• gXHIBIT B
SEBEA' 2007 PROJECT
I •
In the area generally bounded by N.W. '27th Ave, N.W. 23 St,, N.W. 20thivi ,
North River .Dr., including the area, bounded by 'N.W, 30th M., N.W. 14th St.;14;W..22hd
Ave., and N.W. 7th St. and any additional streets as required — projed, 'eOtiVonerits
include: the design and construction of roadway resurfacing, swale restoratio#;,';foUrbs,.
gItters, drainage improvements, sidewalk replacement, lighting ing0.0frientS,
landscaping, signage, and striping.-
• In the area generally bounded by NW. 23rd'Ave, N.W. 3lst St,, N.W. 24th Ave,.and.N.W..„
35th St.; N.W. 34th Ave. from 14th fo 17th St N.W. 18th Tenfrom 3l 32nd Sti N.W.
•
43'1 Ave,, N.W. 43rd Ct., N W 434 P1. from N.W. 5th to NW 7th 'St.and any &idittonal
streets as required — project components include: the design and construction of right-0-....:.•
way enhancements including resurfacing of asphalt pavement. .sWale*ieNiation, ,
sidewalk repairs, landscaping, striping, and drainage as needed.
$ '
•
In the area generally bounded by N.W. 27th Ave., N.W. 38th St., N.W. 221d AVe., and'.
N.W. 28th St., including an area bounded by N.W. 18th Ave., N.W. 20th St., NAV, 14th
Ave., and N.W. North River Dr,' and any additional streets as required 7-- project
components include:. the, design 'and construction of roadway resurfaoing, .swale
restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting.
improvements, landscaping, signage!, and striping.
• In the area generally bounded by N.W. 20th St., N,W. 7th Ave., SR 836, and N.W. 17th
Ave. — project components include:' the design and construction of roadway resurfacing,
sidewalk replacement, ADA ramps, curbs, gutters, drainage improvements, and
landscaping.
• In the area generally bounded by 114.W. 22nd Ave., N.W. 38th St., N.W. 17th Ave., and
N.W. 28th St., .including an area bdunded byN.W. 22nd Ave, N.W. 20th St,,..N.w.
Ave. and N.W. North River Dr. Additional streets as required — project components
include: the design and construction of roadway resurfacing, swale restoration, curbs,
gutters, drainage improveinents, ( sidewalk replacement, lighting improvements,
landscaping, signage, and striping.
MtAMI/4197251.7
B-1
Diskict 2
it
• In the area generally bounded by N.W. 1. Ave., N.E. 20th St., Biscayne Bay, Miami
River — project components include: the design and construction of roadway resurfacing,
swale restoration, curbs, gutters, drainage improvements', sidewalk replacement, lighting
improvements, landscaping, signage, and striping,
, • •
• In the area eat of Biscayne Blvd. on N.E. 83rd. Rd., 85th St., and 86th St. — protect,
components include: .the design and construction of roadway to include milling and
resurfacing, swale restorations, new sidewalks, landscaping and roadway snipping.. •
• In an area generally bounded by.N.E. 6th Ct., N.B. 8th Ave., N.E. 76th St.,.N.E. 10th Ave,,
Litter River and N.E. 72" Terr. — project components inelude: the construction of
roadway improvements, including construction of storm drainage, storm water pump
station, water quality structure, roadway milling and resurfacing, sidewalk replacement,
construction of curbs, gutters, ADA ramps, and swale restoration.
• In the area generally bounded by N.E. 69th .St., N.E. 72" St.,. Biscayne Blvd, and
Biscayne Way — project components include: the eonstruction of roadway improvements,
including construction of storm drainage, storm water pump station, water quality
structure, roadway milling and resurfacing, sidewalk :replacement, construction of orbs,
gutters, ADA ramps, and swale restoration.
• In the area generally bounded by N.W. 2" Ave., N.W. N.E. 34th St., N.E. 39th St., and
Biscayne. Bay, including any additional streets as required - :project componentsinelude:
• . the design and construction' of roadway resurfacing, swale restoration, curbs, gutters,
drainage improvements, Sidewalk replacement, lighting improvements, landscaping,
' .signage, and striping.
• In the area generally bounded by N.W. 2" Ave., N.W. —N.E. 34th St., N.W. —N.E. 24th
St,, and Biscayne Bay, including any additional streets as required — projeet components
. include: the design and construction of roadway resurfacing, swale restoration, curbs,
gutters, drainage improvements, sidewalk replacement, lighting • improvements,
landscaping, signage, and striping.
• In the area generally bounded by S.W. 39th Ave., S.W. 26th St, S.W 27th Ave., and S.
Dixie Hwy., including any additional streets as required - project components include: the
design and construction ,of roadway resurfacing, swale restoration, curbs, gutters,
drainage improvements, sidewalk replacement, lighting improvements, landscaping,
signage, and striping.'
