Miami Trolley
areas being analyzed for future expansion
A conceptual analysis prepared to illustrate the areas that could be served by the
Miami Trolley, based on requests to expand to other areas of the City.
This analysis does not illustrate final route alignments. A detailed analysis of
traffic conditions, ridership demand and trolley routing plans will be required to
further refine the initial assumptions.
15-00524-Submittal-Carlos Cruz-Casas CIP Department -Proposed Service Areas for Trolley Routes
15-00508
Introduction
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
The information presented is in response to several requests from
the Mayor's office, Commissioners, and residents of the City of
Miami to expand the successful Miami Trolley program to other
areas of the City.
The analysis was prepared to illustrate the areas that could be
served by the Miami Trolley with conceptual alignments that would
need to be further analyzed.
Operational characteristics were assumed using similar Miami
Trolley routes and existing MDT bus along the corridors.
Although some of the corridors have existing transit service, it is the
intent of the City to augment on the existing transit service and
therefore improving the opportunities for residents and visitors to
use public transportation.
Management Recommendations
Initial Ranking Criteria
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
Route
Underserved Density Provide Parking Total Ranking Proposed
Area Connectivity Constraints Year
Coconut Grove Extension 00000 00000 00000 00000 00000
2 2016
Little Havana
O 0000 00000 00000 00000 00000 6 2018
Downtown Livable Plan
O 0000 00000 00000 00000 00000 1 2017
Wynwood Art District
O 0000 00000 00000 00000 00000 3 2017
MiMoDistrict 00000 00000 00000 00000 00000
4 2018
NW 17th Avenue
O 0000 00000 00000 00000 00000 5 2018
Little Haiti 00000 00000 00000 00000 00000
7 2019
Operational Characteristics
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
Route
Main Corridor
Route
Operations
Route
Length
Expected Operating Vehicles
Headways Speed
Coconut Grove
Brickell Route Extension
Two -Way
6.2 mi
15 mins 6 mph
4
Little Havana
Calle Ocho/Flagler Street
One -Way
9.5 mi
15 mins 10 mph
4
Downtown Livable Plan
Local Circulator
Two -Way
14.4 mi
15 mins 8 mph
7
Wynwood Art District
Wynnwood/Omni Bus Terminal
Two -Way
2.7 mi
15 mins 6 mph
2
MiMo District
Biscayne Blvd. /NE 2nd Avenue
Two -Way
6.6 mi
18 mins 8 mph
3
NW 17th Avenue
Metrorail/Miami River Access
Two -Way
5.3 mi
15 mins 10 mph
2
Little Haiti
NE/NW 2nd Avenue
One -Way
5.6 mi
15 mins 8 mph
3
Peak Period Vehicles 2
Connects with
Metrorail
Connects with
Metrobus
Connects with existino SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
Miami Trolley Routes ON 05/14/2015. CITY CLERK.
e co
Connects with
Metrobus
Connectivity Details
Connects with potential
Miami Trolley Routes
The analysis focused on enhancing transit experience for residents, businesses
and visitors by increasing connectivity among the existing transit services within
the City of Miami.
L.
lux ST
ILH
�1 �TT=1I jJ7 1 �- I�r
27,1
-J-�
f=(_/_Ti �r°fir - -
I�
L . a,"an
11 1'�1111 "'""n
Tom;
Proposed Extension
--
1195
Extension
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, DI.5
ON 05/14/2015. CITY CLERK.
ILI L '.
Average Speed: 6.0 mph
Route is approx.: 6.2 miles
',,,,,Round Trip Run Time: 62 minutes
Four v?hicles running in peak periods
Expected Headway of 15 minutes
Monday to Saturday 16.5 hrs I Sunday 12 hrs
Coconut Grove — Brickell Extension
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
e, 0 ON 05/14/2015. CITY CLERK.
