 H L • Bay Harbor M H H H H H H H L M " L.- . H ' . '...- -.' '• H L Coral Gables M L H H H H H . H 1 M 'faiii•Iiii:,ii,,.;.'-gf?..::"..,..:',..:::::,'1,:•;.'.;:;•',--;•::,qd:::•Y- '' * .'''.: ,..'i - .2: H '' 1`.;,:';::H•:" .• p ,.,.. ', r.,.. :•,';'.',Mf: Doral M L H H L H H H L M . . . . . •:.: IcPat'aii;t:..,!•.,:',.;•::';,.,!"...*.;:'*:4',!:;d:'.•-.!.; FloridaCity M L H ' H H H H H M M di;iiiiWiii'6';'[.;:i..... '..::... :.: ', :,14 H ....''-'..;',.1-1!. . .......'.'• :,..: H ..-:'.. ' ..'... L '...• M. Hialeah M L H H L M H H L M Hieleh&arcieriS... ',;;.:J,:;,..4.'.V n' '''':,'.. H L..M!;:! .':': Fl-'' ..;.: M Homestead M 1 H H H H H H ' M M • kiiii66iiiiei::..,1,...:,..',....1.:,....:.. iVi.:.. ..' : • ' . ..,, ,. 171::'.......• -14'.,;•:-1... '.14:.;:::::..! • 'H.;.:., ::!•..• L ..';;; ',.•., • Ni;-).. Medley M L H H L M H H L M mli4,..:',.-,.:..,.,.... ,..:. ..';.P':;:'-,:.• . 0 i L • .14,. '';:::.'",:„Fi,.:1, l'.'..-,i0',;:s.,i.... r-I,..,: '..tl .. : 0ii•.;'. Miami Beach M H H 14 H Fl • 1-1 H L M ,i. Miami ' ...;(:.,., ,:: rvil. : .11, ...::14,,,.,..i ;•:'.,„ .t,J,::,.., ...,.. .: I-LH,L.MY, Miami Lakes M 1 H H 1 M H H L M ,iiiiiiiniSlibi6S!.:;,`'::':::;••:1;',.•• •::; 1\1 : ...L:E.-I.' '...1;.k4.4:i.. -;.;1.4.:-:4'. .'*:. i';,:-i:1;::-; ' i4.:"..::!..' ::::'!:„..,,C,,..,,y, Miami Springs M L H H L M H H , L M North 6d,./.1..iiIi6 1‘,.:;::::g.., ,......'1.::.;;. ':1" M:.„ 'IL,.•-.: 1. 1-1..2.... k..: H.; ...', „ Ni '''...1,1...'.!, JA:, L ...144.;.:: North Miami ivi • H H H H H H H L M '"N4ifiiMfaiiii'ii...eab,::!....";';.:,ii.,?„',',1;:i. friii.? ..1 H; ,:'::-.)4.)-...,::: ,..;,..:,4::',..........:,,;.:::.ki...;.'11, ?,.4.;;;',::: ;:.: if:..; .. :,.k.i.. Opa-locka M 1 H H L M H. H L M llsitrf6ii8'.:g6'1;,4.:;.::.:C...',....''•'.:: .'16'',.:H.' ''...,..:; ...':::::13 ti '. ",''..,f,.i :..rM,.,.:: Pinecrest M L H H 14 H H H L M '!-,iiSbiiibViiiiiiii::::....',.fi..."ii.,':'':.'i!n- l';.Tii':'' Li' '',",',.;:`..1-!'..!..:. ',A...'T :gri:t.f.:.: ..... ki. r..‘,.:,.ij-: L., -:::10.iE.: Stymy isles M H H H H H H Fl ' L M rtSid.-...!',!"!5:' ••!.!'...!...1.,fi!':).!!,;'.:::',/!;-',- I".:•:!".; Su. '-.:'Nf!.; - - .,'''FI-'.!. "' ';''i,,.1Y-...-. !Fii,...0i 1; ,.:::,... • ,. .. Sweetwater M L H H L M 1-1L M . , •:'Virll44Gi'deIiSl;',1-:.1J0;.'.:.11:0ii!.... l'1 4"... '4.:.-....,,.; ::h'Ailli:.1':!.:};:;i: :)...;:,:;..1":,01.[ii:':f!„?:#11:, ,,..?:)'...'i!V:tii;:- vii.',i'.'":'''„ West Miami M L - 1 H:!•' 1 H M ..'....''...',, .:-,..,•!':'''.-;:',II''.';'.'1''''!.'2",'1.- . .'!.'itt.'...",.,.',-: 0(1Icai)OhtOtl - '.' a •, . „ .; ,-Vt•'-:L • R ,.-:.H 7 .'..H..--, 1 V ..L rVi;.:`. April 2015 P1-134 142 L S Miarnii-Pade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Miami -Dade County Critical Facilities Inventory The LMSWG recognizes the importance of mitigation to critical facilities and as such uses data supplied by the municipalities and the various county departments to develop a database which includes the critical facilities inventory, NFIP repetitive loss data, his- toric flood data and the locations of hazardous materials that fall under the jurisdiction of Section 302 of the Federal Emergency Planning and Community Right -to -Know Act, This data has been supplied by the Miami -Dade County Division of Environmental Re- sources Management (DERM) and the State Emergency Response Commission.35 Similarly, Miami -Dade and the municipalities control a huge inventory of properties. Therefore, due to its voluminous size, the listing of non -critical municipal public building and facilities will be maintained separately by the county and each municipality. A critical facilities inventory is maintained by Miami -Dade Office of Emergency Manage- ment (OEM) and the Miami -Dade Information Technology Department (ITD) that includes those facilities that have been deemed critical by the state and federal governments. A copy has been supplied to HJEM as well. The inventory includes GIS coverage for the following: the Miami -Dade County street network, day care centers, medical facilities (MMF, hospitals, nursing homes, adult living facilities), Miami -Dade fire stations, munici- pal fire stations, Miami -Dade police stations, municipal police stations, solid waste man- agement sites, sewage treatment plants, sewer pump stations, water treatment plants, Miami -Dade County schools, hazardous materials sites, municipal critical facilities inven- tory, the Miami -Dade evacuation network, and hurricane evacuation centers. in 2014 OEM and ITD updated the Debris Management Plan to update debris clearance measures