Loading...
HomeMy WebLinkAboutExhibit - AgreementJOINT PARTICIPATION AGREEMENT BETWEEN MIAMI-DADE COUNTY AND THE CITY OF MIAMI NE 2 AVENUE FROM NE 42 STREET TO NE 51 STREET This AGREEMENT, made and entered into this day of , 2014, by and between the CITY OF MIAMI, FLORIDA, a municipal corporation of the STATE OF FLORIDA, hereinafter referred to as the "City", and MIAMI-DADS COUNTY, a political subdivision of the STATE OF FLORIDA, hereinafter referred to as the "County". WITNESSETH WHEREAS, both parties herein wish to facilitate the construction of a road improvement project in MIAMI-DADE COUNTY, hereinafter referred to as the "Project" described as follows: Roadway reconstruction, new stormwater system, sidewalks, curb and gutters, pavement markings, signage, signalization, decorative lighting, and landscaping, along NE 2 Avenue from NE 42 Street to NE 51 Street; and WHEREAS, the County wishes to utilize the resources of the City to contract and construct the Project, subject to the terms and conditions of this Agreement, NOW, THEREFORE, in consideration of the promises and covenants contained herein, the parties agree: 09/05/2014 1 1. RESPONSIBILITIES OF CITY: 1.1. Design: The City shall complete at its sole expense, the construction plans, technical specifications, special provisions, pay items and cost estimates for the Project in accordance with standard Florida Department of Transportation, County, and/or City, as applicable, design criteria, to the satisfaction of the County's Public Works and Waste Management Director or their designee. The City's design consultant shall be made available to County at the City's expense solely to review shop drawings and perform required post -design services, limited to Project design. 1.2. Permits and Approvals: The City shall obtain all necessary permits, and utility adjustments; and coordinate the review of construction documents by utilities and permitting agencies. The City shall make all necessary adjustments as required for approval and/or permitting by those agencies. The City shall obtain all necessary permits, and utility adjustments for the Project in accordance with applicable state, federal and local laws and ordinances. The City shall not pay for any permits required by the Miami - Dade County Public Works and Waste Management Department.. 1.3. Right -of -Way: The City shall acquire at its sole expense, any right-of-way that is required to complete the construction of the Project. 1.4. Public Information and Involvement: The City will implement a Public Involvement Plan (PIP) during the design and construction of the Project to provide information to property owners, tenants, and area residents, including but not limited to: public meetings, project documentation and flyers, business 09/05/2014 2 signs, directional parking signs, and schedules for major work to be performed in the area. Appropriate investigation of the Project stakeholders shall be used to develop the goals and objectives to implement the PIP. The City shall submit a copy of the PIP to the County Public Works and Waste Management Director for review and concurrence. Projects that exceed $1,000,000 in construction costs shall comply with the process and guidelines for the preparation and implementation of PIPs as established by Implementing Order 10-13. 1.5. Publicity: By the acceptance of these funds, the City agrees that the Project elements funded by this Agreement shall recognize and adequately reference the County as a funding source. The City shall ensure that all publicity, public relations, advertisements and signs recognizes and references the County for the support of all contracted activities. This is to include, but is not limited to, all posted signs, pamphlets, wall plaques, cornerstones, dedications, notices, flyers, brochures, news releases, media packages, promotions, and stationery. The use of the official County logo is permissible for the publicity purposes stated herein. The City shall submit sample or mock up of such publicity or materials to the County for review and approval. The City shall ensure that all media representatives, when inquiring about the activities funded by this Agreement, are informed that the County is a funding source. 1.6. Accounting: The City shall at all times maintain separate accounting for the costs of the Project so those costs may be independently verified and audited by the County, at the request and cost of the County. The City agrees to 09/05/2014 3 permit the County auditors to inspect the books, records and accounts of the Project for three (3) years after completion of the Project. These records shall be made available to the County for inspection within five (5) business days upon receipt of a written request from the County. 