0
q
YIN iztx sr
3W SdTH ST e X
c 5
Proposed Alignment
• Extend Brickell Route to Coconut Grove
• Seven alternatives studied (analysis completed in October 2013)
• Augments transit service along S Bayshore Drive (currently at 60 mins headway)
• Provides connectivity to/from West Grove, Center Grove, North Grove, and Brickell areas
• Provides service to areas with limited parking
• Local Circulator with access to parks, businesses and groceries stores
MDT Routes
TO 71
nceptua1
JI 1gnment
7tFIT77-1 —
GRAND AVE
foiriCIAN, AVE
MGEarrEIL
t
,
lit Arm Si
1193
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
rst
Average Speed: 10.0 mph
Route is approx.: 13.5 miles
',,,,,Round Trip Run Time: 80 minutes
Five vehicles running in peak periods
Expected Headway of 18 minutes
�1, Monday to Saturday 15.5 hrs
Little Havana
Co Q0
iA
kY FIAGLER ST
TI A+IVE3[ A. kf
483,E
11.1117TH ST
Conceptual
Alignment
NW 171H S3
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
O6 O (XXX)
• One -Way Local Circulator to connect West Flagler, Little Havana and Brickell areas
• Provides access to Jose Marti Park, Miami River and Historic Miami River Hotel
• Provides access to the InterAmerican Campus of Miami Dade College and the Magic City Casino
• Augments on existing MDT Service
TO 71
7-7-1-HT=I FFi
FTIT
ConcepTupl
- Alignment
-.- ---f,---� I
a.�
k
5.191151941
59991,15119 RYE
L
19151
NE R019 s,
1195
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
Average Speed: 10.0 mph
Route is approx.: 9.5 miles
',,,,,Round Trip Run Time: 57 minutes
Four v?hicles running in peak periods
Expected Headway of 15 minutes
�1, Monday to Saturday 15.5 hrs
Little Havana - Short
Co Q0
pIcnl,ETEe. kf
Conceptual
Alignment
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
• One -Way Local Circulator to connect West Flagler, Little Havana and Brickell areas
• Provides access to Jose Marti Park, Miami River and Historic Miami River Hotel
• Provides access to the InterAmerican Campus of Miami Dade College and the Magic City Casino
• Augments on existing MDT Service
I tik
p
TO 71
111
c j E -
J T r- _ H I4 1 �--
-1 1 tom- ,,' , f4
�T-
L-F-P, ir'-1 T1 _I-F_.4-rW'0_11117
II 1. L, ,_1 i^I4--r - ICI, hi. _..
,III
���h
ilh
_F'�t r,1, II 1 it
y_rr�-� III_
17fi rc I
III
[J-_I�L ,-h1r_ VFT � r , _ il
771
1! — iGj L
�
1 J -a
-J - r
�� •E.oR
��
Podill AVE
2711.1 Er
IV. DR
0,41
321.
NW NTH Li
Multiple Routes
Proposed
W E
1195
Proposed „T
Service Area
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, DI.5
ON 05/14/2015. CITY CLERK.
Allows for
Reduction of
Existing Routes
Average Speed: 8.0 mph
Route is approx.: 14.4 miles
`4,hkound Trip Run Time: 101 minutes
Seven vehicles running in peak periods
Expected Headway of 15 minutes
Monday to Saturday 16.5 hrs I Sunday 12 hrs
Downtown Livable Plan
e Go
V
NNW 201H ST
Multiple Roues
Proposed
rn
• [T
SW 1 STH ST
Proposed Service Area
N 15T ST VENETIAN CS
ST r
13THST
Potential adjustments could
include terminating Coral Way
Route at Brickell Station
VENETIAN
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
• City administration developed a CBD
Transportation Vision to create a Livable
Downtown (March 2014)
• Parking Management
• Grid Trolley System
• Other Compatible Services
• Preliminary alternatives analysis for the
transit component completed (April 2014)
• Provide east -west and north -south trolley
on corridors — 1500' apart (approximately
every 3 city blocks)
• Augments on existing MDT service
• Eliminate non -regional MDT bus service in
the Urban Core
• Terminate regional MDT bus service at
major bus terminals
• Gov't Center, Brickell and OMNI
• Promotes walkability in Downtown Miami
• Optimize existing Miami Trolley Operations
ei
•
LI
TO 71
111
h
n /
_ti_ ±±1 _ IVI_IL[_E_
T
_i
L
L `ir'-1 T 0_1 iTtr ,
n r
�NQ... . ,
PAII0 AVE
9611-1
27114 Er
02,41
lut Arm Si
W E
Conceptual
94
Alignment
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
Average Speed: 6.0 mph
Route is approx.: 2.7 miles
',,,,,Round Trip Run Time: 62 minutes
Two vehicles running in peak periods
Expected Headway of 15 minutes
�1, Monday to Saturday 16.5 hrs
Wynwood Art District
e;?\ Go O
MYI 9lfH si
4
sz ti ¢s <
,£
76TH ST
NW ]7TH ST
I ST
44.
g. 3; NW 18T1.1 TER
F
Ate
x.
