HomeMy WebLinkAboutExhibit A SUBhe
CkeL
ekb
MEMORANDUM OF UNDERSTANDING
AMONG
CITY OF MIAMI AND
NATIONAL MARINE MANUFACTURERS ASSOCIATION
THIS Memorandum of Understanding (hereinafter sometimes referred to as "MOU") is entered
into on the day of April, 2015, by and between CITY OF MIAMI, a municipal corporation of the
State of Florida, whose address is 444 S.W. 2nd Avenue, 10th Floor, Miami, Florida 33130 (hereinafter the
"City"), and National Marine Manufacturers Association, Inc., a non-profit association, whose address is
231 S. LaSalle Street, Suite 2050, Chicago, IL 60604 (hereinafter "NMMA"), both of whom are
collectively referred to herein as "the Parties".
WITNES SETH:
WHEREAS, NMMA wants to facilitate the adding of electric utilities to the Property where the
Boat Show will occur for the general health, welfare and safety of the general public, and to improve
convenience, ease, visibility, comfort and accessibility to the general public and patrons of the boat Show
and the Park; and
WHEREAS; these electric utilities, the nature, total cost and extent of which are shown on the
attached Exhibit A have been estimated by Florida Power & Light (FP&L) at the City's request and
NMMA has agreed to fully fund up to the FP&L Final Invoice amount which will be furnished no later
than April 30, 2015; and
WHEREAS, the City, and NMMA will bring the subject matter of this MOU to the City
Commission in April of 2015 with this MOU as an Addendum to the Revocable License Agreement
("RLA") between the parties approved by the City Commission on January 8, 2015, at which time the
MOU will automatically be converted to an Addendum/First Amendment which, on passage of the
Resolution by the City Commission will become an additional Exhibit to their Revocable License
Agreement and shall serve as an Addendum/ First Amendment to the Agreement; and
WHEREAS, this MOU will be binding upon NMMA upon execution, and the City may be
entitled to rely on NMMA's affirmation and commitment to comply with these terms from the date
NMMA signs this MOU; and
NOW THEREFORE, in consideration of the mutual terms, conditions, promises, and covenants
hereinafter set forth, the City and NMMA agree as follows:
RECITALS
I. SCOPE AND COST OF WORK
NMMA will fully fund, the FP&L invoice amount, the electrical utility work and costs reflected
in Exhibit A, Scope of Work and Cost of Work , which is attached hereto and incorporated herein by
reference as if fully set forth herein and which can be summarized as electrical feeds and distribution of
Florida Power and Light Co. ("FPL") facilities to the Property included in the RLA. The cost of the
work to be funded by NMMA for Stage 1 and Stage 2 is estimated to be $1,653,000.00 and shall be
entirely paid by NMMA in the following manner: $903,000.00 for Stage 1 Scope as described in Exhibit
is- -4p
Page 1 of 5
A by Close of Business April 6, 2015. The amount corresponding to the Stage 2 Scope as described in
Exhibit A shall be paid no later than ten (10) days after the City provides NMMA with the FP&L invoice
for the Stage 2 Scope. The City agrees to use its best efforts to work with FP&L to have FP&L complete
the work delineated in Exhibit A by December 1, 2015 and shall be responsible for all repairs necessary
to ensure that all fixed electrical lines, equipment and ports are maintained and fully operational and
available as needed by NMMA each year for the boat show as per the RLA. Any modifications or
changes to the Scope of Work shall only be valid when they have been reduced to writing, duly approved
and signed by an authorized representative of each of the Parties.
II. INDEMNIFICATION
Terms of indemnification will be as per the RLA.
III. MANNER OF USE
This section of the license agreement approved by the City on January 8, 2015 entitled 4.
MANNER OF USE is being modified herein to permit the Licensee access to the Property to set up and
erect necessary equipment up to seventy three (73) days before commencement of the February 2016
Show. The date for commencement of the Show is on or about February 11th in any year the RLA
remains in effect. This section of the agreement is also being modified to permit the Licensee access to
the Property to remove and take down equipment up to twenty eight (28) days after the final date of the
February 2016 Show. The setup and take down dates will be reduced by the City Commission as
determined feasible after the take down period of the February 2016 Show. The City will have the
artificial turf field in place no later than thirty one (31) days after the final date of the show. The final
date of the Show is on or about February 15th in any year the RLA remains in effect.
IV. TERMINATION
Terms of termination will be as per the RLA.
V. NOTICE
It is understood and agreed among the parties that written notice shall be mailed or delivered to
the addresses set forth below and shall constitute sufficient written notice. The parties designate the
following:
For City of Miami:
City Manager
City of Miami
3500 Pan American Drive
Miami, Florida 33133
With a copy to
City Attorney
City of Miami
444 SW 2nd Avenue
Suite 945
Miami, Florida 33130
Page 2 of 5
Director
Department of Real Estate and Asset
Management
City of Miami
444 SW 21" Avenue, 31" Floor
Miami, Florida 33130
For Licensee:
National Marine Manufacturers Association, Inc.
