HomeMy WebLinkAboutR-15-0355City of Miami
Legislation
Resolution: R-15-0355
City Hall
3500 Pan American
Drive
Miami, FL 33133
www.miamigov.com
File Number: 15-00985 Final Action Date: 9/10/2015
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
AUTHORIZING THE CITY MANAGER TO EXECUTE AN OFF -SYSTEM
CONSTRUCTION AND MAINTENANCE AGREEMENT, IN SUBSTANTIALLY THE
ATTACHED FORM, WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION,
TO ACCOMMODATE THE RECONSTRUCTION OF STATE ROAD 9/
NORTHWEST/SOUTHWEST 27TH AVENUE BETWEEN SOUTHWEST 10TH
STREET AND NORTHWEST 1ST STREET, MIAMI, FLORIDA.
WHEREAS, the Florida Department of Transportation ("FDOT") is developing the preliminary
design for a roadway project along State Road 9/Northwest/Southwest 27th Avenue between
Southwest 10th Street and Northwest 1st Street in the City of Miami ("City"); and
WHEREAS, the project includes reconstruction of State Road 9/Northwest/Southwest 27th
Avenue between Southwest 10th Street and Northwest 1st Street with milling and resurfacing, minor
roadway widening, median reconstruction, replacing pavement markings, installing signage, replacing
traffic signals, optimizing the traffic signals phasing and timing, drainage modification and trimming
landscaping improvements; and
WHEREAS, the reconstruction will require the FDOT to construct certain improvements on
local side streets under the jurisdiction of the City; and
WHEREAS, the City concurs with the proposed improvements to State Road
9/Northwest/Southwest 27th Avenue between Southwest 10th Street and Northwest 1st Street and
overall upgrading and enhancement of the area; and
WHEREAS, the City agrees with the terms and conditions in the Off -System Construction and
Maintenance Agreement attached and incorporated hereto;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted
by reference and incorporated as if fully set forth in this Section.
Section 2. The City Manager is authorized {1} to execute the Off -System Construction and
Maintenance Agreement, in substantially the attached form, with FDOT to accommodate the
reconstruction by the FDOT of State Road 9/Northwest/Southwest 27th Avenue between Southwest
10th Street and Northwest 1st Street, Miami, Florida.
Section 3. This Resolution shall become effective immediately upon its adoption and signature
of the Mayor. {2}
City of Miami
Page 1 of 2 File Id: 15-00985 (Version: 1) Printed On: 3/21/2018
File Number: 15-00985 Enactment Number: R-15-0355
Footnotes:
{1} The herein authorization is further subject to compliance with all requirements that may be
imposed by the City Attorney, including but not limited to those prescribed by applicable City
Charter and Code provisions.
{2} If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10)
calendar days from the date it was passed and adopted. If the mayor vetoes this Resolution, it
shall become effective immediately upon override of the veto by the City Commission.
City of Miami Page 2 of 2 File Id: 15-00985 (Version: 1) Printed On: 3/21/2018