Loading...
HomeMy WebLinkAboutLegislationCity of Miami Legislation Resolution City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 14-00609 Final Action Date: A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING THE CITY MANAGER TO EXECUTE A ROADWAY TRANSFER AGREEMENTAND PERPETUAL EASEMENTS (AERIAL), IN SUBSTANTIALLY THE ATTACHED FORMS, WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION ("DEPARTMENT"), TO ACCOMMODATE THE REBUILDING BY THE DEPARTMENT OF THE 1-395 CORRIDOR FROM THE 1-95/ MIDTOWN INTERCHANGE TO THE WEST CHANNEL BRIDGE OF US 41/MAC ARTHUR CAUSEWAY, MIAMI, FLORIDA; FURTHER AUTHORIZING THE CITY MANAGER TO TAKE ALLACTIONS NECESSARY TO ACCOMPLISH SAID TRANSFERS FROM THE CITY OF MIAMI STREET SYSTEM TO THE DEPARTMENT STATE HIGHWAY SYSTEM AND THE GRANTING OF SAID AERIAL EASEMENTS. WHEREAS, the Florida Department of Transportation ("Department") is developing the preliminary design for a roadway project along 1-395 from 1-95 to the west channel bridge of the Mac Arthur Causeway, Miami, Florida; and WHEREAS, the project includes rebuilding the 1-395 corridor with new elevated ramps, updating the alignment, upgrading the roadway surface and creating a new signature bridge with higher structures that will improve visual quality of the bridge; and WHEREAS, the new alignment and bridge structures will require the Department to acquire additional rights -of -way from private property owners and local governmental agencies; and WHEREAS, the transfer of jurisdiction of several City of. Miami ("City") roadways to the Department State Highway System and the granting of several perpetual easements (aerial) to the Department are necessary to accommodate the new bridges for the rebuilding of the 1-395 corridor; and WHEREAS, the City agrees with the terms and conditions in the Roadway Transfer Agreement and the Perpetual Aerial Easements, in substantially the attached forms, and these transfers and easements are mutually agreed upon between the City and the Department; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as fully set forth in this Section. Section 2. The City Manager is authorized{1} to execute a Roadway Transfer Agreement and Perpetual Easements (aerial), in substantially the attached forms, with the Department, to accommodate the rebuilding by the Department of the 1-395 corridor from the I-95/Midtown Interchange to the west channel bridge of US 41/Mac Arthur Causeway, Miami, Florida. City of Miami Page 1 of 2 File Id: 14-00609 (Version: 1) Printed On: 7/8/2014 File Number: 14-00609 Section 3. The City Manager is further authorized{1} to take all actions necessary to accomplish said transfers from the City Street System to the Department State Highway System and the granting of said aerial easements. Section 4. This Resolution shall become effective immediately upon its adoption and signature of the Mayor. {2} APPROVED AS TO FORM AN CORRECTNESS: VI TORIA ENDEZ CITY ATTORNEY N,C0 Footnotes: {1} The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. {2} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. City of Miami Page 2 of 2 File Id: 14-00609 (Version: 1) Printed On: 7/8/2014