9050 Pines Boulevard
Pembroke Pines, FL. 33024
Attention: Cathy Rick -Joule
With a copy to
National Marine Manufacturers Association
231 S. LaSalle St., Suite #2050
Chicago, IL 60604
Attn: Ben Wold. Executive Vice President
Craig Boskey Senior Vice President, & CFO
Jonathan T. Howe, Esq.
Howe & Hutton, Ltd.
20 N. Wacker Dr., Suite 4200
Chicago, IL 60606
VI. AMENDMENTS
Any alterations, amendments, variations, modifications, extensions or waivers of provisions of
this MOU shall only be valid when they have been reduced to writing, duly approved and signed by all
Parties hereto.
INTENTIONALLY BLANK
Page 3 of 5
IN WITNESS HEREOF THE PARTIES HERETO HAVE CAUSED TO BE EXECUTED BELOW
THE SIGNATURES OF THE AUTHORIZED REPRESENTATIVES OF THE PARTIES
HERETO WHO ARE FULLY AND DULY AUTHORIZED TO EXECUTE THIS AGREEMENT
ON BEHALF OF THE RESPECTIVE PARTIES HERETO:
AGREEMENT NUMBER: MOU-EWP-PY'08-02
BY:
BY:
CITY OF MIAMI
Daniel J. Alfonso CITY MANAGER Date
Attest
Todd B. Hannon CITY CLERK Date
Approved as to Legal Form
Victoria Mendez CITY ATTORNEY Date
Approved as to Indemnity/ Insurance:
Anne Marie Sharpe, Risk Manager
NATIONAL MARINE MANUFACTURERS ASSOCIATION INC.
Authorized Corporate Officer Date
Signature and Name of First Witness Signature and Name of Second Witness
Page 4 of 5
Exhibit A
Anticipated Electrical Utility Work
Florida Power and Light Services
The electrical utility work to be provided to the Property located at 3501 Rickenbacker
Causeway by Florida Power and Light Company ("FPL") will be conducted in two stages.
Stage 1 is the installation of underground high voltage feeder line ("feeder") along the public
rights -of -way from the FPL sub -station at 3989 Rickenbacker Causeway to the entrance of the
Property. The feeders will terminate in a switch cabinet installed by FPL which is to be located
on City property within the vicinity of the entrance road.
Cost Estimate - Stage 1 is $903,000.
Under Stage 2, the City will construct two (2) concrete block structures ("vaults") for FPL to
utilize, and install underground electrical conduits from the switch cabinet to each vault. FPL
will install their high voltage equipment inside the vaults, run electrical conductors from the
switch cabinet to the vaults, and energize their equipment.
Cost Estimate - Stage 2 is $750,000.
Page 5 of 5
EXHIBIT A
Project:
Marine Stadium Park Development, B-40668
Reference:
Memorandum of Understanding among: City of Miami and National Marine Manufacturers Association
SCOPE OF WORK - FLORIDA POWER AND LIGHT COMPANY ("FPL")
FPL shall provide electrical service for an electrical load that is approximately 12,000 amperes at 480 volts, three-
phase. FPL will obtain all necessary permits, furnish all materials and perform the work in accordance to the FPL
Distribution Construction Standards and all other applicable codes and standards. The City will construct an
electrical building at the East and West sides of the property. Each building will contain a concrete block room
("electrical vault") for FPL to terminate their high voltage underground lines, install equipment to step the voltage
down to 480 volts and manage their system.
FPL CONSTRUCTION COST
Location
Description
Cost
Rights -of -way
Installation of materials and high voltage equipment that includes, but is
not limited to underground conduits, high voltage conductors,
handholes, breakers and switch cabinet from the FPL sub -station to the
entrance of the property (re: FPL Invoice No. 1800081042)
$903,601.00
Marine Stadium
Property
A. Install high voltage conductors in underground conduits (installed by
the City) from the property entrance to the East and West electrical
vaults
B. Install high voltage equipment inside the electrical vaults
C. Connect to the City's electrical service equipment and energize the
FPL high voltage system
$750,000.00
CITY OF MIAMI
TOTAL: $1,653,601.00
Capital Improvements and Transportation Program Page 1
i API
:•sr)
CITY OF MIAMI
C pitsd Improvements
Transportation
Prog ra a
STING; FPL. -
-STATION
EXHIBIT A
Marine Stadium Park Development
JOB NO,: 8-4066S
DATE: March 2015
DESIGN: A. 6.
