Loading...
HomeMy WebLinkAboutExhibit A01,47fig Deoember 11, 2013 innti EXH1BIT "Air JOHNNYMAKIINEZ, P,E. city Manger Ralph Shuster, Ino, 333 N]3 24 Street, Suite 308 Miaini, FL 33137 • NEW BISCAYNE'SHUSTER— TENTATIVE PLAT#1790 —A (FIRST RESUBNII'ITAL) LOCATED ALONG TIME NORTHWESTERLY SIDE OF L1NCOLN AVENUE AND ALONG THE NORTHEASTERLY SIDE OF BLAINE STREET Ladies and Gentlemen; The City of Miami Plat and Street Committee, at its meeting of December 5, 2013 approved the above tentative plat subject to the following revisions being made to the tentative plat, additional information being provided and/or variances being granted. Please be advised that the processing of your tentative plat cannot proceed until these conditions have been satisfied; 1. In the location sketoh, remove unnecessary lines for the zoning district. 2. Correct the name of the underlying plat in the Legal Description. 3. Show the total width of the streets and show the lots on the opposite aides of Lincoln Avenue and BlaineStreet. 4. Add to zoning information "T3.O and NC.D3 overlay as per Miami 21 Coda°° to the location map, 5, Provide elevations on 25' intervals along the centerline and property line. 6. A letter` from Corcast is required to determine .if any adjustments to their facilities or easements are required. • . 7, Verify with the Miami -Dade County that the proposed plat nani@ is acceptable. 8, All encroachments across proposed tracts and/or lot lines must be removed prior to final plat submittal. 9. An opinion, of title, in the City of M:iaml opinion of title form, must be provided at the time of final submittal. 10, Current backup documentation will be required for all who execute the final plat. A resolution for authority to execute documents and a Certificate of Good standing frown the Secretary of State are required, if applicable, 11. Tentative plat application must be made with Miami.Dade County after receiving approval from the City of Miami Plat and Street Committee, 12, Bo advised that an incomplete final plat package will not be accepted. by the City of Miami, It is the owner's responsibility to work with his surveyor and his attorney to assure that everything is in order before submitting the final plat package. 13. Be advised that if all the requirements for scheduling the final plat for City Commission action are not In order, the final plat will not be scheduled for a City Commission meeting, • 14, A letter ofconcurrenoy from the MialnlrDade County Sohool Board is required prior to the final plat approval <see contact sheet). • 15, Remove the proposed tract line on the location map. 16, Provide a legend for the Section, Township and Range in the location map. DEPARTMENT OF PUPLtC; WORKS 444 S W, end Avenue /Miami, I lot'ida 33130 / (305) 416 1200 / Pax: (305) 41 G-1278 Mailing Address; P.O, Box 530705 Miarni, rL 33233.0708 17. Include the City, County, and State in the location map description.. • 18, Add the subdivisions to the southeast of the proposed plat in the location sketch, Increase the sketoh size to include the subdivision to the southeast, 19, Correct spelling errors, 20, The abbreviation list must include "P.P." and overhead lines. In addition to the above requirements, you should be aware of the following; 1. State and local Jaws require the installation of various physieal improvements in the public rights -of -way when property is platted. These subdivision improvements include paving, drainage, landscaping, sidewalks, etc. In some cases this mild represent a substantial investment on your part. REQUIRED:. The .subr 1 sion. of an electronic copy of the tentative plat, in an AutoCAO version, • to. the• City of Miami Public Works Department, Roadway Plans Section will EXPEDITE the preparation and enhance the ACCURACY of the subdivision improvement letter required for the finial plat approval. 2, The alteration, relocation or installation of utilities such as storm and sanitary sewers, electric,. telephone, water, etc,, caused by this plat will be at the property owner's expense. Also, utility easements nay be required on the property being platted. 3. A building permit will not be issued oxr the property being platted until the final plat is r000rdod or as authorized by the City of Miami Code Section 55-10(1), Also, the Certificate of Occupancy for any building construction will be issued only after all the required subdivision improvements have been oompleted. 4,• Approval for fore flow requirements must be. obtained from the Fire-Resone Department prior to the issuance of a building permit. 5. In order to mitigate problems associated with access and construction activities tbroughont the neighborhood, the contractor/devoloper is encouraged to notify the affected neighborhood residents, in writing, of' the project starting and completion dates at the time of issuance of permits. The oontraotor/developer may coordinate the notifleation of residents with the local City of Miatnl NET Service Center. 6. Additional items must be provided to the City of ,Iviiatni Department of Public Works before the • final' plat is 'submitted. to the City Cornirrission for approval. You will be notified in• welting as to what these items are after the amount of the bond has been determined for the necessary subdivision improvements. 7, Tentative plat approval Is only valid for one (1) year and six (6) months from the date of the 'Plat and Street Committee meeting at whioh time it was approved. If you have any questions coneeming these requirements, please refer to the attached shoot for the appropriate person to contact. Sincerely, zeribe Ihekwaba, Ph.D., P.E. Director of Public Works NifU Tijd t4Itrt, Enclosure: Contact Sheet o: hello and hello Land Surveying Corporation 12230 SW 131 Avenue, Suite 201 Miami, FL 33186 Nzeribo Zhekwaba, Ph.D., RR, Director of Public Works Plat end Street Committee Members Surveys Development and Roadway Plans. Central