1.7. Construction: The City shall procure the services of a licensed contractor holding an engineering contractor's license to construct the Project. The City may award the contract through any available lawful means, in accordance with Section 255.20, Florida Statutes, which, in the City's discretion, affords the most competitive price for construction of the Project and which may include, but is not limited to, bid solicitation, request for proposals, the award of a change order on existing City contract(s), or the extension of unit -prices provided in connection with prior competitive bid awards. Notwithstanding any provision to the contrary, the City shall comply with all applicable County contract compliance and oversight measures relating to the expenditure of County funds, in accordance with Section 6 of this Agreement. Prior to the advertisement to solicit a licensed contractor to construct the Project, the City will contact the County's Public Works and Waste Management Contracts and Specifications Section to ensure this compliance. The construction contract shall also contain a requirement that the contractor(s) provide a payment and performance bond at least in the amount and form required by state law naming the County and City as joint obligees or joint contracting public entities. The construction contract shall contain a contingency amount to address unforeseen conditions and owner required 09/05/2014 4 changes which shall not exceed ten percent (10%) of the base amount of the contract, unless otherwise approved in writing by designated representatives of the County and City. The commitment for the expenditures of any contingency funds shall not be made by the City without the prior written approval of the County Public Works and Waste Management Director. The County shall respond, in writing, within thirty (30) business days of receiving written requests from the City to approve the commitment of contingency funds. Subsequent to the evaluation of bids or proposals by the City and the City's determination of the most advantageous bid or proposal, the City shall provide said evaluation to the County Public Works and Waste Management Director for review and approval. Final commitment of County funds for the Project shall occur upon approval of the contract award recommendation by the County Public Works and Waste Management Director. The County agrees that the selection, retention and discharge of such contractor shall be the responsibility of the City. 1.8. Claims and Change Orders: The City shall notify the County Public Works and Waste Management Director in writing when claims or change orders arise. The City shall also invite the County to participate in negotiations of these claims and change orders. The County shall review and make a determination or approval of all change orders or supplemental agreements, permits, modifications of plans, or other requests for approvals submitted by the City. 09/05/2014 5 1.9. Construction Administration and Inspection: The City shall exercise all responsibilities of the owner under the construction contract, including construction administration and inspections. The City may delegate this function to an authorized agent or Construction Engineering Inspection consultant. The County's inspector shall have an oversight role in the routine daily inspections. In the case of a disagreement over the interpretation of the plans, the County Public Works and Waste Management Director or their designee shall have final authority subsequent to an independent final inspection by the County. The City's designated representative and the County's designated representative shall jointly perform the inspection of the Project which immediately precedes substantial completion. The City shall certify upon completion that the Project has been constructed pursuant to the design plans, specifications and approved change orders. Final payment to the City and obligation of maintenance responsibility to the parties shall be subject to the final acceptance of the Project by the County Public Works and Waste Management Director or their designee. 1.10. Coordination with Miami -Dade County Public Schools: Due to potential safety, operational and bus transportation impacts, the City shall coordinate with Miami -Dade County Public Schools staff to implement maintenance of traffic measures. 2. RESPONSIBILITIES OF COUNTY: 2.1. Funding Amount, Reimbursement of Project Costs: The County agrees to provide funds up to $4,452,661 (this amount includes ten percent (10%) 09/05/2014 6 contingency) for eligible costs, as defined herein, incurred by the City for the construction of the Project. The County shall disburse to the City funds for the Project in the manner set forth in Section 4. The County shall incur no liability for any costs in excess of said funding amount unless there has been a duly authorized increase approved by the Citizens' Independent Transportation Trust and the Board of County Commissioners. The City shall not be obligated to commence work should the bid amount exceed the funding provided by the County. If the bid amount exceeds the funding amount, the City reserves its rights to reject all bids and re -bid the Project or, at the City's sole option, to reject all bids and cancel this Agreement without penalty. or liability providing the County would then be relieved of its duties relative to funding this Project pursuant to this Agreement. 