• In the area known as Marcos Island — project components include: drainage
improvements;
MIAM1/4197251,7
l3-2
District 3
�► In the area enerally bounded by E.W. 22"d Ave., SR 836, the lvliarni River, W.'Flagler
-St., S.W. 12,1 .Ave., and N.W. 7th St., including any additional streets as required.- project
components include: the. design and construction of roadway resurfacing,', swale •
restoration, curbs, gutters, drainage improvements, sidewalk replacement,.,, ighting,
improvements, landscaping, signag4, and striping,
• In the area generally bounded by N.W. — S.W. 271h Ave., N.W. 71" St., S,W..,1-2a' Ave.,
S.W. 8t11 St., including any additional streets as required — project componen.;l"S'iuclixde:
the design and 'construction of roadway resurfacing; swale restoration, eurbs4utters,
drainage improvements, sidewalk' replacement, lighting 'improvements, ' landscaping,
signage, and striping. ..,....,.. .
• In the area generally bounded by S.W, 27th Ave., S.W. 8th St., S.W. 22nd Ave.;,an.1 S.W.....
9th St., including any. additional snieets as required — project coniporients inch de •the
design and construction of roadway resurfacing, swale restoration, :,curbs, ,gutters,
drainage improvements, sidewalk } replacement, lighting irnprovernents, ...landscaping
signage, and striping.
• In the area generally bounded by S.W. 17th Ave.,. SW 18th St,, S.W. 12th Ave:, and'.,S...:
Dixie Hwy., -including any additional streets as required — project components include: ,
the design and construction of roadway resurfacing, swale restoration, curbs, gutters,
drainage improvements, sidewalk replacement, lighting improvements, landscaping,
signage, and striping.
• In the area generally bounded by Sy. 171h Ave., S.W. 8th St., S.W. 12th Ave., and S.W,
18t1' St.; including any additional streets as required — project components include: the
design and construction of roadway resurfacing, swale restoration, curbs, gutters,
drainage improvements, sidewalk replacement, lighting improvements, landscaping,
signage, and striping.
• In the area generally bounded by S.W. 17th Ave., W. Flagler St., S.W. lst Ct.', S.W. 1st
• Ave., 1-95, and S.W. 8th St., including any additional streets as required — project
components include: the design and construction of roadway resurfacing, swale
restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting
irnprovernents, landscaping, signage, and striping.
• In the area of known as Shenandoah/Roads including any additional adjacent areas as
required — project components include; drainage remediation.
MIAMI/4197251.7
13-3
District 4
1: In the area generally bounded by S.W. 16th St,, S,W, 27th Ave., S.W. 22t,d St, and S.W,
32nd Ave. - project components include: the design and construction. of a positive storm
sewer system, road improvements such as damaged sidewalk replacement, damaged curb
and/or gutter replacement, ADA compliant ramp construction, re -sod of swales, milling
and resurfacing,
i
1
• In the area generally bounded by S.W. 37th Ave., S.W. 16th St., S.W. 241h Ave., and S ,
221d St., including any additional streets as required - project .components include: the
design and construction of roadway resurfacing, swale restoration,. curbs, gutters,..
drainage improvements, sidewalk replacement, . lighting improvements, landscaping,'
signage, and striping.
w In the area generally bounded by S.W. 27th Ave., S.W, 22nd St., S.W. 17`h Ave. and .S.
Dixie Hwy., including any additional streets as required -project components include: the
design and construction of roadway resurfacing, swage restoration, curbs; gutters,
drainage improvements, sidewalk replacement, lighting improvements; landscaping,
signage, and striping.
• In the area generally bounded by S.W. 47th Ave,, S,W 57i1' Ave,, W. Flagler St., and S.W.
8th St. - project components include: the construction of a storm sewer system, road
improvements, such as damaged sidewalk replacement, damaged . curb and / • or gutter
replacement, ADA compliant ramp 'construction, resod of swages, milling and
resurfacing.
In the area known as Shenandoah various intersections - project components include: the
construction of traffle circles, including .related drainage improvements, curbs, gutters,
milling and resurfacing, landscaping, and pavement markings.
• In the area known as Flagami various intersections - project components include: the
construction of traffic circles, including related drainage improvements, curbs, •gutters,
milling and resurfacing, landscaping, and pavement markings,
• In the area know as SbenandoablFlagami -• project components include: drainage
remediation,
District 5
• In the area enerally bounded by N.W. 17th Ave, and N.W..19th Ave., from N.W. 45th St.
to N.W, 57t St., including N.W. 18th Ave. from N.W. 43' St, to N.W. 57th St., but not
including N.W. 46th St, and N.W. 54th St. - project components include: the construction
of roadway improvement, including milling and resurfacing, sidewalk repairs, upgrading
swale areas to•provide parking, turf block, curbs, gutters, storm drainage improvements,
pavement markings.