NW 14TH 5T
NW 29TH avt
rn
Nw 281.11 Sr
Nw' 7TH SS
7
rn
rn
NW 29TH ST
NE TH.Tir
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
E3 TH ST I'3OSRAAIp 119ti
Conceptual
Alignment
S VENCRAN WAY VENETIAN CSWY
MDT Routes
• Local Circulator to connect Wynwood Art District to Downtown Miami
• Service provide to OMNI Bus Terminal (transfers to Biscayne Blvd. Express, Miami Beach and others)
• Augments transit service along NW 2 Avenue (currently at 20 mins/30 mins headway)
TO 71
111
L
Esh'
—
_LI , unli▪ y_ IL ,_L
leCif Ho
-H
PAII0 AVE
9611-1
27114 Er
L rn
y�ali
4
28,
NE PM 31
mvIP
Conceptual J
Alignment
Est
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
Average Speed: 8.0 mph
Route is approx.: 6.6 miles
°-,,Round Trip Run Time: 50 minutes
Three vehicles running in peak periods
Expected Headway of 18 minutes
�1, Monday to Saturday 15.5 hrs
MiMo District
to(
N'N 71 ST S T
2
SkYi7:;e,. n
z
p{ya oak') ST v
✓
KO 615T ST
� µY7 ;4T8 5T
NAY EZT4C1 ST
-o
KW 64T11 ST HR' Q9TH ST
KW AdTH ST
NW 24TH ST
MDT Routes
O3 OCHOC,
3 RYIYdt,4 ti
HE emH sr
Conceptual
Alignment
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
• Local Circulator connecting MiMo
District, Morningside, Buena Vista,
Design District and Midtown areas
• One -Way circulation between N 36
Street and N 54 Street
• Potential to combine route with the
Little Haiti Circulator under study
• Augments on existing MDT Service
along NE 2 Avenue
flA
LI
1_'
TO 71
111
I; —Far`-gy m
h
--
77-117-b777--1
T!L YT..._..
_i
1_, I ,- �;j r77� 7 r i
II
L f Ir'-1 T� r I IT,
Irr
n _Tr
= I 1 L—I - T
GRAND AVE
foiriCIANA. AYE
So-
1195
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
Average Speed: 10.0 mph
Route is approx.: 5.3 miles
°-,,Round Trip Run Time: 30 minutes
Two vehicles running in peak periods
Expected Headway of 15 minutes
�1, Monday to Saturday 13.5 hrs
NW l7th Avenue
cio
t irei1#i,•1,01▪ 104WitlllLi -
1.
NMJ 94TH S
}
4
Conceptual
Alignment
MYf 1:?TW'Ep
NW 1ATH ST
NW 29TH AVE
NW7THSS
MDT Route
17
2
D
{
T
1r Bill 111111 1 r 11ll
r'n 44TH 5i
NW 29TH ST
NW6THsT
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
• Enhances access to Metrorail System
• Augments transit service along NW 17
Avenue (currently at 15mins/30 mins)
• Provides service to areas with limited
parking
I-IIfII1
TLI
r I
Ili
l IlL11
�I I
I�-
TO 71
1EHT
i- -ft:, ,,i,J iLy,_,L [-L
L I I
,I
-F rn
k
RAND PP,
7151,1
11,
Conceptual
Alignment
Est
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
Average Speed: 8.0 mph
Route is approx.: 5.6 miles
\Round Trip Run Time: 42 minutes
Three vehicles running in peak periods
Expected Headway of 15 minutes
�1, Monday to Saturday 13.5 hrs
r$ s1TH ST
ittle Haiti Circulator
to Go
1YW T15T ST
a
i
NV, 8394 ST
,17
en
en
fa}Y 12Nl7 51
N'NB1STST ti
MY? 79TH ST
1
A
t.