2.2. County Payments of Project Costs: The County funds provided for eligible costs as defined herein, incurred for the construction of the Project are specified below: Funding Amount Funding Source County Fiscal Year of Commitment $4,452,661 Transportation Surtax Funds 2013-2014 2.3. Project Cost Adjustments: The amount contributed by the County is based on the current estimated costs of the Project. The parties recognize that adjustments to the above -referenced cost may be required in the future and that at the option of the parties, amendments may be entered into to revise the funds available for the Project. Provided that there is no increase in the amount of County funds required as stated in Section 2.1, or of City funding 09/05/2014 7 amounts approved for the Project, amendments may be executed by the City Manager and the County Mayor or County Mayor's designee without the need for approval by the City Commission, the Citizens' Independent Transportation Trust, and the County Commission. Otherwise, further funding commitments shall be subject to the approvals of the parties' respective governing boards. 3. ELIGIBLE COSTS: The parties agree that only the below identified costs that may be incurred by the City that are directly related to the Project are eligible for reimbursement, provided adequate documentation accompanies the reimbursement request in the form of approved invoices, verified payment requests, documented journal entries, and/or check vouchers. For purposes of this Agreement, eligible costs are further defined as those pertaining to the construction of Project elements that are the standard items normally provided for by the County in County roadway construction projects, and not the enhancement of standard items, or the incorporation of items which are in addition to those standard items. The County shall not be assumed to be liable to provide reimbursement for the construction or maintenance of such items that do not conform to this section of the Agreement. If enhancements to standard items are constructed in this Project, the City may request County reimbursement only to a maximum amount corresponding to that which would be expended in providing the normal standard version of that item for a project of the same scope. The parties further agree that eligible costs will not include fees for construction management, construction inspections, and project management. 09/05/2014 8 4. SCHEDULE AND MANNER OF REIMBURSEMENTS: Upon execution of the Agreement, the City shall furnish the County with a copy of the estimated budget for the Project, and will similarly furnish the County with any and all revisions thereto. At the time of contract award for this Project, the City shall submit the Estimated Quarterly Construction Payout Schedule for the Project to the County Public Works and Waste Management Director. Quarterly disbursement of County funds to the City shall be based upon City invoices with certified copies of paid contractor invoices attached and shall not include any other charges. The quarterly submittal for invoice shall also include a certified copy of payment to Sub -Contracted firms. 5. COMPLIANCE WITH LAWS: The parties shall comply with applicable federal, state and local laws, codes, ordinances, rules and regulations in performing their respective duties, responsibilities, and obligations pursuant to this Agreement and with all applicable laws relating to the Project. The parties shall not unlawfully discriminate in the performance of their respective duties under this Agreement. 6. BUSINESS PROGRAM COMPLIANCE AND OVERSIGHT: Whenever County funds are used, the City agrees to comply with applicable County regulations including but not limited to the Community Small Business Enterprise (CSBE)• Program, Community Business Enterprise (CBE) Program, the Community Workforce Program (CWP), and the Responsible Wages and Benefits Ordinance (Ordinance No. 90-143). Specifically, the City agrees to abide by the applicable contract measure recommendation(s) established by the Department of Regulatory and Economic Resources (RER) Project Worksheet for the participation of specified business entities and/or trades, and for CWP requirements, as administered by the 09/05/2014 9 County's RER. RER shall have the right to oversee and perform compliance monitoring, including but not limited to, the right to audit and to require reports and documentation related to the Code. 7. CITIZENS' INDEPENDENT TRANSPORTATION TRUST APPROVAL: Unless waived by action of the County, this Agreement shall only become effective upon approval by the Citizens' Independent Transportation Trust and the Board of County Commissioners. In the event the Agreement is not approved, the Agreement shall be null and void and be of no force or effect. 8. PEOPLE'S TRANSPORTATION PLAN PROJECT SIGNAGE: The County shall furnish and install a Project sign in each direction of traffic indicating that this Project is being funded by the People's Transportation Plan, in coordination with the City, in proximity to the start/end of the Project limits. Should Maintenance of Traffic (MOT) signage be required as part of the work, the Project sign shall be placed an appropriate distance before the MOT signage range. The Project signs shall remain in place for the duration of the work or as directed by the Project engineer. 