M]AM1/4197251.7
B-4
• In the area generally bounded by N.W. 2" a Ave., N.W. 40th St., N. Miami Ave.; and N.W.
46th St. - project components include: the construction of roadway improvements,
including milling and resurfacing, sidewalk repairs, street widening, curb's,'" 'tters,
pavement marking, landscaping, and storm drainage as needed.
• N.E. 38th St. from N. Miami Ave. ' to N.E. 2" Ave, — project components .innlp4 : the.
construction of roadway irnprov4ments, including reconfiguring existing., roadway ,
section, milling and resurfacing; landscaping, lighting, and. associated."' drainage
improvements, , '
• In the area generally bounded by N.E. 2x"t Ave., N.E. 72"d' St., Florida East Coast. Rail
line, and N.E. 62"d St, - project components include: the design and construction of ,a,
variety of streetscape related im arovements, such as ' entrance gateways.: alighting,
directional signs, landscaping, mil. ing and resurfacing, and drainage modifications ,as
needed.
• In the area generally bounded by 1i. Miami Ave., N.E. 48th St,, N.E. 2"d Ave„ N,1✓,. 44th
St. — project components include: "the construction of roadway improve:trietit ',":'such', S
milling and resurfacing, road reconstruction, curbs, sidewalks, medians, storm drainage,
and pavement markings. '
• North River Dr. from N.W. 7th St.1to N.W.' 11th PI. project components include: 'the .
construction of roadway improvements, such as roadway reconstruction, sidewalks, '
associated drainage, landscaping, and streetlighting.
Multi -District
• Citywide — project components include: Miscellaneous sidewalk 'replacements and
construction of ADA improvements!
• In the area generally bounded by W. Flagler St., S.W. 8th St.,' S.W. 67tI' Ave,, and S.W.
62"d Ave. - project components include: the construction of a storm sewer system, road
improvements, such as damaged §idewalk replacement, damaged curb and/or gutter
replacement, ADA compliant ramp construction, resod of swales, milling & resurfacing.
• In an area generally bounded by N.W. 7' St,, W..flagler St., N.W. 57th Ave., and N.W.
52"d Ave. — project components include: the construction of a storm sewer system, road
improvements, such as damaged sidewalk replacement, damaged curb and/or gutter
replacement, ADA compliant ramp Construction, re -sod of swales, milling & resurfacing.
• In the area known as Silver Bluff, which includes various intersections within District 2
and District 4 - project components include: the construction of traffic circles, including
related drainage improvements, curbs, gutters, milling & resurfacing, landscaping, and
pavement Iarkings.
MIAMI/4197251.7
B-5
• • S.W, 32a Ave. from U.S. 1 to S.W. 22'd St. (also known as Coral Way) — project
components include: the construction of roadway improvements, including resurfacing,
(1 swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting
improvements,. landscaping, signage, and striping.
Or if such project components -cannot be constructed as provided above, such other
roadway and sidewalk improvements, as may be determined by the City, including but not
limited to resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk.
replacement, lighting improvements, landscaping, signage, and striping, in the areas descritek
above or in any other areas as may be determined by the City.
MlAM1/4197251.7
13-6
r re% tr:
OCT
IS C
Ch
Tms DOCUMENT IS A
SWISTKUTION TO ORIGINAL
RACKAJP. ORIGINAL CAN iitt: SUN
AT TIE :ENO QV Tills DocvmENT.
Substitute Item for RE 1,
AM 8: 08 Series 2009 Project List for Resolution Exhibit B
i41,.rlqifor .Draft Preliminary Official Statement Appendix G
(c. October 8, 2009 City Commission Agenda
•1, rt.
(Revisions are Underlined)
SERIES 2009 PROJECT
District 1
• In the area -generally bounded by N..W. 27th Ave, N..W.. 7thSt. N.W. 17th Ave:,
and N,W; 38th St,, including the area .along. N.W. 36th St. from N,W. 27th Ave.. west
to the City limits., and N.W. 22nd Ave, N.W. 20th St., NW 17th Ave., and State
Rd. 836 -project components include: the design and construction of roadway
resurfacing, swale restoration, curbs, gutters, drainage improvements., Sidewalk
replacement, ADA compliant ramps, lighting improvements, landscaping,
signage, and striping.
In the area:generally bounded by N.W. 36th St., N.W. 7th Ave., State Rd. 836, and
NW, 17th Ave. -project-components include: thedesign and -co.nstruction of
roachitay resurfacing,swal.e restoration, curbs, gutters.„ drainage improvements,
.sidewalk.replacement, ADA compliant ramps, lighting improvements,
landscaping, signage, and striping,
In the area generally bounded by Tamiarni Canal to N.W. 3rd St, arid N.W. 42'd
Ave. to the City lirnits, and the area generally bounded by N,W, 20th St,, N,W.