FAY 46TH ST
TVIDT Routes
w
MY 79TH ST
r
any 1 d'1h N
HC 87TH 3T
NE 74TH 5T
F
m �
1-✓it11V _ tVWI
MI6 rrIP f't
t8TaTSTST L i-
Vorn s'
KE NEDY CSN
. THST 119SRAMP 1195
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
• Local Circulator connecting Little
Haiti, Buena Vista, Design District
and Midtown areas
• One -Way circulation between N 36
Street and N 54 Street
• Potential to combine route with the
MiMo District Circulator under
study
• Augments on existing MDT Service
along NE 2 Avenue
T!�
IH I1
TO 71
L
h
r r 1�rI=ii jJ 7sir
_ -{ LLB_-
9t4E99 MEP. ore
912199,
NW NTH LI
NE PM 31
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
Downtown Livable
Transportation Plan-
- - : (multiple routes)
Route is approx.: 51.6 miles
27 vehicles running in peak periods
Total Vehicles Running in Peak Period: 54 trolleys
Expected Headway of 15 to 20 minutes
Average Speed: from 6.0 to 10.0 mph
Qo
O&M Costs 1 FY 2016
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
Route
Route Length Expected
Headway
Assumed Peak Period Hours
Speed Vehicles
At Current
Contract Rate
Allapattah
8 mi 15 mins
8 mph
4
15,600
$470,028
Biscayne
9.7 mi 20 mins
6 mph
6
30,638
$923,135
Brickell
7.5 mi 15 mins
8 mph
4 20,426
$615,423
Coral Way
16.3 mi 20 mins
8 mph
6
24,570
$740,294
Health District
2.84 mi 15 mins
8 mph
2
9,360
$282,017
Overtown
3.6 mi 20 mins
10 mph
1
3,250
$97,923
Stadium
4.92 mi 20 mins
8 mph
2
11,050
$332,937
Peak Trolleys*
2
**
**
Fuel
Current Total 52.9 mi
27
114,894
$630,000
$4,091,756
Probable C
osts for Analysis Routes
Coconut Grove Extension
6.2 mi 15
mins 6 mph
4 23,524
$615,435
Little Havana
9.5 mi 15
mins 10 mph
4
8,424 $582,835 ***
Downtown Livable Plan
14.4 mi 15
mins 8 mph
7
35,536 $1,221,530
Wynwood Art District
2.7 mi 15
mins 6 mph
2
11,512
$295,153
MiMo District
6.6 mi 18
mins 8 mph
3
8,424
$437,126
NW 17th Avenue
5.3 mi 15
mins 10 mph
2
11,512
$253,815
Little Haiti
5.6 mi 15
mins 8 mph
3
8,424
$380,723
Additional Peak Trolleys*
2
**
**
Analysis Total 50.3 mi 27 107,356 $3,786,618
Expected Additional Fuel - $730,000
Total 103.2 mi 54 222,250 $8,608,374
Notes:
* Additional vehicles during peak hours to maintain headways
** Hours and Costs included in the Costs per Route
***Cost for the longer version of Little Havana would be approx. $728,500 plus $20,000 in additional fuel costs (one additional trolley needed)
Miami -Dade Transit
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
Orl 05/14/2Q15. CITY CLERK.
Metrobus Operational Characteristics
Route
Main Corridor Scheduled Speed
AM
Scheduled Peak Period Headways
Mid PM
2 NW 2nd Avenue 10.5 mph 20 mins 20 mins 20 mins
3 Biscayne Blvd. 8.9 mph 20 mins 20 mins 20 mins
6 Flagler Street 10.6 mph 60 mins 60 mins 60 mins
7 NW 7th Street 10.7 mph 15 mins 20 mins 15 mins
8 SW 8th Street 10.1 mph 10 mins 15 mins 10 mins
9 NE 2nd Avenue 9.5 mph 12 mins 30 mins 12 mins
10 NE 2nd Avenue 9.1 mph 30 mins 30 mins 30 mins
11 Flagler Street 8.0 mph 8 mins 12 mins 8 mins
16 Biscayne Blvd. 9.8 mph 20 mins 30 mins 20 mins
17 NW 17th Street 12.2 mph 15 mins 30 mins 15 mins
27 W 27th Avenue 11.6 mph 15 mins 15 mins 15 mins
37 SW 37th Avenue 10.0 mph 30 mins 30 mins 30 mins
48 S Bayshore Drive 10.6 mph 60 mins 60 mins 60 mins
51 Flagler Street 11.6 mph 15 mins 30 mins 15 mins
54 N 54th Street 9.8 mph 30 mins 30 mins 30 mins
62 N 62md Street 7.8 mph 12 mins 20 mins 12 mins
93 Biscayne Blvd. 12.0 mph 13 mins 30 mins 15 mins