9. INDEMNIFICATION: To the extent authorized by Florida law, the City hereby agrees to indemnify, defend, save and hold harmless the County to the extent of all the limitations included with Section 768.28, Florida Statutes, from all claims, demands, liabilities and suits of any nature whatsoever arising out of, because of or due to the breach of this Agreement by the City, its agents or employees. It is specifically understood and agreed that this indemnification clause does not cover or indemnify the County for its sole negligence or breach of contract. 09/05/2014 10 To the extent authorized by Florida law, the County hereby agrees to indemnify, defend, save and hold harmless the City to the extent of all the limitations included in Section 768.28, Florida Statutes, from all claims, demands, liabilities and suits of any nature whatsoever arising out of, because of or due to the breach of this Agreement by the County, its agents or employees. It is specifically understood and agreed that this indemnification clause does not cover or indemnify the City for its sole negligence or breach of contract. In the event of breach or non-performance by the persons selected by the City to perform the work, the City shall, upon written request by the County, assign to the County any and all of its rights under the affected contract for purposes of the County's prosecution of claims, actions or causes of action resulting from such breach or non-performance unless the City, at its option, pursues such claims, actions or causes of action through arbitration, administrative proceeding or lawsuit. The. City agrees to cooperate fully with the County in the prosecution of any such claim or action. Any damage recovered by the County which is attributable to an expenditure by the City shall be returned to the City by the County, within sixty (60) business days of receipt. 10. DISPUTE RESOLUTION, APPLICABLE LAW: The parties shall resolve any disputes, controversies or claims between them arising out of this Agreement in accordance with the "Florida Governmental Conflict Resolution Act", Chapter 164, Florida Statutes, as amended. This Agreement shall be governed by the laws of the State of Florida. Venue in any proceedings shall be in Miami -Dade County, Florida. Each party will bear its own attorney's fees. 09/05/2014 11 11.ENTIRE AGREEMENT, AMENDMENTS: This document incorporates and includes all prior negotiations, correspondence, conversations, agreements and understandings applicable to the matters contained herein and the parties agree that there are no commitments, agreements, or understandings concerning the subject matter of this agreement that are not contained in this document. Accordingly, the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements, whether oral or written. It is further agreed that no modification, amendment or alteration in the terms contained herein shall be effective unless set forth in writing in accordance with this section. No modification, amendment or alteration in the terms or conditions contained herein shall be effective unless contained in a written document prepared with the same or similar formality as this Agreement and executed by the parties. 12.JOINT PREPARATION: The parties acknowledge that they have sought and received whatever competent advice and counsel as was necessary for them to form a full and complete understanding of all rights and obligations herein and that the preparation of this Agreement has been their joint effort. The language agreed to expresses their mutual intent and the resulting document shall not, solely as a matter of judicial construction, be construed more severely against one of the parties from the other. 13.SEVERANCE: In the event a portion of this Agreement is found to be invalid by a court of competent jurisdiction, the remaining provisions shall continue to be effective unless the City or County elect to terminate this Agreement. An election to 09/05/2014 12 terminate this Agreement based upon this provision shall be made within seven (7) business days after the finding by the court becomes final. 09/05/2014 13 14. NOTICES: Any and all notices required to be given under this agreement shall be sent by first class mail, addressed as follows: To the County: Attention: Public Works and Waste Management Department c/o Director Miami -Dade County 111 NW First Street, Suite 1640 Miami, Florida 33128 (305) 375-2960 To the City: Attention: Alice Bravo, P.E. Deputy City Manager/Chief of Infrastructure City of Miami 444 SW Second Avenue Miami, Florida 33130 (305) 416-1025 Attention: Mark Spanioli, P.E. Director, Capital Improvements and Transportation Program City of Miami 444 SW Second Avenue, 8th Floor Miami, Florida 33130 (305) 416-1224 09/05/2014 14 IN WITNESS WHEREOF, the parties hereto set their hands and official seals the day and year first above written, ATTEST: MIAMI-DADE COUNTY, FLORIDA, BY ITS BOARD OF HARVEY RUVIN COUNTY COMMISSIONERS CLERK OF THE BOARD BY: BY: Deputy Clerk County Mayor or County Mayor's Designee Approved by County Attorney as to form and legal sufficiency County Attorney ATTEST: CITY OF MIAMI, a municipal corporation of the State of Florida BY: BY: Todd B. Hannon Daniel J. Alfonso City Clerk City Manager (Affix City Seal) Approved by City Attorney Approved as to Insurance Requirements: as to legal form and correctness: Victoria Mendez Ann -Marie Sharpe, Director City Attorney Risk Management Department 09/05/2014 15 MIAMI-DADE COUNTY PUBLIC WORKS DEPARTMENT HIGHWAY DIVISION ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS Project Description PWD PROJECT No, 20040388 DATE: 9/15/2014 ITEM COST TOTAL ESTIMATE JOB (%) GENERAL CONSTRUCTION OPERATIONS 404,875 0,09092883 CONTROL OF EROSION & WATER POLLUTION 28,418 1% CLEARING & GRUBBING 361,682 8%, EARTHWORK 410,336 9% REMOVAL OF SOLID WASTE MATERIAL 0 0% BITUMINOUS SURFACE COURSES AND CONCRETE PAVEMENT 544,606 12% DRAINAGE STRUCTURES & PIPES 814,058 18% CONCRETE 346,303 8% GUARDRAIL & FENCE - 0% SODDING & TREE RELOCATION 172,074 4% IRRIGATION - 0% SIGNALIZATION - 0% PAVEMENT MARKING & SIGNAGE 90,228 2% LIGHTING 680,214 15% BRIDGE - 0 BASE ESTIMATED COST 3,855,501 CONTINGENCY FUND (10%) 385,550 0.08658869 SUBTOTAL 4,241,051 MAINTENANCE OF TRAFFIC (MOT)(2%) 77,110 2% OFF DUTY LAW ENFORCEMENT OFFICER 108,000 2% BITUMINOUS MATERIAL ADJUSTMENT 15,000 0% PWD PERMIT ALLOWANCES 10,000 0,00224585 FPL CONNECTION ALLOWANCE 1,500 0.00033688 GRAND TOTAL $ 4,452,661 100% ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS i •.. .. 9116/2014 N6 2 Ave. front NE 42 Street to NE61 Street Segment 8.3 I , ' - - "--"' ITEM NO. ITEM UNIT oUANT. " 0VEIMIC CURRENT • . AVERAGE 1 SET PRICE ! AMOUNT GENERAL CONSTRUCTION OPERATIONS • ) 1 WSIA-1 ASPHALT SURFACE PAVEMENT REPAIR • Saw col, and remove asphalt from marked area and Trench 4.001 4.001 0,00 OW-S REPLACEMENT (DEBASE AND COLO PATCH SF t 6.50 nit 0,00 102.3 COMMERCIAL MATERIAL FOR DRIVEWAY MAINTENANCE CF. I 29,700 Mr'0- `,»'JO,E1 148,500A0 102.3.1 CSXT FLAGGER (THIS ITEM IS CONTINGENT UPON FIELD CONDITIONS AND MAY BE INCREASED LS ! OR DECREASED BY THE ENGINEER) a - 70 0,00 102-60 WORK ZONE SIGNS ED 30.056 c.�-�'i;��i : � 0.28 7,814.56 102.61 BUSINESS SIGNS (TEMPORARY. POST MOUNTED) EA ' 73 56.50 68.50E 4,124.56 102.71.12 TEMPORARY BARRIER WALL (MI) (WATER FILLED) LF 30.00 30.00 0.00 102-71-14 or 102.71.11A or 102-71-11 BARRIER WALL (F&I) LF ` 1,203 2046 20.46 26,255.79 102-71.24 or 102.71.22 or 102-71.21 BARRIER WALL (RELOCATION) LF 4 7,917 8.60 8.60 08,823.10 102-72 or102.72A or102.72PH2 •„_..,.. .,_ CONCRETE BARRIER -C,L.ASS„E[ MEORAAY,_IMCLUOINGRELOCATION),,,._,•.,„._„._,„_,_ LF,... 28,56 28.58 0.00 102.74.1 OR 102.74.1A BARRICADES ( TEMPORARY TYPEj,.I[ Vp &, DRUM )_ EA/DAY) 203.r661 0.27 _ 0.27 55,831.61 102.74.2 ._ _ _ _.� - - BARRICADES( TEMPORARY, TYPE III, 61_ EA/DAY J. 16,553 0.49 0.49 8,150.93 102.60A or 102.75 or 102.75A or 102-75•P642 CONSTRUCTION SIGNS (TEMPORARY, POST MOUNTED) EA/DAY 0.39 0.39 0.00 102.76 or 102.78A FLASHING ARROW BOARD (TEMPORARY MULTIMODE) - / ADVANCE WARNING ARROW PANEL EA/DAY I 871 9.15. 9.15 7,973.00 102-77 HIGH INTENSITY FLASHING LIGHTS (TEMPORARY TYPE "B") EA/DAY : 17 424 0.49 0,49 8,506.00 102-78 REFLECTIVE PAVEMENT MARKER (TEMPORARY) EA I 2,101 4.00, 4.00 0,404.0D 102-79 LIGHT BARRIER WALL MOUNT (TEMPORARY) EA 9,148 1.60 1.80 16,468.40 102411 VEHICULAR IMPACT ATTENUATOR (INCLUDING RELOCATION & RESET) (TO BE USED WHEN REQUIRED. FOR_MAINTENANCE OF TRAFFIC AND APPROVED BY THE ENGINEER) EA j 1,149 35 1149.35 0.00 102-89 or 102-69.17 BARRICADES (TEMPORARY TYPE III, CLASS H, 12') TEMPORARY IMPACT ATTENUATOR .., EA/OAY)`,'�_�c EA 33 i-p 0.00 1,332.26,• 1332.25 43.984.53 EROSION CONTROL I 104„10-3__._..._,-_,...,, ,._ SEDIMENT BARRIER ..... ..... ... . LF f 6633 1.16 1.10 7,707.55 . 104-11 or 104-11A or 104 FLOATING SILT BARRIER (INCLUDES MAINTENANCE,RELOCATION AND REMOVAL) (THIS ITEM 11B or 104-12-1 IS CONTINGENT UPON FIELD CONDITIONS AND MAYBE INCREASED, DECREASED OR ELIMINATED BY THE ENGINEER) LF i BOO 16.95 15.95. 104.13 CLEANOUT EXISTING DRAINAGE SYSTEM LS ;x-:--:, .-OGS3p: 0,00 104.15 or 104.13.1 STAKED SILT FENCE LF 1 1.51 1,51 0.00 104.16 or 104.16A ROCK BAGS FOR CONTROLLING SILTATION @ CURB & GUTTER INLETS. BAGS ARE TO BE 12' X 122'X A" i FAA i 2,026 . 7.07 7.07 20,710.72 104.18 INLET PROTECTION SYSTEM 1227 65.27 FIELD OFFICE 109.71-6 i FIELD OFFICE (BRIDGE WORK IN EXCESS OF 5 MILLION DOLLARS) DAY 0.00 CLEARING AND GRUBBING 110-1 OR 1101- CLEARING AND GRUBBING (INCLUDES REMOVAL OF EXISTING SIDEWALK, FLEXIBLE 1-1 or 110.1-1B PAVEMENT, CURB AND GUTTER, DRAINAGE STRUCTURES, VEGETATION, TREES AND ANY DEBRIS TO BE DISPOSED OF IN LEGAL AREAS PROVIDED BY THE CONTRACTOR (ASSUME 10% OF BASE ESTIMATE) I LS 1 1 350,600.12 I 350,500.12 110-2 CLEAN EXISTING STRUCTURES 08 I 217,601:1 217.501 0,00 110-2-00 OR 110.2.1.0 CLEAN EXISTING PIPES INCLUDES REMOVAL AND DISPOSAL OF TRASH LF ' 12.25; 12.25( 0.00 110.3 REMOVE EXISTING STRUCTURE LS I 24,000.00 0.00 110-4 REMOVAL OF EXISTING PAVEMENT SY . 4,859 _ -. '11181.60 2.40! 2.401 110.4-1.1 OR 110-4.4 REMOVE AND DISPOSE OF EXISTING CURB AND GUTTER 1 LF 10,87 10.67i 0,00 EARTHWORK 120.1 OR 120-1.2 REGULAR EXCAVATION CY 9,093 7.451 6.60; ai,600.31 �"%�.� 'I' -�.,T.''' - 0.00 120.2-2 BORROW EXCAVATION .