including critical facilities. While the state and federal government defines critical facilities as those listed above, the Miami -Dade LMSWG has defined critical facilities in three types or levels, which are: Level 1 -- A facility that must remain available in ail circumstances and at all times. The community cannot do without this facility at all. Protective measures are an absolute must. • Level 2 — A facility that must be restored within twenty-four hours or risk dire con- sequences to the community. • Level 3 — A facility that must be restored within seventy-two hours or the commu- nity may suffer major problems, The LMSWG concludes that any facility that the community can do without for more than seventy-two hours is not truly critical; important perhaps, but not critical. 35 EMAP4.4,1 April 2015 P1-135 143 LMS Miami -Da de' The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Data Sources Identified We have identified the following data sources as being important and comprehensive to the accomplishment of our mitigation goals, However, additional data sources will surely be discovered as we proceed with the task of mitigation. Federal Emergency Management Agency (FEMA) • National Flood Insurance Program repetitive loss inventory. • Flood Insurance Rate Maps, hurricane storm surge maps, and previous natural haz- ard computer modeling results. New FIRM maps were implemented in 2009 and Miami -Dade is currently undergoing a Coastal Study that is slated to be complete in 2019, • The FEMA website www.femadov has a wealth of accumulated data that can be extremely valuable in developing mitigation measures. Other U. S. Government Databases and Information Sources • National Hurricane Center and the National Oceanographic Atmospheric Administra- tion (NOAA) historical storm related data (including, National Climatic Data Center). • The National Weather Service Miami Forecast Office data files. • National Hurricane Center "SLOSH" models, • National Priorities List (NPL) • Comprehensive Environmental Response, Compensation and Liability Information System List (CERCLIS — the "Superfund") • No Further Remedial Action, Planned List (NFRAP) • Emergency Response Notification System List (ERNS) • RCRA Corrective Action Tracking System List (CORRACTS) • Resource Conservation and Recovery Information System List (RCRIS) • Hazardous Waste Data Management System List (HWDMS) • Facility Index Data System List (FINDS) • Toxic Release Inventory System List (TRIS) • U. S. Immigration and Naturalization Service databases. State of Florida • Florida State University Department of Meteorology hurricane historical database. • State -Funded Action Sites List (SFAS), • State Sites List (SITES), • Solid Waste Facilities List (SLDWST). • Petroleum Contamination Tracking System Report (POTS). • Stationary Tank Inventory System List (TANKS). • Hazardous Waste Compliance & Enforcement Tracking System List (COMHAZ). April 2015 P1-136 144 LMS Mlorni-DaRie The Miami -Dade Local Mitigation Strategy Part 1: The Strategy a South Florida Water Management District (SFWMD). Miami -Dade County • Municipal and County Emergency Management Plans and Comprehensive Plans. • Municipal and County Floodplain Management Plans. • Miami -Dade Stormwater Management Master Plan and Capital Improvements Pro- jects, • Miami -Dade County, Division of Environmental Resources Management (DERM) GIS database. • Miami -Dade County, Information Technology Department, Critical Facilities Inventory and other GIS databases. • Enforcement Case Tracking System Report (ECTS). • Fuel Spill Report (FSPILL), • Hazardous Waste, Report (HW). • Industrial VVaste Reports. • Underground Storage Tanks Report (UST). • Agriculture extension services and databases. Municipal Agencies Staff resources, records and data files, Additional Resources • The American Red Cross will provide information regarding shelters, as well as staff resources and records • Internet web sites provided by the Florida Division of Emergency Management as part of the Local Mitigation Strategy Guidebook CONFLICT RESOLUTION PROCEDURES The Miami -Dade County Local Mitigation Strategy Working Group has established pro- cedures to resolve conflicts between member entities that may arise from the develop- ment of the LMS. It has borrowed extensively from the Regional Dispute Resolution Pro- cess of the South Florida Regional Planning Council. These procedures are designed to clearly identify and resolve problems as early as pos- sible, to utilize procedures in a low-cost to high -cost sequence, to allow