42nd'Ave„., NW 7th St., and N.W. 27th Ave. -project components include: the
design and construction of roadway resurfacing, ewale restoration, curbs, gutters,
drainage improvements, sidewalk replacement,. ADA compliant ramps, lighting
improve.ments, landscaping, signage, and striping.
District 2
• In the. areas generally bounded by N.W. '1st Ave, N.E. 14th St.., Biscayne Bay, and
Miami River, and NW 2nd Ave., N,E,. 14th St, and N.E. 36th St., and Biscayne
Bay, and the area generally bounded by N.E. 36th St.., N.B. 87th St., N..E. 4th Ct. •
and Biscayne Bay -project components include: the design and construction of •
roadway improvements, including milling and resurfacing, curbs, gutters, striping,.
swale restoration,. sidewalk. replacement, ADA compliant ramps, lighting
improvements, landscaping, signage„ and drainage Improvements,
• in the area of South Miami Ave. Rd. from S.W. 1 't Ct. to S. Miami Ave. -project
componentsinclude: the construction of roadway improvements including street
reconstruction, resurfacing, drainage improvements, sidewalk replacement, ADA
compliant ramps, lighting improvements, landscaping, .signage., and I.striping,.,'.
TO THE
SUBMITTED
PUBLIC R C RD FOR
ITEM
• In the area eastof Biscayne Blvd. on N,E. 83.rd Rd., 351h St,, and 86th St -project
components include: the. design and construction of roadway to include milling
and resUrfacing, swale restorations, new sidewalks, landscaping arid roadway
striping. •
• in an area.generally bounded by N.E. 86th St., N.E. 83.rd Te.rr., Biscayne Blvd.,
and East Dixie. Hwy, -project components :include: the construction .of roadway
improvements, including milling an.d resurfacing,.stripIng., swale restoration,
sidewalk replacement, ADA compliant ramps, and drainage improvements.
• In the area generally bounded by N.E, 58th St., N.E. 77th s, N.E. zith Ct., and
Biscayne Blvd. -project components include: the construction of ro:adway.
improvements, including, milling and resurfacing, sidewalk replacement, ADA
compliant ramps, drainage improvementand landscaping.
• Inthe. areas generally bounded by the Miami River, S.W ist Ave„ Rickeribacker
Cswy,„ and Biscayne Bay, and S.W. '27th Ave.., S.. Dix.ie Hwy., Rickenbacker
Cswy., .and Biscayne Bay, and the area generally bounded by S.W. 24th8,W.
271h Ave., N. Prospect Dr,, Biscayne Bay,. and the City limits. to the west -project
components include: the. design and construction -of roadwa.y improvements,
including Milling and resurfacing, curbs, gutters, striping, swale restoration,
sidewalk replacement.ADA compliant ramps, lighting improvements,
landscaping,. signage and drainage. improvements.
• In the area of Bird Ave. from U.S. 1 to Aviation Ave. and McDonald :St. from U.S.
Ito Jackson Ave„ -project compone:nts include: the design and construction of
roadway resurfacing, .swale restoration., .curbs, gutters, drainage improvements,
sidewalk replacement, ADA compliant ramps, lighting improvements, designated
bicycle lanes, landscaping, signage, .and striping.
In the area of Venetian Causeway from Herald Plaza to the City limits -project
components include:, the design and construction of roadway resurfacing,swale
restoration, curbs, gutters, drainage improvements, sidewalk replacement,
lighting improvements, landscaping, sign.age, and striping.
In the area known as South Grove -project components nelude: the design and
construction of speed humps and roadway improvements,. including milling and
resurfacing, swale•restoration,„:drainage improvements., sig.nage., and striping.
• In the area along U.S, -1 from. 19th Ave, to 17th Ave. -project components include:
roadway irtiprovements, In.oluding milling and. resurfacing, curbs, gutters,
replacement of the existing roadway wall„, and landscaping.
In the area known as San Marco and Biscayne Islands -project components
include:. dra.in.ageimprov.e.ments„ roadway improvements, milling and res.urfacing,
curbs, gutters, sidewalk replacement, ADA compliant ramps, swale restoration,.
landscaping, signage, ,and. striping,
District 3
• In the area alon.g N.W. S. River Dr. frorn N,W. 1 St. to N.W.. zit" St. -project
components include: the 'design and construction of roadway resurfacing., curbs,
gutters, drainage improvements, sidewalk replacement, lighting improvements,
landsca.ping, signage, and striping.
• In the areas generally bounded by N.W. 91h St., N,W, 17th Ave, W. Flagler $t.,
arid N.W. 22nd Ave., and NW, •7th St,, N.W. 14th Ct,, N.W. 9th St., and N.W. 17th
Ave. -projeot components include: the design and construction of drainage •
system, resurfacing, cuts, gutters, sidewalk replacement, ADA compliant
ramps, and striping.