CHECKED:
DRAWN: A. B.
SCALE: N.T.S.
DWG NO.:
1
OF I SHEETS
MEMORANDUM OF UNDERSTANDING
AMONG
CITY OF MIAMI AND
NATIONAL MARINE MANUFACTURERS ASSOCIATION
THIS Memorandum of Understanding (hereinafter sometimes referred to as "MOU" ") is
entered into on the day of April, 2015 , by and between CITY OF , a municipal
corporation of the State of Florida, whose address is 444 S.W. 2nd Avenue, 10th F/loor, Miami, Florida
33130 (hereinafter the "City"), and National Marine Manufacturers Associat'bn, Inc., a non-profit
association, whose address is 231 S. LaSalle Street, Suite 2050, Chicago EL 60604 (hereinafter
""NMMA'"), both of whom are collectively referred to herein as "the Patties".
/
/
WITNESSETH: /
WHEREAS, NMMA wants to facilitate the adding o electric utilities to the Property
where the Boat Show will occur for the general health, wel4re and safety of the general public,
and to improve convenience, ease, visibility, comfort and a/cessibility to the general public and
patrons of the boat Show and the Park ; and
WAFREAS; these electric utilities, the nature, total ost and extent of which are shown on
the attached Exhibit A have been estimated by Florida Pow r & Light (FP&L) at the City's request
and NMMA has agreed to fully fund up to the FP&L Final Invoice amount which will be furnished no
later than April 30, 2015 ; and
WHEREAS, the City, and NMMA will brin the subject matter of this MOU to the City
Commission in April of 2015 with this MOU as an Addendum to the Revocable License Agreement
("RLA") between the parties approved by the City ommission on January 8, 2015, at which time the
MOU will automatically be converted to an Adde dum which on passage of the Resolution by the City
Commission will become an additional Exhibit)6 their Revocable License Agreement; and
WHEREAS, this MOU will be bindi upon NMMA upon execution, and the City may be
entitled to rely on NMMA's affirmation and ommitment to comply with these terms from the date
NMMA signs this MOU; and
NOW THEREFORE, in consid / ration of the mutual terrns, conditions, promises, and covenants
hereinafter set forth, the City and NMIA agree as follows:
RECITALS
I. SCOPE AND COST OF WORK
NMMA will fully fund, the FP invoice amount, the electrical utility work and costs reflected in
Exhibit A, Scope of Work and Cost of Work , which is attached hereto and incorporated herein by
reference as if fully set forth he in and which can be sununarized as electrical feeds and distribution of
Florida Power and Light Co. (PFPL") facilities to the Property included in the RLA. The cost of the
NlVfMt
work to be funded by for Stage 1 and Stage 2 is estimated to be $1,653,000.00 and shall be
entirely paid by NMMA in t e following manner: $903,000.00 for Stage 1 Scope as described in Exhibit
A by Close of Business Ap il 6, 2015. The amount corresponding to the Stage 2 Scope as described in
Page 1 of 5
Exhibit A shall be paid no later than 10 days after the City provides NMMA with the FP&L invoice for
the Stage 2 Scope. The City agrees to use its best efforts to work with FP&L to have FP&L complete the
work delineated in Exhibit A by December 1, 2015 and shall be responsible or all repairs necessary to
ensure that all fixed electrical lines, equipment and ports are maintain- + and fully operational and
available as needed by NMMA each year for the boat show as per r RLA. Any modifications or
changes to the Scope of Work shall only be valid when they have bee • reduced to writing, duly approved
and signed by an authorized representative of each of the Parties.
II. INDEMNIFICATION
Terms of indemnification will be as per the RLA.
III. MANNER OF USE
This section of the license agreement approved by e City on January 8, 2015 entitled 4. MANNER OF
USE is being modified herein to pe,'nit the Lice see access to the Property to set up and erect necessary
equipment up to seventy three (73) days before commencement of the Show. The date for
commencement of the Show is on or about ebruary 11th in any year the RLA remains in effect. This
section of the agreement is also being mo• fied to permit the Licensee access to the Property to remove
and take down equipment up to twenty-eht (28) days after the finial date of the Show. The final date of
the Show is on or about February 15th i any year the RLA remains in effect.
IV. TERMINATION
Terms of termination will be as :er the RLA.
V. NOTICE
It is understood and agr d among the parties that written notice shall be mailed or delivered to the
addresses set forth bel•' and shall constitute sufficient written notice. The parties designate the
following:
Fo City of Miami:
ty Manager
ty of Miami
3500 Pan American Drive
Miami, Florida 33133
With a copy to
City Attorney
City of Miami
444 SW 2nd Avenue
Suite 945
Miami, Florida 33130
Director
Department of Real Estate and Asset
Management
Page 2 of 5
City of Miami
444 SW 2'" Avenue, 3'" Floor
Miami, Florida 33130
For Licensee:
National Marine Manufacturers Association,
Inc.