flexibility in which procedures are used, to provide for the appropriate involvement of affected and respon- sible parties, and to provide as much process certainty as possible. April 2015 P1-137 145 LMS The Miami -Dade Local Mitigation Strategy htiami-bacte Part 1: The Strategy There are two basic components: process initiation and settlement meetings. Addition- ally, there are five optional components: pre -initiation meeting, situation assessments, mediation, advisory decision -making, and referral to other dispute resolution processes. The Working Group consists of representatives from Miami -Dade County, its incorporated municipalities, county departments and other participating organizations. In the event of a dispute, parties named in the Initiation Letter (see below) are automati- cally allowed to participate. Other jurisdictions, public or private organizations, groups, or individuals must be suggested by a named party and agreed to by a majority of the named parties before inclusion; or recommended for inclusion by a mediator mutually selected by the named parties. Other jurisdictions, public and private organizations, groups, or individuals seeking to be- come named parties can submit a written petition to the Working Group. Such groups will become named parties if agreed to by a majority of the named parties or by a mutually selected mediator. Named parties have twenty-one days to respond to the Initiation Let- ter, Each named party must appoint a representative whoshould have authority to act. Ju- risdictions are encouraged to designate a representative before one is needed. This per- son will be responsible for the party's interests and maintain communication throughout the process. The representative must be named in writing. • Pre -Initiation Meeting: Any jurisdiction, organization, group or individual may re- quest an informal pre -initiation meeting with the Working Group coordinator, 9 Initiation Letter: The conflict resolution process begins with an Initiation Letter from a jurisdiction's governing body, which is sent to all named parties and the Working Group coordinator. .This must be accompanied by either a resolution or written authorization from the same governing body. The Initiation Letter must identify the issues to be discussed; named parties to be in- volved; name of the initiating party's representative; others who will attend; and a brief history of the dispute that indicates why this dispute is appropriate far this process. • Response Letter: The named parties must send a response letter to the Working Group coordinator and all other named parties, The response fetter must indicate the respondent's willingness to participate in a settlement meeting and include any additional issues for discussion as well as a brief description and history of the dispute from the respondent's point of view. • Situation Assessment: At the request of a jurisdiction, organization, group, or indi- vidual, the Working Group coordinator or other neutral party can perform a situa- tion assessment at any time, before or after initiation of the process. The situation assessment can involve examination of documents, interviews and assessment April 2015 P1-138 146 LM S Miami -bade The Miami -Dade Local. Mitigation Strategy Part 1: The Strategy meetings, and can result in a recommendation concerning the issues to be ad- dressed, parties that may participate, appropriate dispute resolution procedures, and a proposed schedule. Private interests may ask any member of the Working Group to initiate the process. Any public or private organization, group, or individual may request that the Working Group recommend use of the process. The Working Group can recommend that a potential dispute is suitable for the process and transmit its recommendation to the potential par- ties. All requests must be in writing and provide all required information. A Working Group representative must respond after reviewing the petitioner's request; meeting with the requesting organization, group, or individual; and performing a situation assessment. If the Working Group representative agrees with this process, a recommendation will be sent to the potential parties. • Settlement Meetings: At a minimum, the representatives of the named parties must attend the first settlement meeting. This meeting may be facilitated by a member of the Working Group or a mutually agreed upon neutral facilitator. At the initial settlement meeting the named parties must consider adding named parties; consider guidelines for participation; identify