Loading...
HomeMy WebLinkAboutR-15-0144City of Miami Legislation Resolution: R-15-0144 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 15-00231 Final Action Date: 3/26/2015 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING THE CITY MANAGER TO EXECUTE A GRANT OF EASEMENT, IN SUBSTANTIALLY THE ATTACHED FORM, TO FLORIDA POWER AND LIGHT COMPANY, A FOR -PROFIT FLORIDA CORPORATION, FOR A PERPETUAL, NON-EXCLUSIVE EASEMENT OF APPROXIMATELY FOUR THOUSAND FOUR HUNDRED NINETY SEVEN (4,497) SQUARE FEET OF CITY OF MIAMI-OWNED PROPERTY LOCATED AT 3801 RICKENBACKER CAUSEWAY, MIAMI, FLORIDA (VIRGINIA KEY), AS MORE PARTICULARLY DESCRIBED IN EXHIBIT "A," ATTACHED AND INCORPORATED, FOR THE CONSTRUCTION, OPERATION, AND MAINTENANCE OF UNDERGROUND ELECTRIC UTILITY FACILITIES, WITH THE RIGHT TO RECONSTRUCT, IMPROVE, ADD TO, ENLARGE, REMOVE, AND CHANGE THE VOLTAGE AND SIZE OF ANY OR ALL OF THE FACILITIES WITHIN SAID EASEMENT. WHEREAS, Florida Power & Light Company has requested a grant of easement of approximately four thousand four hundred ninety seven (4,497) square feet of City of Miami ("City") owned property, located at 3801 Rickenbacker Causeway, Miami, Florida (Virginia Key); and WHEREAS, this easement will be used to construct, operate, and maintain underground electric utility facilities (including cables, conduits, appurtenant equipment, and appurtenant above ground equipment) to be installed from time to time, with the right to reconstruct, improve, add to, enlarge, remove, and change the voltage and size of any or all of such facilities within said easement, with full right of ingress thereto and egress therefrom; and WHEREAS, the easement is necessary in order to bring electrical service to the building on City -owned property; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as fully set forth in this Section. Section 2. The City Manager is hereby authorized {1} to execute a Grant of Easement, in substantially the attached form, to Florida Power & Light Company, a for -profit Florida Corporation, of a perpetual non-exclusive easement of approximately four thousand four hundred ninety seven (4,497) square feet of City -owned property located at 3801 Rickenbacker Causeway, Miami, Florida (Virginia Key), as more particularly described in Exhibit "A," attached and incorporated, for the construction, operation, and maintenance of underground electric utility facilities, with the right to reconstruct, improve, add to, enlarge, remove, and change the voltage and size of any or all of the facilities within said easement. Section 3. This Resolution shall become effective immediately upon its adoption and signature of the Mayor. {2} City of Miami Page 1 of 2 File Id: 15-00231 (Version: 1) Printed On: 2/16/2018 File Number: 15-00231 Enactment Number: R-15-0144 Footnotes: {1} The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. {2} If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10) calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. City of Miami Page 2 of 2 File Id: 15-00231 (Version: 1) Printed On: 2/16/2018