9050 Pines Boulevard
Pembroke Pines, FL. 33024
Attention: Cathy Rick -Joule
With a copy to
National Marine Manufacturers Associatkon
231 S. LaSalle St., Suite #2050
Chicago, IL 60604
Attn: Ben Wold. Executive Vice P sident
Craig Boskey Senior Vice Presis • nt, & CFO
Jonathan T. Howe, Esq.
Howe & Hutton, Ltd.
20 N. Wacker Dr., Suite 00
Chicago, IL 60606
VI. AMENDMENTS
Any alterations, amendments, v iations, modifications, extensions or waivers of provisions of this MOU
shall only be valid when they have been reduced to writing, duly approved and signed by all Parties
hereto.
INTENTIONALLY BLANK
Page 3 of 5
EN WITNESS HEREOF THE PARTIES HERETO HAVE CAUSED TO BE EXECUTED BELOW
THE SIGNATURES OF THE AUTHORIZED REPRESENTATIVES OF THE PARTIES
HERETO WHO ARE FULLY AND DULY AUTHORIZED TO EXECUTE THIS AGREEMENT
ON BEHALF OF THE RESPECTIVE PARTIES HERETO:
AGREEMENT NUMBER: MOU-EWP-PY'08-02
BY:
CITY OF MIAMI
Daniel J. Alfonso CITY MANAGER Date
Attest
Todd B. Hannon CITY CLERK
Approved as to Legal Form
Victoria Mendez CITY ATTORNEY
Approved as to Indemnity/ Insurance:
Anne Marie Sharpe, Risk Manager
NATIONAL MARINE MANITFAC
Date
Date
RS ASSOCIATION INC.
Authorized Corporate Officer
64-6
BY: 1 0
Date
yr"
Signa e e of nrst ss Signature and Name of Second Witness
iik-AL?fq
Page 4 of 5
Exhibit A
Anticipated Electrical Utility Work
Florida Power and Light Services
The electrical utility work to be provided to the Property located at 3501 R'. onbackar
Causeway by Florida Power and Light Company ("FPL") will be conducted in two ages.
Stage 1 is the installation of underground high voltage feeder line ("feeder" along the public
rights -of -way from the FPL sub -station at 3988 Rickenbocker Causeway to the entrance of the
Property. The feeders will terminate in a switch cabinet installed by FP 'h|uh is to be located
on City property within the vicinity of the entrance road.
Cost Estimate -Stage I is $9 43,000.
Under Stage 2. the City will construct two CD concrete bloc,, structures ("vaults") for FPL to
utilize, and install underground electrical conduits fromwitch cabinet to each vault. FPL
will |notmU their high voltage equipment inside the vaults/run electrical conductors from the
EXHIBIT A
Project:
Marine Stadium Park Development, B-40668
Reference:
Memorandum of Understanding among: City of Miami and National Marine Manufacturers Association
SCOPE OF WORK - FLORIDA POWER AND LIGHT COMPANY ("FPL")
FPL shall provide electrical service for an electrical load that is approximately 12,000 am
phase. FPL will obtain all necessary permits, furnish all materials and perform the work i
Distribution Construction Standards and all other applicable codes and standards. Th
electrical building at the East and West sides of the property. Each building will con
("electrical vault") for FPL to terminate their high voltage underground lines, install
down to 480 volts and manage their system.
FPL CONSTRUCTION COST
res at 480 volts, three -
accordance to the FPL
City will construct an
in a concrete block room
quipment to step the voltage
Location
Description
Cost
Ri hts of wa
g y
Installation of materials and high voltage eq pment that includes, but is
not limited to underground conduits, high v Itage conductors,
handholes, breakers and switch cabinet fr m the FPL sub -station to the
entrance of the property (re: FPL Invoice o. 1800081042)
$903,601.00
Marine Stadium
Property
A. Install high voltage conductors in nderground conduits (installed by
the City) from the property entrancto the East and West electrical
vaults /
B. Install high voltage equipment )(side the electrical vaults
C. Connect to the City's electrical service equipment and energize the
FPL high voltage system t'
i
1
$750,000.00
CITY OF MIAMI
TOTAL: $1,653,601.00
Capital Improvements and Transportation Program Page 1
NEB FPL
Uf E G ,OUN
15
EXISTING FPL. .
5UE3-t5TATION
NEf f PL IT' {
N.frf E.T ELEC
EXHIBIT A
Marine Stadium Park Development
JOB NO.: B-40665
DATE: March 2015
DESIGN: A. B.
CHECKED:
DRAWN: A. B.
SCALE: N.T.S.
DWG NO.:
OF I SHEETS