In the areas generally bounded by N.W. oth
ot N,W. 12th Ave,, W. Flagler St,
and N,VV..22nd Ave., and N.W..71h St., N.W. 22nd Av.e., W, Flagler St,, and N.W,
and the area .generally bounded by S.W. 27th Ave., S.W. 9th St, S.W.
12th, Ave., and W. Hagler St; ,Project components Include the design and
construction of roadway resurfacing, :swale rest:Oration, curbs, gutters, drainage
improVetnents, sidewalk replacement, ADA compliant ramps, lighting
improvements, •landscaping, signage, and striping,
In the areas generally bounded by S.W. 17thAve.,. S.W. 8th St., S.W. 12th Ave.,
and S. Dixie Hwy.; and S.W. 121? Ave., .s 7.th
and N.W. S. River Dr.; an.d
S.W. 7th St., S.W.12th Ave,,.and S. Dixie Hwy, -project components include: the
design and construction of roaclwayreSurfacing„ swale restoration., curbs,
gutters, drainage .improvements, sidewalk replacement,. ADA compliant ramps,
llghting. improvements, landscaping:, signage, and. striping..
District 4
• in the area generally bounded by SW,.161h.St, S.W. 27th Ave.., S.W. 22nd St.. and
SR, 32nd Ave, -project components -include road improvements to include
sidewalk replacement, curb and/or gutter replacement, .ADA compliant ramp
construction„..swale restoration, la.ndscaping, signage„ milling and resurfacing,
and striping,
• In the areas generally..bounded by S.W. 37thAve, N.W.. 7th St., S.W. 27th Ave.
and S. W, 24thSt., and KW; 43d Ave,, N.W.,. 7th St, N.W. 37th Ave, S.W. .8th St,
and the area generally bounded by S.W. 27th Ave,, S.W, 9th St.., S.W. 17th Ave.)
and S, Dixie Hwy-, -project components include:the design and construction of
roadway resurfacing, swale restoration, curbs., gutters, drainage improvements,
sidewalk replacement, ADA compliant ramps, lighting improvements,
landscaping,. signage, and striping.
In the area generally bounded by Tanniami Canal.Rd.„ N.W. 3rd St., S.W. 43
Ave., and S.W. 891 St. ,project components include: the design and construction
of roadway resurfacing„ swale restoration, curbs, utters, 'drainage
improvements, sidewalk replacement, ADA compliant ramps, lighting
improvements, landscaping, signage, and striping..
In the .area known as Shenandoah various intersections -project components
include:. the construction of traffie orcs, including related drainage
Improvements, curbs., gutters, milling and resurfacing, landscaping, and
pavement markings.
In the area known as Flagami various Intersections -project components include:
the construction of traffic circles, Including related drainage :improvements, curbs,
gutters, milling and resurfacing, landseaping, and pavement markings.
In the area known as Silver Bluff various intersections -project components
include: the construction of traffic circles, Including related drainage
improvements, Curbs, gutters, milling and resurfacing, landscaping, and
pavement markings.
District 5
• In the areas known as Li ert City, Curry Taylor and Buena Vista Heights,
generally bounded by N.W, 19th Ave., N.W. 581" St, N.E. 4th Ct., and N.W. 36111
St., and N.W. 17'" Ave., N.W. TV' St., N,E, 41" Ct., and N, W. 58'" St, -project
components include; the design and construction of roadway resurfacing, swale
restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA
compliant ramps, lighting improvements, landscaping, signage, and striping.
In the areas known as Oak Grove, Little Haiti and Little River, generally Pounded
by N.W. 7''' Ave„ NW. 79th $t., N.E. 4th Ct, N.W. 71' St., and NAN. IVIlarni CL,
N,E. 84'h St., N.E, 4th Pl., and N.E 79"" St -project components include: the
design and construction of roadway resurfacing, swale restoration, curbs,
gutters, drainage improvements, .sidewalk replacement, ADA compliant ramps,
lighting improvements, landscaping, signage, and striping.
• In the areas generally bounded by N.W. 7'h Ave., N.W. 36'" St., N,W. is' Ave.,
and the Miami River, and Statel Rd. 836, N.W. 7'" Ave., and the Miami River,
including the areas known as W_Yilv.YPP.O. and Spring Garden -project components
include: the design and construction of roadway resurfacing, swale restoration,
curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant
.ramps, lighting Improvements, landscaping, signage, and striping.