[(CONTRACTOR SUPPLIED, TRUCK MEASUREMENT) (THIS ITEM IS CONTINGENT UPON FIELD CONDITIONS AND MAY BE INCREASED, DECREASED, OR ELIMINATED 8Y THE ENGINEER)]t3P 120-4 SUBSOIL EXCAVATION ( THIS ITEM IS CONTINGENT UPON THE ACTUAL FIELD CONDITIONS AND MAY BE INCREASED. DECREASED OR ELIMINATED BY THE ENGINEER) CY CY 15,14 7.85 0.00 120-5 CHANNEL EXCAVATION CY 18.50 18.50 0,00 120-5 OR 120-6.1 !-EMBANKMENT (INCLUDES BORROW) (THIS ITEM IS CONTINGENT UPON EXISTING FIELD CONDITIONS AND MAY BE INCREASED, DECREASED OR ELIMINATED BY THE ENGINEER ) CY 553 24,210 1,123 14,18 3.34 _ . , 4.67 13,11 14.63 3 34 4..67. 13.11 8,008 81 _ BD 9i6.74 5 244_41 __ 0.00 . 160.4 TYPE"8" STABILIZATION (12' THICK) (MIN C.B R. 30) _ SY- 162.1.11 I PREPARE SOIL LAYER (FINISHED. SOIL IAYER)(6") SY .._ ........ - 200.1-1 or 230•1 rLIMEROCK BASE.(6" THICK,. SINGLE ("OURSE)(DRLYE 111Y TORATION). SY .. „ 22,055 11.53 11.53 254,286.98 ., . 200.1.2 OR 200.1-10 LIMEROCIC BADE ((6" THICK) (DOUBLE COURSE) (PRIMED)) I LIMEROCK BASE (8" THICK, PRIMED) _ 5Y .......... ........ 200-1.2A , LIMEROCK BASE (16" DOUBLE COURSE PRIMED) 17.00 17.00 0.00 REMOVAL OF SOLID WASTE MATERIAL 126-4-2 SOLID WASTE REMOVAL AND DISPOSAL SY 0.00 455-133-2 SHEET PILING STEEL (TEMP) 8Y 0.00 BITUMINOUS SURFACE COURSES AND CONCRETE PAVEMENT 300.1-3. •. ,_._ 327-70.51 334-2-11 334-2-13-1 334-2-13.2 337.2 or 337-2.1 or 337-71-1 or 337.3 or 337-5.3 or 337-7.3 Of 331,.1.3 ....... ___ ._ 837-7.21A or 337.6-32 BITUMINOUS MATERIAL (_TACK COAT) GAL z 0: 0,00 MILLING, 1" AVERAGE DEPTH ) SY 693 3,43 3.12 1159,47 HOT MIX ASPHALT SP-9.5 TRAFFIC/L. (1" THICK) j TON 110,00 110.00 0.00 HOT MIX ASPHALT Sf'-8.5 TRAFFIC A (1"THICK) TON 100.00 100.00 0.00 LiOT MIX ASPHALT SP•12,5 TRAFFIC C TON 3,639 100.94 109.94 400,053.47 ASPHALTIC CONCRETE FRICTION COURSE (FC•3) (1' THICK • 11018SY AVG.) TON _ 1 213 _ _ 112,39 117,31 112.39 117.31 0.00 742,292.99 _ _ _ APSIIALTICCONCRETE FRICTION COURSE (FC•9.5)SRU8BE�1" THICKNESS)___..__-. �� - _ _ TON - 370-1 BRIDGE APPROACH EXPANSION JOINT FOR CONC. PAVEMENT LF 202.50 202.50 0.00 DRAINAGE STRUCTURES AND PIPES 400.1-75 CLASS !CONCRETE ((MISCELIANEOUS) (TRENCH BUILD-UP, COLLARS, PIPE PLUGS,5TRUCTURE PLUGS ETC.) (THIS ITEM I5 CONTINGENT UPON FIELD CONDITIONS AND MAY BE INCREASED DECREASED OR ELIMINATED R,Y_TNE ENGII1EER)I.... . . . ... . ....__„_, ,. CLASS (CONCRETE, (WELCOME WALL) .__ INLETS ( CURD) TYPE P-4 ...............__ .._ _........_...... __............._.. INLETS ( OURS) TYPE P-4 (>10) _. _ . ,.. CY .,., _ _ ., CY ..... EA , EA ,., . _ ,100 270.55 231.00 25,251,40 •- 400.1.15AB vnxsz=x,._''.i,; 0.00 3 358 26 3358.28 0.00 425.1.341 or 425.1.341A 1 15 2 7 7 . 3,581.05 3,690.58 3,929.01 - 5,241,02 3,936.13 4,777.33 3,835.07 3581.5 3600_66 3928,01 524.02 3930,13 4777.93 3935.07 3 581.95 55.360.15 7,858.03 0.00 . ,27,552.0 „,_0,00 27,815,46 425.1.343 425.1.351 ,.. .. INLET CURB ( TYPE P-5 )< 10' EA 425.1.353 or 425-1.362 INLET .(CURS)TYPE P-6)(>101 _ _ INLET (CURB)(TYPE P-5)f>10') (W/BAFFLE) INLET, CURB (TYPE P-6 I. 10' EA EA EA 425.1-353A _ 425.1.381 425-1-361A INLET(CURB)TYPE P-8(WITH BAFFLE) INLET (CURBNTYPB 5.61(1P) INLET (CURBj(TYPE J-4)(>10') - EA EA EA _,,,•„ 425.1.383 or 425.1.362A 425.7•441 or A�o 5.1.441A or 425.1-451 or 425.1.-4 -025.1.451 or 425.)-451A or 425-1.1816 �.yam. ,; r`e•rc"'-; ��--.�, y:; _e.-z =?' n0 > K-r- p0{)Q 0,00 INLETS ((CURB) (TYPE J•5) EA 3 1 8,446.23 ,. 6,780.29 5,581.00 Zy,,,_ 7,102,35 6A46.23� (i700,20. 5501.00 - = ,,,0 , a 7102.35. 16,338.70 0,00 0,00 0,00 7,102.35 425.1.462 _._..... ________ __._..._ .. 141E_7S ((CURB) (TYPE J•6) (>10) EA 426.453A 425 1 455 INLETS ((CURB) (TYPE J•5) (>10), w/ baffle „,,..,,.•, .-,..,,_. INLETS ( CURB ITYPE J•5 ( PARTIAL ) EA EA 4231.451 - _ _ _ INLET CURB (TYPE J•6) EA Pogo 1 of 3 8/18I2014 ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS 911512074 ! NE.2 Ave. from NE 42 Street to NE 51 Street Segment 8.3 I r'"'-...._........ ... f �. ... ITEM NO. 1 ITEM ( UNIT OVANT, OVERALL CURRENT ! . AVERAGE SET PRICE ' A410UNT 425-1.4618 11NLET CURB (TYPE J-6) >10' (W/BAFFLE!_ EA 7,749.23 774923'! 0,00 425.1.481C!INLET CURB fTYPE J-U) (W/ AFFLE) FA ,., 13,194.90, 8194.90! 0.00 426.1-462 ;INLET CURB (TYPE J-6) >10' k EA 1 6,961.005961,061 5,901.00 425.1.721 or_425-1.903A I INLC•T,_i'YPE p-11 <10'. I EA 3 3,838.33 3633.33' 10 900,00 _ 425_7-720 � �,,...1INLET CURB (TYPE_ J-11) (>10') i 06 5,500,00 6500.001 425.1-903B or 425-1-722 `INLET, TYPE P-11 >10' 1 EA 1 4550.00, 4A65p:00 425.1-907A, POLLUTION RETARDANT BAFFLE (ANY TYPE),fANY DIMENSION)_,- 1 25 .._,4,550.00 363.76; 393.70, 9,843.76 .... ............_,,,____1 425.2-71A TYPES J-7TS10' i EA 2 4.017.82 401702. 8,035.65 .„MANHOLES 425.2-71B (MANHOLES TYPEJ-7>10' j EA 4,219.50' 4219.50: 0.00 425.2.71C 'MANHOLES TYPE J-7a10' EA 3,2.06,23 3200.23; 0.00 __ 425-2-72 (MANHOLE TYPE J-77-, (ANY DIMENSION, MAXIMUM 15' DEE.P1, ! EA 11 5,685,94, 5685.94 62,645.31 ., _._ 430-171.101„_......_..............___.._,..._ PIPE CULVERT - UP TO 24" DIA(ROUND)LF 35,50! 35.50:; 0 OD 430.15 or 430-23 or 430-171- 123 ,or 43¢175-1,15„_.......__....._....._.._-- ............................ ._......_.._.-_ . PIPE CULVERT 15" DIAMETER / PIPE CULVERT (15" SS) LF i 507 47.17 47.17: 23,914.39 430-18 or 430-171-125 or 430-176.118 _._ ._._..._...._ ........ PIPE CULVERT- 18" DIAMETER i LF I 1,178 48.90 46.90; 67,604.20 430.18-15A PVC PIPE CULVERT- 15" DIAMETER LF 43.00 43.00, 0.00 430-18.18 PIPE CULVERT- 18" DIAMETER HOPE LF 44.00 44.00) 0.00 430-18-24 or 430-175.124 PIPE CULVERT- 24" DIAMETER HDPE LF 49.00 49.001 0.00 430.18.30 PIPE CULVERT- 30' DIAMETER HDPE i LF 59.00 59.00, D.00 430.18.36 or430-176.136 IPIPECULVERT. 38"DIAMETER HDPE LF 121 72.50 72.601 8,772,50 430.19.16 1 DUCTILE IRON PIPE AND FITINGS, 18" DIAMETER 1 LF - 130.00 130.00, 0,00 430- PIPE CULVERT 71"X47' ELLIPTICAL i LF � 009 0.00 _ _ 443-70 OR 443.70.36 OR EXFILTRATION DRAIN. 36" DIAMETER (INCLUDES THE COST OF PERFORATED PIPE, BALLAST LF 443.70.6E OR 443-70.8.3 OR I ROCK, PLASTIC FILTER FABRIC,EXCAVATION AND BACKFILLING WITH SELECTED FILL 443.70;6 MATERIAL) _ T ' 2,771 162.88 ; - ! 451,340.46 162.88 465-133-2 • SHEET PiLINO, TEMPORARY•CRITICAL. [ SF 11.97 11.97: 0,00 515-3 or 615.1-2A !HANDRAIL PIPE (ALUMINUM) LF 55.28 55.28: 0.00 CONCRETE 520.1.1 OR 520-1-10 or (CONCRETE CURB AND GUTTER , TYPE "F" (6" CURB,18" GUTTER) (INCLUDES COST OF LF 520-1.1QB- I LIMEROCK) 7,543 17.02 118,589.10 _t5:72;.,-, 521-73 ,REMOVAL OF CONCRETE BARRIER WALK 1: LF 55.00 65.00 0.00 _ . , 522-1 0R 522-1(1) (CONCRETE SIDEWALK (4" THICK RESTORATION AND NEW ,CLASS I CONCRETE. 3000 P.S.1) ! SY I (INCLUDING PEDESTRIAN RAMPS) i 1 6,540 _ 31,98 ' 30.33198,933.68 522-2 0R 522-2(1) !CONCRETE SIDEWALK (6" THICK, 0000 P.S.). CONCRETE AT 213 DAYS) (INCLUDES DRIVEWAYS) 1 SY 805 40.77 36.52; 29,399.89 530-78 (RIP RAP- ARTICULATING BLOCK SY 85.00 65,001 0 OD BARRIERS GUARDRAIL AND FENCE 1 550.2.4 CHAIN LINE FENCE TYPE "(3: (4' HIGH) ? LF ,-(,NEW 555-1.1 !DIRECTIONAL BORE (o 6') LF 25.78 25.781 0,00 565.1.2 I DIRECTIONAL BORE (t 12") 1 LF 15.50 15.501 O.DO SODDING AND TREE RELOCATION 1 570.1-2 )PERFORMCE TURF (SODDING,! ) SY 1,123 2.60 2-501 2,807.60 675.1.1 .f SODDING (PENSACOLA BAHIA OR MATCH EXISTING) (INCLUDES WATERING) 1 SY 356 3.5610.00 680.336 ITREE TRIMING . g EA 565.00 0,00 581-01A 'METAL TREE GRATE (FURNISH AND INSTALL)(INCLUDE INSTALATION OFCONC. COLLAR,ROOT i EA GUARD,TREE GRATEAND EXCAVATION OF THE TREE PITS, ACCORDING TO SPECIFICATION AND..) j 102 1,350.00 137,700.00 1350.00' 503-12-12(M) [TREE PLANTING MAHOGNY (SWITENIA MAHOGANI) 1 EA ' 650.00 550.00! 0.00 583.19 COCCOLOSA DIVERSITOLIA (PIGEON PLUM) i EA 34 450,00 450.001 15,300.00 (783-3-1(M) _._ GREEN BUTTOMWOOD (CONOCARPUS ERECTUS) 1 EA 34 550.00 550.0D. 18,700.00 5833A SILVER BUTTONWOOD (CONOCARPUS ERECTUS VAR. SPECIES) (16'11T,) LF 34 > -" >; ' 04. 374.00 590-34 4" PVC SCH. 40 (IRRIGATION SLEEVE) 1 LF � s .�`C>3 0.00 590.36 6" PVC SCH, 40 IRRIGATION SLEEVE) - 1 LF J't: ti, . - 0,00 IRRIGATION 590-70 .IRRIGATION SYSTEM LS 1 58,975.00 0.00 SIGNALI0ATION 1 - 647-11.51 MAST ARM COMBINATIONS, STANDARD DS-22 AS 22,193,00 22193,00' 0,00 690.80 REMOVE SPAN WIRE ASSEMBLY . EA 512.74 512.74. 0.0,0 800.90 REMOVE CABLING AND CONDUIT pi 873.93 873.931 0.00 090-100 I REMOVE MISCELLANEOUS SIGNAL EQUIPMENT (PULL BOXES) PI 1,177.95 1177.95i 0.00 PAVEMENT MARKING AND SIGNAGE 1 700-1-25 ROADSIDE SIGNIONE WAY RIGHT • R6_1R) AS 2«'S3,5p�4 0,00 700-20-4or 700.20.40 RELOCATE EXISTING SIGNS, SINGLE POST j AS .(`'n. 41 111,86 111136' 4,556.14 700-40-1/700-20.11 or 700-40-1-S ROADSIDE SIGN INCLUDING POST AND STRAPS (SEE PLAN SHEET FOR SIGN DESCRIPTION) AS _ I 44 24743 247.43i 10,886.81 700.46.1 or 700.20.6 or 700-20.60 REMOVE EXISTING SIGN EA 26 74.15 38.67, 966.05 706.1 12or/06.3 REFLECTIVE PAVEMENT MARKERS (CLASS B, MONO OR B(-DIRECTIONAL, ALL COLORS) EA 372 4.48 4,46, 1 857.42 710-11.111 PAINTED PAVEMENT MARKINGS (STANDARD) (W11)TE),(SQLID).f0")NM 3 850.00 850.00'1 2,650.00 710.11-'1,24 PAINTED PAVEMENT MARKINGS (STANDARD, WHITE, SOLID, 18') r LF 1,00 1.00. 0,00 710-11.125 PAINTED PAVEMENT MARKINGS (STANDARD, WHITE,_.SOLID 24"),,,LF 792 1,00 _•,•.1_00' 792.00 710-11.180 PAINTED PAVEMENT MARKINGS (STANDARD WHITE, MESSAGE) I.I,.. EA••• 02.45 92.45`- 0,00 -_„..,, 710-11.170 PAINTED PAVEMENT MARKINGS (STANDARD, WHITE, ARROWS) 4EA 20.00 20.001 0.00 710-11-211 PAINTED PAVEMENT MARKINGS (STANpARR) (yELLO}N(_(So D..(G.a,_ i 850,00 850.00! 2,550.00 710-11-222 _._ .__NM PAINTED PAVEMENT MARKINGS (STANDARD, YELLOW,_80LID, 181 LF 1.0D 1.00! 0,00 710.11.241-�•,.,,,.,• PAINTED PAVEMENT MARKINGS (STANDARD)(YEI,.,LO.W!)_(SKIP)„(0")..__...._.�.._. LF 0.30 0.30; 0,00 _ 711-31 711.3A/ 711-3(2)/711.11• ....-...__. PAVEMENT MESSAGES ((ONLY/MEROEISCHOOURR) (THERMOPLASTIC)) _._ EA •___,.,,.-. 44 109.86 i 4,331.82 109.86; 160n11-3E 711.71-260 _ MESSAGESYELLQWTHERty10PIASTIC EA 110.00 110.00: 0,00 711-11-270 _...._,_.......... ..... DIRECTIONAL ARROWS YELLOW THERMOPLASTIC EA 58.50 56.50; 0,00 711-4 /711-11-170 DIRECTIONALARROWS fTHERMOPLASTIC) • EA 43 58,12 58.121 2,493,09 711-46 ,,,,,. DIRECTIONAL ARROWS( THERMOPLASTIC)(12 SF) ..,,_. F_A 47.00 47.00: 0.00 0.00 711.4E DIRECTIONAL ARROWS (THERMOPLASTIC)(16 SF) EA . 53.00 53.00, 000 711-4D ,..... DIRECTIONAL ARROWS THERMOPLASTIC (278F) ..__. EA .............._..._ __.._ 70,00 �••�7o.00i 0:00 711-4E DIRECTIONAL ARROWS THERMOPLASTIC(SPECIAL) EA 106.00 106.00. 0,90 711-5/711-11.151 IOEl GU.B1ES ye" pOT7EA).,(2'•A' WHITE),[THERMOPLAS)'IC)I LF 821 1.24- •� -- 1.24!1 022.18 ,.-,_,___,._.__._...._....._..._....................._...... 711-5A or 711-11-251 _ _ G)IDELINES I(6 DOTTED) 2 q YELLOW ( THERMOPLASTIC, LEAD FREE)). 