Loading...
HomeMy WebLinkAboutPre-LegislationCity of Miami Legislation Resolution: R-11-0509 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 11-01081 Final Action Date: 12/15/2011 A RESOLUTION OF THE MIAMI CITY COMMISSION ACCEPTING THE BIDS RECEIVED SEPTEMBER 1, 2011, PURSUANT TO INVITATION FOR BID NO. 274253, FROM DRC EMERGENCY SERVICES, LLC, BYRD BROTHERS EMERGENCY SERVICES, LLC, AND CROWDER-GULF JOINT VENTURE, INC., THE THREE (3) LOWEST RESPONSIVE AND RESPONSIBLE BIDDERS, FOR EMERGENCY DEBRIS REMOVAL AND DISPOSAL SERVICES, ON AN AS -NEEDED CONTRACTUAL BASIS, FOR THE DEPARTMENT OF SOLID WASTE, FOR AN INITIAL CONTRACT PERIOD OF TWO (2) YEARS, WITH THE OPTION TO RENEW FOR THREE (3) ADDITIONAL ONE-YEAR PERIODS; ALLOCATING FUNDS FROM THE VARIOUS SOURCES OF FUNDS, SUBJECT TO THE AVAILABILITY OF FUNDS AND BUDGETARY APPROVAL AT THE TIME OF NEED. BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The bids received September 1, 2011, pursuant to Invitation for Bid No. 274253, from DRC Emergency Services, LLC, Byrd Brothers Emergency Services, LLC, and Crowder -Gulf Joint Venture, Inc., the three (3) lowest responsive and responsible bidders, for emergency debris removal and disposal services, on an as -needed contractual basis, for the Department of Solid Waste, for an initial contract period of two (2) years, with the option to renew for three (3) additional one-year periods, are accepted, with funds allocated from the various sources of funds, subject to the availability of funds and budgetary approval at the time of need. Section 2. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.{1} Footnotes: {1} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. City of Miami Page 1 of 1 File Id: 11-01081 (Version: 1) Printed On: 7/14/2014 AWARD SHEET IFB NO. 274253 - EMERGENCY DEBRIS REMOVAL AND DISPOSAL DRC Emergency Services, LLC Byrd Brothers Emergency Services LLC CrowderGulf Joint Venture Inc. Item Description Est. Qty UOM Unit Price Extended Amount Extended Amount Unit Price Extended Amount # 1 Emergency road clearance 70 Hr. $ 225.00 $ 15,750,00 $ 225.00 $ 15,750.00 $ 6,938.00 $ 485,660.00 # 2 Removing debris from public property and rights -of -way and hauling to Temporary Debris Storage and Reduction Site. 350000 Cu. Yd. $ 7.22 $ 2,527,000.00 $ 9.00 $ 3,150,000.00 $ 9.00 $ 3,150,000.00 #3 Removing debris from private property and hauling to Temporary Debris Storage and Reduction Site. 350000 Cu. Yd. $ 7.36 $ 2,576,000.00 $ 10.00 $ 3,500,000.00 $ 9.50 $ 3,325,000.00 #4 Mobilization and Demobilization 1 Ea $ 1.00 $ 1.00 $ 1.00 $ 1.00 $ 20,000.00 $ 20,000.00 # 5 Debris sorting, grinding, chipping, mulching and reduction of debris at Temporary Debris Storage and Reduction Site based on cubic yards hauled In. 700000 Cu, Yd. $ 2.12 $ 1,484,000.00 $ 2.50 $ 1,750,000.00 $ 3.50 $ 2,450,000.00 # 6 Hauling chipped debris to Final Disposal Site, based on cubic yards of reduced amount hauled in. 200000 Cu. Yd. $ 3.62 $ 724,000.00 $ 6.67 $ 1,334,000.00 $ 3.60 $ 720,000.00 # 7 Picking up and hauling of non -vegetative and C&D (Non -Burnable) debris to Disposal Site. 100000 Cu. Yd. $ 8.12 $ 812,000.00 $ 10.00 $ 1,000,000.00 $ 9.80 $ 980,000.00 # 8 Picking up and hauling of vegetative (Burnable) debris to Disposal Site 600000 Cu. Yd. $ 7.22 $ 4,332,000.00 $ 10.00 $ 6,000,000.00 $ 8.50 $ 5,100,000.00 # g Management of Temporary Debris Storage and Reduction Site (Site Reclamation) based on cubic yards hauled In, 700000 Cu. Yd. $ 0.92 $ 644,000.00 $ 1.50 $ 1,050,000.00 $ 1.50 $ 1,050,000.00 #10 Removing hanging limbs, tree hangers, and broken limbs per tree regardless of the number of hangers and limbs removed (up to a height of 65 feet)(Prices shall be provided on a cradle to grave basis, which is one price for removal through disposal at final destination.) 100 Ea. $ 166.00 $ 16,600.00 $ 100.00 $ 10,000.00 $ 95.00 $ 9,500.00 #11 Removal of I rees up to, but less than 6 inches in diameter(Prces shall be provided on a cradle to grave basis, which is one price for removal through disposal at final destination.) 25 Ea. $ 220.00 $ 5,500.00 $ 20.00 $ 500.00 $ 30.00 $ 750.00 # 12 Removal of 1 rees 6 inches in diameter and up, but less than 12 inches(Prices shall be provided on a cradle to grave basis, which is one price for removal through disposal at final destination) 25 Ea. $ 420.00 $ 10,500.00 $ 50.00 $ 1,250.00 $ 70.00 $ 1,750.00 # 13 Removal of 1 rees 12 inches n diameter and up, but less than 24 inches (Pnces shall be provided on a cradle to grave basis, which is one price for removal through disposal at final destination) 25 Ea. $ 670.00 $ 16,750.00 $ 145.00 $ 3,625.00 $ 125.00 $ 3,125.00 # 14 Removal of 1 rees 24 inches In diameter and up, but less than 4B inches (Prices shall be provided on a cradle to grave basis, which is one price for removal through disposal at final destination.) 20 Ea. $ 900.00 $ 18,000.00 $ 278.00 $ 5,560.00 $ 225.00 $ 4,500.00 # 15 Removal of 1 rees equal to or greater than 48 inches in diameter(Prices shall be provided on a cradle to grave basis, which is one price for removal through disposal at final destination.) 10 Ea. $ 1,050.00 $ 10,500,00 $ 278.00 $ 2,780.00 $ 300.00 $ 3,000.00 # 16 Removal of Hazardous Stumps- 25 inches in diameter, but less than 36 inches in diameter 10 Ea. $ 600.00 $ 6,000.00 $ 250.00 $ 2,500.00 $ 200.00 $ 2,000.00 # 17 Removal of Hazardous Stumps- 37 inches in diameter, but less than 49 Inches in diameter 10 Ea. $ 800.00 $ 8,000.00 $ 200.00 $ 2,000.00 $ 300.00 $ 3,000.00 # 18 Removal of Hazardous Stumps- equal to or greater than 49 inches in diameter 10 Ea. $ 940.00 $ 9,400.00 $ 300.00 $ 3,000.00 $ 400.00 $ 4,000.00 # 25 Sand screening at Temporary Debris Storage and Reduction Site based on cubic yards hauled in. 50000 Cu. Yd. $ 2.08 $ 104,000.00 $ 12.00 $ 600,000.00 $ 8.00 $ 400,000.00 #26 Addtional cost for EWaste handling 50000 Cu. Yd. $ 2.08 $ 104,000.00 $ 3.00 $ 150,000.00 $ 30.00 $ 1,500,000.00 #27 Addtiona costforE ante an ling 12500 Ton $ 5.00 $ 62,500.00 $ 12.00 $ 150,000.00 $ 500.00 $ 6,250,000.00 Total $ 13,406,501.00 $ 18,730,966.00 $ 25,462,285.00