Loading...
HomeMy WebLinkAboutBid Tabulation SheetTABULATION OF BIDS IFB 274336 - Biannual Underwater Visual Inspection and Reporting/Repair Services Blue Water Marine Services, Inc. Commercial Diver Services Kearns Construction Company Item # Description UOM Unit Price Unit Price Unit Price It 1 Mooring Unit Inspection Cost or swap out Each $74.00 $60.00 $120.00 # 2 Cost of installation only for Through Buoy Rod / Hardware (Provided by the City) Each $40.00 $40.00 $150.00 # 3 Cost of installation only for 18" EMI Buoy (Provided by the City) - Each $20.00 $40.00 $105.00 #4 Cost of installation only for StormSoft Down Line Unit (Provided by the City) Each $40.00 $40.00 $105.00 # 5 Cost to provide and install 1 Y' screw pin galvanized shackle (Provided by the Contractor) Each $39.20 $65.00 $148.00 #6 Cost for providing and installing 1" eye to eye galvanized swivel (Provided by the Contractor) Each $47.60 $72.00 $160.00 # 7 Cost for providing and installing 7/8" screw pin galvanized shackle: (top of StormSoft) (Provided by the Contractor) Each $37.00 $40.00 $130.00 # 8 Cost for providing and installing 7/8" screw pin galvanized shackle: (bottom of StormSoft} (Provided by the Contractor) Each $37.00 $40.00 $130.00 # 9 Cost for to secure Mooring -Occupied Vessel (using tag line) Each $15.00 $50.00 $115.00 # 10 Cost of installation only for Pennant Line Unit (Provided by the City) fa $25.00 $75.00 $472.00 $1,238.00 $369.80 TOTAL (AS BID) Page 1 of 1 Created by: Yadissa Calderon - 9/14/2011 Approved by: Department Director/ Designee