11 LF _12 _ _ 7 12 0,00 711 5-1 or 711-33 SKIP TRAFFIC, 2 OF 6 WHITE THERMDP}i)STIC 4 SKIP LF .20 0,00 __- 71143.51 SOLID TRAFFIC, STRIPE G WHITE LF ___-_1_20' 0 74 0 74. 0 00 CSTRIPE _(OYELLOWJ_......._...._._ i LF 711-6-81A OR 21.1.�35.81 SOLID TRAFFIC STRIPE,(0" WHITE).jTHERMDPLASTIC), I LF ...... 3c< OM-6, _..._..__._.000 13 113, 000 ,__„_„-~•_,� 711.6.121 SOLID TRAFFIC STRIPE (12" WHITE THERMOPLASTIC) LF ,63. 1,83. O,90 711-0-241A OR 711.11.180 YIELD TRAFFICSTRIPE,(24' WHITE)i LP • •.,.• 2.76 2.70' _.....,. 0.00 ............................_.,....._..._-........._.._.._.............._.._........___.........,.._-...,.._...... 711.7 OR 711-7-1 REMOVE EXISTING PAVEMENT MARKINGS SF 9,04�5 1 3.77 3,77! 34,114,73 711-11 _SKIP TRAFFIC STRIPE,.6'8"WHITE THERMOPLASTIC -10' SKIP _ IF _ ,,,,,,__,,,,, 711-17 REMOVAL (THERMOPLASTIC) SF 3,810 0.90�•„ 0:90 0,00 2.94 2 04 17 212.19 _,.... _. . 711-23-01 SOLID TRAFFIC STRIPE WHITE) [ ,NM,.imp .._,._.,.._1;58415,-_._ 7684.15 2,439.69 ... 711-24-01 SOLID TRAFFIC STRIPE (6" YELLOW) NM 1,263.00 1283.00 0.00 Paget of 3 9/15/2014 ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS 9/16/2014 NE 2 Ava, from NE 42 Strout to NE 51 Wool Segment 6.3 L-- ;_..59 + ITEM NO. CURRENT ITEM LINN WANT. AVERAGE BET PRICE AMOUNT 711.35-81 or 711-11-122 _' SOLID TRAFFIC STRIPE (8" WHITE) (THERMOPLASTIC ; )_,„,_,,.. is 1,06 L09 0;00 711-35;121/711.11.123 _ SOLID TRAFFIC STRIPE (12"WHITE) (THERMOPLASTIC) ' LF I 1,607 ' 1.77; 1.77 2,90483 711.35.18011-6.181/7114 1- 124 SOLID TRAFFIC STRIPE (18" WHITE) (THERMOPLASTIC) 7 LF 594 i 2,37i 2.37 1,410.06 711.35.241/ 711• 3-241/711.11• 125 SOLID TRAFFIC STRIPE (24" WHITE) (THERMOPLASTIC) ( LF 290 1 _ ..3.55I....._......._3.6y 1,020.33 028. 711.36.01 or 711.36.81A or ......._ .._ SOLID TRAFFIC STRIPE (8" YELLOW) (THERMOPLASTIC) i LF ! 0;60 0.00 .......__.... 711.35.81 or 711.11-222 O...._...1 SOLIDLF 60LIDTRAPFlCSTRIPE(8"Y0LL0W)THERMOPLASTIC i D,92! 0.82. ,0;00 000 711.38.181 or 711.6-181A or 711.11-224 I SOLID TRAFFIC STRIPE (18"YELLOW)(THERMOPLASTIC) LF 44 i 2.311 2.34 102.82 711.11.111 SOLID TRAFFIC STRIPE (8" WHITE) THERMOPLASTIC NM 3,027.501 3027.50 0,00 711a1.112..,,_-_„_.__._,_ SOLID TRAFFIC (a"WHITE) THERMOPLASTIC ' NM 5,300.00' 5300.00 0.00 711-11.211 _STRIPE ,. SOLID TRAFFIC STRIPE (6" YELLOW) THERMOPLASTIC I NM 1.240 3,030,00 3030.03 3,757.20 711.11.231 SKIP TRAFFIC STRIPE (6" YELLOW4 THERMOPLASTIC _ I GM 0,932 r 892.68i 892.66 _ _ 832,15 711.37.121 SOLID TRAFFIC STRIPE, 'THERMOPLASTIC (12' WHITE) • NM P. W 0•D0 71 i•37.241 SOLID TRAFFIC STRIPE, THERMOPLASTIC (24"WHITE) I NM .:*$ -* �.. 'xff7000-'b0 0.00 LIGHTING 716-10.5 CONCRETE POLE BASE (45' MOUNTING HEIGIiTISPECIAL , -, ,,�„ .-„yz 16Q0 00 _ 0.00 715.l-113A or715.1-12 CONDUCTOR, F&I, INSULATED NO. 61G1 j LF 20,592 ' 2.58I 2.58 52 728.39 715.2.111 CONDUIT - 3/4" PVC SCHEDULE 40 a LF 11.001 11,001 0.00 716-2.115 or 715-2.1158 or 715-2-11A CONDUIT PVC SCHEDULE AO, 2" - LF 6,064 : [ 7 11,03 11.D3' ' 75,700,11 715.4-400 LIGHT POLE COMPLETE (RELOCATE)„, 2,118.87 2118.87 715.7-11 or 716.7.11A or 715:7.11 B or 715-7-12 ,--..- .0.00 LOAD CENTER (INCUDES SWITCH, WEATHERHEAD & WIRE AT SERVICE POINT) 1 EA I 2 1 11,614.27 i 5,007.13! 5807.13' _ _. 71rri-42 LOAD CENTER (FM) (REMOVED) I EA 4 i 152.68 152.68 10506 715-14-11 PULLBOX, ROADSIDE I EA 100 672.l7j 572.171 6236� 6,17 / 115:1.412 PULL BOX (INCLUDING GROUND ROD, GROUND WIRE, ROCKS AND CLAMPS,) EA iY 812.801 61'2.001 0.00 715.411.145 or 715-511-130A 'DECORATIVE LIGHT POLE I EA 8,798.22) 6798.221 _ 0.00 715.450 or 715-4.600 or 715350.00D REMOVE LIGHTING POLE i EA 30 I 13383,00 i- 446.10` 448.101 715.500-1 _ POLE CABLE DISTRIBUTION SYSTEM ((COIJVENTIONAL)(INSTALLATION ONLY MIAMI-DADE WILL EA 66 V i 93,616,BB SUPPLY KIT)) I - 1,440.28, 1440,261 715-516.120 LIGHT POLE COMPLETE, SPECIAL DESIGN, F & I, Polo Top Mount, Aluminum, 20' : EA ";--.-,,,,.. 6000.00 _ _ . 0,00 715-518.120 LIGHTING POLE COMPLETE No. DECORATIVE) (ran (SEE PLANS FOR DETAILS) FA 1 65 5,700.00 5700.0D 370,500,00 BRIDGE I I B.455.3.2 OR 455-3-2 PRESTRESSED CONCRETE PILING FURNISHED (18" S.O.) LF ' 105.99; 105.961 0.00 PB•550.2 FENCING (TYPE B) ! IF ' + • 7,1,Rati 000 _ _ PB•550.8 END POSTASSEMBLY(TYPE S FENCING) EA ,'..:Z.L.=" "- -;W0;00. 0.00 BASE ESTIMATE 1 i 3 855,601.32 999 OR 2.999 .CONTINGENCY FUND (1005 OF BASE ESTIMATE AMOUNT) LS 365,650.13 SUB -TOTAL' 1 4,241,051.45 DEDICATED ALLOWANCES! 102.1 0R 102.1H MAINTENANCE OF TRAFFIC (INCLUDING TEMPORARY REFLECTIVE PAVEMENT MARKERS, i LS MARKINGS, TRAFFIC CONES, TEMPORARY SIGNS, FLAG MEN, ETC.) (ASSUME 244 OF BASE ESTIMATE) • 77,110.03 1027..9A OFF -DUTY LAW ENFORCEMENT OFFICER I LS 1 ____ 108,000.00 106,050,00 __,._,_, _ 300-1.989 BITUMINOUS MATERIALADJUSTMENT.(SET DURING B1DD!NG)(15,000/MI) I LB 1 ,..,,_,,,_,^ 15,000.00 15,00000 556.1-6 JACK AND BORE 30" STEEL CASING L.LS 900 ALLOWANCE PERMITS LS 1. 18000.00 10,000,W. 800-6 FPL CONNECTION ALLOWANCE I LS 2 750.00 1,500.00 .. ... _ __.L..._, L ... _.._......_.- GRAND -TOTAL. A452,66148 i , NOT ALWAYS REQUIRED • AMOUNT; TO BE ASSUMED I SET' I PRICE SET • NOT AN AVERAGE ) .E1 !toms In Red have been dropped from the AverBne for the SET PRICK ........,......._.- " ....................._f. .�_......-,....._.... Pone 3of3 9/1512014