D• Northwest Road and Storm Sewer improvements project in the area :generally
bounded by N..W. 71 St., N.W. 7thAve, INLW 62'1cl St.,: and N..W., 1.2th Ave -
project components include:. the construction of drainage improvements., milling
and resurfacing„ curbs, gutters, sidewalks replacement, ADA compliant ramps,
and swale restoration,
• Buena Vista Heights Improvements Phase II in the area generally bounded by N,
Miami Ave, N.W. 2nd Ave,, N.W. 491h St, an.d N,W. -46111 :St, -project components
include: the ,design and construction of roadway improvement Including
widening and milling and resurfaCing„ swale restoration, curbs, gutters, drainage
improvements, sidewalk replacement ADA compliant ramps, landscaping, and
striping,
Multi -District
-a. Citywide -project components includ.e Miscellaneous sidewalk replacements and
construction of ADA compliant improvements:.
a In the area generally bounded by Biscayne Blvd,, Miami Ave, $,E.. 21'd St, and
N.E. 3rd $t.,and alone NW. -8thSt, from N.W. 2nd Ave to N.E, 2nd Ave, -project
:components include:. the construction of road improvements„ such as damaged
sideWalk replacement damaged curb and/or gutter replacement,. drainage
system improv.ements.„ ADA compliant rampco.nstruction, milling and
resurfacing, lighting, landscaping, and pavement markings including crosswalks,
of In an area generally bounded by N.W„20th St., State Rd., 836, N.W. 7thAVe.,, and
N.W.17th Ave, -project -components include: the design and construction of
roadway improvements, such as. da.maged. -sidewalk replacement, dam.ages1-.curb
.anclicr gutter replacement, ADA cemplie:nt ramp .construction„ milling and
resurfacing, and. landscaping,
a In the area -generally bounded by S. 9th s,, S. I on) St, S.W.1st Ave,, and SE.. 181-
Ave.. —project components include: the .construction of a pump station and.
drainage system improvements, roadway improvernents, including milling and
.resurfacing, curbs .andlor gutterreplacement, and -sidewalk reconstruction,
Or if such project components -cannot be. constructed as provided above, such other
roadway and sidewalk improvements., as may be determined by the City,. in.cluding but
not :limited to milling and resurfacing, swale restoration,. curbs, gutters., drainage
improvements, sidewalk replacement, ADA compliant improvements,: lighting
improvements, landscaping, signage„ and striping, in the areas described above or in.
any other areas as may be deterMined by the City,
•
III fUTED
Exhibit T3
Series 2009 Project
SU
District 1.
cot
<flu,
STITUTED
SERIES 2009 PROJECT
o In the re a generally bounded by N.W. 2.7th Ave, NW, 7th St,, Ave., and N.W. 38th
incluclin the area along N.W. 36th St. from N.W, 27th Ave, west to the City limits, and NAN, 22"
Ave., N.W. ,0th St, N.W. 3.7th Ave,, and State Rd. 836 -project components include; the design
and constru o.n of roadway resurfacing, swale restoration, curbs, gutters, drainage
improvements, dewalk replacement, ADA compliant raMps, lighting improvements,
landscaping, Signe e, and striping.
Iri the area generally b. nded by N.W. 36th St., N.W. 7th Ave, State Rd, 836, and N.W. 17th Ave. -
project components Inclu ; the design andconstruction of roadway resurfacing, swale
restoration, curbs, gutters, inage improvements, sidewalk replacement, ADA compliant
ramps,. lighting Improvements, ndscaping,:signage, and striping,
• in the area generally bounded by Ta fern!. Canal to N.W. riSt., and N.W. 42nd Ave. to the City
limits, and the area generally bounde N.W, 20th St, N.W. 42' Ave., N.W. 7th St,, and N.W.
27th Ave. -project components include: t si design and construction of roadway resurfacing,
swaie restoration, curbs, gutters, drainage provenients, sidewalk replacement, ADA compliant
ramps, lighting Improvements, landscaping, sh age, and striping,
District 2
• In the areas generally bounded by N.W. lv Ave., N.E, 14 t., :Biscayne Bay, and Miami River,
and N.W. 2" Ave., N.E. 14th St., and N.E, 36th St., and MSG e Bay, and the area generally
bounded by N.E. 36th St, N.:E, 87th St., N.E. 4th Ct„ andRiscayn Bay -project components
include: the design and construction of roadway Improvements, Wing milling ancl
resurfacing, curbs, gutters, striping, swaie restoration, sidewalk reNement, ADA compliant
ramps, lighting ImproveMents, landscaping, signage, and drainage itr) ro9ements.
• In the area of South Miami Ave. Rd. from S.W. 1.8 Ct. to S. Miami Ave, .proct.cornpbhents
include: the construction of roadway Improvements including street reconsction, resurfacing,
drainage improvements, sidewalk replacement, ADA compliant ramps, lighting') prOvements,
landscaping, signage, and striping.
SUBSTITUTE
• In the area east of Biscayne Blvd. on N,E, 83Rd., 85th St,, and SEIth St. -project components
include: the deSign and construction of roadway to include milling and resurfacing, swale
restorations, new sidewalks, landscaping and roadway striping.