202 NE 2nd Avenue 9.9 mph 60 mins 45 mins 60 mins
207 SW 7th Street/SW 1st Street 7.1 mph 15 mins 20 mins 15 mins
208 SW 8th Street/ Flagler Street 7.3 mph 15 mins 20 mins 15 mins
238 NW 7th Street 12.1 mph 40 mins 60 mins 45 mins
249 Coconut Grove Circulator 8.0 mph 20 mins 20 mins 20 mins
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
Analysis of All Half -Cent Revenues & Balances - Assuming all new routes are initiated per the Recommended Management Implementation Schedule
Description
2015
2016
2017
2018
2019
2020
2021
2022
doh
Surtax Revenues (1
14.968.298 515.417.347 515.879.868 516.356.264 516.846.952 517.352.360 517.872.931 518.409.119 518.961.393 519.530.234 520.116.141
Other Revenues (2) $643,429 $1,174,991 $1,900,910 $1,692,275 $1,502,749 $945,699 $848,119 $867,979 $888,831 $910,726 $933,716
Transit Carry Over $15,969,134 $14,485,944 $8,534,719 $833,258 ($5,617,109) ($7,212,401) ($9,421,499) ($9,242,016) ($11,219,799) ($12,660,485) ($13,546,888)
Total Revenues $31,580,861 $31,078,283 $26,315,497 $18,881,797 $12,732,591 $11,085,658 $9,299,552 $10,035,082 $8,630,425 $7,780,475 $7,502,969
Administration Costs $748,415 $770,867 $793,993 $817,813 $842,348 $867,618 $893,647 $920,456 $948,070 $976,512 $1,005,807
Miami Trolley O&M $4,028,709 $5,144,365 $7,899,166 $8,620,131 $9,262,691 $9,460,396 $9,662,982 $12,340,540 $12,340,540 $12,340,540 $12,340,540
Other Transit Expenditures (3) $765,000 $771,625 $778,416 $785,376 $792,510 $799,823 $807,319 $815,002 $822,877 $830,949 $839,222
Vehicle Acquisition (4) $1,600,000 $2,200,000 $2,200,000 $800,000 $0 $0 $0 $0 $0 $0 $0
Vehicle Replacement (5) $0 $0 $0 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000
Additional Transit Staff (6) $0 $0 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000
Debt Service $4,884,293 $6,180,379 $6,177,665 $6,180,432 $6,180,444 $6,179,320 $6,177,620 $6,178,884 $6,179,424 $6,179,363 $6,180,411
CIP Projects (7) $5,068,500 $4,476,328 $4,633,000 $4,795,154 $1,700,000 $2,200,000 $0 $0 $0 $0 $0
Tri-Rail Contribution $0 $3,000,000 $2,500,000 $1,500,000 $167,000 $0 $0 $0 $0 $0 $0
Remaining $14,485,944 $8,534,719 $833,258 ($5,617,109) ($7,212,401) ($9,421,499) ($9,242,016) ($11,219,799) ($12,660,485) ($13,546,888) ($13,863,011)
Notes:
(1) Surtax Revenue Budget based on 95 % of Projections
(2) Other Revenues include FDOT Grants, FTA Formula Grants and Advertising Program
(3) Other Transit Expenditures include the On -Demand Transportation Program, Transit Studies and Miami Trolley Program Signs Replacements
(4) Vehicle Acquisition listed one year prior start of revenue service
(5) Vehicle Replacement Program assume contribution each year starting in year 2017
(6) Additional transit staff is due to the increase in workload and requirements by the Federal Government
(7) CIP Projects as listed in the Capital Improvement Plan.
Coconut Grove
Little Havana
Downtown Miami
Wynwood
MiMo District
NW 17th Avenue
Little Haiti
Starting Year
2016
2018
2017
2017
2018
2018
2019
Other Factors to Consider
SUBMITTED INTO THE PUBLIC
RECORD FOR ITEM RE.3, D1.5
ON 05/14/2015. CITY CLERK.
• Deadline for Transit Service Development Program is
June 1st, 2015
— 50 percent match for first three years of operations
• Increase in Federal Requirements and Obligations when
exceed 50 vehicles operating in peak hour
• Need to acquire new vehicles
• New routes
• Vehicle replacement
• Increase in administration staff