the issues to be addressed; explore options for a solution; and seek agreement. If the settlement meeting is not held or it produces no agreement to proceed with media- tion or advisory decision making, then the participating parties may formally withdraw from the process or proceed to a joint meeting of the governing bodies (as in Florida Statute 164); litigation; administrative hearing; or arbitration, • Mediation: If two or more named parties submit a request for mediation to the Working Group, then a representative of the Working Group will assist them in selecting and retaining a mediator. Alternatively, the named parties may request that the Working Group coordinator make the selection or request similar assis- tance from the South Florida Regional Planning Council. A mediator who understands hazard mitigation issues and is acceptable to the named parties shall mediate all disputes. Mediators shall be guided by the Standards of Pro- fessional Conduct, Florida Rules for Certified and Court Appointed Mediators, Rules 10,020-10.150 F.A.C. • Advisory Decision Making: If two or more named parties submit a request for advisory decision making to the Working Group, then a representative of the Working Group will assist in selecting and retaining an appropriate neutral. Al- ternatively, the named parties may request that the Working Group coordinator make the selection. A neutral party that understands hazard mitigation issues and is acceptable to the named parties shall handle all disputes, April 2015 P1 -139 147 MS 1_4. Miami»Oade .The Miami -Dade Local Mitigation Strategy Part 1: The Strategy Initial settlement meetings are scheduled and held within thirty days of receipt of the ini- tiation letter. Additional settlement meetings, mediation, or advisory decision -making must be completed within forty-five days of the date of the conclusion of the initial settle- ment meeting. Timeframes may be altered by mutual agreement of the named parties. The optional components of this process may be used in any order. In the early stages of the process, the parties should address deferring or seeking stays of judicial or administrative proceedings while using this process. The form of all agreements shall be determined by the named parties and may include: inter -local agreements; concurrent resolutions; memoranda cf understanding; contracts; plan amendments; deed restrictions; or other forms as appropriate. Agreements signed by the party's representative may be in the form of a recommendation to a formal body and subject to its formal approval. Two or more parties may reach agreements even if all of the named parties don't agree or don't sign a formal agreement. After settlement meetings, mediation, or advisory decision -making, the named parties must submit a joint report to the Working Group. The report must contain any statements that any of the named parties wants included as well as: • An identification of the issues discussed; • A list of potentially affected or involved jurisdictions, public or private organizations, groups, or individuals (even those who are not named parties); • A timeframe for starting and ending informal negotiations, additional settlement meetings, mediation, advisory decision making, joint meetings of elected bodies, administrative hearings or litigation; • Any additional assistance required; A cost allocation agreement; and • •A description of responsibilities and schedules for implementing and enforcing agreements reached. Appropriate opportunities for public input should be considered during the process. Ap- plicable public notices and public records requirements must be observed (Chapters 119 and 120, F.S.). April 2015 P1 -140 148 MS MW.111F-bade The Miami -Dade Local Mitigation Strategy Part 1: The Strategy The participants agree to make every effort to keep costs at a minimum. All costs are to be shared equally among the parties unless otherwise agreed upon or as recommended by a mediator mutually selected by the parties. To the extent possible, the confidentiality provisions of Chapter 44, F.S. will govern me- diation under this process. By participating in this process, participants agree not to offer any comments, meeting records, or written or verbal settlement offers as evidence in subsequent judicial or administrative action. For further information please contact: Cathie Perkins LMS Coordinator 9300 NW 41st Street Miami, FL 33178 (305) 468-5400 Cathie.berkins(@,miamidade.gov mdims©miamidade,gov website: http //www,miamidade,gcv/fire/mitigation.asp April 2015 P1-141 149