• I an area generally bounded by N.E. 86'h St,, NE83Terr, Biscayne Blvd„ and East Dixie Hwy.
ect components Include; theiconstruction of roadway improvements, Including milling and
resu ing, striping, swale restoration, sidewalk replacement, ADA compliant ramps, and
drainage mprovements,
• In the area geVirally bounded by N.E. 58th St., N.E:77th St., N,E., lith Ct., and Biscayne Blvd. -
protect compon ts include; the:construction of roadway improvements, intluding, milling and
resurfacing, sidew lc replacement, ADA compliant ramps, drainage Improvements and
landscaping.
• in the areas generally .bo:u d by the Miami River, S.W. 1" Ave„ Rickenbacker Cswy„ and
Biscayne Bay, and SAY, 27th e, S. Dixie Hwy,, Rlckenbacker Cswy., and Biscayne Bay, and the
area generally bounded by S; .• 4th St., S.W. 27th Ave.,'N. Prospect Dr,, Biscayne Bay, and the
City limits tothe west -project c onents include: the .design and construction of roadway
improvements, including Milling an esurfacing, curbs, gutters, striping, swale restoration,
sidewalk replacement, ADA cornpllnt mps, lighting improvements, landscaping, signage and
drainage improvements,
• In the area of Bird Ave. from U.S. 1 to Aviation v , and McDonald St. from U.S. 1 toiackson
Ave. -project components include: the design an construction of roadway resurfacing, swale
restoration, curbs, gutters, drainage lrnprovements ewalk replacement, ADA compliant
ramps, lighting improvements, designated bicycle Ian landscaping, signage, and striping,
• in the .area of Venetian Causeway from Herald Plaza to the ty limits -project components
includethe design and construction of roadway resurfacingale restpratiOn,curbs„ gutters,
drelnageilTiprOvements, sideWalk replacement', lighting iMproVe ents, landscaping, signage,
and striping,
• In the are known as South Grove -project components include.: the des n and construction of
•speed humps and roadWay improvements, inclOclIng milling and resurfacirfg, swale restoration,
drainage Improvements, sign:age, and striping.
• In the area along U.S. 1, from lethAve. to Irh Ave. -project components include; r
improvements, including milling and resurfacing, curbs, gutters, replacement of the
roadway wall, and landscaping.
dway
Isting
SUBSTIT TED
In the area known as San Marco. and Biscayne Islands -project components include: drainage
improvements, roadway improvements, milling and resurfacing, curbs, gutters, sidewalk
eplacement, ADA compliant ramps, swale restoration, landscaping, sIgnage, and striping.
District 3
• In the arelong N.W., S. River Dr. from N.W. St. toN,W.4th.St, -project components include:
the.design a d construction. of roadway resurfacing, curbs, gutters, drainage improvements,
sidewalk repla ement, lighting Improvements, landscaping, signage, and striping.
• In the.areas genera bou:nde.d by N.W. 9th St., N.W. 17th Ave., W. Flagler St,, and N.W. 22" Ave.,
and N,W, 7th St., N.W, 4th Ct, N.W, 9th St., and N.W. 17th Ave. -project components Include: the
design and construction f drainage system, resurfacing, curbs, gutters, .sidewalk replacement,
ADA compliant ramps, an trping,.
In the areas generally bounded y St„ NW. 12thAve„ W. Fiagler St., and N.W. 22'd Ave.,
and N.W. 7th St., N.W, 22'd Ave., . Piagier $t., and N.W. 27th Ave., and the area generally
hounded by S,W.27th Ave., S.W. S.W. 12d'Ave„ arid W, Fiagler St, -project components
include: the design and: construction o roadwayresuifacng, swale restoration, curbs, gutters,
drainage Improvements, sidewalk repa ment, ADA compliant ramps, lighting improvements,
landscaping, signage, and striping.
• In the areas generally bounded by S.W. 17th Ave, S,W, 8th St., S.W. 12th Ave,, and S. Dixie Hwy,;.
and S.W. 12th Ave., S.W. 7th St., and N,W. S. River r,; and SN. 7th St., S,W. 12th Ave., and S.
Dixie Hwy, -project components. Include: the design nd construction of roadway resurfacing,
swale restoration, curbs, gutters, drainageimproveme ts, sidewalk replacement, ADA
compliant ramps, lighting improvements, landscaping,. I age, and striping.
.District 4
• In the area generally bounded by S.W. 16thSt„ S.W, 27th Ave„ S.W. St., and S,W, 32' Ave. -
project components Include road improvements to include sidewalk • lac ment, curb and/or
gutter replacement, ADA compliant ramp construction, swaie restored landscaping, signage,
milling and resurfacing, and striping.
• In the.areas generally bounded by S.W. 37th Ave., N.W, 7th St, S.W. 27th Ave, . W. 24th St,
and N,W, 43'd Ave,, N.W. 7th St., KW. 37th Ave., S.W. 8th St., and the area general bounded by
S.VV, 27th Ave„ S.W. 9th St„ S,W, 17th Ave., and S. Dixie Hwy. -project components in ucle: the
design and construction of roadway resurfacing, swale restoration, curbs, gutters, dra age
improvements, sidewalk replacement, ADA compliant ramps, lighting improvements,
landscaping, sIgnage, arid striping,
SUB
'MED
• In the area generally bounded by Tamiaml Canal Rd., NM, 3'd St., S.W. 43`6Ave., and 5,W, ath St.
-project components Include: the design and construction of roadway resurfacing, swale
storation, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant
ps, lighting improvements, landscaping, signage, and strlping.
• In th e known. as Shenandoah various Intersections project components include: the,
construct: n of traffic circles, including related drainage improvements, curbs, gutters, milling
and resurfa g,tandscaping, and pavement markings.
• In the area know as Flagaml various intersections -project components include:, the
construction of tra c circles, including related drainage improvements, curbs, gutters, milling
and resurfacing, land ping, and pavement markings,
• In the area known as Silver luffvarious intersections -project components include the
construction of traffic circles,eluding related drainage Improvements, curbs, gutters, milling
and resurfacing, landscaping, an pavement markings,
District 5
• In the areas generally bounded by N.W. 10h Ave,, N.W. 58th St., N.E. 4th Ct., and N.W. 36th St,,
and N.W, lrh Ave., N.W, 7eSt„ N.E. 4th Ct., nd N. W, 58thSt, -project components include:
the design and construction of roadway resurfa in , swale restoration, curbs, gutters, drainage
•improvements, sidewalk replacement, ADA comp nt ramps, lighting Improvements,
landscaping, sIgnage, and striping.
In the areas generally bounded by N.W. 7th Ave„ N.W. 79 St., N.E. 491Ct., N.W. 71 5t., and
N.W. Miami Ct., N.E. 84th St., N.E. 4th PI., and N,E 79th St. -pr' ect components include: the
design and construction of roadway resurfacing, swale restore 'on, curbs, gutters, drainage
improvements, sidewalk replacernent, ADA compliant ramps, lig ting improvements,
landscaping, sIgnage, and striping,
• In the areas generally bounded by N.W. 7th Ave., NM, 36th St., N.W. e., and the Miami
River, and State Rd. 836, N.W. 7th Ave., and the Miami River -project comp nents include: the
design and construction of roadway resurfacing, swale restoration, curbs, gu ers, drainage
Improvements, sidewalk replacement, ADA compliant ramps, lighting improve ents,
landscaping, signage, and striping.
• In the area generally bounded by N,W. 7l St,, N,W, 7th Ave., N.W, St., and N.W. 1Ih Ave -
projeCt components include: the construction'of drainage improvements, Mil:ling and
SU
3110
sTrru
D
resurfacing, curbs, gutters, sidewalks replacement, ADA compliant ramps, and swaie
restoration.
• in the area generally bounded byN. Miaml.Ave„ N.W. 2°Ave„ NW, 40th St., and N.W. 46'1'
project components include: the design and construction of roadwaylmprovement, including
widening and milling and resurfacing, swale restoration, curbs, gutters, drainage improvements,
sidewalk replacement, ADA.compliant ramps, landscaping, and striping..
Multi -District
• Citywide -projeCt Components include.: MIScellaneous sidewalk replacements and. construction
of ADA compliant improvements.
• In the area generally bounded by Biscayne Blvd., Miami Ave., 5,E. 214 $t., and N.E. 3rd St. -project
components include; the construction of road improvements, such as damaged sidewalk
replacement, damaged curb and/or gutter replacement, drainage ystem Improvements, ADA
compliant ramp construction, milling and resurfacing, lighting, landscaping, arid pavement
markings including crosswalks,
• In an area generally bounded by N.W. 20th St., State Rd, 836, N.W. 7th Ave„ and N.W, 17thAve..
project cornponents include: the design and construction of roadway improvements, such as
•damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA compliant
ramp construction, Milling and resurfacing, and landscaping.
In the area generally bounded by S. 91." St, S. 1091St., S.W., 1° Ave, and 5,.E. ft Ave, —project
components include; the construction of a pump station and drainage system Improvements,
roadway Improvements, including milling and resurfacing, curbs and/or gutter replacement,
and sidewalk reconstruction.
Or if such project components cannot be constructed as prOvided above, such other roadway and
sidewalk improvements, as may be determined by the City, Including but riot limited to milling and
resurfacing, swale restoration, curbs, gutters, drainage Improvements, sidewalk replacement, ADA
compliant Improvements, lighting improvements, landscaping, signage, and striping, In the areas
described above or in any other areas as may be determined bythe City.